FINAL SPECIFICATIONS w NTB FS1219 26.pdf
PDF 2 MB Posted
- Solicitation number
- B26002508
- Issued by
- Maui County, Hawaii
About this file
Summary
This is a specifications and contract document from the State of Hawaii Department of Transportation Airports Division for the furnishing and delivery of two Pierce Multi-Purpose Structural Fire Fighting Vehicles—one to Kahului Airport on Maui and one to Daniel K. Inouye International Airport on Oahu. The project, numbered FS1219-26, requires delivery of both vehicles within 1,095 calendar days from the Notice to Proceed. The specifications are restrictive with no substitutions or equals permitted; bidders must specify the exact Pierce model being offered. Proposals must be submitted and uploaded to Hawaii's eProcurement System (HIePRO) by the specified bid opening date and time. The contract includes comprehensive technical specifications covering chassis design, engine and transmission systems, cab configuration with crew seating, electrical systems including a 10-kilowatt hydraulic generator, pumping equipment with a 2,000 GPM capacity, warning lighting systems, and custom paint and lettering. Bidders are required to provide factory inspection trips for up to three airport personnel at each truck if manufacturing timelines differ, with all travel and lodging costs borne by the bidder.
Bid pricing shall include all applicable state and federal taxes, installation, modification, and instructional training costs. Out-of-state vendors must account for Hawaii's general excise tax at 4.5% for Oahu and 4% for neighbor islands, plus applicable use taxes of 0.5%. The award will be made to the lowest responsive and responsible bidder within sixty calendar days of bid opening, based on the total amount for comparison of bids. No bid or performance bonds are required. Upon contract award, the successful bidder must submit tax clearance certificates from both the Hawaii Department of Taxation and Internal Revenue Service, a certificate of compliance from the Department of Labor and Industrial Relations, and a certificate of good standing from the Department of Commerce and Consumer Affairs within six months of issuance. The contractor must execute the contract within ten days of award and maintain comprehensive insurance coverage including workers' compensation, auto liability, and general liability with minimum limits of $1,000,000. Final payment will not be issued until all compliance documents and vendor certifications are provided and final inspection and acceptance are completed.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FINAL ADDENDUM NO 1 FS1219 26.pdf | ||
| FINAL ADDENDUM NO 2 FS1219 26.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF HAWAII
DEPARTMENT OF TRANSPORTATION
AIRPORTS
SPECIFICATIONS, SPECIAL, PROVISIONS
PROPOSAL AND CONTRACT
FOR
FURNISHING AND DELIVERY
OF
ONE (1) MULTI-PURPOSE STRUCTURAL
FIRE FIGHTING VEHICLE AT
KAHULUI AIRPORT,
KAHULUI, MAUI, HAWAII
AND
ONE (1) MULTI-PURPOSE STRUCTURAL
FIRE FIGHTING VEHICLE AT
DANIEL K. INOUYE INTERNATIONAL AIRPORT,
HONOLULU, OAHU, HAWAII
PROJECT NO. FS1219-26
�0�1�����2 3��4��-�����567�8.2 9:.�:����� �.� .�12�- 0/ �0�3�/ �2��1 �;1/.2.
�1 �:�� <�;1/.2.
<�81.
<�/1=1
<�1�������567�8.2 9:.�:����� �.� .�12�- 0/ �0�3�/ �2��1 ��1� �2�;>� ��.4�� � ���1 ��12�1 �:�� <�/���2.2.<��1/.<�/1=1
<�:��?�� ���>�-�6@6A9@B����CC�,�)�(����*+��!���D�E�F���C�����&���G�������#���!�CC�#�)����#��(����,H���'*H"C����,�����!#*�)!��D�E�F�*(CIG����+�#��*��!��+*CC*��()��D�E�F�C�(J�+*#��H"*#��(���(+*#H���*(�*(�K�(�*#���)���#���*(L�!��"�LMM!��"#*G�!�����G)*�M��C'*H�G!�HCG�� �!���*C�'�����*(���"�'�+�'���*(���"#*"*��C���(��������*(�C��*'�H�(�������)(�����*#��('*#"*#�����,I�#�+�#�('���!�CC�,������C�,C���(��D�E�FG�� �D�E�F�FNNO��&PO�&Q�O�Q�&��DRO����R�I��S��T$TU�����TL$$�"GHG������������(��#����H�������G�� VWWXYZ�Z[\]]�Ẑ_̀ Va�\bW�̂c]d\W�a[X�ed̀ c]XaX�cYdcdZ\]�ad�/ X:���cYVdY�ad�a[X�dffXY�ŴX�W\aX�\bW�aV̀X>��:YdcdZ\]Z�YXeXVgXW�\faXY�Z\VW�ŴX�W\aX�\bW�aV̀X�Z[\]]�bda�_X�edbZVWXYXW>��1bh�\WWVaVdb\]�ẐccdYa�Wdê X̀baZ�Xic]VeVa]h�WXZVjb\aXW�\Z�edbfVWXbaV\]�\bWkdY�cYdcYVXa\Yh�Z[\]]�_X�̂c]d\WXW�\Z�\�ZXc\Y\aX�fV]X�ad�/ X:��>��
| VWWXYZ�Z[\]]�bda�Vbe]̂WX�edbfVWXbaV\]�\bWkdY�cYdcYVXa\Yh�Wdê X̀baZ�\Z�c\Ya�df�a[XVY�cYdcdZ\]>�� | [X�YXedYW�df�X\e[�_VWWXY�\bW�a[XVY�YXZcXeaVgX�cYdcdZ\]�Z[\]]�_X�dcXb�ad�ĉ_]Ve�VbZcXeaVdb>��-1 | ||
| 2.��� | ��.:2�1�� | /��:��:��12� | ��/ |
X:����/122� ��0��.����-�����?�� ��>���!���'*"��*+��*#J�'*(������*+�N�#(��!�()��(��&�C���#I�*+�F(������R�C���E�#"*�����#�'��#�C�N�#��N�)!��()�K�!�'C�����l�!�C���Q�#"*#���(��F(������R�C���E�#"*�����#�'��#�C�N�#��N�)!��()�K�!�'C�����&�(��C�lG�D(*�I��D(��#(���*(�C�Q�#"*#�G��
� �� !�"#$%&�$'# �(#)�*+�,-,.+�#$�,/--�0121+�3451�� �����
�7
�8��9 �7
8�������
�:��7�� ������6������6�������������������������;������
����8����;��� ���6�������� � �8������� ���6�����6���
���6������������������������
���6�������� �����>�7 �������6������=����
����8�� ?��:��>��6����������� �����?����;�?�����6��� 8��?�����6���
��::��6������;����� @�A�BB�CDD�<��6��
������6��:��>��6����������� 6��� ����?����;�>�7 ���6�����6��� �6�����6������� �6�����6��� ����7 ����;8��������� ������������=�6����6����
��������EFE��DEG�F�ED8�� ����
8����;�:���
���6�������� �H�� 6����������� :��������=�����66�����6
�<����� @�A�BFCH�IFB�������<����������
�����7
�A�C�B�G8��� �J�����J�:��;� 6� ���;����K�������:�
����>�JL
6���7
��BB�MG=��
�6��:�� �:��N 6�8�OPQ�RSTS�UQVWXYZQ[Y�\]�OXW[̂V\XYWY_\[�̀QabcWY_\[�Q[Y_YcQd�ef\[d_̂gX_Z_[WY_\[�_[��
�h8@8�H :��������=i�O_YcQ�jkl�m\dQ�\]�� ��?� �=�������B=�� ��::��6��� �:��N 6�8������ �H ��������������7 �6�����6�� ���7
6���������������� ������6 =�6����=�������������>��=���� L��� 6�
���;��C�?� �������FF�8�
| �� | ��� | *��� |
| ��� | ��� |
| ���� | � |
| ���� | ���� |
����,����'� � � � �� � � � � � ��������� � � � ����-./���'�0�12./0�3��,
| ��3� | �� |
| � | ����� |
| ������ | �1� | �� |
| ����45��/0�/6761+6�31�68�1� | ���9!��9"9:����� |
FURNISHING AND DELIVERY OF
ONE (1) MULTI-PURPOSE STRUCTURAL FIRE FIGHTING VEHICLE AT
KAHULUI AIRPORT, KAHULUI, MAUI, HAWAII AND
ONE (1) MULTI-PURPOSE STRUCTURAL FIRE FIGHTING
VEHICLE AT DANIEL K. INOUYE INTERNATIONAL AIRPORT,
HONOLULU, OAHU, HAWAII
TABLE OF CONTENTS
PAGE
Special Provisions....................................SP-1 - SP-3
Specifications
Section 1
(Matls.)
Definition of Terms. ............... 1-1 - 1-4
Section 2 Proposal Requirements and Conditions. ..................... 2-1 - 2-3
Section 3 Award and Execution of Contract. ... 3-1 – 3-4
Section 4 Scope of Work. ..................... 4-1 - 4-3
Section 5 Control of Work. ................... 5-1 - 5-2
Section 6 Control of the Material and Equipment. ...................... 6-1 - 6-3
Section 7 Legal Relations and Responsibility. ................. 7-1 - 7-4
Section 8 Prosecution and Progress. .......... 8-1 - 8-7
Section 9 Payment. ............................ 9-1 - 9-2
Section 10 General Specifications. ........... 10-1 - 10-5
Section 11 Technical Specifications and Requirements. . . . . . . . 11-1 - 11-142
Proposal..............................................PF-1 - PF-5
Proposal Schedule................................PF-6 – PF-10
Forms
Contract. . . . . . . . . . . . . . . . . . . . .KF1 – KF3
SPECIAL PROVISIONS
SP-1
SPECIAL PROVISIONS
The Specifications contained herein are amended as follows:
A. SECTION 1 – DEFINITION AND TERM
1.33 SUBCONTRACTOR is amended by deleting it and replacing it with the following:
"1.33 SUBCONTRACTOR-An individual, partnership, firm, corporation, or joint venture, or other legal entity, as licensed or required to be licensed under Chapter 444, Hawaii Revised Statutes, as amended, which enters into an agreement with the Contractor to perform a portion of the work."
Add the following new definitions:
"1.39 HAWAll ePROCUREMENT SYSTEM (HIePRO) - The State of Hawaii eProcurement System for issuing solicitations, receiving proposals and responses, and issuing notices of award."
B. SECTION 2 – PROPOSAL REQUIREMENTS AND CONDITIONS is amended by the following:
2.3 WITHDRAWAL OF PROPOSALS is amended by replacing the
entire subsection with:
"2.3 DELIVERY OF PROPOSALS-Bidders shall submit and upload the complete proposal to HIePRO prior to the bid opening date and time. Proposals received after said due date and time shall not be considered. Any additional support documents explicitly designated as confidential and/or proprietary shall be uploaded as a separate file to HIePRO. Bidders shall not include confidential and/or proprietary documents with the proposal.
The record of each bidder and respective bid shall be open to public inspection. Original (wet ink, hard copy) proposal documents are not required to be submitted. Contract award shall be based on evaluation of proposals submitted and uploaded to HIePRO.
FAILURE TO UPLOAD THE COMPLETE PROPOSAL TO HIePRO SHALL BE GROUNDS
FOR REJECTION OF THE BID.
If there is a conflict between the specification document and the HIePRO solicitation, the specifications shall govern and control, unless otherwise specified."
2.4 WITHDRAWAL OF PROPOSALS is amended by replacing the
entire subsection with:
"2.4 WITHDRAWAL OF PROPOSALS - Bids may be modified or withdrawn prior to the bid opening date and time. Withdrawal or revision of proposal shall be completed and submitted and uploaded to HIePRO prior to the bid opening date and time."
SP-2
2.5 PUBLIC OPENING OF PROPOSALS is not applicable.
2.10 BID PREPARATION (adding new requirements)
1. Legal Name. Bidder is required to submit the bid using bidder’s exact legal name and License Number as registered at the Department of Commerce and Consumer Affairs. Failure on the part of the bidder to meet this requirement shall result in rejection of bid.
2. Bid Quotation. Bid price(s) quoted herein shall be based on delivery to destination and shall include all other costs and applicable taxes. Bid shall also include, when applicable, costs for installation, modification and instructional training in use of equipment.
3. Tax Liability. Work to be performed under this bid solicitation is a business activity taxable under Chapter 237, Hawaii Revised Statutes (H.R.S.) and Chapter 238, H.R.S., where applicable. Both out-of-state vendors and Hawaii vendors are advised that the gross receipts derived from this bid solicitation are subject to the general excise tax imposed by Chapter 237, H.R.S., at the current rate of 4.5% for Oahu, 4% for the neighbor islands, and where applicable to tangible property imported into the State of Hawaii for resale, subject to the 1/2% use tax imposed by Chapter 238, H.R.S.
4. Make, Model and Other Information. Bidder must identify on the proposal the exact brand or manufacturer’s name and equipment/product model number, order number or other identifier(s) of each item offered. Failure to do so or the inclusion of remarks such as “as specified” shall result in rejection of bid.
If any of the called-for elements of product information is missing from bidder’s proposal, the State will not be able to determine from the information given, whether or not the product is acceptable. If additional space is needed to provide complete product identification, bidders may attach a separate sheet to the bid for that purpose. Bidders will not be allowed to clarify product identification after bid opening. This is to assure that all bids are submitted under the same conditions with no opportunity for one bidder to have advantage over any other bidder after exposure of offers.
5. Brochures and Specification Literature. Bidder shall submit with his/her bid, current brochures and/or specifications required for bid item(s). Upon request, bidder shall furnish at his/her own expense, within five (5) working days from date of State’s request, any further information required to determine
SP-3
acceptability of equipment offered.
C. SECTION 3.1 – AWARD OF CONTRACT is amended by adding the following after the second paragraph:
“The awarding of the contract(s) will be made by Vehicle Model/Type as listed in the proposal schedule(s) and be awarded to the lowest responsible bidder(s) whose proposal complies with all the requirements prescribed per item.
Within five (5) working days of official commencement date of the Notice to Proceed (NTP), the contractor shall submit to the Project Manager listed in the NTP, a copy of the order(s) placed with the factory for each item awarded. Within ten (1) working days after the factory order is submitted, the Contractor shall also provide a copy of the factory’s acknowledgement and confirmation of receiving the order. Requests for extension of time will NOT be considered unless both these documents are furnished with the time limits specified.”
D. 6.2 TRADE NAMES AND ALTERNATES is deleted.
SPECIFICATIONS
Mtls. & Serv.
1-1 1/22/04
SECTION 1 - DEFINITION AND TERMS
Whenever the following pronouns are used in these specifications, or in any documents or instruments where these specifications govern, the intent and meaning shall be interpreted as follows:
1.1 ADDENDA - A written document which may be issued by the
Director during the bidding period involving changes to the specifications and plans, if any, which shall be considered and made a part of the contract.
1.2 AIRPORTS DIVISION - Airports Division, Department of
Transportation, State of Hawaii.
l.3 AWARD - The written acceptance of a proposal by the State.
1.4 BIDDER - Any individual, partnership, corporation or
other legal entity, or combination thereof, submitting a proposal for the work contemplated, acting either directly or through a duly authorized representative.
1.5 CALENDAR DAY - Every day shown on the calendar. If no
designation of calendar or working day is made, “day” shall mean calendar day.
1.6 CHANGE ORDER - A written order issued by the Director to
the Contractor requiring the contract work to be performed in accordance with a change or changes that may involve an adjustment in contract time and price or requiring performance of any unforeseen work essential to complete the contract.
1.7 CONTRACT - The written agreement between the State and
the Contractor setting forth the obligations of the parties thereunder, including, but not limited to, the performance of the work, the furnishing of labor and materials, and the basis of payment.
The contract includes the (1) notice to bidders, (2) proposal, (3) contract form and contract bond, (4) specifications, (5) special provisions and plans, if any, (6) addenda, (7) notice to proceed, and (8) change orders and agreements that are required to complete the work, all of which constitute one instrument.
1.8 CONTRACT BOND - The approved form of security, executed
by the Contractor and its Surety or Sureties, guaranteeing the completion of the work in accordance with the terms of the contract, and guaranteeing full payment of all claims for labor, materials, and supplies used or incorporated in the work.
1-2 1/22/04
1.9 CONTRACT TIME - The number of working days or calendar
days allowed for completion of the contract, including authorized time extensions.
If a calendar date is specified as the date of completion in lieu of the number of working days or calendar days, the contract shall be completed by that date.
In case the contract is for a specified period of time, the contract time shall be for said specified period of time.
1.10 CONTRACTOR - The individual, partnership, corporation
or other legal entity, or combination thereof, contracting with the State for performance of the prescribed work.
1.11 DEPARTMENT - The State Department of Transportation.
1.12 DIRECTOR - The Director of Transportation, acting
either directly or through the Director's duly authorized representative.
1.13 EQUAL OR APPROVED EQUAL - Whenever this term is used in
the specifications and plans, if any, it means a brand or article pre-qualified in accordance with Section 6.2 Trade Names and Alternates and which may be used in place of the one specified.
1.14 H.A.R. or HAR - Hawaii Administrative Rules.
1.15 H.R.S. or HRS - Hawaii Revised Statutes.
1.16 HARBORS DIVISION - Harbors Division, Department of
Transportation, State of Hawaii.
1.17 HIGHWAYS DIVISION - Highways Division, Department of
Transportation, State of Hawaii.
1.18 HOLIDAYS - The days which are set apart and established
as State holidays pursuant to Section 8-1, H.R.S.
1.19 INSPECTOR - The Director's authorized representative
assigned to make detailed inspections of contract performance and materials supplied.
1.20 NOTICE TO BIDDERS - The public announcement, as
required by law, inviting proposals for the work to be performed or materials to be furnished.
1-3 1/22/04
1.21 NOTICE OF FINAL ACCEPTANCE - Written notice from the
Director to the Contractor that the entire contract has been completed in all respects in accordance with the specifications and plans, if any, and any changes thereof previously approved by the Director.
1.22 NOTICE TO PROCEED - Written notice from the Director to
the Contractor advising the Contractor of the date on which he is to begin the prosecution of the work.
1.23 PLANS - The contract drawings approved by the Director
which show the location, character, dimensions and details of the work to be done and shall be a part of the contract.
1.24 PROCUREMENT OFFICER - The Director's duly authorized
representative including project managers, project engineers and contract administrators assigned to prepare, evaluate and administer contracts for the purchasing of goods and services.
1.25 PROPOSAL (OR BID) - The offer of a bidder, on the
prescribed form, to perform the work and to furnish the labor and materials at the prices quoted.
1.26 PROPOSAL FORM - The approved format prepared by the
Department or a facsimile thereof on which bids for the work must be prepared and submitted. (Reasonable facsimile acceptable for bidding.)
1.27 PROPOSAL GUARANTY - The security furnished with a
proposal to guarantee that the bidder will enter into the contract and furnish all other requirements if the bidder's proposal is accepted.
1.28 QUALIFICATION QUESTIONNAIRE - The specified forms on
which the bidder shall furnish required information as to the bidder's ability to perform and finance the work.
1.29 S.L.H. or SLH - Session Laws of Hawaii.
1.30 SPECIAL PROVISIONS - Revisions to the specifications.
The specific clauses setting forth conditions or requirements peculiar to the project under consideration which are not thoroughly or satisfactorily stipulated in these specifications.
1.31 SPECIFICATIONS - The directions, provisions, and
requirements pertaining to the method and manner of performing the work and to the quantities and qualities of materials to be furnished under the contract.
1.32 STATE - The State of Hawaii.
1-4 1/22/04
1.33 SUBCONTRACTOR - An individual, partnership, corporation, other legal entity, or any combination thereof, that enters into an agreement with the Contractor to perform a portion of the work for the Contractor.
1.34 SUPERINTENDENT - The Contractor's representative who is
responsible for and in charge of the work.
1.35 SURETY - The corporation, partnership or individual, other than the Contractor, executing a bond furnished by the Contractor and guaranteeing performance by the Contractor.
1.36 TITLES (OR HEADINGS) - The titles or headings of the
Sections herein are intended for convenience of reference and shall not be considered as having any bearing on their interpretation. Unless otherwise indicated, whenever the word "Section" is used, reference is being made to a Section in these specifications.
1.37 WORK - The furnishing of all labor, materials, equipment, and other incidentals necessary or convenient for the successful completion of the project and the execution of all the duties and obligations imposed by the contract.
1.38 WORKING DAY - Any day, except Saturdays, Sundays and
State holidays.
Matls. only
2-1 3/1/2019
SECTION 2 - PROPOSAL REQUIREMENTS AND CONDITIONS
2.1 PROPOSAL FORMS - All proposals shall be made on forms
furnished by the Department. All proposals shall give the prices proposed in the spaces provided and shall be signed by the bidder, who shall fill out all blanks in the proposal form as therein required.
2.2 REJECTION OF PROPOSALS CONTAINING ALTERATIONS, ERASURES,
OR IRREGULARITIES - Proposals may be rejected if they show any alterations of form, additions not called for, conditional bids, incomplete bids, erasures, or irregularities of any kind.
When proposals are signed by any agent, other than the officer or officers of a corporation authorized to sign contract on its behalf or a member of copartnership, a Power of Attorney must be on file with the Department prior to opening bids or shall be submitted with the proposal;
otherwise, the proposal may be rejected as irregular and unauthorized.
Members of a joint venture may be requested to supply the Department with a copy of their joint venture agreement or each member of the joint venture may be required to sign the proposal.
2.3 DELIVERY OF PROPOSALS - Each proposal shall be placed, together with the proposal guaranty, when required, in an envelope and sealed and so marked as to indicate the identity of the project, the name and address of the bidder, and other required information and then delivered as indicated in the Notice to Bidders. Proposals will be received up to the time fixed in the Notice to Bidders for the opening of bids.
2.4 WITHDRAWAL OF PROPOSALS - Any proposal may be withdrawn
at any time prior to the time fixed in the Notice to Bidders for the opening of proposals upon the filing of a written request therefor with the Department, executed by the bidder or his duly authorized representative. The withdrawal of a proposal shall not preclude a bidder from submitting a new proposal.
2.5 PUBLIC OPENING OF PROPOSALS - Proposals will be opened
and read publicly at the time and place indicated in the Notice to Bidders. Bidders or their authorized agents are invited to be present.
2.6 DISQUALIFICATION OF BIDDERS - Any of the following
reasons may be considered as being sufficient grounds for the disqualification of a bidder and the rejection of his proposal or proposals.
2-2 3/1/2019
A. More than one proposal for the same work from an individual, firm, or corporation under the same or different name.
B. Evidence of collusion among bidders. Participants in such collusion will receive no recognition as bidders for any future work of the Department until such participant shall have been reinstated as a qualified bidder.
C. Evidence of assistance from a person who has been an employee of the agency within the preceding two years and who participated while in State office or employment in the matter with which the contract is directly concerned, pursuant to Section 84-15, HRS.
D. Lack of proposal guaranty.
E. Unsigned proposal or proposal not signed in ink by person or persons legally authorized to submit a proposal on behalf of the bidder.
2.7 MATERIAL GUARANTY - The bidder may be required to
furnish a complete statement of the origin, composition and manufacture of any or all materials to be used in the prosecution of the work, together with samples. Such samples may be subjected to tests to determine their quality and fitness for the work.
2.8 OUT-OF-STATE BIDDERS - Pursuant to Section 103D-1008, Hawaii Revised Statutes, on out-of-state purchases where the bidder or vendor is an out-of-state vendor, not doing business in the State, the bid price of such out-of-state vendor, for the purpose of determining the lowest price bid, shall be increased by the applicable retail rate of general excise tax and the applicable use tax. The lowest responsible bidder, taking into consideration the above increases, shall be awarded the contract, but the contract amount of any contract awarded shall be the amount of the bid offered and shall not include the amount of said increases.
Such increases will not be applied in case an out-of-state vendor specifies in its bid that its bid price includes said general excise tax; the bidder will be required to pay said general excise tax and use tax in case the bidder is awarded the contract.
2-3 3/1/2019
2.9 TAX REQUIREMENTS - Work to be done under this contract
is a taxable transaction and the bidder receiving the award for this work will be required to pay the State of Hawaii General Excise Tax (GET) and the State of Hawaii use Tax.
Additional information regarding the tax rates may be obtained from the Department of Taxation (DOTAX) website at http://tax.hawaii.gov/geninfo/countysurcharge/
If awardee is an out-of-state bidder not holding a
Hawaii GET License, the awardee will have to obtain a Hawaii GET License and pay all taxes due to obtain a tax clearance required before final contract payment is made by the State.
To obtain the tax clearance applications, see subsection 3.1.A. Tax Clearance of these Specifications.
Vendors may apply for either a regular or a one-time GET
License. Information on applying for a GET License may be found at http://tax.hawaii.gov/geninfo/get/ http://tax.hawaii.gov/geninfo/countysurcharge/ http://tax.hawaii.gov/geninfo/get/
3-1 Mtls. Only r3/1/24
SECTION 3 - AWARD AND EXECUTION OF CONTRACT
3.1 AWARD OF CONTRACT - The State reserves the right to reject any and all proposals and to waive any defects as may be deemed to be in the best interest of the public.
The award of contract, if it be awarded, shall be made within sixty (60) calendar days after the opening of bids to the lowest responsive and responsible bidder whose proposal complies with all the prescribed requirements. The Department may request the bidders to allow the Department to consider the bids for the issuance of an award beyond the sixty (60) calendar day period.
Agreement to such an extension shall be made by a bidder in writing. Only bidders who have agreed to such an extension shall be eligible for the award. No response to request shall mean bidder shall no longer be eligible for award.
Requirement for award. The Bidder, as proof of compliance with the requirements of section 103D-310(c), HRS, upon award of a contract made pursuant to section 103D-302, HRS, shall provide the documents listed below. The documents shall be submitted promptly to the Department. If a valid certificate/clearance is not submitted on a timely basis upon award, the Bidder may be deemed non-responsible.
A. Tax Clearance.
Pursuant to section 103D-310(c), 103-53 and 103D-328, HRS, the bidder shall submit a tax clearance certificate from the State of Hawaii Department of Taxation (DOTAX) and the Internal Revenue Service (IRS), subject to section 103D-328, HRS, current within six months of issuance date.
FORM A6, TAX CLEARANCE CERTIFICATE, is available at the following website:
https://tax.hawaii.gov/
To receive DOTAX Forms by fax or mail, phone (808)587-4242 or 1-800-222-3229.
The application for the Tax Clearance Certificate is the responsibility of the bidder. Bidder shall submit directly to the DOTAX or IRS. The approved certificate may then be submitted to the Department.
https://tax.hawaii.gov/
3-2 Mtls. Only
B. Certificate of Compliance.
Pursuant to section 103D-310(c), HRS, the bidder shall submit a certificate of compliance for Hawaii Employment Security Law (Chapter 383, HRS), Workers’ Compensation Law (Chapter 386, HRS), Temporary Disability Insurance (Chapter 392, HRS), and Prepaid Health Care Act (Chapter 393, HRS), from the State of Hawaii Department of Labor and Industrial Relations (DLIR), current within six months of issuance date.
Form LIR#27, Application for Certificate of Compliance with section 3-122-112, HAR, is available at the following website:
https://labor.hawaii.gov/
Contact the DLIR Unemployment Insurance Division at (808) 586-8926 for additional information.
Inquiries regarding the status of a LIR#27 Form are available from the DLIR Disability Compensation Division at (808)586-9200.
The application for the Certificate of Compliance is the responsibility of the bidder.
Bidder shall submit directly to the DLIR. The approved certificate may then be submitted to the Department.
C. Certificate of Good Standing.
Pursuant to section 103D-310(c), HRS, the bidder shall submit a certificate of good standing from the business registration division (BREG) of the State of Hawaii Department of Commerce and Consumer Affairs (DCCA), current within six months of issuance date, to demonstrate it is either:
(1) incorporated or organized under the laws of the State; or
(2) registered to do business in the State as a separate branch or https://labor.hawaii.gov/
3-3 Mtls. Only division that is capable of fully performing under the contract.
A Hawaii business that is a sole proprietorship, is not required to register with the BREG, and therefore not required to submit a certificate of good standing. Bidders are advised of costs associated with registering and obtaining a Certificate of Good Standing from the DCCA.
To purchase a Certificate of Good Standing, go to On-Line Services at the following website:
https://cca.hawaii.gov/
The application for the Certificate of Good Standing is the responsibility of the bidder.
Bidder shall submit directly to the DCCA. The approved certificate may then be submitted to the Department.
D. IN LIEU OF the certificates referenced in subsection A, B, and C, bidder may make available proof of compliance through a state procurement office designated certification process.
3.2 CANCELLATION OF AWARD - The State reserves the right to
cancel the award of any contract any time before the execution of said contract by all parties without any liability to the successful bidder or any other bidder.
3.3 EXECUTION OF CONTRACT - The contract shall be executed
by the successful bidder and returned, together with the contract bonds, when required, within ten (10) days after the award of the contract or within such further time as the Director may allow after the bidder has received the contract for execution.
Pursuant to Section 103D-309, H.R.S., the contract shall not bind the State in any way unless said contract has been fully and properly executed by all the parties thereto and the Comptroller has endorsed thereon a certificate that there is available an unexpended appropriation over and above all outstanding contracts, sufficient to cover the amount required by the contract.
3.4 FAILURE TO EXECUTE CONTRACT - Failure to execute the
contract and file acceptable bonds, when required, within https://cca.hawaii.gov/
3-4 Mtls. Only ten (10) days after the award of the contract, or within such further time as the Director may allow, shall be cause for the cancellation of the award and the forfeiture of the proposal guaranty. Award of the contract may then be made to the next lowest responsible bidder.
4-1 1/22/04
SECTION 4 - SCOPE OF WORK
4.1 WORK TO BE DONE - The work to be done is described in
the Section(s) following Section 9 of these specifications.
4.2 PERFORMANCE OF WORK - The Contractor shall employ, so
far as possible, such methods and means in carrying out his work so as not to cause any interruption, disturbance, or interference with the public.
In case the Contractor is performing work in a building, the Contractor shall conduct the work in such a manner so as not to cause any interruption, disturbance, or interference with the business activities of the tenants in the building.
4.3 EXTRA WORK - New and unforeseen items of work will be
classed as extra work when they cannot be covered by any of the various items for which there is a bid price.
4.4 CHANGES AND CLAIMS FOR ADJUSTMENT
A. Change order. By a written order, at any time, and without notice to any surety, the procurement officer may, subject to all appropriate adjustments, make changes within the general scope of this contract in any one or more of the following:
1. Drawings, designs, or specifications, if the goods to be furnished are to be specially manufactured for the State in accordance therewith;
2. Method of shipment or packing;
3. Place of delivery;
4. Changes in the work within the scope of the contract; or
5. Changes in the time of performance of the contract that do not alter the scope of work.
B. Adjustments of price or time for performance. If any change order increases or decreases the contractor's cost of, or the time required for, performance of any part of the work under this contract, whether or not changed by the order, an adjustment shall be made and the contract modified in writing accordingly. Any adjustment in contract price made pursuant to this clause shall be determined in accordance with the price adjustment clause of this contract. Failure of the parties to agree to an adjustment shall not excuse the contractor from proceeding with the contract as changed, provided that the procurement officer promptly and duly make the provisional adjustments in payment or time for performance as may be reasonable. By proceeding with the work, the contractor shall not be deemed to have
4-2 1/22/04 prejudiced any claim for additional compensation, or an extension of time for completion.
C. Time period for claim. Within thirty (30) days after receipt of a written change order under subsection
(a) unless the period is extended by the procurement officer in writing, the contractor shall file notice of intent to assert a claim for an adjustment. Later notification shall not bar the contractor's claim unless the State or county is prejudiced by the delay in notification.
D. Claim barred after final payment. No claim by the contractor for an adjustment hereunder shall be allowed if notice is not given prior to final payment under this contract.
E. Other claims not barred. In the absence of a change order, nothing in this clause shall be deemed to restrict the contractor's right to pursue a claim as under the contract or for breach of contract.
4.5 PRICE ADJUSTMENT
Any adjustment in contract price pursuant to a clause in this contract shall be made in one or more of the following ways:
A. By agreement on a fixed price adjustment before commencement of the pertinent performance or as soon thereafter as practicable;
B. By unit prices specified in the contract or subsequently agreed upon;
C. By the costs attributable to the event or situation covered by the clause, plus appropriate profit or fee, all as specified in the contract or subsequently agreed upon;
D. In such other manner as the parties may mutually agree; or
E. In the absence of agreement between the parties, by a unilateral determination by the procurement officer of the costs attributable to the event or situation covered by the clause, plus appropriate profit or fee, all as computed by the procurement officer in accordance with generally accepted accounting principles and applicable sections of chapters 3-123 and 3-126 of the Hawaii Administrative Rules.
4-3 1/22/04
4.6 VARIATION IN QUANTITY
Upon agreement of the parties, the quantity of goods or services or both specified in this contract may be increased by a maximum of ten (10) percent provided (1) the unit prices will remain the same except for any price adjustments otherwise applicable and (2) the procurement officer makes a written determination that such an increase will either be more economical than awarding another contract or that it would not be practical to award another contract.
1/22/04 5-1
SECTION 5 - CONTROL OF WORK
5.1 AUTHORITY OF DIRECTOR - The Director shall decide all
questions which may arise as to the quality or acceptability of materials furnished and work performed, the manner of performance and rate of progress of the work, and compensation for work performed, interpretation of the contract and fulfillment of the contract on the part of the Contractor. The Director shall have authority to enforce and make effective such decisions and orders which the Contractor fails to carry out properly and diligently. The decision of the Director shall be final.
5.2 COORDINATION OF PLANS, SPECIFICATIONS AND SPECIAL
PROVISIONS - These specifications, plans, special provisions, and all supplementary documents are essential parts of the contract, and a requirement occurring in one is as binding as though occurring in all. They are intended to be complementary and to describe and provide for a complete work.
5.3 CLAIMS AND DISPUTES - The Contractor may give notice in
writing to the procurement officer for claims that extra compensation, damages, or an extension of time for completion is due the Contractor for one or more of the following reasons:
A. Requirements not clearly covered in the contract, or not ordered by the procurement officer as an extra work;
B. Failure between the State and the Contractor to agree to an adjustment in price for a contract change order issued by the State; or
C. An action or omission on the part of the procurement officer requiring performance changes within the scope of the contract.
The Contractor shall continue with performance of the contract in compliance with the directions or orders of the procurement officer, but by so doing, the Contractor shall not be deemed to have prejudiced any claim for additional compensation, damages, or an extension of time for completion; provided:
A. The notice in writing be given:
1. Before the commencement of the work involved, if at that time the Contractor knows of such requirements or the occurrence of such actions or omissions; or
2. Within thirty (30) calendar days after the
1/22/04 5-2
Contractor knows of such requirements or the occurrence of such action or omission if the Contractor did not have such knowledge before the commencement of the work; or
3. Within thirty (30) calendar days after receipt of the written contract change order that was not agreed upon by both parties; or
4. Within such further time as may be allowed by the procurement officer in writing.
B. The notice shall clearly state the Contractor's intention to make claim and the reasons why the Contractor believes that additional compensation, changes or an extension of time may be remedies to which the Contractor is entitled; and afford the procurement officer every facility for keeping records of the actual cost of work. Failure on the part of the Contractor to give such notification or to afford the procurement officer proper facilities for keeping strict account of actual cost shall constitute waiver of the claim for such extra compensation. The filing of such notice by the Contractor and the keeping of costs by the procurement officer shall not in any way be construed to prove the validity of the claim.
The procurement officer will review the notice and render a decision. The procurement officer's decision shall be final and conclusive unless, within thirty (30) calendar days from the date of the decision, the Contractor mails or otherwise furnishes a written appeal to the Director. The decision of the Director shall be final. Later notification of such claims shall not bar the Contractor's claim unless the State is prejudiced by the delay in notification. No claim by the Contractor for an adjustment hereunder shall be allowed if notice is not given before final payment under this contract. Any adjustment in the contract price made pursuant to this clause shall be determined according to Section 4.5 - Price Adjustment.
The provisions of this Section shall not be construed as establishing any claims contrary to the terms of Section 4.4
- Changes and Claims for Adjustment.
Nothing herein contained, however, shall excuse the Contractor from compliance with any rules of law precluding any state officers and any Contractors from acting in collusion or bad faith in issuing or performing contract change orders which are clearly not within the scope of the
6-1 1/22/04
SECTION 6 - CONTROL OF MATERIAL AND EQUIPMENT
6.1 DEFECTIVE MATERIALS - All materials not conforming to
the requirements of these specifications or the special provisions shall be considered defective and all such materials, whether in place or not, shall be rejected. They shall be removed immediately from the site of the work, unless otherwise permitted by the Director. No rejected materials, the defects of which have been subsequently corrected, shall be used until approval in writing has been given by the Director. Upon failure on the part of the Contractor to comply promptly with any order to remove and replace defective materials, the Director may remove and replace defective material and to deduct the cost of removal and replacement from any monies due or to become due the Contractor.
6.2 TRADE NAMES AND ALTERNATES - For convenience in
designation on the plans or in the specifications, certain equipment or articles or materials may be designated under a trade name or the name of a manufacturer and its information catalogue. The use of alternate equipment or an article or material which is of equal quality and of the required characteristics for the purposes intended will be permitted, subject to the written approval of the Director, in accordance with the following requirements:
A. QUALIFICATION BEFORE BID OPENING - When the specifications and/or plans specify one or more manufacturer's brand names of materials or equipment to indicate a quality, style, appearance, or performance, the bidder will be assumed to have based its bid on one of the specified named products, except where such proprietary product are specified, alternate brands may be qualified if found equal or better by the Director.
Bidders requesting qualification of alternate proprietary products must submit a request to the Director for review and approval at the earliest date possible, but in any event, such request must be received at the Contracts office not later than ten (10) days before the bid opening date, not including the bid opening date.
It shall be the responsibility of the bidder to submit sufficient evidence based upon which a determination can be made by the Director that the alternate brand is qualified. The evidence shall be transmitted with a covering letter which shall list the evidence submitted and the items for which the substitution is requested.
If the evidence accompanying a request for substitution is insufficient to qualify a particular
6-2 1/22/04 model, the request shall be denied provided that further evidence may be submitted to qualify the item five (5) days prior to the bid opening date if the initial request was made prior to the deadline set above.
B. SUBSTITUTION AFTER BID OPENING - Substitution of material or equipment will not be allowed after the bid opening date except under the following unforeseen circumstances:
1. If a specified or pre qualified item is delayed by a lengthy strike in the factory or other unforeseeable contingency beyond the control of the Contractor which would cause an abnormal delay in the project completion.
2. If a specified or pre qualified item is found to be unusable due to change or other circumstances.
3. If the Contractor is willing to provide a more recently developed or manufactured item of material or equipment of the same manufacturer which the Director determines to be equal or better than the one specified or pre-qualified.
A substitution request, regardless of reason, shall be fully explained in writing by the Contractor and shall include its justification for said request, the quantities and unit prices involved, quotations and such other documents as are deemed necessary to support the request. Any savings in cost will accrue to the State and any additional cost for the substituted items will be paid by the Contractor.
The burden of proof as to the comparative quality and suitability of alternate equipment, articles, or materials shall be upon the bidder or Contractor and bidder or Contractor shall furnish, at its own expense, all information necessary or related thereto as required by the Director. The Director shall be the sole judge as to the comparative quality and suitability of alternate equipment, articles or materials and the Director's decisions shall be final.
The above shall not be construed to mean that substitution for brand name specified materials and equipment will be allowed; the Director reserves the right to deny any request he deems irregular or not in the best interest of the State.
6-3 1/22/04
6.3 ASSIGNMENT OF ANTITRUST CLAIMS FOR OVERCHARGES FOR GOODS
AND MATERIALS PURCHASED
A. Vendor and purchaser recognize that in actual economic practice, overcharges resulting from antitrust violations are in fact usually borne by the purchaser.
Therefore, vendor hereby assigns to purchaser any and all claims for such overcharges as to goods and materials purchased in connection with this order or contract, except as to overcharges which result from antitrust violations commencing after the price is established under this order or contract and which are not passed on to the purchaser under an escalation clause.
B. Contractor and owner recognize that in actual economic practice, overcharges resulting from antitrust violations are in fact usually borne by the owner.
Therefore, contractor hereby assigns to owner any and all claims for such overcharges as to goods and materials purchased in connection with this order or contract, except as to overcharges which result from antitrust violations commencing after the price is established under this order or contract and any change order. In addition, contractor warrants and represents that each of its first tier suppliers and subcontractors shall assign any and all such claims to owner, subject to the aforementioned exception.
SECTION 7 - LEGAL RELATIONS AND RESPONSIBILITY
7.1 LAWS TO BE OBSERVED - The Contractor shall comply with
all federal, state, city and county laws, ordinances, rules and regulations which in any manner affect those engaged or employed in the work, the materials used in the work, and the conduct of the work. Any reference to such laws, ordinances, rules and regulations shall include any amendments thereto effective as of the date of the call for sealed proposals.
The Contractor shall hold harmless, indemnify, defend and where appropriate, insure the State, its officers, agents and employees against any claim or liability arising from or based on the violation of any such laws, ordinances, rules or regulations. If any discrepancy or inconsistency is discovered in the contract for the work in relation to any law, ordinance, rule, regulation, order or decree, the Contractor shall forthwith report the same to the Director in writing.
7.2 PERMITS AND LICENSES - The Contractor shall procure all
permits and licenses, pay all charges and fees, and give all notices necessary and incident to the due and lawful prosecution of the work.
7.3 PATENTS - The Contractor shall assume all costs arising
from the use of patented materials, equipment, devices, or processes used on or incorporated in the work, and shall hold harmless, indemnify, defend and where appropriate, insure the State, its officers, agents and employees from all suits at law or actions of every nature, for or on account of the use of any patented materials, equipment, devices or processes.
7.4 RESPONSIBILITY FOR INJURY AND DAMAGE - The State, its
officers, agents and employees shall not be held accountable in any manner for any loss or damage to the work or any part thereof, or for any of the materials and equipment used or employed in performing the work, or for any injury to any person or persons either workers or the public, or for any damage to property caused by the Contractor or its workers or any one employed by the Contractor. The Contractor shall be responsible for any liability imposed by law for any injury to any person or any damage to property resulting from defects or obstructions or from any cause whatsoever during the progress of the work or at any time before its completion and final acceptance. The acceptance of the completed work of the Contractor by the Director shall not relieve the Contractor from any liability which may have accrued or may accrue as a result of the performance of the work by the Contractor. The Contractor shall hold harmless, indemnify, defend and where appropriate, insure the State, its officers, agents and employees, from all suits or actions of every name, kind and description, brought for or on account of
Mtls. only
7-1 r3/03/14 any injuries or damages sustained by any persons or property caused by the Contractor, its servants or agents, or by or on account of any act or omission of the Contractor or its servants or agents, regardless of whether such actions or any claim is brought against them or any one of them before or after the final acceptance of the work. In addition to any remedy authorized by law, the State may withhold payment of any money due to Contractor as shall be reasonable until disposition has been made of any suits or claims for injuries or damages.
It is not the intention of the parties to this contract to make the public or any member thereof a third party beneficiary hereunder, or to authorize anyone not a party hereto to maintain a suit for personal injuries or property damage based on a contract theory of liability. In any event, the Contractor shall hold harmless, indemnify, defend and where appropriate, insure the State from suits and claims for personal injuries or property damage where such injuries or damage are caused by the negligent acts or omissions of the Contractor, its agents or employees.
7.5 COOPERATION BETWEEN CONTRACTORS - Where two or more
Contractors are employed on related or adjacent work, each shall conduct its operations in such a manner as not to cause any unnecessary delay or hindrance to the other.
7.6 CONTRACTOR'S RESPONSIBILITY FOR WORK - Until the
acceptance of the contract, the Contractor shall have the charge and care thereof and shall bear the risk of injury or damage to any part thereof by the action of the elements or from any other cause, whether arising from the execution or from the non-execution of the work. The Contractor shall rebuild, repair, restore, and make good all damages to any portion of the work occasioned by any of the above causes before its completion and acceptance and shall bear the expenses thereof.
7.7 NO PERSONAL LIABILITY - Neither the Director nor any
other officer or authorized employee of the Department shall be personally responsible for any liability arising under the contract.
7.8 INSURANCE - Prior to commencing with the work, the
Contractor shall, at its own expense, obtain and submit to the Department, Certificate of Insurance from an insurance company authorized by the laws of the State to issue such insurance in the State of Hawaii showing full policy coverage of the Contractor.
7-2 r3/03/14
TYPES OF INSURANCE:
A. Workers’ Compensation:
The Contractor shall obtain worker’s compensation insurance for all persons whom they employ in carrying out the work under this contract. This insurance shall be in strict conformity with the requirements of the most current and applicable State of Hawaii Worker’s Compensation Insurance laws in effect on the date of the execution of this contract and as modified during the duration of the contract. The minimum limit of liability for workers compensation is the HRS 386 statutory limit.
B. Comprehensive Automobile Liability:
The Contractor shall obtain Auto Liability Insurance covering all owned, non-owned and hired autos with a combined single Limit of not less than $1,000,000 per accident for bodily injury and property damage with the State of Hawaii named as additional insured. The required limit of insurance may be provided by a single policy or with a combination of primary and excess policies.
C. Commercial General Liability:
The Contractor shall obtain General Liability insurance with a limit of not less than $1,000,000 per occurrence and in the aggregates. The General liability insurance shall include the State of Hawaii as an additional insured. The required limit of insurance may be provided by a single policy or with a combination of primary and excess policies.
All policies must provide that 30 days prior written notice of cancellation or material change in coverage be given to certificate holders stated above.
Such insurance when accepted by the Director in writing shall become applicable and shall remain unmodified throughout the entire term of the contract and in no event shall be terminated or otherwise allowed to lapse prior to written certification of final acceptance of the work by the State. Such insurance aforementioned shall cover the State for all work performed under the contract, all work performed incidental thereto or directly or indirectly connected therewith, including other work performed outside of the work area, and all change orders.
7-3 r3/03/14
Any delay in the submission and approval of insurance certificates shall not be justification of or grounds for a request by the Contractor postponing the issuance of a notice to proceed notwithstanding the fact that the Contractor shall not be allowed to proceed with the work until said certificates are submitted and approved.
Failure to obtain…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .