This is a Final Specifications and Notice to Bidders document issued by the State of Hawaii Department of Transportation Highways Division for Federal-Aid Project No. ER-27(008), a drainage improvement project on Kaumualii Highway near Omao Stream Bridge in the District of Koloa, Island of Kauai. The scope of work encompasses demolition and removal of existing drainage structures, concrete aprons, asphalt concrete pavement, and chain link fencing; abandonment in place of an existing 24-inch reinforced concrete pipe drain with controlled low-strength material; installation of a 42-inch reinforced concrete pipe with accompanying drain manhole, grated drain inlets, and concrete outlet structure; installation of grouted rubble paving, reinforced concrete apron, and asphalt concrete pavement; installation of chain link fencing and erosion control matting; and site preparation work including clearing, grubbing, excavation, backfilling, grading, and grassing. Bidders must register and submit complete proposals through HIePRO, with the offer due date of October 29, 2026, at 2:00 p.m. Hawaii Standard Time. A virtual pre-bid conference is scheduled for October 8, 2026, at 10:00 a.m. HST via Microsoft Teams, with attendance encouraged but not mandatory. Requests for Information and Substitution Requests must be submitted by October 15, 2026, at 2:00 p.m. HST. The estimated construction cost ranges from $10,000,000 to $11,000,000.

To be eligible for contract award, bidders must possess a valid State of Hawaii General Engineering "A" license prior to award. The project is subject to federal requirements including Davis-Bacon wage determinations, Contract Work Hours and Safety Standards Act provisions, and nondiscrimination requirements under Title 49 Code of Federal Regulations Part 26. HDOT has suspended race-conscious Disadvantaged Business Enterprise contract goals and counting of DBE participation pending completion of DBE certification reevaluation, with reserved provisions allowing for reinstatement. The contractor must perform at least 30 percent of contract work with its own organization and must report all subcontractor and supplier payments electronically through HDOT's online Vendor Management System. HDOT will make monthly progress payments without withholding retainage, and contractors must pay all subcontractors within 10 calendar days of receiving payments from HDOT. The contract is funded through federal-aid highway appropriations and subject to compliance with applicable federal and state labor standards, safety regulations, and environmental protection requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE OF HAWAII

DEPARTMENT OF TRANSPORTATION

HIGHWAYS DIVISION

HONOLULU, HAWAII

SPECIAL PROVISIONS

PROPOSAL

CONTRACT AND BOND

FOR

KAUMUALI’I HIGHWAY

KAUMUALI’I HIGHWAY DRAINAGE IMPROVEMENTS

VICINITY OF OMAO STREAM BRIDGE

FEDERAL-AID PROJECT NO. ER-27(008)

DISTRICT OF KOLOA

ISLAND OF KAUAI

FY 2027

NTB-1

NOTICE TO BIDDERS

Hawaii Revised Statutes (HRS), Chapter 103D

The receiving of bids for KAUMUALIʻI HIGHWAY DRAINAGE

IMPROVEMENTS, VICINITY OF OMAO STREAM BRIDGE, DISTRICT OF KOLOA,

ISLAND OF KAUAI, FEDERAL-AID PROJECT NO. ER-27(008), will begin as of the

HIePRO Release Date. Bidders shall register and submit complete bids through HIePRO only.

Refer to the following HIePRO link for important information on Vendor Registration:

https://hiepro.ehawaii.gov/welcome.html.

The solicitation plans, specifications, proposal, and additional documents designated or incorporated by reference shall be available in HIePRO.

HIePRO OFFER DUE DATE AND TIME is October 29, 2026, at 2:00 p.m., Hawaii

Standard Time (HST). Bidders shall submit and upload the complete proposal to HIePRO prior to the offer due date and time. Proposals received after said due date and time shall not be considered. Any additional support documents explicitly designated as confidential and/or proprietary shall be uploaded as a separate file to HIePRO. Bidders shall not include confidential and/or proprietary documents as part of their proposal. The record of each bidder and their respective proposal shall be open to public inspection.

FAILURE TO UPLOAD THE PROPOSAL TO HIePRO SHALL BE GROUNDS FOR

REJECTION.

The scope of work includes but is not limited to: demolition and removal of existing drainage structure, concrete apron, asphalt concrete pavement and chain link fencing; fill the existing 24” RCP drain pipe crossing Kaumualii Highway with controlled low-strength material

(CLSM) and abandon in place; installation of 42” reinforced concrete pipe; installation of drain

NTB-2

manhole, grated drain inlets and concrete outlet structure; installation of grouted rubble paving, reinforced concrete apron and asphalt concrete pavement; installation of chain link fencing and erosion control matting; clearing and grubbing; excavation; backfilling; grading; and grassing.

The estimated cost of construction is between $10,000,000 and $11,000,000.

To be eligible for award, bidders shall possess a valid State of Hawaii General

Engineering "A" license prior to the award of contract.

A virtual pre-bid conference is scheduled for October 8, 2026, at 10:00 a.m., HST, on

Microsoft Teams. Interested bidders shall contact Jeff Aguinaldo, Project Manager, directly at jeff.j.aguinaldo@hawaii.gov, no later than three working days prior to the scheduled pre-bid conference to receive the meeting invitation. All prospective bidders and/or their respective representatives are encouraged to attend, however, attendance is not mandatory. All information presented at the pre-bid conference shall be provided for clarification and information only. Any amendments to the solicitation shall be made by formal addendum and posted in HIePRO.

All Request for Information (RFI) questions and Substitution Requests shall be submitted in HIePRO no later than October 15, 2026, at 2:00 p.m., HST. RFI questions received after the stated deadline shall not be addressed. Substitution Requests received after the stated deadline shall not be considered. Verbal RFI(s) shall not receive a response. All responses to RFI questions shall be provided for clarification and information only and issued by formal addendum. Any amendments to the solicitation shall be made by formal addendum and posted in HIePRO.

If there is a conflict between the solicitation and information stated in the pre-bid conference, the meeting minutes, and/or the responses to RFI questions, the solicitation shall govern and control, unless as amended by formal addendum.

Campaign contributions by State and County Contractors. Contractors are hereby notified of the applicability of HRS § 11-355 which states that campaign contributions are prohibited from

NTB-3

specified State or County government contractors during the term of the contract if the contractors are paid with funds appropriated by a legislative body. For more information, contact the

Campaign Spending Commission at (808) 586-0285.

Protests. Any protest of this solicitation shall be submitted in writing to the Director of

Transportation, in accordance with HRS § 103D-701 and Hawaii Administrative Rules § 3-126.

The Equal Employment Opportunity Regulations of the Secretary of Labor implementing

Executive Order (EO) 11246 has been revoked as per EO 14173. To the extent any contract document references this EO, or associated provisions, those references are inoperative.

The U.S. Department of Transportation Regulation entitled “Nondiscrimination in

Federally Assisted Programs of the U.S. Department of Transportation”, Title 49, Code of

Federal Regulations (CFR), Part 21, is applicable to this project. Bidders are hereby notified that the Department of Transportation shall affirmatively ensure that the contract entered into pursuant to this advertisement shall be awarded to the lowest responsible bidder without discrimination on the grounds of race, color, national origin, or sex (as directed by

23 CFR Part 200).

Disadvantaged Business Enterprise (DBE). The U.S. Department of Transportation

Regulations entitled "Participation by Disadvantaged Business Enterprise in Department of

Transportation Financial Assistance Programs", Title 49, CFR, Part 26, is applicable to this project. Bidders are hereby notified that the Department of Transportation shall enforce compliance with the applicable requirements of the Disadvantaged Business Enterprise program with respect to this project.

Bidders shall read the following included in the solicitation:

1. “CIVIL RIGHTS COMPLIANCE AND DISADVANTAGED BUSINESS

NTB-4

ENTERPRISE SPECIAL PROVISIONS”

Driving While Impaired (DWI) Education. The Hawaii Department of Transportation

(HDOT) encourages all organizations contracted with HDOT to have an employee education program preventing DWI. DWI is defined as operating a motor vehicle while impaired by alcohol or other legal or illegal substances. HDOT promotes this type of program to accomplish our mission to provide a safe environment for motorists, bicyclists, and pedestrians utilizing our State highways, and expects its contractors to do so as well.

For additional information, contact Jeff Aguinaldo, Project Manager, by phone at

(808)241-3018, or by email at jeff.j.aguinaldo@hawaii.gov.

The State reserves the right to reject any or all proposals and to waive any defects in said proposals in the best interest of the public.

ROBIN K. SHISHIDO

Deputy Director of Transportation for Highways

HIePRO RELEASE DATE: September 29, 2026

ER-27(008)

-1- 4/23/26

TABLE OF CONTENTS

Instructions for Contractor’s Licensing

Civil Rights Compliance And Disadvantaged Business Enterprise Special Provisions

Required Federal-Aid Contract Provisions

Special Provisions Title Page

Special Provisions:

DIVISION 100 - GENERAL PROVISIONS

Section Description Pages

101 Terms, Abbreviations, and Definitions 101-1a – 101-13a

102 Bidding Requirements and Conditions 102-1a – 102-8a

103 Award And Execution of Contract 103-1a – 103-4a

104 Scope of Work 104-1a – 104-2a

105 Control of Work 105-1a – 105-3a

106 Material Restrictions and Requirements 106-1a – 106-4a

107 Legal Relations and Responsibility To Public 107-1a – 107-3a

108 Prosecution And Progress 108-1a – 108-25a

109 Measurement and Payment 109-1a – 109-2a

DIVISION 200 - EARTHWORK

Section Description Pages

201 Clearing and Grubbing 201-1a

202 Removal of Structures and Obstructions 202-1a

206 Excavation and Backfill for Drainage Facilities 206-1a

207 Ditch and Channel Excavation 207-1a

Temporary Water Pollution, Dust, and Erosion Control

209-1a – 209-28a

280 Shaft Construction 280-1a – 280-9a

-2- 4/23/26

DIVISION 300 - BASES

304 Aggregate Base Course 304-1a

305 Aggregate Subbase Course 305-1a

Controlled Low-Strength Material (CLSM) for Utilities and Structures

314-1a

DIVISION 400 - PAVEMENTS

401 Hot Mix Asphalt Pavement 401-1a – 401-35a

DIVISION 500 - STRUCTURES

503 Concrete Structures 503-1a – 503-8a

DIVISION 600 - INCIDENTAL CONSTRUCTION

601 Structural Concrete 601-1a – 601-15a

602 Reinforcing Steel 602-1a – 602-2a

603 Culverts and Storm Drains 603-1a

604 Manholes, Inlets and Catch Basins 604-1a –604-2a

607 Chain Link Fences and Gates 607-1a

612 Grouted Rubble Paving 612-1a

617 Planting Soil 617-1a

619 Planting 619-1a – 619-3a

629 Pavement Markings 629-1a – 629-5a

636 E-Construction 636-1a – 636-5a

641 Hydro-Mulch Seeding 641-1a

645 Work Zone Traffic Control 645-1a – 645-19a

663 Erosion Control Matting 663-1a – 663-3a

671 Protection of Endangered Species 671-1a – 671-6a

-3- 4/23/26

DIVISION 600 – INCIDENTAL CONSTRUCTION

Section Description Pages

672 Microtunneling 672-1a – 672-14a

684 Construction Instrumentation and Monitoring 684-1a – 684-6a

685 Muck Handling and Disposal 685-1a – 685-4a

Portable Concrete Barrier and End Treatment System

694-1a – 694-9a

699 Reinforced Concrete Jacking Pipe 699-1a

DIVISION 700 - MATERIALS

702 Bituminous Materials 702 -1a

703 Aggregates 703 -1a

705 Joint Materials for Concrete Structures 705-1a

717 Cullet and Cullet-Made Materials 717-1a – 717-2a

Macro-Synthetic Fibers for Concrete Reinforcement

719-1a

750 Traffic Control Sign and Marker Materials 750-1a – 750-2a

780 Reinforced Concrete Jacking Pipe 780-1a – 780-11a

Requirement of Chapter 104, HRS Wages and Hours of Employees on Public Works Law

Federal Wage Rates

Proposal Title Page

Proposal .................................................................................................. P-1 – P-7 Proposal Schedule .................................................................................P-8 - P-13

Surety Bid Bond

Sample Forms

Contract

Performance Bond (Surety)

-4- 4/23/26

Performance Bond

Labor and Material Payment Bond (Surety)

Labor and Material Payment Bond

Disclosure of Lobbying Activities Standard Form - LLL and LLL-A

Statement of Compliance Form WH-348

Chapter 104, HRS Compliance Certificate

END OF TABLE OF CONTENTS

DBE Special Provisions - FEDERAL

(rev. 05/29/26)

CIVIL RIGHTS COMPLIANCE AND DISADVANTAGED BUSINESS

ENTERPRISE SPECIAL PROVISIONS

I. GENERAL

This project is subject to Title 49 Code of Federal Regulations (CFR), Part 26, entitled "Participation by Disadvantaged Business Enterprise in Department of Transportation Financial Assistance Programs," hereinafter referred to as the "DBE Regulations" and is incorporated and made a part of this contract herein by this reference, as revised by the United States Department of Transportation’s (USDOT) DBE Interim Final Rule (IFR) issued October 3, 2025 (hereinafter referred to as IFR). The following shall be incorporated as part of the contract documents for compliance. If any requirements herein conflict with the general provisions or special provisions applicable to this project, the requirements herein shall prevail unless specifically superseded or amended in the special provisions or by addendum.

II. POLICY

The Hawaiʻi Department of Transportation’s (HDOT) and its political subdivision’s Disadvantaged Business Enterprise (DBE) program will operate in a nondiscriminatory manner and without regard to race or sex, while maximizing efficiency of service.

Bidders/offerors, subcontractors, consultants, vendors, suppliers, distributors, manufacturers, trucking companies, service providers, etc. shall fully inform themselves with respect to the requirements of the DBE Regulations.

HDOT’s DBE program remains in effect pursuant to 49 CFR Parts 23 and 26. However, consistent with the USDOT’s IFR effective October 3, 2025, HDOT has suspended race-conscious measures including DBE contract goals, counting of DBE participation, and associated special provisions, pending the completion of HDOT’s DBE certification reevaluation. Where indicated, HDOT reserves the right to reinstate or amend DBE special provisions at a later date, subject to approval by the appropriate USDOT operating administration.

HDOT reserves the right to reimplement, revise, or otherwise modify any reserved provisions, in whole or in part, following its reevaluation period or upon receipt of additional federal guidance. Upon such reimplementation, contractors will be notified in writing and shall comply with the updated requirements as directed by HDOT.

III. NON-DISCRIMINATION POLICY

Each contract signed with a prime contractor (and each subcontract the prime contractor signs with a subcontractor) shall include the following assurance:

“The contractor, sub-recipient, or subcontractor shall not discriminate on the basis of race, color, national origin, or sex in the performance of this contract. The contractor shall carry out applicable requirements of 49 CFR Part 26, as revised by the

(rev. 05/29/26)

DBE IFR, in the award and administration of USDOT assisted contracts. Failure by the contractor to carry out these requirements is a material breach of this contract, which may result in the termination of this contract or such other remedy as the recipient deems appropriate which may include, but is not limited to: 1) withholding monthly progress payments; 2) assessing sanctions; 3) liquidated damages; and/or 4) disqualifying the contractor from future bidding as non-responsible.”

The prime contractor agrees to include the above statements in any subsequent contracts that it enters into with other contractors and shall require those contractors to include similar statements in further agreements.

IV. BIDDER/OFFEROR RESPONSIBILITIES (RESERVED)

V. PROPOSAL REQUIREMENTS (RESERVED)

VI. COUNTING DBE PARTICIPATION TOWARDS CONTRACT GOAL

(RESERVED)

VII. USE OF JOINT CHECKS UNDER THE DBE PROGRAM (RESERVED)

VIII. DEMONSTRATION OF GOOD FAITH EFFORTS FOR CONTRACT AWARD

(RESERVED)

IX. ADMINISTRATIVE RECONSIDERATION (RESERVED)

X. AWARD OF CONTRACT (RESERVED)

XI. REPLACEMENT OF A DBE ON A PROJECT WITH A CONTRACT GOAL

(RESERVED)

XII. CONTRACT COMPLIANCE

This contract is subject to contract compliance tracking, and the prime contractor and all subcontractors are required to report payments electronically in the HDOT online Vendor Management System (hereafter referred to as “online tracking system”.) The prime contractor shall report the date payment was made by HDOT and shall report payment to all subcontractors for the audit period. The prime contractor and all subcontractors are responsible for responding by any noted response date or due date to any instructions or request for information, and to check the online tracking system on a regular basis to manage contact information and contract records.

The prime contractor is responsible for ensuring all subcontractors have completed all requested items and that their contact information is accurate and up-to-date. HDOT may require additional information related to the contract to be provided electronically through the online tracking system at any time before, during, or after contract award.

Information related to contractor access of the online tracking system will be provided to designated point of contact with each contractor upon award of the contract. The online

(rev. 05/29/26) tracking system is web-based and can be accessed at the following internet address:

https://hdot.dbesystem.com/.

XIII. PAYMENT

A. HDOT will make an estimate in writing each month based on the items of work performed and materials incorporated in the work and the value therefore at the unit prices or lump sum prices set forth in the contract. All progress estimates and payments will be approximate only and shall be subject to correction at any time prior to or in the final estimate and payment. HDOT will not withhold any amount from any payment to the contractor, including retainage.

B. The contractor shall pay all subcontractors within 10 calendar days after receipt of any progress payments from HDOT. This clause applies to all subcontractors, and all tiers of subcontracts. As per HRS § 103-10.5 Prompt payment, the contractor will verify that payment or retainage has been released to the subcontractors or its suppliers within the specified time through entries in HDOT’s online tracking system during the corresponding monthly audits.

Prompt payment will be monitored and enforced through the contractor’s reporting of payments to its subcontractors and suppliers in the online tracking system.

Subcontractors, including lower tier subcontractors and/or suppliers will confirm the timeliness and the payment amounts received utilizing the online tracking system. Discrepancies will be investigated by the DBE Program Office and the project engineer. Payments to the subcontractors, including lower tier subcontractors, and including retainage released after the subcontractor or lower tier subcontractor’s work has been completed to HDOT’s satisfaction, will be reported by the Contractor or the subcontractor.

C. When any subcontractor has satisfactorily completed its work as specified in the subcontract, and there are no bona fide disputes, the contractor shall make prompt and full payment to the subcontractor of all monies due, including retainage, within 10 calendar days after the subcontractor’s work is satisfactorily completed.

A subcontractor’s work is satisfactorily completed when all the tasks called for in the subcontract have been accomplished and documented, as required by HDOT.

The contractor must obtain the prior written approval from HDOT before it can continue to withhold retainage from any subcontractor who has completed its portion of the work. This clause applies all subcontractors, and all tiers of subcontracts.

XIV. RECORDS

The contractor shall maintain and keep all records necessary for HDOT to determine compliance with the contractor’s compliance obligations. The records shall be available at reasonable times and places for inspection by HDOT and appropriate Federal agencies.

https://hdot.dbesystem.com/ https://capitolwebsite.azurewebsites.net/hrscurrent/Vol02_Ch0046-0115/HRS0103/HRS_0103-0010_0005.htm

(rev. 05/29/26)

The records to be kept by the contractor shall include:

1. The names, address, phone number, and contact person of consultants, subcontractors, manufacturers, suppliers, distributors, truckers and vendors;

2. The nature of work of each consultant, subcontractor, manufacturer, supplier, distributor, trucker and vendor;

3. The dollar amount contracted with each consultant, subcontractor, manufacturer, supplier, distributor, trucker and vendor; and

4. Cumulative dollar amount of all change orders to the subcontract.

XV. FAILURE TO COMPLY WITH STATED REQUIREMENTS

The contractor shall carry out applicable requirements of 49 CFR Part 26 in the award and administration of USDOT assisted contracts. All contractors, subcontractors, manufacturers, suppliers, and distributors are hereby advised that failure to carry out all requirements specified herein shall constitute a material breach of contract that may result in termination of the contract or such other remedy as deemed appropriate by HDOT including but not limited to:

1) withholding monthly progress payments; 2) assessing sanctions; 3) liquidated damages; and/or 4) disqualifying the contractor from future bidding as non-responsible.

FHWA-1273 – Revised June 25, 2026

CONTRACT PROVISIONS FOR

FEDERAL-AID CONSTRUCTION CONTRACTS

I. General II. Nondiscrimination III. Davis-Bacon and Related Act Provisions IV. Contract Work Hours and Safety Standards Act

Provisions V. Subletting or Assigning the Contract VI. Safety: Accident Prevention VII. False Statements Concerning Highway Projects VIII. Implementation of Clean Air Act and Federal Water

Pollution Control Act IX. Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion X. Certification Regarding Use of Contract Funds for

Lobbying XI. Use of United States-Flag Vessels

ATTACHMENTS

A. Employment and Materials Preference for Appalachian Development Highway System or Appalachian Local Access Road Contracts (included in Appalachian contracts only).

I. GENERAL

1. Historically, contracting agencies using Federal-aid highway funds were required to ensure Form FHWA-1273 was physically incorporated into all contracts and subcontracts.

Effective June 10, 2026, this requirement was eliminated [91 FR 25492]. Future use of Form FHWA-1273 is now optional on the part of the contracting agency using Federal-aid highway funds. FHWA continues to make Form FHWA-1273 available as a convenience to contracting agencies. Contracting agencies must continue to ensure compliance with the provisions cited in Form FHWA-1273 in accordance with the provisions regardless of the use of Form FHWA-1273.

Accordingly, the contracting agency retains the authority to determine whether the contractor must use Form FHWA-1273 to physically incorporate required contract provisions in each subcontract and in lower tier contracts. Where permitted by the contracting agency, the contractor may choose other ways to include required contract provisions in each subcontract, besides incorporating Form FHWA-1273. Contract provisions in Form FHWA-1273 are not required to be physically included in subcontracts for design services on Federal-aid design-build contracts, or in purchase orders, rental agreements and other agreements for supplies or services.

The applicable provisions of Form FHWA-1273 are incorporated by reference for work done under any purchase order, rental agreement or agreement for other services. The prime contractor or design-builder shall be responsible for compliance by any subcontractor, lower-tier subcontractor or service provider.

Contracting agencies may reference Form FHWA-1273 in solicitation-for-bids or request-for-proposals documents.

2. Subject to the applicability criteria noted in the following sections, these contract provisions shall apply to all work performed on the contract by the contractor's own organization and with the assistance of workers under the contractor's immediate superintendence and to all work performed on the contract by piecework, station work, or by subcontract.

3. A breach of any of the stipulations contained in these Required Contract Provisions may be sufficient grounds for withholding of progress payments, withholding of final payment, termination of the contract, suspension / debarment or any other action determined to be appropriate by the contracting agency and FHWA.

4. Selection of Labor: During the performance of this contract, the contractor shall not use convict labor for any purpose within the limits of a construction project on a Federal-aid highway unless it is labor performed by convicts who are on parole, supervised release, or probation. 23 U.S.C. 114(b).

The term Federal-aid highway does not include roadways functionally classified as local roads or rural minor collectors.

23 U.S.C. 101(a).

II. NONDISCRIMINATION

The contractor and all subcontractors must comply with the following policies: 29 CFR Parts 1625-1627, 23 U.S.C. 140, Section 504 of the Rehabilitation Act of 1973, as amended (29 U.S.C. 794), Title VI of the Civil Rights Act of 1964, as amended (42 U.S.C. 2000d et seq.), and related regulations including 49 CFR Parts 21, 26, and 27, including any amendments thereto.

Note: The U.S. Department of Labor has exclusive authority to determine compliance with 29 CFR Parts 1625-1627. The contracting agency and the FHWA have the authority and the responsibility to ensure compliance with 23 U.S.C. 140, Section 504 of the Rehabilitation Act of 1973, as amended (29 U.S.C. 794), and Title VI of the Civil Rights Act of 1964, as amended (42 U.S.C. 2000d et seq.), and related regulations including 49 CFR Parts 21, 26, and 27, including any amendments thereto.

The provisions of the Americans with Disabilities Act of 1990 (42 U.S.C. 12101 et seq.) set forth under 28 CFR Part 35 and 29 CFR Part 1630 are incorporated by reference in this contract.

1. Assurances Required:

a. The requirements of 49 CFR Part 26, including any amendments thereto, and the State DOT’s FHWA-approved Disadvantaged Business Enterprise (DBE) program are incorporated by reference.

b. The contractor, subrecipient or subcontractor shall not discriminate on the basis of race, color, national origin, or sex in the performance of this contract. The contractor shall carry out applicable requirements of 49 CFR part 26, including any amendments thereto, in the award and administration of DOT-assisted contracts. Failure by the contractor to carry out these requirements is a material breach of this contract, which may result in the termination of this contract or such other remedy as the recipient deems appropriate, which may include, but is not limited to:

(1) Withholding monthly progress payments;

(2) Assessing sanctions;

(3) Liquidated damages; and/or

(4) Disqualifying the contractor from future bidding as non-responsible.

c. The Title VI and nondiscrimination provisions of U.S.

DOT Order 1050.2A at Appendixes A and E, including any amendments thereto, are incorporated by reference. 49 CFR Part 21.

III. DAVIS-BACON AND RELATED ACT PROVISIONS

This section is applicable to all Federal-aid construction projects exceeding $2,000 and to all related subcontracts and lower-tier subcontracts (regardless of subcontract size), in accordance with 29 CFR 5.5. The requirements apply to all projects located within the right-of-way of a roadway that is functionally classified as Federal-aid highway. 23 U.S.C. 113.

This excludes roadways functionally classified as local roads or rural minor collectors, which are exempt. 23 U.S.C. 101.

Where applicable law requires that projects be treated as a project on a Federal-aid highway, the provisions of this subpart will apply regardless of the location of the project. Examples include: Surface Transportation Block Grant Program projects funded under 23 U.S.C. 133 [excluding recreational trails projects], the Nationally Significant Freight and Highway Projects funded under 23 U.S.C. 117, and National Highway Freight Program projects funded under 23 U.S.C. 167.

The following provisions are from the U.S. Department of Labor regulations in 29 CFR 5.5 “Contract provisions and related matters” with minor revisions to conform to the FHWA- 1273 format and FHWA program requirements.

1. Minimum wages (29 CFR 5.5)

a. Wage rates and fringe benefits. All laborers and mechanics employed or working upon the site of the work (or otherwise working in construction or development of the project under a development statute), will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by regulations issued by the Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of basic hourly wages and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those contained in the wage determination of the Secretary of Labor which is attached hereto and made a part hereof, regardless of any contractual relationship which may be alleged to exist between the contractor and such laborers and mechanics. As provided in paragraphs (d) and (e) of 29 CFR 5.5, the appropriate wage determinations are effective by operation of law even if they have not been attached to the contract. Contributions made or costs reasonably anticipated for bona fide fringe benefits under the Davis-Bacon Act (40 U.S.C. 3141(2)(B)) on behalf of laborers or mechanics are considered wages paid to such laborers or mechanics, subject to the provisions of paragraph 1.e. of this section; also, regular contributions made or costs incurred for more than a weekly period (but not less often than quarterly) under plans, funds, or programs which cover the particular weekly period, are deemed to be constructively made or incurred during such weekly period. Such laborers and mechanics must be paid the appropriate wage rate and fringe benefits on the wage determination for the classification(s) of work actually performed, without regard to skill, except as provided in paragraph 4. of this section. Laborers or mechanics performing work in more than one classification may be compensated at the rate specified for each classification for the time actually worked therein: Provided, That the employer's payroll records accurately set forth the time spent in each classification in which work is performed. The wage determination (including any additional classifications and wage rates conformed under paragraph 1.c. of this section) and the Davis-Bacon poster (WH–1321) must be posted at all times by the contractor and its subcontractors at the site of the work in a prominent and accessible place where it can be easily seen by the workers.

b. Frequently recurring classifications. (1) In addition to wage and fringe benefit rates that have been determined to be prevailing under the procedures set forth in 29 CFR part 1, a wage determination may contain, pursuant to § 1.3(f), wage and fringe benefit rates for classifications of laborers and mechanics for which conformance requests are regularly submitted pursuant to paragraph 1.c. of this section, provided that:

(i) The work performed by the classification is not performed by a classification in the wage determination for which a prevailing wage rate has been determined;

(ii) The classification is used in the area by the construction industry; and

(iii) The wage rate for the classification bears a reasonable relationship to the prevailing wage rates contained in the wage determination.

(2) The Administrator will establish wage rates for such classifications in accordance with paragraph 1.c.(1)(iii) of this section. Work performed in such a classification must be paid at no less than the wage and fringe benefit rate listed on the wage determination for such classification.

c. Conformance. (1) The contracting officer must require that any class of laborers or mechanics, including helpers, which is not listed in the wage determination and which is to be employed under the contract be classified in conformance with the wage determination. Conformance of an additional classification and wage rate and fringe benefits is appropriate only when the following criteria have been met:

(i) The work to be performed by the classification requested is not performed by a classification in the wage determination; and

(ii) The classification is used in the area by the construction industry; and

(iii) The proposed wage rate, including any bona fide fringe benefits, bears a reasonable relationship to the wage rates contained in the wage determination.

(2) The conformance process may not be used to split, subdivide, or otherwise avoid application of classifications listed in the wage determination.

(3) If the contractor and the laborers and mechanics to be employed in the classification (if known), or their representatives, and the contracting officer agree on the https://www.ecfr.gov/current/title-29/part-3 https://www.govinfo.gov/link/uscode/40/3141 https://www.govinfo.gov/link/uscode/40/3141 https://www.ecfr.gov/current/title-29/part-1 classification and wage rate (including the amount designated for fringe benefits where appropriate), a report of the action taken will be sent by the contracting officer by email to DBAconformance@dol.gov. The Administrator, or an authorized representative, will approve, modify, or disapprove every additional classification action within 30 days of receipt and so advise the contracting officer or will notify the contracting officer within the 30–day period that additional time is necessary.

(4) In the event the contractor, the laborers or mechanics to be employed in the classification or their representatives, and the contracting officer do not agree on the proposed classification and wage rate (including the amount designated for fringe benefits, where appropriate), the contracting officer will, by email to DBAconformance@dol.gov, refer the questions, including the views of all interested parties and the recommendation of the contracting officer, to the Administrator for determination. The Administrator, or an authorized representative, will issue a determination within 30 days of receipt and so advise the contracting officer or will notify the contracting officer within the 30–day period that additional time is necessary.

(5) The contracting officer must promptly notify the contractor of the action taken by the Wage and Hour Division under paragraphs 1.c.(3) and (4) of this section. The contractor must furnish a written copy of such determination to each affected worker or it must be posted as a part of the wage determination. The wage rate (including fringe benefits where appropriate) determined pursuant to paragraph 1.c.(3) or (4) of this section must be paid to all workers performing work in the classification under this contract from the first day on which work is performed in the classification.

d. Fringe benefits not expressed as an hourly rate.

Whenever the minimum wage rate prescribed in the contract for a class of laborers or mechanics includes a fringe benefit which is not expressed as an hourly rate, the contractor may either pay the benefit as stated in the wage determination or may pay another bona fide fringe benefit or an hourly cash equivalent thereof.

e. Unfunded plans. If the contractor does not make payments to a trustee or other third person, the contractor may consider as part of the wages of any laborer or mechanic the amount of any costs reasonably anticipated in providing bona fide fringe benefits under a plan or program, Provided, That the Secretary of Labor has found, upon the written request of the contractor, in accordance with the criteria set forth in § 5.28, that the applicable standards of the Davis-Bacon Act have been met. The Secretary of Labor may require the contractor to set aside in a separate account assets for the meeting of obligations under the plan or program.

f. Interest. In the event of a failure to pay all or part of the wages required by the contract, the contractor will be required to pay interest on any underpayment of wages.

2. Withholding (29 CFR 5.5)

a. Withholding requirements. The contracting agency may, upon its own action, or must, upon written request of an authorized representative of the Department of Labor, withhold or cause to be withheld from the contractor so much of the accrued payments or advances as may be considered necessary to satisfy the liabilities of the prime contractor or any subcontractor for the full amount of wages and monetary relief, including interest, required by the clauses set forth in this section for violations of this contract, or to satisfy any such liabilities required by any other Federal contract, or federally assisted contract subject to Davis-Bacon labor standards, that is held by the same prime contractor (as defined in § 5.2). The necessary funds may be withheld from the contractor under this contract, any other Federal contract with the same prime contractor, or any other federally assisted contract that is subject to Davis-Bacon labor standards requirements and is held by the same prime contractor, regardless of whether the other contract was awarded or assisted by the same agency, and such funds may be used to satisfy the contractor liability for which the funds were withheld. In the event of a contractor's failure to pay any laborer or mechanic, including any apprentice or helper working on the site of the work all or part of the wages required by the contract, or upon the contractor's failure to submit the required records as discussed in paragraph 3.d. of this section, the contracting agency may on its own initiative and after written notice to the contractor, take such action as may be necessary to cause the suspension of any further payment, advance, or guarantee of funds until such violations have ceased.

b. Priority to withheld funds. The Department has priority to funds withheld or to be withheld in accordance with paragraph 2.a. of this section or Section IV, paragraph 3.a., or both, over claims to those funds by:

(1) A contractor's surety(ies), including without limitation performance bond sureties and payment bond sureties;

(2) A contracting agency for its reprocurement costs;

(3) A trustee(s) (either a court-appointed trustee or a U.S.

trustee, or both) in bankruptcy of a contractor, or a contractor's bankruptcy estate;

(4) A contractor's assignee(s);

(5) A contractor's successor(s); or

(6) A claim asserted under the Prompt Payment Act, 31 U.S.C. 3901–3907.

3. Records and certified payrolls (29 CFR 5.5)

a. Basic record requirements (1) Length of record retention.

All regular payrolls and other basic records must be maintained by the contractor and any subcontractor during the course of the work and preserved for all laborers and mechanics working at the site of the work (or otherwise working in construction or development of the project under a development statute) for a period of at least 3 years after all the work on the prime contract is completed.

(2) Information required. Such records must contain the name; Social Security number; last known address, telephone number, and email address of each such worker; each worker's correct classification(s) of work actually performed;

hourly rates of wages paid (including rates of contributions or costs anticipated for bona fide fringe benefits or cash equivalents thereof of the types described in 40 U.S.C.

3141(2)(B) of the Davis-Bacon Act); daily and weekly number mailto:DBAconformance@dol.gov mailto:DBAconformance@dol.gov https://www.govinfo.gov/link/uscode/31/3901 https://www.govinfo.gov/link/uscode/31/3901 of hours actually worked in total and on each covered contract;

deductions made; and actual wages paid.

(3) Additional records relating to fringe benefits. Whenever the Secretary of Labor has found under paragraph 1.e. of this section that the wages of any laborer or mechanic include the amount of any costs reasonably anticipated in providing benefits under a plan or program described in 40 U.S.C.

3141(2)(B) of the Davis-Bacon Act, the contractor must maintain records which show that the commitment to provide such benefits is enforceable, that the plan or program is financially responsible, and that the plan or program has been communicated in writing to the laborers or mechanics affected, and records which show the costs anticipated or the actual cost incurred in providing such benefits.

(4) Additional records relating to apprenticeship. Contractors with apprentices working under approved programs must maintain written evidence of the registration of apprenticeship programs, the registration of the apprentices, and the ratios and wage rates prescribed in the applicable programs.

b. Certified payroll requirements (1) Frequency and method of submission. The contractor or subcontractor must submit weekly, for each week in which any DBA- or Related Acts-covered work is performed, certified payrolls to the contracting agency. The prime contractor is responsible for the submission of all certified payrolls by all subcontractors. A contracting agency or prime contractor may permit or require contractors to submit certified payrolls through an electronic system, as long as the electronic system requires a legally valid electronic signature; the system allows the contractor, the contracting agency, and the Department of Labor to access the certified payrolls upon request for at least 3 years after the work on the prime contract has been completed; and the contracting agency or prime contractor permits other methods of submission in situations where the contractor is unable or limited in its ability to use or access the electronic system.

(2) Information required. The certified payrolls submitted must set out accurately and completely all of the information required to be maintained under paragraph 3.a.(2) of this section, except that full Social Security numbers and last known addresses, telephone numbers, and email addresses must not be included on weekly transmittals. Instead, the certified payrolls need only include an individually identifying number for each worker ( e.g., the last four digits of the worker's Social Security number). The required weekly certified payroll information may be submitted using Optional Form WH–347 or in any other format desired. Optional Form WH–347 is available for this purpose from the Wage and Hour Division website at https://www.dol.gov/sites/dolgov/files/WHD/ legacy/files/wh347/.pdf or its successor website. It is not a violation of this section for a prime contractor to require a subcontractor to provide full Social Security numbers and last known addresses, telephone numbers, and email addresses to the prime contractor for its own records, without weekly submission by the subcontractor to the contracting agency.

(3) Statement of Compliance. Each certified payroll submitted must be accompanied by a “Statement of Compliance,” signed by the contractor or subcontractor, or the contractor's or subcontractor's agent who pays or supervises the payment of the persons working on the contract, and must certify the following:

(i) That the certified payroll for the payroll period contains the information required to be provided under paragraph 3.b.

of this section, the appropriate information and basic records are being maintained under paragraph 3.a. of this section, and such information and records are correct and complete;

(ii) That each laborer or mechanic (including each helper and apprentice) working on the contract during the payroll period has been paid the full weekly wages earned, without rebate, either directly or indirectly, and that no deductions have been made either directly or indirectly from the full wages earned, other than permissible deductions as set forth in 29 CFR part 3; and

(iii) That each laborer or mechanic has been paid not less than the applicable wage rates and fringe benefits or cash equivalents for the classification(s) of work actually performed, as specified in the applicable wage determination incorporated into the contract.

(4) Use of Optional Form WH–347. The weekly submission of a properly executed certification set forth on the reverse side of Optional Form WH–347 will satisfy the requirement for submission of the “Statement of Compliance” required by paragraph 3.b.(3) of this section.

(5) Signature. The signature by the contractor, subcontractor, or the contractor's or subcontractor's agent must be an original handwritten signature or a legally valid electronic signature.

(6) Falsification. The falsification of any of the above certifications may subject the contractor or subcontractor to civil or criminal prosecution under 18 U.S.C. 1001 and 31 U.S.C. 3729.

(7) Length of certified payroll retention. The contractor or subcontractor must preserve all certified payrolls during the course of the work and for a period of 3 years after all the work on the prime contract is completed.

c. Contracts, subcontracts, and related documents. The contractor or subcontractor must maintain this contract or subcontract and related documents including, without limitation, bids, proposals, amendments, modifications, and extensions. The contractor or subcontractor must preserve these contracts, subcontracts, and related documents during the course of the work and for a period of 3 years after all the work on the prime contract is completed.

d. Required disclosures and access (1) Required record disclosures and access to workers. The contractor or subcontractor must make the records required under paragraphs 3.a. through 3.c. of this section, and any other documents that the contracting agency, the State DOT, the FHWA, or the Department of Labor deems necessary to determine compliance with the labor standards provisions of any of the applicable statutes referenced by § 5.1, available for inspection, copying, or transcription by authorized representatives of the contracting agency, the State DOT, the FHWA, or the Department of Labor, and must permit such representatives to interview workers during working hours on the job.

https://www.govinfo.gov/link/uscode/40/3141 https://www.govinfo.gov/link/uscode/40/3141 https://www.dol.gov/sites/dolgov/files/WHD/legacy/files/wh347/.pdf https://www.dol.gov/sites/dolgov/files/WHD/legacy/files/wh347/.pdf https://www.ecfr.gov/current/title-29/part-3 https://www.govinfo.gov/link/uscode/18/1001 https://www.govinfo.gov/link/uscode/31/3729 https://www.govinfo.gov/link/uscode/31/3729

(2) Sanctions for non-compliance with records and worker access requirements. If the contractor or subcontractor fails to submit the required records or to make them available, or refuses to permit worker interviews during working hours on the job, the Federal agency may, after written notice to the contractor, sponsor, applicant, owner, or other entity, as the case may be, that maintains such records or that employs such workers, take such action as may be necessary to cause the suspension of any further payment, advance, or guarantee of funds. Furthermore, failure to submit the required records upon request or to make such records available, or to permit worker interviews during working hours on the job, may be grounds for debarment action pursuant to § 5.12. In addition, any contractor or other person that fails to submit the required records or make those records available to WHD within the time WHD requests that the records be produced will be precluded from introducing as evidence in an administrative proceeding under 29 CFR part 6 any of the required records that were not provided or made available to WHD. WHD will take into consideration a reasonable request from the contractor or person for an extension of the time for submission of records. WHD will determine the reasonableness of the request and may consider, among other things, the location of the records and the volume of production.

(3) Required information disclosures. Contractors and subcontractors must maintain the full Social Security number and last known address, telephone number, and email address of each covered worker, and must provide them upon request to the contracting agency, the State DOT, the FHWA, the contractor, or the Wage and Hour Division of the Department of Labor for purposes of an investigation or other compliance action.

4. Apprentices and equal employment opportunity (29 CFR 5.5)

a. Apprentices (1) Rate of pay. Apprentices will be permitted to work at less than the predetermined rate for the work they perform when they are employed pursuant to and individually registered in a bona fide apprenticeship program registered with the U.S. Department of Labor, Employment and Training Administration, Office of Apprenticeship (OA), or with a State Apprenticeship Agency recognized by the OA. A person who is not individually registered in the program, but who has been certified by the OA or a State Apprenticeship Agency (where appropriate) to be eligible for probationary employment as an apprentice, will be permitted to work at less than the predetermined rate for the work they perform in the first 90 days of probationary employment as an apprentice in such a program. In the event the OA or a State Apprenticeship Agency recognized by the OA withdraws approval of an apprenticeship program, the contractor will no longer be permitted to use apprentices at less than the applicable predetermined rate for the work performed until an acceptable program is approved.

(2) Fringe benefits. Apprentices must be paid fringe benefits in accordance with the provisions of the apprenticeship program. If the apprenticeship program does not specify fringe benefits, apprentices must be paid the full amount of fringe benefits listed on the wage determination for the applicable classification. If the Administrator determines that a different practice prevails for the applicable apprentice classification, fringe benefits must be paid in accordance with that determination.

(3) Apprenticeship ratio. The allowable ratio of apprentices to journeyworkers on the job site in any craft classification must not be greater than the ratio permitted to the contractor as to the entire work force under the registered program or the ratio applicable to the locality of the project pursuant to paragraph 4.a.(4) of this section. Any worker listed on a payroll at an apprentice wage rate, who is not registered or otherwise employed as stated in paragraph 4.a.(1) of this section, must be paid not less than the applicable wage rate on the wage determination for the classification of work actually performed.

In addition, any apprentice performing work on the job site in excess of the ratio permitted under this section must be paid not less than the applicable wage rate on the wage determination for the work actually performed.

(4) Reciprocity of ratios and wage rates. Where a contractor is performing construction on a project in a locality other than the locality in which its program is registered, the ratios and wage rates (expressed in percentages of the journeyworker's hourly rate) applicable within the locality in which the construction is being performed must be observed. If there is no applicable ratio or wage rate for the locality of the project, the ratio and wage rate specified in the contractor's registered program must be observed.

b. Equal employment opportunity. The use of apprentices and journeyworkers under this part must be in conformity with 29 CFR part 30, including any amendments thereto.

c. Apprentices and Trainees (programs of the U.S. DOT).

Apprentices and trainees working under apprenticeship and skill training programs which have been certified by the Secretary of Transportation as promoting EEO in connection with Federal-aid highway construction programs are not subject to the requirements of paragraph 4 of this Section III.

23 CFR 230.111(e)(2). The straight time hourly wage rates for apprentices and trainees under such programs…