Final_RWBS_CRANE_MODIFICATION_-.pdf

PDF 872 KB Posted

Attached to
RWBS CRANE MODIFICATION
Solicitation number
QQ-2026-126
Issued by
Collier County, Florida

About this file

This is a Request for Quote issued by Collier County, Florida for structural modifications at the Raw Water Booster Pump Station located at 841 7th Street SW, Naples, Florida. The county is soliciting a lump sum quotation for repairs and renovations to eliminate obstructions in the facility's hurricane strengthening infrastructure that are preventing an overhead crane system, installed in 2025, from achieving sufficient access to all piping and valves. The scope of work, prepared by engineering firm Tetra Tech, Inc., includes the removal and/or alteration of structural framing as detailed in attached engineering plans. The quote is due by May 1, 2026, with a site visit scheduled for April 20, 2026 at 10:00 a.m. The assigned project manager is Anthony Lupo, contact number (239) 207-0248. Upon issuance of a purchase order, the contractor will have 120 days to achieve final completion and must provide project manager contact information within 5 work days of purchase order issuance.

Collier County does not accept quotes with terms and conditions; all quantities provided are estimates and the contractor is responsible for final quantity take-offs. The project is categorized as repairs, renovation, and maintenance work. Pricing information and funding sources are not specified in this document. The quote form provided contains blank line items for task descriptions, quantities, and pricing, with a total placeholder of $0.

View the file

Other files

File Type Posted
RWBS_CRANE_MODIFICATION.pdf PDF
Insurance_Requirements_Template.docx DOCX document
STRUCTURAL_GENERAL_NOTES.docx DOCX document
100%_PLans.pdf PDF
Rwbs_crane_building_modification_project_pictures.msg MSG file
PO_Terms_and_Conditions.pdf PDF
Quick_Quotes_Instructions_Version_1_.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pathway / Parking

Building Envelope

Life & Safety

REQUEST FOR QUOTE

PROJECT TYPE

Repairs

Renovation

Maintenance

PROJECT SUMMARY

The Scope of Work is the official description of the work that is to be completed during the contract. The scope of work must be consistent with the project timeline and contract price methodology.PROJEC PROJECT NAME

REQUIRED SIGNATURES

FUND/ COST CENTER

GL CODE

PROJECT NAME PROJECT LOCATION & ADDRESS

QUOTE DUE DATE AUTHORIZED PROJECT

DECISION & BUDGET CONTACT

CONTRACT # REQUEST DATE

SCOPE OF WORK

PER OUR PROCUREMENT DIVISION, COLLIER COUNTY IS NOT ALLOWED TO ACCEPT QUOTES WITH TERMS AND CONDITIONS.

FOR MORE INFORMATION REFERENCING THE FOLLOWING, PLEASE CLICK THE LINK BELOW

COLLIER COUNTY TERMS AND CONDITIONS

DIVISION DESIGNEE (REQUESTING DIVISION)

ASSIGNED PROJECT MANAGER SITE VISIT

DATE & TIME

New Construction

Development

Consulting / Estimate

Other - _________________

PROJECT MANAGER

Attached Photos https://www.colliercountyfl.gov/home/showpublisheddocument/74077/636364888296470000

Untitled

VCP Pathways

Project Name :

Scope of work

Task Description Quantity Total Price

Total $ - 0

** All quantities given are estimates. Contractor is responsible for final take off and quantities. **

Company:

Signature:

image1.png

Check Box1: Yes
Check Box2: Off
Check Box3: Off
Check Box4: Off
Check Box5: Off
Check Box6: Off
Check Box7: Off
Check Box8: Off
Check Box9: Off
Check Box10: Off
Text18: Pamela Libby
Text19: 4008-253214
Text20:
2026-04-15T09:25:20-0400
libby_p
2026-04-15T09:25:29-0400
libby_p
Date2_af_date: 4/15/26
Date3_af_date: 4/20/2110:00
Date4_af_date: 5/1/26
Check Box11: Yes
Text11:
Text13: RWBPS Crane Accessibility
Text14: 841 7TH ST SW
Text17: ANTHONY LUPO
Text3: CALENDAR INVITE FOR SITE VISIT TO FOLLOW, IF APPROPRIATE
Text2: "REQUEST FOR QUOTE" RECEIVAL RESPONSE REQUIRED
Scope: The County is requesting a lump sum quotation for structural modifications at the Raw Water Booster Pump Station, 841 7th St SW, Naples, FL. The existing overhead crane system, installed in 2025, currently does not provide sufficient access to all piping and valves within the facility due to interference from existing hurricane strengthening structural elements. The crane system itself shall not be modified under this scope.

Engineering plans prepared by Tetra Tech, Inc. identify required modifications to portions of the hurricane strengthening infrastructure to eliminate obstructions and allow the crane to achieve its intended functional access. The work includes, but is not limited to, the removal and/or alteration of structural framing as detailed in the attached plans that are incorporated into this Scope of Work.

Additional Information:

1. Upon issuance of purchase order contractor will provide Project Manager contact within 5 work days.

2. Collier County Project Manager is Anthony Lupo (239) 207-0248.

3. Contractor will have 120 days to final completion from issuance of the purchase order.