Final_RFB_785_2500000269_1_SO_FORM.PDF
PDF 397 KB Posted
- Attached to
- RFB-129-25 EDU FFA Camp HVAC Replacement
- Solicitation number
- RFB 785 2500000269 4
- Issued by
- Breckinridge County, Kentucky
About this file
This is a Request for Bid (RFB) issued by the Commonwealth of Kentucky, Department of Education, for HVAC replacement services at the FFA Leadership Center Recreation Hall in Hardinsburg, Kentucky. The project encompasses mechanical, electrical, and architectural work including installation of a variable refrigerant flow (VRF) system with wall-mounted indoor units for classrooms and fan coil units for the recreation hall, replacement of the existing panelboard with a new one, upgrades from fluorescent to LED lighting with enhanced controls, installation of a new voice evacuation fire alarm system, and replacement of windows and doors. A mandatory site visit is scheduled for November 25, 2024, at 10:00 A.M. Central Time at 111 FFA Camp Road, Hardinsburg, Kentucky 40143. Electronic bids must be submitted through the Commonwealth's eProcurement system by December 10, 2024, at 1:30 P.M. Eastern Time. A public bid reading will be conducted via conference call on the closing date at 2:30 P.M. Eastern Time.
Bidders must submit all responses electronically through the Commonwealth's Vendor Self Service (VSS) system at https://vss.ky.gov and are required to register 24 to 48 hours prior to submission. Bidders shall enter $0.00 for the contract amount in the e-procurement system, with the actual contract amount submitted on the Official Bid Document as a single combined PDF attachment with any required Bid Bond. All project plans, specifications, and drawings are available at no charge through https://www.stateofkyplanroom.com. Interested contractors should contact the Purchasing Agent, Susan Ward, at 502-226-0335 for procurement questions. Project contact information includes the Architect, Consultant, Project Manager, and Agency representative as listed in the RFB.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum Three.pdf | ||
| Addendum One .pdf | ||
| Final_RFB_785_2500000269_2_SO_FORM.PDF | ||
| Addenum Two .pdf | ||
| Final_RFB_785_2500000269_3_SO_FORM.PDF | ||
| Final_RFB_785_2500000269_4_SO_FORM.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Document ID: RFB 785 2500000269 Page: 1
Commonwealth of Kentucky
SOLICITATION
Modification: No Version #:
TITLE: RFB-129-25 EDU FFA Camp HVAC Replacement
Date Issued:
11/14/2024 Record Date:
11/14/2024
Solicitation Closes Date:
12/10/2024 Time:
13:30
Solicitation No:
RFB 785 2500000269
Online Bidding Prohibited: No For Information Call:
Susan Ward 502-226-0335
Bid Receiving Location:
Bid Receiving
See Terms & Conditions for Bid Submission Instructions
Other KY
Vendor Customer Number:
Vendor Name:
Phone Number:
Fax Number:
Email Address:
Ordering
Address:
City, State, Zip:
Contact Name:
Contact Email:
Contact Phone Number:
Payment
Address:
City, State, Zip:
Contact Name:
Contact Email:
Contact Phone Number:
Ownership Type
__ Sole Proprietorship __ Partnership __ Corporation __ Other_________________________
SIGNATURE OF AUTHORIZED AGENT IS REQUIRED UNLESS RESPONSE
IS SUBMITTED ELECTRONICALLY. FAILURE TO SIGN SHALL RENDER
THE BID INVALID.
Signature X_________________________________________ FEIN#____________________ Date____________
All offers subject to all terms and conditions contained in this solicitation.
Document ID: RFB 785 2500000269 Page: 2
Line Items
Commodity Group: Default
Line CL Description Quantity UOM Unit Cost Line Total or Contract Amnt
1 RFB-129-25 EDU FFA Camp HVAC Replacement
Comm Code Comm Description Manufacturer Model # Manuf Part #
912 CONSTRUCTION SERVICES, GENERAL
(INCL. MAINTENANCE AND REPAIR
Extended Description
***ONLY ONLINE BIDS WILL BE ACCEPTED FOR THIS RFB.***
Emailed and hard copies delivered by any method WILL NOT BE ACCEPTED.
On this line, Bidders must enter $0.00 for Contract Amount in the e-procurement system. Actual Contract Amount must be entered on "Official Bid Document" and submitted as an attachment in the e-procurement system. Vendors should review and update, if necessary, all addresses and contact persons for their account prior to bid submission. This information will carry forward to a contract if awarded, therefore please ensure all information is correct.
** Entire Official Bid Document and Bid Bond (if required) should be combined as one PDF and uploaded**
The following Project Narrative describes Mechanical, Electrical, and Architectural work associated with the HVAC renovation of the Recreation Hall on the Future Farmers of America campus.
Mechanical:
All existing window air conditioning units and floor finned tube radiators are to be removed. The new mechanical system is a variable refrigerant flow (VRF) system that will utilize refrigerant as the method of cooling/heating. Each classroom will have two (2) wall-mounted indoor units to adequately cool or heat the classroom. The recreation hall will have three (3) fan coil units installed for cooling or heating the space. Condensing units will be installed exterior to the building in two separate locations to decrease the distance of piping installation. A VRF monitoring system will be installed in the recreation hall and can be utilized to control the individual units that are installed. The VRF system will also connect to the campus BAS enabling users to log-in online to view system performance and set any parameters needed.
Electrical:
The existing panelboard will be replaced with a new panelboard to ensure the safety and reliability of electrical systems when the building is utilized.
Existing lighting will be upgraded from fluorescent to LED improving not only the aesthetic of the spaces but has increased lower occupant stimulation levels and provides opportunity to lower operational cost. New exterior lighting will replace the existing exterior lighting. Lighting controls will be upgraded to meet current code requirements.
The existing fire alarm system is not compliant with current code requirements. There will be a new voice evacuation fire alarm system and devices for the safety of occupants within the building.
Architectural:
The existing windows and doors will be replaced with new windows and doors which will improve thermal comfort and building energy efficiency. The exterior and interior finishes are remaining to keep the initial aesthetic of the building.
Shipping Information Finance - Division of Engineering & Contract Administration
The Bush Building, 403 Wapping St 1st Floor
Frankfort KY 40601
Billing Information Finance - Division of Engineering & Contract Administration
The Bush Building, 403 Wapping St 1st Floor
Frankfort KY 40601
Document ID: RFB 785 2500000269 Page: 3
Submission Checklist
The following items will be required to be submitted with bid:
Item
REQUEST FOR BID NO. RFB-129-25
HVAC Replacement FFA Leadership Center Recreation Hall Kentucky Department of Education Hardinsburg, Kentucky
Project Description
The following Project Narrative describes Mechanical, Electrical, and Architectural work associated with the HVAC renovation of the Recreation Hall on the Future Farmers of America campus.
Mechanical:
All existing window air conditioning units and floor finned tube radiators are to be removed. The new mechanical system is a variable refrigerant flow (VRF) system that will utilize refrigerant as the method of cooling/heating.
Each classroom will have two (2) wall-mounted indoor units to adequately cool or heat the classroom. The recreation hall will have three (3) fan coil units installed for cooling or heating the space. Condensing units will be installed exterior to the building in two separate locations to decrease the distance of piping installation. A VRF monitoring system will be installed in the recreation hall and can be utilized to control the individual units that are installed. The VRF system will also connect to the campus BAS enabling users to log-in online to view system performance and set any parameters needed.
Electrical:
The existing panelboard will be replaced with a new panelboard to ensure the safety and reliability of electrical systems when the building is utilized.
Existing lighting will be upgraded from fluorescent to LED improving not only the aesthetic of the spaces but has increased lower occupant stimulation levels and provides opportunity to lower operational cost. New exterior lighting will replace the existing exterior lighting. Lighting controls will be upgraded to meet current code requirements.
The existing fire alarm system is not compliant with current code requirements. There will be a new voice evacuation fire alarm system and devices for the safety of occupants within the building.
Architectural:
The existing windows and doors will be replaced with new windows and doors which will improve thermal comfort and building energy efficiency. The exterior and interior finishes are remaining to keep the initial aesthetic of the building.
SITE VISIT INFORMATION:
There will be a site visit meeting on this project. Interested contractors are encouraged to attend. The site visit will be held on 11/25/2024 at 10:00 A.M. Central Time. Someone from the design team will meet contractors at 111 FFA Camp Road, Hardinsburg, KY 40143.
ALL PROCUREMENT QUESTIONS SHALL BE DIRECTED TO BUYER OF RECORD FOR THIS
PROJECT.
IMPORTANT: Site visit participants shall follow any applicable health and safety guidelines for all Commonwealth of Kentucky construction projects.
PROJECT CONTACTS:
Architect: Steven Ward, Studio Kremer Architects, Inc., steven@studiokremer.com, (502) 345-6263 Consultant: Paul Graves, CMTA, pgraves@cmta.com, (502) 326-3085 Project Manager: Tony Yates, Division of Engineering and Contract Administration, Tony.Yates@ky.gov, (502) 229-9759 Agency: Josh Mitcham, Kentucky Department of Education, josh.mitcham@education.ky.gov, (270) 756-2301 Purchasing Agent: Susan Ward, Division of Engineering and Contract Administration, Susan.Ward@ky.gov,
(502) 226-0335
OBTAINING PLANS AND SPECIFICATIONS:
Document Phase Document Description Page 4
2500000269 Final RFB-129-25 EDU FFA Camp HVAC Replacement Total Pages: 5
For all project information and documents go to: https://www.stateofkyplanroom.com. For customer service you may contact Lynn Imaging, Phone 1-800-888-0693. There is no charge for plans and specifications. Contractor will need to download bid documents, specifications, and drawings. If contractors want a hard copy, they can choose to pay for this option. Contractors that receive plans and specifications from other sources will not be registered as a planholder and will not receive addenda.
ELECTRONIC BID SUBMITTAL:
Solicitation responses (“bid”) shall be received by electronic submission through the Commonwealth’s eProcurement system.
Please be advised: Bids shall not be accepted via postal carrier (USPS, UPS, FED EX, etc.) nor can bids be hand delivered.
Response must contain all information required by the Solicitation and be executed by an authorized agent of the Bidder, affirmed by electronically submitting the bid through the eProcurement system. All bid documents shall be complete when the bid is submitted.
To bid, all bidders SHALL be registered in the Commonwealth eProcurement System via the Vendor Self Service (VSS) System at https://vss.ky.gov . Allow 24 – 48 hours to complete Vendor Registration. Vendors must be logged in to their Vendor Self Service account to submit a response. The Customer Resource Center is not able to complete registrations and activate accounts on the same day. Closing dates will not be extended for Vendors not registered by the date/time of the bid closing. Vendor Self Registration Guides are provided at https://vss.ky.gov under “Download Vendor Forms and Quick Reference Guides.”
All bidders are cautioned to begin their electronic submission in sufficient time to complete before the closing date and time. Delays due to inability to register, document upload impediments, or technical difficulties shall not be justification for acceptance of a late bid or proposal. If you need assistance, please contact the
Customer Resource Center (CRC)
- Email at Finance.CRCGroup@ky.gov;
- Locally at 502-564-9641 or toll-free 877-973- HELP (4357).
Online bid responses must be in an “Accepted” status prior to the closing date and time of the solicitation. The assigned date and time stamp from the eProcurement system generated at the time of final acceptance and formal submission by the vendor shall establish the date and time the bid was submitted. A bid may be modified or withdrawn electronically through VSS prior to the bid closing date and time.
Please be advised, VSS will not allow submission of an online response after the published date and time for closing.
Bidders shall attach the Official Bid Document and Bid Bond (if required) as a single combined attachment when submitting their electronic bids.
All results will be posted to https://www.stateofkyplanroom.com after the bid opening and review. If additional information is needed from the successful bidder, the buyer may be in contact.
There will be a public bid reading by conference call on the bid opening date at 2:30 P.M. Eastern Time.
The dial in number is 502-782-2663 or 844-603-5060.
Conference ID# 240522018# Participant code is 75309#
Document Phase Document Description Page 5
2500000269 Final RFB-129-25 EDU FFA Camp HVAC Replacement Total Pages: 5 https://www.stateofkyplanroom.com https://vss.ky.gov/ https://vss.ky.gov/ mailto:Finance.CRCGroup@ky.gov https://www.stateofkyplanroom.com/
File details come from the government source that posted it. Updated .