Final_RFB_785_2400000114_1_SO_FORM.PDF

PDF 793 KB Posted

Attached to
RFB-66-24 HVAC Replacement WKCC
Solicitation number
RFB-785-2400000114-5
Issued by
Lyon County, Kentucky

About this file

This document is a Solicitation (RFB 785 2400000114) issued by the Commonwealth of Kentucky for the HVAC Replacement project at the West Kentucky Correctional Complex. The project generally consists of replacing the existing HVAC systems in the Operation Building, including installation of overhead ductwork, air terminal units, grade mount packaged units, kitchen exhaust systems, furnaces, condensing units, boilers, hot-water piping, pumps, HVAC controls, gas piping, and associated electrical power improvements. A site visit meeting is scheduled for September 25, 2023 at 10:00 A.M. Central Time, and interested contractors must complete an NCIC background check to attend. The Solicitation has a closing date of October 17, 2023 at 2:00 PM. All bid submissions must be made through the Owner's Document Collaboration System, and no late bids will be accepted.

The Solicitation does not provide specific pricing terms or set-aside requirements. It indicates that the project will be funded by the Commonwealth of Kentucky, but does not disclose the available budget or funding sources. Contractors are required to submit all necessary bid documents and forms as part of their response.

View the file

Other files

File Type Posted
Final_RFB_785_2400000114_5_SO_FORM.PDF PDF
Final_RFB_785_2400000114_3_SO_FORM.PDF PDF
Addendum Three.pdf PDF
Addendum Two .pdf PDF
Final_RFB_785_2400000114_4_SO_FORM.PDF PDF
Final_RFB_785_2400000114_2_SO_FORM.PDF PDF
Addendum One .pdf PDF
Addendum Four.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Document ID: RFB 785 2400000114 Page: 1

Commonwealth of Kentucky

SOLICITATION

Modification: No Version #:

TITLE: RFB-66-24 HVAC Replacement WKCC

Date Issued:

09/12/2023 Record Date:

09/12/2023

Solicitation Closes Date:

10/17/2023 Time:

14:00

Solicitation No:

RFB 785 2400000114

Online Bidding Prohibited: Yes For Information Call:

Susan Ward 502-564-3050

Bid Receiving Location:

Bid Receiving

See Terms & Conditions for Bid Submission Instructions

Other KY

Vendor Customer Number:

Vendor Name:

Phone Number:

Fax Number:

Email Address:

Ordering

Address:

City, State, Zip:

Contact Name:

Contact Email:

Contact Phone Number:

Payment

Address:

City, State, Zip:

Contact Name:

Contact Email:

Contact Phone Number:

Ownership Type

__ Sole Proprietorship __ Partnership __ Corporation __ Other_________________________

SIGNATURE OF AUTHORIZED AGENT IS REQUIRED UNLESS RESPONSE

IS SUBMITTED ELECTRONICALLY. FAILURE TO SIGN SHALL RENDER

THE BID INVALID.

Signature X_________________________________________ FEIN#____________________ Date____________

All offers subject to all terms and conditions contained in this solicitation.

Document ID: RFB 785 2400000114 Page: 2

Line Items

Commodity Group: Default

Line CL Description Quantity UOM Unit Cost Line Total or Contract Amnt

1 RFB-66-24 HVAC Replacement WKCC

Comm Code Comm Description Manufacturer Model # Manuf Part #

912 CONSTRUCTION SERVICES, GENERAL

(INCL. MAINTENANCE AND REPAIR

Extended Description The project shall generally consist of replacement of existing HVAC systems within the Operation Building at West Kentucky Correctional Complex.

Work includes installation of overhead ductwork, air terminal units, grade mount packaged units, kitchen exhaust systems and ductwork, furnaces and condensing units, boilers, hot-water piping, pumps, HVAC controls, gas piping, and associated electrical power improvements. Trades involved include but are not limited to: demolition, plumbing, mechanical, HVAC, insulation, controls, electrical, and fire alarm.

Shipping Information Finance - Division of Engineering & Contract Administration

The Bush Building, 403 Wapping St 1st Floor

Frankfort KY 40601

Billing Information Finance - Division of Engineering & Contract Administration

The Bush Building, 403 Wapping St 1st Floor

Frankfort KY 40601

Document ID: RFB 785 2400000114 Page: 3

Submission Checklist

The following items will be required to be submitted with bid:

Item

There will be a site visit meeting on September 25, 2023 at 10:00 A.M.

Central Time. Interested contractors are encouraged to attend. The site visit meeting will be held at 374 New Bethel Church Road, Fredonia, KY 42411.

To attend this site visit meeting you must have a NCIC background check.

The NCIC background check form is in the spec book. The form must be emailed to Tera Litchfield, tera.litchfield@ky.gov no later than 9-20-23, 3:00 PM, Central Time. If your background check is not turned in by this date, you will not be permitted to enter the facility.

Please follow current state COVID guidelines for all Commonwealth of Kentucky construction projects. See Notice to Contractors/Advertisement for Bids for further COVID information.

: Bryan Atkins, Marcum Engineering, LLC., Phone: (270) 444-9274, batkins@marcumengineering.net

: Dwayne Brown, Division of Engineering, Phone:(270) 210-0253, Dwayne.Brown@ky.gov

Jeremy Belt, Department of Corrections, Phone: (270) 388-2211 , jeremey.belt@ky.gov

Susan Ward, Division of Contract Administration, Phone: (502) 226-0335, Susan.Ward@ky.gov

Document Description Page 4

2400000114 RFB-66-24 HVAC Replacement WKCC mailto:batkins@marcumengineering.net mailto:Dwayne.Brown@ky.gov mailto:jeremey.belt@ky.gov mailto:Susan.Ward@ky.gov https://www.stateofkyplanroom.com .

For customer service you may contact Lynn Imaging, Phone:

1-800-888-0693. There is no charge for plans and specifications.

Contractors will need to download bid documents, specifications and drawings. If contractors want a hard copy, they can choose to pay for this option. Contractors that receive plans and specifications from other sources as a planholder and

. . For all other project information you must visit the State Plan Room.

All documents related to this project shall be submitted, transmitted, transferred, reviewed, approved or rejected, and/or otherwise processed using the Owner's Document Collaboration System ( eCommunications) which is the Owner's web-based document collaboration system that shall be used by all project participants. No submission, transmittal, transfer, review, approval or processing shall be deemed Official without the use of this system.

It is important that requesting firms identify the position of their firm as to the PRIME BIDDER, MISC. SUBCONTRACTOR, MATERIAL

SUPPLIER OR OTHER.

to the Bush Building. All forms in your bid document shall be completely filled out when your bid is submitted.

Instructions are included in the solicitation.

I

Bidders are encouraged to take a screen shot verifying bid submittal. This is a secure website, no one can see

Document Description Page 5

2400000114 RFB-66-24 HVAC Replacement WKCC https://www.stateofkyplanroom.com these bids but the buyers. They are date and time stamped when submitted.

Please note that the instructions for MOVEit state that contractors will be notified when their bid is received. Buyers will NOT be notifying contractors.

All results will be posted to Lynn Imaging planroom after the bid opening and review. If additional information is needed from the successful bidder the buyer will be in contact.

THE

UPLOAD TIME MAY VARY DUE TO THE SIZE OF YOUR BID/PROPOSAL

AND/OR INTERNET SPEED. NO LATE BIDS WILL BE ACCEPTED.

Bidder assumes full responsibility for timely delivery of the bid in compliance with the above described procedures and conditions.

Bidder assumes full responsibility for timely delivery of the bid in compliance with the above-described procedures and conditions.

Document Description Page 6

2400000114 RFB-66-24 HVAC Replacement WKCC

File details come from the government source that posted it. Updated .