Final_RFB_605_2700000028_1_SO_FORM.PDF
PDF 462 KB Posted
- Attached to
- Pedestal and Bases - FEDERAL - REBID
- Solicitation number
- RFB 605 2700000028 1
- Issued by
- Kentucky
About this file
This Request for Bid (RFB) is issued by the Commonwealth of Kentucky Transportation Cabinet Division of Purchases on behalf of the Division of Traffic Operations to establish a master agreement contract for pedestals and bases. The solicitation requests eight line items: 200 units of pedestal poles with breakaway bases and anchor bolts; 25 breakaway bases only; 70 one-way pedestal top mounting brackets; 75 two-way pedestal top mounting brackets; 35 post tops; 500 pole-mounted FSA boxes; 5 pole feet; and 5 pole feet with conduit hubs. All products must meet specific federal standards including FHWA/KYTC MASH certification for breakaway bases and compliance with ASTM specifications for anchor bolts. The RFB was issued on July 17, 2026, with a written questions deadline of July 23, 2026, a bid closing date of August 6, 2026, at 1:30 PM Eastern Time, and a tentative award date of August 31, 2026. The initial master agreement contract period runs from award through August 31, 2027, with four optional one-year renewal periods available. Bids must be submitted electronically through the Kentucky Vendor Self Service eProcurement system only, with no paper submissions accepted. A public bid reading will be held on the closing date via conference line.
Evaluation will be based on best value using a ranking approach with price weighted at 95 points and delivery time weighted at 5 points, with the lowest bidder receiving maximum points on price and the bidder with the best delivery time receiving maximum points on delivery. Pricing shall be F.O.B. Destination Freight Prepaid and Allowed, with the vendor bearing all shipping and freight charges. The contract is funded by Federal Highway Administration funds and is subject to Buy America and Build America Buy America (BABA) Act requirements, including certification that all manufacturing processes for steel, iron, and aluminum components occur in the United States. Required certifications include non-collusion, Build America Buy America compliance, insurance coverage with minimum Commercial General Liability of $1,000,000 per occurrence and $2,000,000 aggregate, and affidavits regarding campaign finance compliance and artificial intelligence use. The Commonwealth reserves the right to adjust quantities as needed, with estimated quantities provided as reference only and no guarantee of purchase volumes.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| How to Submit an Online Response - March 2023.pdf | ||
| SHOCK HAZARD STICKER-120.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Document ID: RFB 605 2700000028 Page: 1
Commonwealth of Kentucky
SOLICITATION
Modification: No Version #:
TITLE: Pedestal and Bases - FEDERAL - REBID
Date Issued:
07/17/2026 Record Date:
07/16/2026
Solicitation Closes Date:
08/06/2026 Time:
13:30
Solicitation No:
RFB 605 2700000028
Online Bidding Prohibited: No
For Information Call:
LATASHA CHENAULT
502-782-5673
Bid Receiving Location:
Bid Receiving
See Terms & Conditions for Bid Submission Instructions
Other KY
Vendor Customer Number:
Vendor Name:
Phone Number:
Fax Number:
Email Address:
Ordering
Address:
City, State, Zip:
Contact Name:
Contact Email:
Contact Phone Number:
Payment
Address:
City, State, Zip:
Contact Name:
Contact Email:
Contact Phone Number:
Ownership Type
__ Sole Proprietorship __ Partnership __ Corporation __ Other_________________________
SIGNATURE OF AUTHORIZED AGENT IS REQUIRED UNLESS RESPONSE
IS SUBMITTED ELECTRONICALLY. FAILURE TO SIGN SHALL RENDER
THE BID INVALID.
Signature X_________________________________________ FEIN#____________________ Date____________
All offers subject to all terms and conditions contained in this solicitation.
Document ID: RFB 605 2700000028 Page: 2
Line Items
Commodity Group: Default Commodity Group
Line CL Description Quantity UOM Unit Cost Line Total or Contract Amnt
1 Pedestal pole with breakaway base & anchor bolts
200.00000 EA
Comm Code Comm Description Manufacturer Model # Manuf Part #
28574 Pole Line Hardware: Anchors, Arms, Bolts, Braces, Brackets, Extended Description Pedestal pole with breakaway base & anchor bolts See section 1 for specifications.
***ONLY ONLINE BIDS WILL BE ACCEPTED FOR THIS RFB.*** Emailed and hard copies delivered by any method WILL NOT BE ACCEPTED.
See attached document How to Respond to an Online Bid through the Kentucky Vendor Self Service site (updated).pdf.
Please enter contact person, phone number and email in the Comments Section.
Vendors should review and update, if necessary, all addresses and contact persons for their account prior to bid submission. This information will carry forward to a contract if awarded, therefore please ensure all information is correct.
POLE. Provide 4 and a half inch O.D. aluminum schedule 40 pipe to provide maximum of 9 feet overall mounting height. Provide a pole that meets or exceeds Component Products CPI-AP.
BREAKAWAY BASE. Provide a breakaway base cast from 319 aluminum alloy. Provide base that has been tested and has accepted by the FHWA/ KYTC in accordance with MASH (look at FHWA website for manufacturers under Sign Supports, Mailboxes & Delineators): https://highways.dot.gov/ safety/rwd/reduce-crash-severity). Provide a base that meets or exceeds Frey Manufacturing CP6 Series.
Each door on the pedestal shall have a 3x 2 shock hazard sticker applied to the outside of the door. Install 3" from the top of the door. The sticker shall be metalcraft Ply695 prem stylemark label with .007 thickness, with UV white Polycarbonate material, and with Mc53fl pressure sensitive adhesive or approval equal. See attachment for wording
ANCHOR BOLTS. Use anchor bolts(Minimum 4) that conform to the requirement of ASTM F 1554 grade 105 for headed for Steel. Provide each anchor bolt with 2 galvanized hex nuts as well as one flat and one lock washer. Provide nuts that equal or exceed the proof load of the bolts strength.
Provide bolts that are hot-dip galvanized to the requirements of either ASTM A 123 (fabricated products) or ASTM A 153 (hardware items). Protect anchor bolt threads from damage during shipping. You can use Stainless Steel Anchors to conform to the requirements of ASTM A193 Grade B8. Provide mill test reports on anchor bolts.
PACKAGING Package breakaway base, anchors bolts, and hardware in a single container or burlap bag. Poles can be packaged separate from the other items.
KYTC Warehouse (T-02-0670)
FOR INTERNAL USE ONLY
Document ID: RFB 605 2700000028 Page: 3
2 Pedestal breakaway base only 25.00000 EA
Pedestal breakaway base only
BREAKAWAY BASE. Provide a breakaway base cast from 319 aluminum alloy. Provide base that has been tested and has accepted by the FHWA/ KYTC in accordance with MASH (look at FHWA website for manufacturers under Sign Supports, Mailboxes & Delineators): https://highways.dot.gov/ safety/rwd/reduce-crash-severity). Provide a base that meets or exceeds Frey Manufacturing CP6 Series.
Each door on the pedestal shall have a 3x 2 shock hazard sticker applied to the outside of the door. Install 3" from the top of the door. The sticker shall be metalcraft Ply695 prem stylemark label with .007 thickness, with UV white Polycarbonate material, and with Mc53fl pressure sensitive adhesive or approval equal. See attachment for wording
KYTC Warehouse (T-02-0671)
3 Pedestal top mounting bracket one way 70.00000 EA
Pedestal top mounting bracket one way
Provide a slip Fitter Assembly 1- & 2-way Aluminum with necessary hardware. There shall be aluminum threaded plugs for openings not used by this bracket. Provide a pole that meets or exceeds PELCO Products Inc. SE-3037. Package each whole bracket (all hardware) in a single container or box.
KYTC Warehouse (T-02-0650)
4 Pedestal top mounting bracket 2-Way 75.00000 EA
Pedestal top mounting bracket 2-Way
Document ID: RFB 605 2700000028 Page: 4
Provide a 2-way 16 and one-half inch CTC aluminum with necessary hardware. There shall be aluminum threaded plugs for any opening not used by this bracket. Provide a pole that meets or exceeds PELCO Products Inc. SE-3089. Package each whole bracket (all hardware) in a single container or box.
KYTC Warehouse (T-02-0660)
5 Post Top 35.00000 EA
Post Top
Provide a natural aluminum post top that can be securely attached to the pole that is 4 and one-half inch O.D. aluminum schedule 40 pipe. Package each post top (all hardware) in a single container or box.
KYTC Warehouse (T-02-0661)
6 FSA Box Pole Mounted 500.00000 EA
FSA Box Pole Mounted
Provide a 4 holed pole mounted aluminum rectangular housing that is compatible with our standard pedestrian detector (Polara rectangular Bulldog).
Provide a natural aluminum painted surface. Provide all necessary hardware to seal the enclosure.
This shall meet UL 514A.
Package each FSA box (all hardware) in a single container or box.
KYTC Warehouse (T-06-0710)
Document ID: RFB 605 2700000028 Page: 5
7 Pole Feet 5.00000 EA
Pole Feet
Aluminum hub plate for large pole with 1.5-inch NPS. PELCO Products SE-0357 or approved equal. Package each pole feet in a single container or box.
KYTC Warehouse (T-02-0690)
8 Pole Feet with conduit hub 5.00000 EA
Pole Feet with conduit hub
Aluminum hub plate with 1.5-inch NPS with 1.25-inch NPT conduit hub. There shall be an aluminum threaded plug for the conduit hub. PELCO Products SE-0382 or approved equal. Package each pole feet with conduit hub in a single container or box.
KYTC Warehouse (T-02-0680)
Shipping Information Various Shipping
See Extended Description
Various KY
Billing Information KYTC Division of Traffic Operations
200 Mero Street 3rd Floor Frankfort KY 40622
Document ID: RFB 605 2700000028 Page: 6
Submission Checklist
The following items will be required to be submitted with bid:
Item The bidder with the lowest price receives maximum score.
The bidder with the best delivery receives maximum score.
ELECTRONIC BID SUBMISSION
Bid responses shall be received by electronic submission in the eProcurement system.
Link: https://vss.ky.gov
An electronic bid shall be authorized by the proper agent of the firm by the act of submitting it electronically through the eProcurement system.
Bid information MUST be completed online. Response must contain all required information for the Solicitation.
All bidders MUST be registered in the Commonwealth eProcurement System via the Vendor Self Service System at https://vss.ky.gov.
Allow 24 – 48 hours to complete Vendor Registration. Vendors must be logged in to their Vendor Self Service (VSS) account in order to submit a response. Registrations completed the day of bid closing must be completed by the Vendor in the VSS portal. The Customer Resource Center is not able to complete registrations and activate accounts on the same day. Closing dates will not be extended for Vendors not registered by the date/time of the bid closing. Vendor Self Registration Guides are provided at https://finance.ky.gov/eProcurement/Pages/doing-business-with-the-commonwealth.aspx
All bidders are cautioned to begin their electronic submission in sufficient time to complete before the closing date and time. Delays due to technical difficulties or document upload impediments shall not be justification for acceptance of a late bid or proposal. Vendor attention to this advisory is encouraged. If you need assistance, please contact the Customer Resource Center (CRC) by email at Finance.CRCGroup@ky.gov or phone 502-564-9641 or toll-free 877-973-HELP (4357).
BID PRICES SUBMITTED ON COMPANY QUOTE FORMS ARE DISCOURAGED. COMPANY TERMS AND
CONDITIONS AND/OR SALES AND USE AGREEMENTS OFTEN CONFLICT WITH STANDARD SOLICITATION
REQUIREMENTS AND MAY RESULT IN REJECTION OF BID OFFER.
Online bid responses must be in an “Accepted” status and shall be assigned a date and time stamp from the eProcurement system at the time of final acceptance and formal submission by the vendor. The system will not allow submission of an online response after the published date and time for closing.
An offer may be modified or withdrawn by electronic or written notice ONLY if received prior to the bid closing date and time. An electronic offer may be modified by applying the appropriate electronic signature and following the procedure in the state’s eProcurement signature.
PUBLIC BID READINGS
Any person wishing to hear a bid reading may call our conference line at 502-564-4495, Enter the Conference ID Code 240522126 and
Participant Code 228420, at 3:00 pm, Eastern Time on the bid closing date.
BID SUBMISSION CHECKLIST:
The vendor MUST include the following with the bid submission. If the items below are not submitted with the bid, the Commonwealth MUST deem the bid non-responsive and SHALL NOT be considered for award.
_____ BID INFORMATION – COMPLETED (See Section 5.00)
All other items MUST be submitted prior to award however, vendors are strongly encouraged to include with bid submission.
Document Phase Document Description Page 7
2700000028 Final Pedestal and Bases - FEDERAL - REBID Total Pages: 37 https://vss.ky.gov https://vss.ky.gov https://emars311.ky.gov/webapp/vssprdonline3111d/AltSelfService https://finance.ky.gov/eProcurement/Pages/doing-business-with-the-commonwealth.aspx https://finance.ky.gov/eProcurement/Pages/doing-business-with-the-commonwealth.aspx mailto:Finance.CRCGroup@ky.gov
_____ CERTIFICATE OF AUTHORITY – REGISTRATION WITH SECRETARY OF STATE BY FOREIGN
ENTITY (See Section 2.23)
_____ REQUIRED AFFIDAVIT(S) (See Attachments A, B, C, etc. as applicable)
_____ CERTIFICATE OF INSURANCE (Section 1.01)
_____ NON COLLUSION CERTIFICATION (Section 1.02 E)
_____ BUY AMERICA/BABA (Section 1.02 F)
_____ SPECIFICATION/PRODUCT LITERATURE
PLEASE READ THIS SOLICITATION AND ITS INSTRUCTIONS IN ITS ENTIRETY.
This is a Request for Bid (RFB).
Vendors shall comply with the terms and conditions stated in the solicitation.
Any efforts to negotiate these terms and conditions SHALL NOT be accepted and SHALL cause the bid to be deemed non-responsive.
Vendors should review and comply with the general bidding requirements listed under “Procurement Laws, Preference, Regulations and Policies” and “Response to Solicitation” located on the eProcurement Web page at https://finance.ky.gov/eProcurement/Pages/procurement-laws-regulations-and-policies.aspx and https://finance.ky.gov/eProcurement/Pages/doing-business-with-the-commonwealth.aspx respectively. The vendor must comply with all applicable statutes, regulations and policies related to this procurement.
Section 1 - Specifications – Commodity
1.00 - Specifications of Commodity
Line 1 - Pedestal pole with breakaway base & anchor bolts
POLE. Provide 4 and a half inch O.D. aluminum schedule 40 pipe to provide maximum of 9 feet overall mounting height. Provide a pole that meets or exceeds Component Products CPI-AP.
BREAKAWAY BASE. Provide a breakaway base cast from 319 aluminum alloy. Provide base that has been tested and has accepted by the FHWA/KYTC in accordance with MASH (look at FHWA website for manufacturers under Sign Supports, Mailboxes & Delineators): https://highways.dot.gov/safety/rwd/reduce-crash-severity). Provide a base that meets or exceeds Frey Manufacturing CP6 Series.
Each door on the pedestal shall have a 3x 2 shock hazard sticker applied to the outside of the door. Install 3" from the top of the door. The sticker shall be metalcraft Ply695 prem stylemark label with .007 thickness, with UV white Polycarbonate material, and with Mc53fl pressure sensitive adhesive or approval equal. See attachment for wording
ANCHOR BOLTS. Use anchor bolts(Minimum 4) that conform to the requirement of ASTM F 1554 grade 105 for headed for Steel. Provide each anchor bolt with 2 galvanized hex nuts as well as one flat and one lock washer.
Provide nuts that equal or exceed the proof load of the bolts strength. Provide bolts that are hot-dip galvanized to the requirements of either ASTM A 123 (fabricated products) or ASTM A 153 (hardware items). Protect anchor bolt threads from damage during shipping. You can use Stainless Steel Anchors to conform to the requirements of ASTM A193 Grade B8. Provide mill test reports on anchor bolts.
PACKAGING Package breakaway base, anchors bolts, and hardware in a single container or burlap bag. Poles can be packaged separate from the other items.
Line 2 - Pedestal breakaway base only
Document Phase Document Description Page 8
2700000028 Final Pedestal and Bases - FEDERAL - REBID Total Pages: 37 https://finance.ky.gov/eProcurement/Pages/procurement-laws-regulations-and-policies.aspx
BREAKAWAY BASE. Provide a breakaway base cast from 319 aluminum alloy. Provide base that has been tested and has accepted by the FHWA/KYTC in accordance with MASH (look at FHWA website for manufacturers under Sign Supports, Mailboxes & Delineators): https://highways.dot.gov/safety/rwd/reduce-crash-severity). Provide a base that meets or exceeds Frey Manufacturing CP6 Series.
Each door on the pedestal shall have a 3x 2 shock hazard sticker applied to the outside of the door. Install 3" from the top of the door. The sticker shall be metalcraft Ply695 prem stylemark label with .007 thickness, with UV white Polycarbonate material, and with Mc53fl pressure sensitive adhesive or approval equal. See attachment for wording
Line 3 - Pedestal top mounting bracket One-way
Provide a slip Fitter Assembly 1- & 2-way Aluminum with necessary hardware. There shall be aluminum threaded plugs for openings not used by this bracket. Provide a pole that meets or exceeds PELCO Products Inc. SE-3037.
Package each whole bracket (all hardware) in a single container or box.
Line 4 - Pedestal top mounting bracket Two-Way
Provide a 2-way 16 and one-half inch CTC aluminum with necessary hardware. There shall be aluminum threaded plugs for any opening not used by this bracket. Provide a pole that meets or exceeds PELCO Products Inc. SE-3089.
Package each whole bracket (all hardware) in a single container or box.
Line 5 – Post Top
Provide a natural aluminum post top that can be securely attached to the pole that is 4 and one-half inch O.D.
aluminum schedule 40 pipe. Package each post top (all hardware) in a single container or box.
Line 6 - FSA Box Pole Mounted
Provide a 4 holed pole mounted aluminum rectangular housing that is compatible with our standard pedestrian detector (Polara rectangular Bulldog). Provide a natural aluminum painted surface. Provide all necessary hardware to seal the enclosure.
This shall meet UL 514A.
Package each FSA box (all hardware) in a single container or box.
Line 7 – Pole Feet Aluminum hub plate for large pole with 1.5-inch NPS. PELCO Products SE-0357 or approved equal. Package each pole feet in a single container or box.
Line 8 - Pole Feet with conduit hub
Aluminum hub plate with 1.5-inch NPS with 1.25-inch NPT conduit hub. There shall be an aluminum threaded plug for the conduit hub. PELCO Products SE-0382 or approved equal. Package each pole feet with conduit hub in a single container or box.
1.01- Required Insurance Coverage The awarded vendor(s) shall be responsible for maintaining, and not reducing, the following insurance coverages, types, and limits of liability. Further awarded vendor shall be able to produce evidence of insurance in compliance with (C) through the entire contract:
A. Commercial General Liability Insurance in accordance with minimum limits of liability of $1,000,000.00 per occurrence, $2,000,000.00 aggregate. The Commonwealth, in the Request for Solicitation, may require higher limits depending on the type of solicitation.
B. Additional Types of Insurance
1. Automobile Liability Insurance (If Applicable) Automobile Liability Insurance is required for delivery, onsite training, services or events in all situations where the Contractor must drive to any property where Commonwealth operations occur. With regard to delivery, if the
Document Phase Document Description Page 9 items requested in this solicitation will be delivered by the awarded Contractor or Subcontractor, proof of Automobile Liability Insurance must be provided prior to award. If items will be delivered by common courier (USPS, FedEx, UPS, Old Dominion Freight Line, etc.), this requirement does not apply.
The Contractor or Subcontractor must provide a certificate of insurance coverage for any vehicle used in performance of this contract, whether owned, non-owned, or hired, or other vehicles utilized by the Contractor or Subcontractor.
Said policy of insurance to have a minimum coverage limit of $1,000,000.00 per occurrence combined single limit for bodily injury, including death, and property damage.
This requirement does not apply if the Contractor does not own, lease, or hire any automobiles to be used in connection with performance under any Contract resulting from this Solicitation.
C. Evidence of Insurance Coverage
The successful bidder shall provide evidence of insurance coverage as required. Failure to do so shall constitute a material breach of this Contract and may result in immediate cancellation of the Contract.
For all required insurance coverages, during the course of the Contract, the awarded vendor shall not be self-insured or utilize a Captive Insurer or a fronting policy that shifts risk back to the awarded vendor without prior written approval by the Office of the Controller of the Commonwealth.
Further, the awarded vendor shall not utilize an insurer or similar entity not in good standing with the Insurance Commissioner to fulfill the insurance requirements of the contract without prior written approval by the Office of the Controller of the Commonwealth.
Such approvals may require additional financial review, proof of funds, or bonding requirements sufficient for the risk associated with the services covered by the Contract, and approval or rejection is within the sole discretion of the Commonwealth’s Office of the Controller.
Contractor shall furnish the Certificate of Insurance prior to award and shall, upon request of the Commonwealth at any time during the contract term, provide a current, valid Certificate of Insurance.
Contractor and/or its insurer shall provide immediate notice of nonrenewal or cancellation of coverage during the course of the Contract.
All Certificates of Insurance must be signed by an authorized representative of the insurance agency, shall be in compliance with the laws of the Commonwealth of Kentucky, and shall be placed with a licensed resident or non-resident agent who represents insurance companies authorized to do business in Kentucky. The insurer shall have an AM Best rating of B+ or higher. Visit www.ambest.com for verification. Failure to meet this requirement may result in the bid being deemed non-responsive. A list of authorized companies can be found at https://insurance.ky.gov/ppc/ Company/Default.aspx.
A Certificate of Insurance (COI) on an ACORD form shall include the following:
# The certificate holder shall be listed as:
Kentucky Transportation Cabinet Division of Purchases
200 Mero Street, 4th Floor Frankfort, Kentucky 40622
# Endorsement of Additional Insured. Certificate of Insurance must contain the following language in the Description of Operations box:
“The Commonwealth and its agents are Additional Insureds for the contract resulting from the solicitation. Additional insured protection afforded is on a primary and non-contributory basis.”
A copy of the Endorsement of Additional Insured must be submitted with the Certificate of Insurance.
Document Phase Document Description Page 10 http://www.ambest.com https://insurance.ky.gov/ppc/Company/Default.aspx https://insurance.ky.gov/ppc/Company/Default.aspx
# The contract number in the Description of Operations box.
D. Subcontractors
If the contract allows for Subcontractors and utilizes Subcontractors, prior to the commencement of any work by a Subcontractor.
# The primary Contractor’s Certificate of Insurance must identify coverage that meets or exceeds the insurance requirements defined in this contract and that covers Subcontractor and its work in support of the Contract or the Subcontractor must submit and maintain a Certificate of Insurance that also meets or exceeds the insurance requirements of the Primary Contractor defined in this contract, with an Additional Insured Endorsement.
# KYTC reserves the right to request copies of all Subcontractor’s Certificate(s) of Insurance at any time.
1.02 - Federal Language
Funds from the Federal Highway Administration will be used to make payment against the resulting contract. The following clauses shall apply:
A. KYTC Standard Specifications
Except as provided herein, conform to all requirements of the Transportation Cabinet’s Current Standard Specifications for Road and Bridge Construction. Section references herein are to the Cabinet’s Current Standard Specifications for Road and Bridge Construction.
The Standard Specifications can be found at: https://transportation.ky.gov/Construction/Pages/Kentucky-Standard- Specifications.aspx
B. FHWA 1273
https://www.fhwa.dot.gov/programadmin/contracts/1273/1273.pdf
C. PROJECT WAGE RATES
Wage Rates (Davis Bacon) do not apply because this contract is for commodities and not services.
D. PROHIBITION ON TELECOMMUNICATIONS EQUIPMENT OR SERVICES
In accordance with the FY 2019 National Defense Authorization Act (NDAA), 2 CFR 200.216, and 2 CFR 200.471, Federal agencies are prohibited, after August 13, 2020, from obligating or expending financial assistance to obtain certain telecommunications and video surveillance services and equipment from specific producers. As a result of these regulations, contractors and subcontractors are prohibited, on projects with federal funding participation, from providing telecommunication or video surveillance equipment, services, or systems produced by:
Huawei Technologies Company or ZTE Corporation (or any subsidiary or affiliate of such entities)
Hytera Communications Corporation, Hangzhou Hikvision Digital Technology Company, or Dahua Technology Company (or any subsidiary or affiliate of such entities)
E. NON COLLUSION CERTIFICATION
Per KRS 45A.325, “Any agreement or collusion among bidders or prospective bidders which restrains, tends to restrain, or is reasonably calculated to restrain competition by agreement to bid at a fixed price, or to refrain from bidding, or otherwise, is prohibited.”
Per 23 USC 112 (c) “The Secretary shall require as a condition precedent to his approval of each contract awarded by competitive bidding pursuant to subsection (b) of this section, and subject to the provisions of this section, a sworn statement, executed by, or on behalf of, the person, firm, association, or corporation to whom such contract is to be awarded, certifying that such person, firm, association, or corporation has not, either directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any action in restraint of free competitive bidding in connection with such contract.”
Document Phase Document Description Page 11
2700000028 Final Pedestal and Bases - FEDERAL - REBID Total Pages: 37 https://transportation.ky.gov/Construction/Pages/Kentucky-Standard-Specifications.aspx https://transportation.ky.gov/Construction/Pages/Kentucky-Standard-Specifications.aspx https://www.fhwa.dot.gov/programadmin/contracts/1273/1273.pdf https://www.law.cornell.edu/definitions/uscode.php?width=840&height=800&iframe=true&def_id=23-USC-1264422296-293024739&term_occur=999&term_src=
The attached Non-Collusion Certification must be submitted to Division of Purchases prior to award of contract.
F. BUY AMERICA REQUIREMENT AND BUILD AMERICA, BUY AMERICA (BABA) ACT
1.0 BUY AMERICA REQUIREMENT
Follow the “Buy America” provisions as required by Title 23 Code of Federal Regulations § 635.410. Except as expressly provided herein all manufacturing processes of steel or iron materials including but not limited to structural steel, guardrail materials, corrugated steel, culvert pipe, structural plate, prestressing strands, and steel reinforcing bars shall occur in the United States of America, including the application of:
• Coating,
• Galvanizing,
• Painting, and
• Other coating that protects or enhances the value of steel or iron products.
The following are exempt, unless processed or refined to include substantial amounts of steel or iron material, and may be used regardless of source in the domestic manufacturing process for steel or iron material:
• Pig iron,
• Processed, pelletized, and reduced iron ore material, or
• Processed alloys.
The Contractor shall submit a certification stating that all manufacturing processes involved with the production of steel or iron materials occurred in the United States.
Produce, mill, fabricate, and manufacture in the United States of America all aluminum components of bridges, tunnels, and large sign support systems, for which either shop fabrication, shop inspection, or certified mill test reports are required as the basis of acceptance by the Department.
The use of foreign steel and iron materials may only be under the following conditions:
1) When the materials are not permanently incorporated into the project; or
2) When the delivered cost of such materials used does not exceed 0.1 percent of the total Contract amount or $2,500.00, whichever is greater.
The Contractor shall submit to the Engineer the origin and value of any foreign material used.
2.0 BUILD AMERICA, BUY AMERICA (BABA)
The Contractor shall comply with the Federal Highway Administration (FHWA) Buy America Requirement in Title 23 Code of Federal Regulations § 635.410 and all relevant provisions of the Build America, Buy America (BABA) Act, contained within the Infrastructure Investment and Jobs Act (IIJA), Pub. L. No. 117-58, §§ 70901-52 enacted November 25, 2021. The BABA requires iron, steel, manufactured products and construction materials used in infrastructure projects funded by federal financial assistance to be produced in the United States. The Contractor shall comply with Title 2 C.F.R. § 184.
A) Iron and Steel Requirements. BABA permits FHWA participation in the Contract only if domestic steel and iron will be used on the Project. To be considered domestic, all steel and iron used, and all products manufactured from steel and iron must be produced in the United States and all manufacturing processes, including application of coating, for these materials must occur in the United States. Coating includes all processes that protect or enhance the value of the material to which the coating was applied. This requirement does not preclude a minimal use of
Document Phase Document Description Page 12 foreign steel and iron materials, provided the cost of such materials does not exceed 0.1% of the total contract amount under the Contract or $2,500.00 whichever is greater.
B) Construction Material Requirements. BABA permits FHWA participation in the Contract only if all “construction materials”, as defined in the IIJA and OMB Memorandum M-24-02, are produced in the United States.
The Buy America preference applies to the following materials incorporated into infrastructure projects:
• non-ferrous metals
• plastic and polymer-based products (including polyvinylchloride, composite building materials, and polymers used in fiber optic cables)
• glass (including optic glass)
• fiber optic cable
• optical fiber
• lumber
• engineered wood
• drywall
C) Manufactured Products Requirements. All manufactured products incorporated into the project must comply with the following:
1) All manufactured products used in Federal-aid projects must have final assembly occur in the United States to be considered Buy America compliant.
2) Effective with the October 2026 letting, in addition to the requirement specified in paragraph 1), the cost of the components of the manufactured product that are mined, produced or manufactured in the United States must be greater than 55% of the total cost of all components of the manufactured product. Each manufactured item must be classified into one of the following categories: iron or steel product, manufactured product, construction material or another product category as specified by law or in 2 CFR Part 184. Items shall not be classified into multiple categories.
3.0 ADDITIONAL BABA ACT REQUIREMENTS.
A) De Minimis Waiver. The De Minimis Costs portion waives the application of the requirements of the BABA Act for construction materials and manufactured products under a single financial assistance award when the total value of the non-compliant products is no more than the lesser of $1,000,000 or 5% of the total applicable costs for the project. Applicable costs are defined as the costs of all steel, iron, manufactured products and construction materials. Cement and cementitious materials; aggregates such as stone, sand, or gravel; and binding agents and additives, standing alone, should not be included in the determination of total applicable project costs. The De Minimis waiver cannot be applied to a single item exceeding $1,000,000 in value.
If the Contractor seeks to utilize the waiver, the entire administrative burden lies solely with the Contractor, including all documentation and tracking of actual costs of steel, iron, manufactured products and construction materials to ensure that the 5% threshold is not exceeded. Records must be retained for at least five (5) years after receipt of the Contractor’s Final Release Letter.
Additionally, the Contractor shall notify the Engineer in writing of the intent to utilize the waiver prior to purchasing any De Minimis material and/or products. This written notice shall include the estimated cost of the De Minimis material and/or products and the estimated total applicable costs for the project. Any noncompliant items outlined in the project specific Utilities and Rail Certification Note shall also be included.
B) Certification. Prior to the issuance of the Notice to Proceed, the Contractor shall submit a Department approved Build America, Buy America Certificate, certifying compliance with all applicable requirements. Once submitted, Document Phase Document Description Page 13 the Contractor is bound by the Certification. A false certification is a violation of 18 U.S.C. § 1001 and may result in criminal penalties. The Contractor bears the burden of proof of compliance.
In addition to the required Contractor certification, each manufacturer and/or supplier shall submit a certification to certify materials or supplies are in compliance with the applicable domestic material content procurement preferences found in the Buy America Act requirements (23 CFR 635.410) and the BABA Act (BABA) requirements (2 CFR part 184). The individual completing this form takes full responsibility for the information included in the form. The manufacturer/supplier shall utilize the AASHTO Domestic Materials Self-Certification Form.
C) Project Specific Waiver. At the Contractor’s request, the Cabinet may, but is not obligated to, seek a waiver of Buy America requirements if grounds for the waiver exist under 23 C.F.R. § 635.410(c) or will comply with the applicable Buy America requirements if a waiver of those requirements is not available or not pursued by the Cabinet. The time associated with the project specific waiver process will be considered non-compensable. Refer to the Federal Highway Administration’s Buy America webpage for more information.
4.00 DEFINITIONS.
A) Construction Materials. Pursuant to the definition in 2 CFR 184.3, construction materials are articles, materials or supplies that consist of only one of the following items. Minor additions of articles, materials, supplies or binding agents to a construction material do not change the categorization of a material as a “construction material”. All manufacturing processes for the construction material must occur in the United States.
• non-ferrous metals;
• plastic and polymer-based products (including polyvinylchloride, composite building materials, and polymers used in fiber optic cables);
• glass (including optic glass);
• optical fiber;
• lumber;
• engineered wood; or
• drywall.
Not included: primarily iron or steel items; a manufactured product; cement and cementitious materials; aggregates such as stone, sand, or gravel; or aggregate binding agents or additives.
“All manufacturing processes” is defined as the final manufacturing process and the immediately preceding manufacturing stage for the construction material.
B) Manufactured Products. Pursuant to the definition in 2 CFR 184.3, manufactured products means articles, materials, or supplies that have been:
• (i) processed into a specific form and shape; or
• (ii) combined with other articles, materials, or supplies to create a product with different properties than the individuals’ articles, materials, or supplies.
An article, material, or supply classified as a manufactured product may include components that are construction materials, iron or steel products.
C) Iron and Steel. Pursuant to the definition in 2 CFR 184.3, iron or steel products means articles, materials, or supplies that consist wholly or predominantly of iron or steel or a combination of both. •
Predominantly of iron or steel or a combination of both means that the cost of the iron and steel content exceeds 50 percent of the total cost of all its components. The cost of iron and steel is the cost of the iron or steel mill products
Document Phase Document Description Page 14
(such a bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the product and a good faith estimate of the iron or steel components.”
The Certificate of Compliance must be submitted to Division of Purchases prior to award of contract.
G. DISADVANTAGED BUSINESS ENTERPRISE PROGRAM
DBE requirements do not apply because this contract is for commodities and not services.
Section 2 - Terms and Conditions of the Contract
2.00 – Scope of the Contract
The Kentucky Transportation Cabinet Division of Purchases issues this solicitation on behalf of the Division of Traffic Operations to award a master agreement contract for: Pedestals and Bases.
2.01 - Contract Components and Order of Precedence
The Commonwealth’s acceptance of the offer indicated by the issuance of an Award by the KYTC Division of Purchases shall create a valid Master Agreement consisting of the following:
1. The written Master Agreement between the Parties;
2. Any Addenda to the Solicitation;
3. Any provisions of the Solicitation and all attachments thereto;
4. The Bidder’s response to the Solicitation, and
5. The Kentucky Revised Statutes KRS 45A.
In the event of an inconsistency between provisions of the solicitation, the inconsistency shall be resolved by giving precedence in the following order: (a) the Specifications; (b) other provisions of the Solicitation, whether incorporated by reference or otherwise; (c) Contract or Master Agreement Terms and Conditions; (d) FAP 110-10-00 – General Conditions and Instructions for Solicitations and Contracts.
2.02 - Initial Contract Period
The Master Agreement will be for the initial period beginning upon award and expiring 8/31/2027.
2.03 - Optional Renewal Period
This Master Agreement may be extended at the completion of the initial contract period for four (4) additional one-year periods. This extension must have the written approval of the vendor and the KYTC Division of Purchases.
The Commonwealth of Kentucky reserves the right to renegotiate any terms and/or conditions as may be necessary to meet requirements for the extended period. The vendor will be advised of any proposed revisions prior to the renewal periods. In the event proposed revisions cannot be agreed upon, either party shall have the right to withdraw without prejudice from either exercising the option or continuing the contract in an extended period.
2.04 - Divisions/Agencies to Be Served
Document Phase Document Description Page 15
This contract shall be for use by the following Divisions/Agencies of the Kentucky Transportation Cabinet:
Division of Traffic Operations
No shipments or services are authorized until an official Delivery Order has been fully processed by an authorized agency.
2.05 - Quantity Basis of Contract
Any and all quantities mentioned in this solicitation are purely estimates and are not to be implied nor inferred as being guarantees. The State is obligated to buy only that quantity needed by its agencies during the term of the contract. Requirements may exceed the quantities shown and the contractor will be required to furnish all requirements shown on Delivery Orders dated during the life of the contract.
2.06 - Exception to Required Use of Contract
The establishment of this Master Agreement is not intended to preclude the use of similar products when requested by the agency. The Commonwealth of Kentucky reserves the right to acquire large requirements through other competitive processes.
2.07 - Basis of Price Revisions
PRICE ADJUSTMENTS: Unless otherwise specified, the prices established by the Master Agreement shall be firm for the contract period subject to the following:
A. Price Increases: A price increase will not be allowed during the first twelve (12) months of the contract. The price increase must be based on industry wide price changes. The contract holder must request in writing a price increase at least thirty (30) days prior to the effective date and shall provide firm proof that the price increase(s) is justified. The KYTC Division of Purchases may request additional information or justification. If the price increase is denied, the contract holder may withdraw from the contract without prejudice upon written notice and approval by the KYTC Division of Purchases; however, the vendor must continue service at the contract prices until a new contract can be established (usually within sixty (60) days).
B. Price Decreases: The contract price shall be reduced to reflect any industry wide price decreases. The contract holder is required to furnish the KYTC Division of Purchases with notice of any price decreases as soon as such decreases are available.
C. Extended Contract Periods: If the contract provides for an optional renewal period, a price adjustment may be granted at the time the contract is renewed, subject to price increase justification as required “A. Price Increases”.
2.08 - Addition or Deletion of Items or Services
The KYTC Division of Purchases reserves the right to add new and similar items, with the consent of the vendor, to the contract. If an addition is agreeable to both parties, the KYTC Division of Purchases will issue a Modification.
Until such time as the vendor receives a Modification, the vendor shall not accept Delivery Orders from any agency referencing such items or services.
2.09 - Changes and Modifications to the Contract
During the period of the contract, a modification shall not be permitted in any of its conditions and specifications, unless the contractor receives electronic or written approval from the KYTC Division of Purchases. If the contractor finds at any time that existing conditions make modification in requirements necessary, the contractor shall report
Document Phase Document Description Page 16 the matter promptly to the KYTC Division of Purchases for consideration and decision. All contract modifications shall be subject to the provisions of 200 KAR 5:311.
2.10 - Basis of Shipment
Quotations of unit prices on this solicitation shall be F.O.B. Destination Freight Prepaid and Allowed to the receiving agency. The vendor shall be fully responsible for all shipments and freight charges involved to the ordering agency. The responsibility for filing freight claims lies with the vendor.
2.11 - Notices
The Division of Purchases Buyer identified below shall be the sole point of contact throughout the procurement process. All communications, oral and written (regular, express, or electronic mail) concerning this procurement shall be submitted to:
Latasha Chenault
Division of Purchases
Kentucky Transportation Cabinet
Phone: 502-782-5673
E-mail: latasha.chenault@ky.gov
From the issue date of this solicitation until a Contractor(s) is selected and the selection is announced, Offerors are not permitted to communicate with any Commonwealth staff concerning this solicitation
After the award of a contract, all programmatic communications are to be made to the Agency Contact Person identified in the contract document with a copy to the Division of Purchases Buyer.
After the Award of a contract, all communications of a contractual or legal nature are to be made to the KYTC Division of Purchases Buyer.
2.12 Delivery Orders for Commodities
No shipments are authorized until an official Delivery Order has been fully processed by an authorized agency or payment has been made via Pro-Card.
Penalties assessed for late deliveries will be calculated based on the date of the Delivery Order and the delivery time stated in Section 2.13.
Payment shall be made against the actual quantities received. The Delivery Order shall be modified to adjust quantities if needed.
Any and all items or portions of items not delivered on or prior to the expiration date of the contract shall be considered cancelled after that date. There will be no claim for damages allowed by reason of cancellation thereof.
2.13 - Deliveries
Delivery at the earliest possible date is desired.
Document Phase Document Description Page 17 mailto:latasha.chenault@ky.gov
Vendor guarantees delivery of all requested items within ________ calendar days after receipt of delivery order.
The Vendor agrees that when delivery is not made within the contracted due date, one percent (1%) per day shall be deducted from the Vendor’s invoice for each day the Vendor fails to meet the contracted delivery date.
The Vendor is not responsible for and shall not be penalized for delays in its delivery when caused by factors or events outside Vendor’s control, including but not limited to acts or omissions of the Commonwealth or third parties, acts of civil or military authority, civil disturbance, war, terrorism, pandemics, explosions, fire, floods, tornadoes or other natural disasters or acts of God.
2.14 - Inspection
All supplies, equipment and services shall be subject to inspection or tests by the Commonwealth prior to acceptance. In the event supplies, equipment or services are defective in material or workmanship or otherwise not in conformity with specified requirements, the Commonwealth shall have the right to reject the items or services or require acceptable correction at the vendor’s expense.
2.15 – Payments
The Commonwealth will make payment within thirty (30) working days of receipt of Contractor's invoice and of acceptance of goods and/or services except when the agency has transmitted a rejection notice to the vendor in accordance with KRS 45.453 and KRS 45.454. For the purpose of this provision, a working day is any weekday except for Commonwealth employee holidays up to the agency close of business. The Commonwealth may make a partial payment of goods or services that it has received according to the terms of the contract.
Payments are predicated upon successful completion and acceptance of the described work, services, supplies, or commodities, and delivery of the required documentation. Invoices for payment shall be submitted to the agency contact person or agency representative and, except Personal Service Contract invoices, shall include the following information, as applicable:
(1) Contract and/or delivery order number;
(2) Name of Contractor Entity or Individual;
(3) Contractor designated point of contact;
(4) Unique Invoice Number;
(5) Invoice Date;
(6) Item numbers;
(7) Descriptions of goods or services provided;
(8) Sizes of goods provided;
(9) Quantities provided;
(10) Unit prices; and
(11) Extended totals (unit price x quantity) for invoiced line items.
For Personal Service Contracts, invoices must be submitted on the Personal Service Contract Invoice form established by the Government Contract Review Committee, available at:
https://apps.legislature.ky.gov/moreinfo/contracts/PSC%20INVOICE%20FORM.pdf
The Commonwealth will make a good faith effort to notify the Contractor within fifteen (15) working days of the Contractor’s failure to submit a proper invoice or a dispute of the goods or services provided. The Contractor shall address the Commonwealth’s concerns within ten (10) calendar days and resubmit a corrected invoice with a new invoice number for payment. If the Contractor has not rectified the problem with the invoice or the good or service within the ten (10) calendar day correction period, any revised submitted invoice shall be considered a new invoice with a new date of submission for calculation of any late payment penalty.
Document Phase Document Description Page 18 https://apps.legislature.ky.gov/moreinfo/contracts/PSC%20INVOICE%20FORM.pdf
If the Commonwealth has not notified the Contractor of any issue with the invoice or the goods and/or services and the Contractor has not received payment by the twenty-fifth (25th) business day after the Contractor submitted the invoice, the Contractor should notify its Commonwealth contract representative that its invoice is still pending payment.
Except as otherwise explicitly provided in the contract, payments shall be issued to the Contractor within thirty (30) working days of receipt of Contractor's invoice or of acceptance of goods and/or services. In the event of an invoice payment dispute between the Contractor and purchasing agency, the Contractor shall first attempt resolution of the dispute via submission to the purchasing agency in accordance with the payment dispute process posted on the Finance and Administration Cabinet website, located at:
https://finance.ky.gov/office-of-the-secretary/office-of-general-counsel/Pages/procurement-and-protest-resources.aspx
If submission to the purchasing agency fails to resolve the payment dispute, the Contractor may submit a contract dispute regarding payment to the Finance Secretary for resolution. In accordance with KRS 45.454, and except as provided by KRS 371.405, there shall be payable to the Contractor a penalty of one-percent (1%) on any undisputed amount each month or fraction thereof owing to the Contractor after 30 working days following the receipt of the goods or services and receipt of the invoice unless otherwise agreed between the Commonwealth and the Contractor. After a resolution is determined, the purchasing agency shall begin to assess penalties due the Contractor and remit the penalty payment to the Contractor within ten (10) working days.
2.16 - Vendor’s Report
The vendor(s) may be asked to furnish the KYTC Division of Purchases, a report showing volume which has been sold to the Commonwealth and its using agencies each six (6) months of the contract period. The report will include political subdivisions and university purchases. This report may be the vendor’s computer printout sheet or form.
This shall apply to all items, which are to become a part of this contract. This report must reference usage by brief description, product number or other format designated by the KYTC Division of Purchases.
2.17 - Post Contract Agreements
The Master Agreement shall represent the entire agreement between the parties. Prior negotiations, representations, or agreements, either written or oral, between the parties hereto relating to the subject matter hereof shall be of no effect upon this contract. Unless, contractually provided, the Commonwealth shall not be required to enter into nor sign further agreements, leases, company orders or other documents to complete or initiate the terms of the contract.
Any such documents so obtained will be non-binding on the State and be cause for breach of contract.
2.18 - Service Performance
All services performed under contract shall be in accordance with the terms and conditions of the contract. It will be the agency’s responsibility to ensure that such services rendered are performed and are acceptable.
The relationship between the State and the Contractor is that of client and independent Contractor. No agent, employee, or servant of the Contractor or any of its subcontractors shall be or shall be deemed to be an employee, agent, or servant of the State for any reason. The Contractor will be solely and entirely responsible for its acts and the acts of its agents, employees, servants and subcontractors during the performance of this Contract.
Deviations of services performed will not be made without the written approval of the KYTC Division of Purchases.
Problems that arise under any aspect of performance should first be resolved between the vendor and the agency. If such problems and/or disagreements cannot be resolved they should be referred to the KYTC Division of Purchases for mediation.
2.19 - Assignment
Document Phase Document Description Page…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .