FINAL PLANS S30246.pdf

PDF 6 MB Posted

Attached to
S30246 Kahului Harbor, Piers 1-2, Refurbish Comfort Stations
Solicitation number
B26002908
Issued by
Maui County, Hawaii

About this file

This is a final construction plan document prepared by the State of Hawaii Department of Transportation Harbors Division for the refurbishment of comfort stations at Kahului Harbor, Piers 1-2, located in Maui, Hawaii. Project number S30246 encompasses the renovation of two comfort station facilities: one at Pier 1 Makai and one at Pier 2 Young Brothers. The architectural firm Ushijima Architects, Inc. served as the lead architect, with Mechanical Enterprise Inc. providing mechanical engineering and Coffman Engineers, Inc. providing electrical engineering services. The final plans document contains 19 sheets of construction drawings dated March 2026, including site vicinity maps, existing and new floor plans, reflected ceiling plans, interior elevations, construction details, and plumbing diagrams for both comfort station locations.

The construction drawings provide detailed specifications for demolition and new construction work, including floor transition details, bathroom cove details, typical mounting heights, furred wall sections, and comprehensive plumbing plans and diagrams. The document includes mechanical, plumbing, and electrical design specifications necessary for bidders to estimate project costs and develop construction schedules. All professional design team members hold current professional licenses as indicated by their expiration dates noted on the plans. The project appears to be in the final design phase with no specific contract award date, response deadline, or funding amount referenced in the plans documentation itself.

View the file

Other files

File Type Posted
FINAL SPECIFICATIONS w NTB S30246.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MAKENA

WAILEA

KIHEI

MAALAEA

OLOWALU

LAHAINA

KAANAPALI

HONOKOWAI

KAPALUA

NAPILI

KAHAKULOA

WAIHEE

WAIEHU

WAILUKU KAHULUI

PAIA

HAIKU

KEANAE

NAHIKU

HANA

MAKAWAO

HALEAKALA

ULUPALAKUA

KULA

PUKALANI

PROJECT LOCATION

T-1

VICINITY MAP

KAHULUI HARBOR, PIERS 1 - 2,

REFURBISH COMFORT STATIONS, MAUI, HAWAII

STATE OF HAWAII

DEPARTMENT OF TRANSPORTATION

HARBORS

PROJECT DIRECTORY

USHIJIMA ARCHITECTS, INC.ARCHITECT:

MECHANICAL: MECHANICAL ENTERPRISE INC.

LOCATION MAP

NORTH

NORTH

S30246

ELECTRICAL: COFFMAN ENGINEERS, INC.

SHEET

0F SHTS.

FOR DIRECTOR OF TRANSPORTATION DATE 19

DEPARTMENT OF TRANSPORTATION

S T A T E O F H A W A I I

APPROVED BY:

1 VICINITY MAP

T-1 SCALE: NTS

2 ISLAND OF MAUI

T-1 SCALE: NTS

03/27/2026 https://stateofhawaii.na1.adobesign.com/verifier?tx=CBJCHBCAABAAWAbQiRyUglAQcjYFnYQe4XA9U64knjdk

SHEET INDEXSHEET INDEX

REV DATE DESCRIPTION BY APPROVED

SHEET TITLE

JOB TITLE

JOB NUMBER

DESIGNED BY:

DRAWN BY:

CHECKED BY:

DATE:

SCALE:

SHEET

19 0F SHTS.

HARBORS

DEPARTMENT OF TRANSPORTATION

S T A T E O F H A W A I I

AS SHOWN

UAI

UAI

TH

MARCH 2026

OR UNDER MY SUPERVISION

THIS WORK WAS PREPARED BY ME

S30246

USHIJIMA ARCHITECTS, INC.

EXP 4–30–28

REFURBISH COMFORT STATIONS,

KAHULUI HARBORS, PIER 1 - 2,

MAUI, HAWAII

GENERAL NOTES

T-2

1 EXIST./DEMO. FLOOR PLAN

A100 SCALE: 3/8" = 1'-0"

2 EXIST./DEMO. REFLECTED CEILING PLAN

A100 SCALE: 3/8" = 1'-0"

GENERAL NOTES

LEGEND

REV DATE DESCRIPTION BY APPROVED

SHEET TITLE

JOB TITLE

JOB NUMBER

DESIGNED BY:

DRAWN BY:

CHECKED BY:

DATE:

SCALE:

SHEET

19 0F SHTS.

HARBORS

DEPARTMENT OF TRANSPORTATION

S T A T E O F H A W A I I

AS SHOWN

UAI

UAI

TH

MARCH 2026

OR UNDER MY SUPERVISION

THIS WORK WAS PREPARED BY ME

S30246

USHIJIMA ARCHITECTS, INC.

EXP 4–30–28

REFURBISH COMFORT STATIONS,

KAHULUI HARBORS, PIER 1 - 2,

MAUI, HAWAII

A100

SHEET TITLE

JOB TITLE

JOB NUMBER

DESIGNED BY:

DRAWN BY:

CHECKED BY:

DATE:

SCALE:

SHEET

19 0F SHTS.

HARBORS

DEPARTMENT OF TRANSPORTATION

S T A T E O F H A W A I I

AS SHOWN

UAI

UAI

TH

MARCH 2026

OR UNDER MY SUPERVISION

THIS WORK WAS PREPARED BY ME

S30246

USHIJIMA ARCHITECTS, INC.

EXP 4–30–28

REFURBISH COMFORT STATIONS,

KAHULUI HARBORS, PIER 1 - 2,

MAUI, HAWAII

A101

1 EXIST./NEW FLOOR PLAN

A101 SCALE: 3/8" = 1'-0"

2 EXIST./NEW REFLECTED CEILING PLAN

A101 SCALE: 3/8" = 1'-0"

LEGEND

REV DATE DESCRIPTION BY APPROVED

SHEET TITLE

JOB TITLE

JOB NUMBER

DESIGNED BY:

DRAWN BY:

CHECKED BY:

DATE:

SCALE:

SHEET

19 0F SHTS.

HARBORS

DEPARTMENT OF TRANSPORTATION

S T A T E O F H A W A I I

AS SHOWN

UAI

UAI

TH

MARCH 2026

OR UNDER MY SUPERVISION

THIS WORK WAS PREPARED BY ME

S30246

USHIJIMA ARCHITECTS, INC.

EXP 4–30–28

REFURBISH COMFORT STATIONS,

KAHULUI HARBORS, PIER 1 - 2,

MAUI, HAWAII

A102

1 EXIST./DEMO. FLOOR PLAN

A102 SCALE: 3/8" = 1'-0"

2 EXIST./DEMO. REFLECTED CEILING PLAN

A102 SCALE: 3/8" = 1'-0"

JOB TITLE

JOB NUMBER

DESIGNED BY:

DRAWN BY:

CHECKED BY:

DATE:

SCALE:

SHEET

19 0F SHTS.

HARBORS

DEPARTMENT OF TRANSPORTATION

S T A T E O F H A W A I I

AS SHOWN

UAI

UAI

TH

MARCH 2026

OR UNDER MY SUPERVISION

THIS WORK WAS PREPARED BY ME

S30246

USHIJIMA ARCHITECTS, INC.

EXP 4–30–28

REFURBISH COMFORT STATIONS,

KAHULUI HARBORS, PIER 1 - 2,

MAUI, HAWAII

A103

1 EXIST./NEW FLOOR PLAN

A103 SCALE: 3/8" = 1'-0"

2 EXIST./NEW REFLECTED CEILING PLAN

A103 SCALE: 3/8" = 1'-0"

A200

1 PIER 1 MAKAI COMFORT STATION INTERIOR ELEVATIONS

A200 SCALE: 1/4" = 1'-0"

REV DATE DESCRIPTION BY APPROVED

SHEET TITLE

JOB TITLE

JOB NUMBER

DESIGNED BY:

DRAWN BY:

CHECKED BY:

DATE:

SCALE:

SHEET

19 0F SHTS.

HARBORS

DEPARTMENT OF TRANSPORTATION

S T A T E O F H A W A I I

AS SHOWN

UAI

UAI

TH

MARCH 2026

OR UNDER MY SUPERVISION

THIS WORK WAS PREPARED BY ME

S30246

USHIJIMA ARCHITECTS, INC.

EXP 4–30–28

REFURBISH COMFORT STATIONS,

KAHULUI HARBORS, PIER 1 - 2,

MAUI, HAWAII

A201

SHEET TITLE

JOB TITLE

JOB NUMBER

DESIGNED BY:

DRAWN BY:

CHECKED BY:

DATE:

SCALE:

SHEET

19 0F SHTS.

HARBORS

DEPARTMENT OF TRANSPORTATION

S T A T E O F H A W A I I

AS SHOWN

UAI

UAI

TH

MARCH 2026

OR UNDER MY SUPERVISION

THIS WORK WAS PREPARED BY ME

S30246

USHIJIMA ARCHITECTS, INC.

EXP 4–30–28

REFURBISH COMFORT STATIONS,

KAHULUI HARBORS, PIER 1 - 2,

MAUI, HAWAII

1 PIER 2 YOUNG BROTHERS COMFORT STATION INTERIOR ELEVATIONS

A201 SCALE: 1/4" = 1'-0"

SND TSCD

TPH

W/C

MA

XMA

X

MIN

MI

N

MA

X MA

X

LAV

MI

N

MI

N

MAX

MA

X

KNEE CLEARANCE

MI

NW/C

36" GB 42" GB

SD

A300

REV DATE DESCRIPTION BY APPROVED

SHEET TITLE

JOB TITLE

JOB NUMBER

DESIGNED BY:

DRAWN BY:

CHECKED BY:

DATE:

SCALE:

SHEET

19 0F SHTS.

HARBORS

DEPARTMENT OF TRANSPORTATION

S T A T E O F H A W A I I

AS SHOWN

UAI

UAI

TH

MARCH 2026

OR UNDER MY SUPERVISION

THIS WORK WAS PREPARED BY ME

S30246

USHIJIMA ARCHITECTS, INC.

EXP 4–30–28

REFURBISH COMFORT STATIONS,

KAHULUI HARBORS, PIER 1 - 2,

MAUI, HAWAII

1 FLOOR TRANSITION FROM EXISTING TO NEW

A300 SCALE: NTS

2 BATHROOM COVE DETAIL

A300 SCALE: NTS

4 TYPICAL MOUNTING HEIGHTS

A300 SCALE: 1/2" = 1'-0"

3 FURRED WALL SECTION

A300 SCALE: NTS

JOB TITLE

JOB NUMBER

DESIGNED BY:

DRAWN BY:

CHECKED BY:

DATE:

SCALE:

SHEET

19 0F SHTS.

HARBORS

DEPARTMENT OF TRANSPORTATION

S T A T E O F H A W A I I

AS SHOWN

MEI

MEI

RRT

REFURBISH COMFORT STATIONS,

MARCH 2026 S30246

KAHULUI HARBORS, PIER 1 - 2,

OR UNDER MY SUPERVISION

THIS WORK WAS PREPARED BY ME

MECHANICAL ENTERPRISES, INC

EXP 4–30–26

MAUI, HAWAII

GENERAL NOTES AND LEGEND

M000

JOB TITLE

JOB NUMBER

DESIGNED BY:

DRAWN BY:

CHECKED BY:

DATE:

SCALE:

SHEET

19 0F SHTS.

HARBORS

DEPARTMENT OF TRANSPORTATION

S T A T E O F H A W A I I

AS SHOWN

MEI

MEI

RRT

REFURBISH COMFORT STATIONS,

MARCH 2026 S30246

KAHULUI HARBORS, PIER 1 - 2,

OR UNDER MY SUPERVISION

THIS WORK WAS PREPARED BY ME

MECHANICAL ENTERPRISES, INC

EXP 4–30–26

MAUI, HAWAII

PIER 1 - MAKAI COMFORT STATION DEMO AND NEW PLUMBING PLAN

M100

JOB TITLE

JOB NUMBER

DESIGNED BY:

DRAWN BY:

CHECKED BY:

DATE:

SCALE:

SHEET

19 0F SHTS.

HARBORS

DEPARTMENT OF TRANSPORTATION

S T A T E O F H A W A I I

AS SHOWN

MEI

MEI

RRT

REFURBISH COMFORT STATIONS,

MARCH 2026 S30246

KAHULUI HARBORS, PIER 1 - 2,

OR UNDER MY SUPERVISION

THIS WORK WAS PREPARED BY ME

MECHANICAL ENTERPRISES, INC

EXP 4–30–26

MAUI, HAWAII

PIER 2 - YOUNG BROTHERS COMFORT STATION

DEMO AND NEW PLUMBING PLAN

M101

JOB TITLE

JOB NUMBER

DESIGNED BY:

DRAWN BY:

CHECKED BY:

DATE:

SCALE:

SHEET

19 0F SHTS.

HARBORS

DEPARTMENT OF TRANSPORTATION

S T A T E O F H A W A I I

AS SHOWN

MEI

MEI

RRT

REFURBISH COMFORT STATIONS,

MARCH 2026 S30246

KAHULUI HARBORS, PIER 1 - 2,

OR UNDER MY SUPERVISION

THIS WORK WAS PREPARED BY ME

MECHANICAL ENTERPRISES, INC

EXP 4–30–26

MAUI, HAWAII

PLUMBING DIAGRAMS

M200

JOB TITLE

JOB NUMBER

DESIGNED BY:

DRAWN BY:

CHECKED BY:

DATE:

SCALE:

SHEET

19 0F SHTS.

HARBORS

DEPARTMENT OF TRANSPORTATION

S T A T E O F H A W A I I

AS SHOWN

MEI

MEI

RRT

REFURBISH COMFORT STATIONS,

MARCH 2026 S30246

KAHULUI HARBORS, PIER 1 - 2,

OR UNDER MY SUPERVISION

THIS WORK WAS PREPARED BY ME

MECHANICAL ENTERPRISES, INC

EXP 4–30–26

MAUI, HAWAII

PLUMBING DETAILS

M300

Arch
T-1
Sheets and Views
Title Sheet
T-2
Sheets and Views
T-2 Sheet Index
A100
Sheets and Views
A100
A101
Sheets and Views
A101
A102
Sheets and Views
A102
A103
Sheets and Views
A103
A200
Sheets and Views
A200
A201
Sheets and Views
A201
A300
Sheets and Views
A300
2026-3-18 Final Mechanical Set
Sheets and Views
004 M001 Gen Notes-M000
004 M100 Pier 1-M100
004 M101 Pier 2-M101
004 M200 Diagrams-M200
004 M300 Details-M300
Refurbish Comfort Station Pier 1 Pier 2 Electrical Drawings FINAL
30246 Final Specs temp.pdf
2026-03-27T22:53:12+0000
Certified by Adobe Acrobat Sign

File details come from the government source that posted it. Updated .