This is a Statement of Work (SOW) for non-hazardous waste collection and disposal services at Long Island National Cemetery in Farmingdale, New York. The contractor must provide two factory-new or newly refurbished 30 cubic yard open-top roll-off dumpsters and perform on-call pickup services Monday through Friday between 8:00 AM and 4:30 PM, with pickup guaranteed within 48 hours of request. The estimated service volume is 52 pickups per fiscal year, with monthly pickups varying between 4 and 9 loads depending on cemetery activities. All pricing must be all-inclusive, covering materials, labor, transportation, environmental fees, fuel surcharges, and all other incidental costs, with payment calculated per load rather than by weight. The contractor is responsible for dumpster maintenance and replacement if damaged, compliance with all federal, state, and local environmental and safety requirements, obtaining necessary permits and licenses, and proper disposal at approved licensed landfills.
The contract period runs for one base year (April 1, 2026 through March 31, 2027) with four one-year renewal options, and this is a firm-fixed-price contract. A mandatory site visit during the second week of the solicitation period must be scheduled in advance with the Cemetery Director at (631) 454-4949 or Jeffrey.Tavares@va.gov. The contractor must comply with wage determination 2015-4157, Revision 30, and must coordinate closely with the Contracting Officer's Representative (COR) to ensure work does not interfere with burial services or cemetery operations. Contractor personnel must maintain professional appearance and conduct, demonstrate sensitivity to the cemetery's mission, and maintain regular communication with the Safety Officer. The government reserves the right to designate representatives for oversight, and any contract modifications must be authorized in writing by the VA Contracting Officer. Contractors must accept government credit card payment and must have workers' compensation and liability insurance as required by New York State law.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C78626Q50035 - LINC Trash Removal Services.docx | DOCX document | |
| Wage Determination No 2015-4157 - Revision No 30 - Publish Date 12-03-2025.doc | DOC document | |
| LINC Dumpster Rental Waste Removal Services Price Schedule (FY-26).docx | DOCX document | |
| PAST PERFORMANCE QUESTIONAIRE.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUPPLIES OR SERVICES & PRICES / COSTS
PRICE SCHEDULE
Scope: The Contractor shall furnish all personnel, equipment, supplies, materials, vehicles and other items / services necessary and incident to the provision NON-HAZARDOUS WASTE (TRASH) COLLECTION & DISPOSAL SERVICES at the Long Island National Cemetery, located at 2040 Wellwood Ave, Farmingdale, NY 11735.
SITE VISIT: ALL INTERESTED OFFERORS MUST CONTACT Long Island National Cemetery Director at (631) 454-4949 or via email at Jeffrey.Tavares@va.gov at the Long Island National Cemetery to set up a site visit appointment. Site visits will be scheduled during the second week of the solicitation period. An appointment must be made in advance prior to visit. No exceptions.
Post Award Conference: Prior to commencement of work, contract awardee is required to make an appointment for a conference with the COR and/or Contracting Officer to assure that all parties understand all contractual obligations and the role that each party serves.
Duration: The term of the contract is from date of award through one year with four (4) one year renewal options.
Type of Contract: This is a firm-fixed price type contract for the supplies / services specified and effective for the period stated in the Schedule. Quantities of services specified in the Price Schedule are estimates only and are not purchased by this contract.
Note: Landfill Rates: If the landfill used by the Contractor for disposal of waste / trash picked-up under this contract adjusts its tonnage fee for disposal, that fact shall not constitute the basis for an equitable price adjustment.
All-Inclusive Pricing: Unit Costs offered must be “All-Inclusive” for materials, labor, transportation, surcharges, fees and services necessary and incident to the provision of Non-Hazardous Waste Collection & Disposal Services. “All-Inclusive” pricing includes environmental fees, fuel surcharges and all other services necessary and incident to the required work. There will be no additional costs or special service charges. Invoices shall reflect only those costs indicated in the Price Schedule.
DESCRIPTION / SPECIFICATIONS / WORK STATEMENT
A.1 SCOPE
(a) The Contractor shall provide NON-HAZARDOUS WASTE (TRASH) COLLECTION & DISPOSAL SERVICES to Long Island National Cemetery, located at 2040 Wellwood Ave. Farmingdale, NY 11735.
(b) The Contractor shall be responsible for the collection of and delivering non-hazardous waste to an approved, licensed, certified disposal area / landfill. Disposal shall be conducted in accordance with all local, State and Federal legal requirements and in an environmentally safe manner.
A.2 SPECIFICATIONS
(a) Dumpster Requirements: The Contractor shall provide factory new or newly refurbished (within the past three months and in a “like new” state of condition) roll-off type dumpster(s) at the beginning of the contract period. Each dumpster shall display the company name and contactor information. The containers shall be compatible with the contractors pick up equipment, shall be water tight, rodent proof and inherently fire proof. Dumpster requirements are as follows:
| Description |
| Qty |
| Location |
30 cubic yard Open Top Roll-Off Dumpster
| 2 |
| Cemetery Spoils Area |
(b) Waste / trash placed in dumpsters shall consist of plastic or aluminum beverage containers, magazines, newspapers, mixed office papers, fresh and artificial floral arrangements, grave blankets, cafeteria waste, general office waste and food wrappings.
(c) Dumpsters which become damaged due to handling and use shall be replaced at no cost to the Government. Damaged or unsightly dumpsters shall be replaced at the written request of the Contracting Officer or his/her Representative.
(d) The Contractor shall be responsible for cleaning up and disposing of all trash, garbage, and debris spilled from the dumpsters during the Contractor’s pickup and disposal process.
(e) All non-hazardous waste / trash shall be removed and disposed-of off the Government premises. No on-site burning or disposal is allowed.
(f) The Contractor is solely responsible for full compliance with all Federal, State, Local and all other applicable laws, policies, rules and regulations. In the event of a conflict of two or more regulations, the strictest of the regulations shall apply.
(g)The Contractor shall be responsible for the provision of all permits, licenses, certifications and fees necessary to perform the required services.
(h) No recycling activities are included in this work
(i) On – Call Pickup: The Contractor shall pickup and empty dumpsters, transport and dispose of (off-site) non-hazardous waste (trash) from Long Island National Cemetery. Pickup and disposal services shall be provided on an “On Call” basis and will be Monday through Friday, during daily work business hours of 8:00 AM through 4:30 PM. Pickup shall be within 48 hours of the request.
QUANTITY & PAYMENT
(a) Pick-up / Empty / Return two (2) open top 30 cubic yard roll off containers. Estimated 52 pickups (loads) per fiscal year.
(b) Pickups may vary from a minimum of 4 to a maximum of 9 per month based on months activities.
(c) Dump fee per 30 cubic yard container shall be by the load - not by weight.
(d) Payment: Contractor must have the ability to accept Government Credit Card for payment.
A.3 EQUIPMENT AND GENERAL REQUIREMENTS
(a) The Contractor shall provide and be responsible for all dumpster maintenance, labor supervision, equipment, handling, and transportation of waste.
(b) The Contractor and COR shall jointly determine suitable location(s) for the dumpster(s) to ensure the locations do not interfere with Long Island National Cemetery operations, and which maintain a clear access for the Contractor’s collection vehicles.
(c) All vehicles and materials handling equipment shall be equipped with OSHA approved back-up alarms.
A.4 WORK HOURS
(a) Hours Of Operation: Waste / trash removal services shall be performed at Long Island National Cemetery during normal Hours of Operation - Monday through Friday, with the exception of National Holidays (see National Holiday schedule below), between the hours of 8:00 a.m. – 4:30 p.m. The Contractor may provide services during the weekends (Saturday & Sunday) during the hours of 8:00 a.m. – 4:30 p.m., with written authorization from the COR.
(b) National Holidays: Contract personnel will not be required to work on the ten holidays observed by the Federal Government. Unless otherwise specified, when a holiday falls on a Sunday, the following Monday shall be the legal holiday as observed by the Federal Government. When a holiday falls on a Saturday, the preceding Friday shall be observed as the legal holiday. The ten holidays observed by the Federal Government are as follows:
| Holiday |
| Date |
| Month |
| New Years Day |
| 1st |
| January |
| Martin Luther King Jr.’s Birthday |
| 3rd Monday |
| January |
| President’s Day |
| 3rd Monday |
| February |
| Memorial Day |
| Last Monday |
| May |
| Juneteenth |
| 19th |
| June |
| Independence Day |
| 4th |
| July |
| Labor Day |
| 1st Monday |
| September |
| Columbus Day |
| 2nd Monday |
| October |
| Veterans Day |
| 11th |
| November |
| Thanksgiving Day |
| 4th Thursday |
| November |
| Christmas Day |
| 25th |
| December |
Or any other day specifically declared by the President of the United States to be a National Holiday.
A.5 COMPLIANCE WITH APPLICABLE FEDERAL STATE AND LOCAL REQUIREMENTS
In performing work under this contract, the Contractor shall comply with all relevant federal, state, and local statues, ordinances, laws, and regulations.
A.6 INDEMNITY - ENVIRONMENTAL HEALTH AND SAFETY VIOLATIONS
Should the contractor, in the performance of work under this contract, fail to comply with the requirements of environmental permits, local laws of regulations, state laws or regulations, Federal laws or regulations, the Statement of Work and its Attachments and cause any environmental, health, or safety liability to be assessed against the Government, the Contractor agrees to indemnify the Government from this liability. This requirement shall be placed in all subcontracts awarded by the contractor under this contract.
A.7 REPRESENTATIVES OF THE CONTRACTING OFFICER
(a) The Contracting Officer reserves the right to designate representatives to act for him/her in furnishing technical guidance and advice or generally supervise the work to be performed under the contract. Such designation will be in writing and will define the scope and limitations of designee's authority. A copy of the designation(s) shall be furnished to the Contractor at time of award.
(b) The VA Contracting Officer will delegate one (or more) representatives to serve as the Contracting Officer’s Representative (COR). The COR may direct and arrange the Contractor’s work schedule in specific areas of the cemetery to coordinate with daily cemetery activities and operations. Duties and responsibilities of the COR include day-to-day monitoring of the contract as follows:
(c) Providing contract oversight and technical guidance to the Contractor.
(d) Placing orders for services.
(e) Verification / certification of payments to the Contractor for services rendered.
(f) Assuring that any changes effecting work involved, price, terms and/or conditions under the contract are not implemented before written authorization is issued by the Contracting Officer.
(g) All administrative functions remain with the VA Contracting Officer. Any modifications to the contract, including those involving no-cost changes, increases and decreases in cost or level of services provided, termination or extension of the contract (in part or in whole) and decisions concerning claims or disputes, must be authorized in writing by the Government Contracting Officer.
A.8 MISCELLANEOUS
(a) Safety
(i) The Contractor must meet all safety requirements of Long Island National Cemetery's Safety Officer, Department of Veterans Affairs, OSHA, and the State of New York. It is incumbent upon the Contractor to be familiar with these requirements. "Safety" shall also include the Contractor having a safety representative who maintains regular and routine contact with the Safety Officer of Long Island National Cemetery.
(ii) Adequate warning devices, barricades, guards, flagmen or other necessary precautions shall be taken by the Contractor to give advice and reasonable protection, safety, and warnings to persons and vehicular traffic within the area.
(iii) Contractor shall demonstrate a clear understanding of, and sensitivity to, environmental issues and be consistent and fully compliant with all applicable Federal, State, County and City laws, ordinances, Right-to-Know laws, EPA guidelines, and regulations.
(b) Reporting "On-The-Job" Injuries
(i) The Contractor is required to report all "on-the-job" injuries incurred by the Contractor, its agents or employees, resulting from performance of this contract.
(ii) Contractor will notify the COR (either orally or via telephone) within twenty-four (24) hours of the injury and provide details and exact location of the incident.
(iii) This will be followed up by a written notice to the COR. Any Contractor (including its agents and employees) that knowingly files a false claim may be criminally prosecuted.
(c) Responsibilities
(i) The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work site.
(ii) Communication & Coordination of Work with COR: Communication with the COR is strongly encouraged. Burial activities at NCA shall take precedence over contract work activities. Work activity and noise cannot disturb Burial Services. Trucks and workers are prohibited from passing through the service area during this period.
(iii) Insurance, Licenses & Permits: The Contractor shall possess and maintain all necessary insurance, licenses and permits required for contract performance. Contractor is responsible for any injury to himself/herself, his/her employees, as well as for any damage to personal or public property that occurs during the performance of this contract that is caused by his/her employees fault or negligence, and shall maintain personal liability and property damage insurance having coverage for a limit as required by the laws of the State of Pennsylvania. The Contractor is responsible for repair and / or replacement of any damaged structures and / or other Government property.
(d) Contractor Personnel
The Contractor is responsible for:
(i) Directing, overseeing and coordinating the work involved.
(ii) Staying abreast of all upcoming cemetery functions including special holiday events and interment activities.
(iii) Ensuring that contract work does not cause any committal service, ceremony, procession or visitation to be delayed, altered, or otherwise impacted in such a way that the dignity, security, or safety of the event or visit is compromised.
(iv) Contractor will re-direct work throughout the rest of the Cemetery – so that productive use of labor and equipment is assured, and downtime is avoided. If the Contractor fails to re-direct employees away from an event in a timely fashion, the COR may then do so.
(e) Communication & Coordination of Work with COR
(i) Communication with the COR (or designee) is strongly encouraged.
(ii) Burial activities at the National Cemetery shall take precedence over contract work activities. Work activity and noise cannot disturb Burial Services.
(iii) Trucks and workmen are prohibited from passing through the service area during this period. Note: To cause the least possible interference with cemetery activities, contract personnel will stop (cease) all work in areas where burials are taking place. As a general "rule-of-thumb", work should not take place within 1,000 feet of an ongoing committal service or ceremony.
(iv) Notwithstanding the Contractors responsibility for total management during the performance of this contract, the administration of the contract will require maximum coordination between the Government and the Contractor. The Government shall provide, at the time of contract award, a list of Government personnel authorized to act as Contracting Officer's Representatives.
(f) Personnel Appearance
(i) Contractor personnel shall maintain a neat and professional appearance throughout its workforce, vehicles, equipment, and work areas.
(ii) Contractor personnel shall be fully clothed at all times, to include an upper garment to cover the body from the waist to neck and long pants or slacks. Contractor personnel must wear a uniform bearing the name of the Contractor, or by wearing badges bearing the Contractor’s name and the employee’s name in English.
(iii) Other clothing, in question, shall require the COR written approval. No clothing shall be worn with inappropriate phrases, logos, words or images as determined by the COR.
(g) Personnel Conduct
(i) Due to the sensitive mission of the cemetery, the work often requires contact with, and exposure to, grieving individuals. Contractor personnel must exercise and exhibit absolute decorum, composure and stability at all times.
(ii) The Contractor employees shall behave with appropriate courtesy and respect while within the Cemetery or at its perimeter or entrances. Shouting, cursing, angry outbursts, sleeping, intoxication, and violence or criminal acts of any kind will not be tolerated - and is cause for immediate removal from the Cemetery.
(End of Work Statement)
File details come from the government source that posted it. Updated .