XLSX spreadsheet 23 KB Posted

Attached to
Eq Rental- Highway Sweeping D-5
Solicitation number
RFB 605 2500000185 1
Issued by
Bath County, Kentucky

About this file

This is a Highway Sweeping Work Location Schedule for District 5 prepared by the Kentucky Transportation Cabinet, covering sweeping operations across multiple interstate highways and state routes in Bullitt, Shelby, and Jefferson counties. The work includes sweeping of pavement areas, curblines, bridges, barrier walls, and overhead structures on I-65, I-64, I-71, I-265, I-264, and KY 841. The schedule specifies 152.093 total sweeping miles to be completed across multiple cycles, with sweeping frequencies ranging from 3 to 12 cycles per route segment. The contract requires completion of a full sweeping cycle within 21 calendar days and designated partial sweeping cycles within 5 calendar days. The work encompasses rest areas, bridge structures, tunnels, and highway segments with varying complexity levels, from simple pavement sweeping to operations involving multiple overhead structures and barrier walls.

The schedule indicates that certain sweeping work totaling 6.902 miles across designated segments is paid through the Local Surface Infrastructure Operations and Repair Bond (LSIORB) program, with the remaining 145.191 miles funded through standard highway maintenance operations. The document does not specify pricing terms, bid due dates, award dates, contract duration, or renewal options, as it functions primarily as a detailed work location and scope reference document. No information is provided regarding incumbent contractors, set-asides, bonding requirements, or specific funding amounts, suggesting this document serves as the technical specifications component of a larger solicitation package.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Highway Sweeping Work Location Sheet
District 5

Route County Project Number From To Sweeping Miles # of Cycles Total Miles Description

I-65BullittFE01 015-0065Rest Area Exit RampRest Area Entrance Ramp0.69832.094Sweep all pavement areas at the Rest Area
112-114(MP 113.650)(MP 112.952)
I-64ShelbyFE01 106-0064Rest Area Exit RampRest Area Entrance Ramp0.7232.16Sweep all pavement areas at the Rest Area
028-029(MP28.250)MP28.970

Subtotal 3 Cycles Route(s) 1.418 (Miles measured from begin to end of RA Ramps)

KY 841JeffersonFE01 056-0841US 31WI-65
000-010(MP 0.000)(MP 10.000)2.45614.7Sweep curblines, bridges & barrier walls
I-265JeffersonFE01 056-0265I-65I-717.105642.63Sweep curblines, bridges & barrier walls
010-035(MP 10.000)(MP 35.000)

Subtotal 6 Cycles Routes 9.555 (Miles for length of cleaning ONLY)

I-264JeffersonFE01 056-0264I-64I-7146.1112553.32Sweep curblines , Bridges, barrier walls and
000-024(MP 0.000)(MP 23.055)overhead bridges at KY 864, KY 1703, KY 1932
I-64 , US 60 and US 42
I-64JeffersonFE01 056-0064Mellwood Bridge (Eastside)0.047 mile West of Browns Lane10.34812124.176Sweep all bridges and tunnels
006-012(MP 6.701)(MP 11.875)
I-64JeffersonFE01 056-00640.700 mile East of I-2641.0 miles West of I-2659.94612119.352Sweep curblines , Bridges, barrier walls and
012-018(MP 12.943)(MP 17.916)overhead bridges at Blankenbaker Parkway
(KY 913)
I-64JeffersonFE01 056-0064English Station Rd BridgeShelby Co Line8.80212105.624Sweep curblines, bridges & barrier walls
019-024(MP 19.573)(MP 23.974)
I-65BullittFE01 015-0065Hardin Co Line0.672 mile North of Hardin Co Line1.3441216.128Sweep curblines, bridges & barrier walls
103-104(MP 103.308)(MP 103.980)
I-65BullittFE01 015-0065Beginning of the Roadway BridgeEnd of the Railroad Bridge0.274123.288Sweep curbline of the railroad bridge and the roadway bridge
112-113(MP 112.517)(MP 112.654)
I-65BullittFE01 015-00650.2 Mile South of KY 4800.2 Mile North of KY 443.0881237.056Sweep curblines, bridges, barrier walls and
115-117(MP 115.321)(MP 116.865)the overhead bridges at KY 44, KY 245 and KY1526
I-65BullittFE01 015-0065Beg. Of Barrier WallEnd of Barrier Wall0.138121.656Sweep the barrier wall ( NORTHBOUND ONLY)
118-119(MP 118.180)(MP 118.042)
I-65JeffersonFE01 056-00650.8 Mile North of the0.245 Mile South of the14.77812177.336Sweep curblines, bridges, barrier walls and
123-132Bullitt County LinePhillips Lane Bridgeoverhead bridges at I-265, KY 1065, KY 1631
(MP 123.900)(MP 131.289)and all ramp bridges at I-265
I-71JeffersonFE01 056-0071I-64I-2649.93212119.184Sweep bridges and curblines
000-005(MP 0.000)(MP 4.966)
I-64ShelbyFE01 106-0064Beg. Of Barrier WallEnd of Barrier Wall17.80212213.624Sweep curblines, bridges barrier walls and
023-033(MP 23.974)(MP 32.875)overhead bridges at KY 1848 and KY 55
I-65JeffersonFE01 056-00650.254 Mile South of theSouth End Ali Bridge8.58212102.984Sweep all paved areas outside of roadway
131-136Phillips Lane Bridge(MP 135.58)
(MP 131.289)
I-64JeffersonFE01 056-0064Sherman Minton BridgeRiver Road Bridge9.97612119.712Sweep all paved area outside of roadway
000-005(MP 0.000)(MP 4.988)

Subtotal 12- Cycles Routes 141.12

Sweeping Paid for by LSIORB

I-64JeffersonFE01 056-0064River Road BridgeMellwood Bridge (Eastside)3.4261241.112Sweep all paved area outside of roadway
005-007(MP 4.988)(MP 6.701)
I-65JeffersonFE01 056-0065South End Ali BridgeNorth End of River Bridges3.4761241.712Sweep all paved areas outside of roadway
136-138(MP 135.58)(MP 137.318)

Subtotal 12- Cycles Routes 6.902

Total Sweeping Miles 152.093 1837.848

Maximum time to complete a Full Sweeping Cycles : 21 Calendar Days
Maximum time to complete a Designated Partial Sweeping Cycle: 5 Calendar Days