FINAL FLYER eg Gunnison WTP Industry Briefing 15May2025 r2 (1).pdf

PDF 7 MB Posted

Attached to
Notice of Intent to Solicit Water Treatment Plant Replacement
Solicitation number
25-10
Issued by
Grand County, Colorado

About this file

This document is an invitation flyer from the City of Gunnison, Colorado, announcing an Industry Pre-Procurement Briefing for a new Water Treatment Plant Progressive Design-Build Project. The online briefing is scheduled for Thursday, May 15, 2025, from 1:00-2:00 PM Mountain Standard Time, with no RSVP required. The city will be initiating procurement of progressive design-build services for a new Water Treatment Plant located at the VanTyl Ranch, marking a transition from groundwater supply to treated surface water. Optional site visits will be available from May 19-22, 2025, on a first-come, first-served basis following the briefing.

The project is estimated to cost approximately $35 million and will utilize a two-step progressive design-build procurement process. The approach allows for an integrated design-build team to collaborate with the city in developing the new facility through a phased method. Phase one will include review of existing information, design, and preconstruction, while phase two will focus on final design, construction, and commissioning. The project may be subject to federal and state funding terms, and a 30% design set has already been developed. The city emphasizes that plans can change and no future procurement is guaranteed, providing an open invitation for industry experts to learn more about the potential opportunity.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

You’re Invited….

City Of Gunnison, Colorado Industry Pre-Procurement Briefing New Water Treatment Plant Progressive Design-Build Project

Join the City of Gunnison for an on-line open-invitation Industry Briefing regarding our new Water Treatment Plant project:

Thursday, May 15, 2025 1:00PM-2:00PM, Mountain Standard

No RSVP necessary, please share this invitation with others.

Teams Meeting Link: Market Briefing Presentation WTP Reservations for optional site access available on a first come, first served basis following the conclusion of the briefing. Site visits will be May 19-22, 2025.

We’re moving from groundwater supply to treated surface water.

This summer, the City of Gunnison will be initiating the procurement of progressive design-build services* for a new

Water Treatment Plant located at the VanTuyl Ranch.

Prior to initiating a two-step progressive design-build procurement process, the City will share information about the project with all interested parties.

* Plans can always change, no future procurement is guaranteed.

https://teams.microsoft.com/l/meetup-join/19%3ameeting_MzY5NTMzM2EtMGIzOC00Mzk5LTk3N2UtNGEzNTljYjdiMWYy%40thread.v2/0?context=%7b%22Tid%22%3a%225e0eb617-bbcc-449f-b1c3-a73273204ecb%22%2c%22Oid%22%3a%22ca801f6d-ee29-4e63-8c51-e714e6d1c1a5%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_MzY5NTMzM2EtMGIzOC00Mzk5LTk3N2UtNGEzNTljYjdiMWYy%40thread.v2/0?context=%7b%22Tid%22%3a%225e0eb617-bbcc-449f-b1c3-a73273204ecb%22%2c%22Oid%22%3a%22ca801f6d-ee29-4e63-8c51-e714e6d1c1a5%22%7d

File details come from the government source that posted it. Updated .