FINAL DRAWINGS Replace Roofs.pdf
PDF 695 KB Posted
- Solicitation number
- 36C25723B0054
About this file
This document outlines specifications for replacing roofs on three buildings at the Department of Veterans Affairs Amarillo VA Health Care System facility. The contractor will replace fully adhered EPDM roofs with new sloped fully adhered TPO roofing systems on Buildings 9, 10, and 45, which range in size from approximately 5,265 square feet. The contractor must comply with all applicable safety regulations and standards. Davis-Bacon wage rates apply to the project located in Potter County, Texas. Temporary traffic control and flaggers when lanes are blocked are required. The contractor will field verify dimensions, provide silt barriers, and protect landscaping. All debris must be removed daily and receipts submitted within five business days. Any damage to the facility will be repaired at no cost. Air inlets must be covered, and all impacted areas patched. Downspouts and scuppers will be replaced and tested for continuous water flow.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Abstract of Offers 36C25723B0054 Signed.pdf | ||
| 36C25723B0054 0003.docx | DOCX document | |
| 36C25723B0054 0001 Add RFIs.pdf | ||
| 36C25723B0054 0002.docx | DOCX document | |
| Wage Determination.pdf | ||
| PRE-BID RFIs with Responses.pdf | ||
| Pre-Bid Sign-In Sheet.pdf | ||
| 36C25723B0054_1.docx | DOCX document | |
| FINAL SPECIFICATIONS Replace Roofs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF VETERANS AFFAIRS
AMARILLO VA HEALTH CARE SYSTEM
6010 AMARILLO BLVD WEST
AMARILLO, TX 79106
REPLACE ROOF BUILDING 9, 10, & 45
504-22-105
1. CONTRACTOR SHALL COMPLY WITH OSHA REGULATIONS, STATE OF TEXAS LAW CONCERNING ROOF
WORK AND VA SAFETY GUIDELINES.
2. DAVIS/BACON WAGE RATES APPLY (POTTER COUNTY).
3. CONTRACTOR SHALL PROVIDE TEMPORARY TRAFFIC CONTROL AS PER THE GUIDELINES SET FORTH IN THE TEXAS MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES, LATEST EDITION, SHALL BE OBSERVED DURING
CONSTRUCTION WHILE WHENEVER TRAFFIC IS IMPEDED.
4. FLAGGER(S) REQUIRED TO DIRECT TRAFFIC WHEN ANY ONE LANE IS BLOCKED.
5. CONTRACTOR MUST NOTIFY ENGINEERING BEFORE CLOSING ANY LANE OR SIDEWALK. THE REQUEST MUST BE MADE AT LEAST TEN (10) BUSINESS DAYS PRIOR TO THE DATE FOR WHICH THE CLOSURE IS
PROJECTED. REQUESTS TO BLOCK TRAFFIC SHALL BE APPROVED BY COR.
6. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL COMPARE THE DIMENSIONS SHOWN ON THE CONSTRUCTION PLANS WITH THOSE MEASURED IN THE FIELD. ANY DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER OR CONTRACTING OFFICER REPRESENTATIVE IMMEDIATELY.
7. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS.
8. CONTRACTOR SHALL PROVIDE SILT BARRIER TYPE FENCE WHENEVER BLOCKAGE OF PEDESTRIAN TRAFFIC
OR ANY AREA IS TO BE BLOCKED OFF.
9. CONTRACTOR TO TAKE NECESSARY PRECAUTIONS TO PROTECT ALL SHRUBS, PLANTS AND TREES ALONG AREAS WHERE WORK MAY BE PERFORMED, INCLUDING THE IMMEDIATE REMOVAL OF NAILS, SCREWS, HARDWARE AND DEBRIS DUE TO ACTIVE VEHICLES AND PEDESTRIANS.
10. ALL AREAS INVOLVED AND NOT INVOLVED IN THE SCOPE OF WORK FOR THIS PROJECT SHALL BE KEPT CLEAN AND FREE OF OBSTRUCTIONS AT ALL TIMES. ERECT BARRICADES AND WARNING SIGNS TO DIVERT
AND WARN PASSERS-BY OF THE CONSTRUCTION WORK.
11. ALL MATERIAL DEVELOPED AND ACCUMULATED DURING DEMOLITION, UNLESS OTHERWISE NOTED TO BE REUSED, SHALL BECOME PROPERTY OF THE CONTRACTORS AND LEGALLY RECYCLED OR DISPOSED OF OFF- SITE. ALL TRASH AND DEBRIS TO BE REMOVED ON A DAILY BASIS AND ALL RECYCLED AND WASTE
RECEIPTS SHALL BE TURNED OVER TO THE C.O.R. WITHIN FIVE (5) BUSINESS DAYS.
12. ANY DAMAGE CAUSED TO THE BUILDING OR GOVERNMENT EQUIPMENT (A.K.A: AIR HANDLERS, LOUVERS, ETC.) SHALL BE REPAIRED OR REPLACED BACK TO ITS ORIGINAL CONDITIONS AT NO ADDITIONAL COST TO THE GOVERNMENT. IF THERE IS PRIOR DAMAGE, THE CONTRACTOR IS TO DOCUMENT AND TURN PHOTOS IN TO THE CO AND COR PRIOR TO START OF WORK, OTHERWISE, THE CONTRACTOR WILL BE HELD ACCOUNTABLE IF IT APPEARS THAT THE DAMAGE MAY HAVE BEEN FROM A CONTRACTOR OF THIS
PROJECT.
13. COVER ALL AIR INLETS AIRTIGHT TO PREVENT DUST FROM ENTERING THE BUILDING.
14. PATCH AND REPAIR ALL IMPACTED AREAS TO ORIGINAL CONDITION WHERE DEMOLITION OR DAMAGE
OCCURRED.
15. FULLY ADHERED E.P.D.M. ROOF TO BE REPLACED WITH FULLY ADHERED T.P.O. ROOFING SYSTEM.
16. ALL DOWNSPOUTS AND FLAT ROOFS SHALL BE WATER TESTED TO VERIFY NO LEAKS OCCUR IN
ACCORDANCE TO ASTM D5957-98(2013) STANDARD GUIDE FOR FLOOD TESTING HORIZONTAL
WATERPROOFING INSTALLATIONS.
17. ALL DOWNSPOUT AND FLAT ROOFS SHALL BE TESTED FOR CONTINUOUS WATER FLOW.
GENERAL NOTES
1. BUILDING 9 AND 10 EACH HAVE A FULLY ADHERED E.P.D.M. FLAT ROOF APPROXIMATE 5,265 SQ.FT. WITH SIX GUTTERS AND FIVE OVERFLOW SCUPPERS ON BOTH LONG SIDES OF BUILDING. EXISTING ROOF TO BE REMOVED TO METAL DECK AND REPLACED WITH NEW SLOPED FULLY ADHERED T.P.O. SLOPE TO BE BUILT UP TO GUIDE WATER TO THE DRAINS. T.P.O. SHALL RUN UP ALL PARAPET WALLS AND BE TERMINATED
UNDER FLASHING.
2. BUILDING 45 HAS A FULLY ADHERED E.P.D.M. FLAT ROOF APPROXIMATE 5,265 SQ.FT. WITH EIGHT GUTTERS AND EIGHT OVERFLOW SCUPPERS ON BOTH LONG SIDES OF BUILDING. EXISTING ROOF TO BE REMOVED TO METAL DECK AND REPLACED WITH NEW SLOPED FULLY ADHERED T.P.O. SLOPE TO BE BUILT UP TO GUIDE WATER TO THE DRAINS. T.P.O. SHALL RUN UP ALL PARAPET WALLS AND BE TERMINATED
UNDER FLASHING.
3. ANY HOLES FOUND UNDERNEATH EXISTING E.P.D.M. OR FLASHING TO BE PATCHED AND SEALED IN ACCORDANCE TO INDUSTRY STANDARDS FOR METAL FLAT ROOFS. ALL HOLES ARE TO BE FILLED FOR
WATER TIGHTNESS.
4. ALL DOWNSPOUTS ARE TO BE SNAKED, CLEANED, AND REPAIRED WITH FLOW UNINTERRUPTED IN ORDER TO GIVE CONTINUOUS FLOW OF RAIN WATER. DOWNSPOUTS ARE CURRENTLY IN GOOD ORDER, MAY
FIND SOME WITH A DING DUE TO MOWER TO BE REPAIRED.
5. SCUPPERS TO BE REPLACED WITH T.P.O. WITH FLOW OF WATER ABLE TO EASILY FLOW THROUGH WITHOUT BECOMING CLOGGED. ALL SCUPPERS SHALL BE TRIMMED TO NOT STICK OUT AND TO BE
SEALED AND BLENDED WITH EXTERIOR WALL TO NOT STICK OUT.
6. FLASHING TO BE REPLACED AND COVER TERMINATION BAR.
7. ALL ROOF VENTS AND PIPES SHALL BE CODE COMPLIANT WITH NEW ROOFING SYSTEM. CONTRACTOR TO
FIELD VERIFY PRIOR TO BIDDING THE AMOUNT, LOCATION AND SIZE.
8. LAY-DOWN AREAS ARE NOT APPROVED UNTIL NOTICE TO PROCEED IS ISSUED. MATERIALS SHALL BE FENCED, LOCKED AND SECURED AT ALL TIMES UNLESS LOADING OR UNLOADING. PARKING IS LIMITED, CARPOOLING IS RECOMMENDED.
KEY NOTES
OVERFLOW DRAIN (SCUPPER) KEY NOTE REFERENCE
EXISTING DOWNSPOUT
LEGEND
1 BUILDING 10
0'-3/32" = 1'-0"
4 5
2 BUILDING 09
0'-3/32" = 1'-0"
3 BUILDING 45
0'-3/32" = 1'-0"
4 SITE MAP
0'-1/64" = 1'-0"
6 71 3
4 5 6 71 3
4 5 6 72 3
File details come from the government source that posted it. Updated .