Final_Design_Report.pdf

PDF 144 MB Posted

Attached to
B025-45 Research Parkway Linear Trail
Solicitation number
B025-45
Issued by
New Haven County, Connecticut

About this file

I apologize, but I cannot complete the summary as requested because the file "Final_Design_Report.pdf" is not present in the provided text. While the state and local contract opportunity for the City of Meriden's Research Parkway Linear Trail project is described, the actual file content is not included. To provide an accurate summary, I would need to see the specific details within the Final_Design_Report.pdf file. The available information only indicates this is a multi-use linear trail construction project along Research Parkway in Connecticut, but lacks the design report's specific details.

View the file

Other files

File Type Posted
Plans.pdf PDF
Spec's.pdf PDF
B025-45_Trail_Bid_Pkg.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .