Final AS Builts CO FTNP FLFO900(1).pdf

PDF 15 MB Posted

Attached to
CO NP MULTI PMS(2), Pavement Preservation Colorado Phase 2
Solicitation number
69056723R000012
Issued by

About this file

This document provides details on a federal contract opportunity from the Department of Transportation Federal Highway Administration. The solicitation number is 69056723R000012 for the CO NP MULTI PMS(2), Pavement Preservation Colorado Phase 2 opportunity. This is a contract for pavement preservation services in Colorado to be performed in Phase 2. The solicitation was issued to maintain and preserve highways and roads through repair and resurfacing. The response deadline and award date are not specified, nor are any pricing, set-aside, or incumbent details provided in this document. The file attached is plans and specifications for the roadwork totaling 15MB in size.

View the file

Other files

File Type Posted
Amendment A002.pdf PDF
QA_12-14-2023.pdf PDF
QA_12-13-2023.pdf PDF
Amendment A001.pdf PDF
QA_12-07-2023.pdf PDF
COLM_C6_Final_Report.pdf PDF
FOLA_C6_Final_Report.pdf PDF
FLH Bridge oversized or overload vehicle permit request form Oct 2018.pdf PDF
BLCA_C6_Final_Report.pdf PDF
FLFO_C6_Final_Report.pdf PDF
CO NP MULTI PMS(2) PHASE 2 PLANS_signed.pdf PDF
RFP_69056723R000012_CO NP MULTI PMS(2).pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

10+12.00

860860

4 4

2 2

2.7

214.8

15.93 1,866.2

Item removed in agreement with NPS

6,569.2 1,140.79

1,166.9

811.7 181.0

5,392.0

2.2

1.1

4.6 2,810.6

1,087.80 535.07

589.0

2 Wheelstop in Admin Parking Lot not accounted for29

286.1

1.5

1.5 13.5

1,695.0

Need to revisit

0.638

4.6

219.4

214.8

1,866.2 06,569.2 1,140.79 0

1,087.8 535.07 0 0

0 02,954.0 6,569.2 1,675.86

Need to revisit

1160 2

See Sheet E2 for locations for placement

2 4

0 0

15.93

15.93

2 Wheelstop in Admin Parking Lot not accounted for

1 1

1 1

1166.9 286.0

875.0

811.7

286.1

1097.8

Actual 3 Bus Parking and 2 HCP Signs

One way arrow

No Right Turn 1

2 Right Turn Arrow

Subexcavation-13 +27.00 to 13+84.00

Relocated Electric Line Charging Station

Lowered to Code at Same Location

Grade ditch to drain

Concrete Curb & Gutter, 12-inch Depth

See Special 615-C, Sheet 2 for final changes made

See Sheet C3-1 and Sheet C3-2 for New Layout of the Overflow Parking Lot and Exit

Concrete Curb & Gutter, 12-inch Depth

Concrete Curb & Gutter, 12-inch Depth

Rip Rap Channel

Rip Rap Channel

Moved Direction arrow to first stall

New Edge of Embankment

See Sheet C3-1 and Sheet C3-2 for New Layout of the Overflow Parking Lot and Exit

Rip Rap Channel

C3-1Moved Direction arrow to first stall

Rip Rap Channels

C3-2

Moved Direction arrow to first stall

Curb and Gutter

Curb and Gutter

No Check Dams were used

700 LNFT of Fiber Roll Installed Schedule A

60 LNFT of Fiber Roll Installed Option X

60 LNFT of Fiber Roll Installed Option X

180 LNFT of Fiber Roll Installed Option X

140 LNFT of Fiber Roll Installed Schedule A

Inlet Protection Option X Inlet Protection Option X

Inlet Protection Schedule A

Inlet Protection Schedule A

Inlet Protection Schedule A

Inlet Protection Schedule A

Check Dam Schedule A

60 LNFT of Fiber roll installed Schedule A x

Extended 12 inch curb and gutter to ramp and eliminated 11 feet of sidewalk.

Matched joints with stripping see Sheet T19X for details

Superseded x

Moved Direction arrow to first stall