Final AS Builts CO FTNP FLFO900(1).pdf
PDF 15 MB Posted
- Solicitation number
- 69056723R000012
About this file
This document provides details on a federal contract opportunity from the Department of Transportation Federal Highway Administration. The solicitation number is 69056723R000012 for the CO NP MULTI PMS(2), Pavement Preservation Colorado Phase 2 opportunity. This is a contract for pavement preservation services in Colorado to be performed in Phase 2. The solicitation was issued to maintain and preserve highways and roads through repair and resurfacing. The response deadline and award date are not specified, nor are any pricing, set-aside, or incumbent details provided in this document. The file attached is plans and specifications for the roadwork totaling 15MB in size.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
10+12.00
860860
4 4
2 2
2.7
214.8
15.93 1,866.2
Item removed in agreement with NPS
6,569.2 1,140.79
1,166.9
811.7 181.0
5,392.0
2.2
1.1
4.6 2,810.6
1,087.80 535.07
589.0
2 Wheelstop in Admin Parking Lot not accounted for29
286.1
1.5
1.5 13.5
1,695.0
Need to revisit
0.638
4.6
219.4
214.8
1,866.2 06,569.2 1,140.79 0
1,087.8 535.07 0 0
0 02,954.0 6,569.2 1,675.86
Need to revisit
1160 2
See Sheet E2 for locations for placement
2 4
0 0
15.93
15.93
2 Wheelstop in Admin Parking Lot not accounted for
1 1
1 1
1166.9 286.0
875.0
811.7
286.1
1097.8
Actual 3 Bus Parking and 2 HCP Signs
One way arrow
No Right Turn 1
2 Right Turn Arrow
Subexcavation-13 +27.00 to 13+84.00
Relocated Electric Line Charging Station
Lowered to Code at Same Location
Grade ditch to drain
Concrete Curb & Gutter, 12-inch Depth
See Special 615-C, Sheet 2 for final changes made
See Sheet C3-1 and Sheet C3-2 for New Layout of the Overflow Parking Lot and Exit
Concrete Curb & Gutter, 12-inch Depth
Concrete Curb & Gutter, 12-inch Depth
Rip Rap Channel
Rip Rap Channel
Moved Direction arrow to first stall
New Edge of Embankment
See Sheet C3-1 and Sheet C3-2 for New Layout of the Overflow Parking Lot and Exit
Rip Rap Channel
C3-1Moved Direction arrow to first stall
Rip Rap Channels
C3-2
Moved Direction arrow to first stall
Curb and Gutter
Curb and Gutter
No Check Dams were used
700 LNFT of Fiber Roll Installed Schedule A
60 LNFT of Fiber Roll Installed Option X
60 LNFT of Fiber Roll Installed Option X
180 LNFT of Fiber Roll Installed Option X
140 LNFT of Fiber Roll Installed Schedule A
Inlet Protection Option X Inlet Protection Option X
Inlet Protection Schedule A
Inlet Protection Schedule A
Inlet Protection Schedule A
Inlet Protection Schedule A
Check Dam Schedule A
60 LNFT of Fiber roll installed Schedule A x
Extended 12 inch curb and gutter to ramp and eliminated 11 feet of sidewalk.
Matched joints with stripping see Sheet T19X for details
Superseded x
Moved Direction arrow to first stall