This document is an amendment to a solicitation for a federal highway construction contract. The amendment revises special contract requirements and traffic control plans for a multi-phase pavement preservation project in Colorado managed by the Department of Transportation Federal Highway Administration. Revisions include limiting work during specific event days, staggering work across no more than two parks at a time, protecting existing wheel stops, and requiring two-way radio communication between traffic controllers. Nighttime work is permitted but must use downcast lighting and minimize off-site impacts. The amendment also modifies labor standards clauses and the definition of subcontracting self-performance. Offerors must acknowledge any amendments prior to the solicitation response deadline.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
N/A
PAGE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)
A001 12/14/2023 N/A See Box 14
6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A
Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.
X
69056723R000012
9B. DATED (SEE ITEM 11)
11/16/2023
10A. MODIFICATION OF CONTRACT/ORDER NO.
N/A
10B. DATED (SEE ITEM 13)
CODE: N/A FACILITY CODE: N/A
N/A
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
(__ ) is extended, ( x ) is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
N/A
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN
ITEM 10A.
N/A
B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D OTHER (Specify type of modification and authority)
N/A
E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
CO NP MULTI PMS(2), Pavement Preservation Colorado Phase 2
See page 2
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, rema ins unchanged and in full force and effect.
15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
N/A
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION NOT USABLE
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Amendment No. A001, dated 12-14-2023 CO NP MULTI PMS(2)
Solicitation No. 69056723R000012 Pavement Preservation Colorado Phase 2
REVISIONS ARE AS FOLLOWS:
SPECIAL CONTRACT REQUIREMENTS
Page E-22, Subsection 108.01, Commencement, Prosecution, and Completion of Work.
Revises paragraph (f) and adds paragraph (g).
Pages E-51 through E-52, Subsection 156.04, Accommodating Traffic During Work.
Adds paragraph (b)(4).
ENCLOSURES
Pages:
E-22
E-51 through E-52
E-22 DIVISION 100
Special Contract Requirements
Project: CO NP MULTI PMS (2), Pavement Preservation Colorado Phase 2 complete this work according to the contract; administrative costs for this work; and other costs associated with this work for accommodating traffic and maintaining roadways.
This date will not be extended for any reason, except for delays caused by the Government.
(d) Additional Work Restrictions.
(1) Do not work in COLM during the following event days.
(a) Tour of the Moon Bicycle Ride. Friday and Saturday of this event in September.
(b) Rim Rock Marathon. On the weekend of this event in November.
(2) COLM Route 0010 Rimrock Drive. Perform all surface treatment construction operations using continuous feed micro surfacing equipment according to Section 409.
Truck mounted micro surfacing equipment can be used in areas where physical constraints preclude the use of continuous feed equipment.
(3) BLCA. Do not begin work prior to July 7, 2025.
(e) Perform work at maintenance areas on a weekend, or as directed by the CO.
(f) Limit surface treatment and culvert work to two parks at any one time. Mobilization, final sweeping, and pavement marking is allowed at more than two parks at a time.
(g) Where wheel stops are present within parking lot work limits, perform surfacing work around wheel stops, and protect wheel stops when working around them.
108.01A Labor. (Added Subsection).
Follow the requirements of FAR Clause 52.222-6 Construction Wage Rate Requirements.
Adjacent or virtually adjacent work sites, as used in FAR Clause 52.222-6, are defined to be work sites within ½ mile of the project. Application of Construction Wage Rate Requirements
(Davis-Bacon Act) for work sites beyond ½ mile of the project will be determined by the CO.
108.02 Subcontracting Amend as follows:
Delete the text of the first paragraph and substitute the following:
Follow the requirements of FAR Clause 52.222-11 Subcontracts (Labor Standards) and FAR
Clause 52.236-1 Performance of Work by the Contractor.
Delete the last paragraph and substitute the following:
In FAR Clause 52.236-1 Performance of Work, the percentage of work performed by the
Contractor will be computed as the cost of the contract work performed on-site by the Contractor’s employees divided by the total cost of the contract.
Revised by Amendment A001
E-51 DIVISION 150
Project: CO NP MULTI PMS (2), Pavement Preservation Colorado Phase 2
(4) FLFO Routes 0901 and 0902 may be closed one at a time, after coordinating closures at least 14 days in advance.
156.07 Limitations on Construction Operations. Amend as follows:
Delete paragraph (g) and substitute the following:
(g) Provide two-way radio communications between Traffic Control Supervisor, flaggers, and pilot cars. Provide two-way radio communications between flaggers, unless flaggers can see each other and communicate. Citizen band radios are not acceptable. Make radio equipment available to the CO.
Delete paragraph (i) and substitute the following:
(i) Unless otherwise directed by the CO, limit construction caused delays to public traffic to a maximum of 15 minutes per cumulative passage through the project; and
Add the following:
(k) Do not perform construction operations that cause delays or otherwise interferes with public traffic during the following dates and times.
(1) From 6:00 p.m. Friday through 7:00 a.m. Tuesday for Memorial Day holiday.
(2) From 6:00 p.m. Friday through 7:00 a.m. Tuesday for Labor Day holiday.
(3) From 6:00 p.m. July 3 through 7:00 a.m. July 5 for Independence Day Holiday.
(4) On any other holiday listed in Subsection 101.04, unless approved by the CO.
(5) Construction operations outside of maintenance areas are not allowed from 6:00 p.m.
Friday through 6:00 a.m. Monday, unless approved by the CO.
(l) For purposes of facilitating traffic, perform grading or surfacing part-width at a time. Make the width not under construction available to public traffic under alternate one-way control.
Furnish pilot car and driver, or flaggers, or both, as ordered by the CO, to direct traffic through sections of road under one-way control.
(m) When parked, unattended public vehicles restrict construction operations within approved closure limits and durations, coordinate the removal of these public vehicles with the CO.
(n) On routes with two of more travel lanes in each direction, ensure at least one travel lane in each direction within the work zone remains open to public traffic at all times. This requirement does not apply to routes under approved closures.
E-52 DIVISION 150
Project: CO NP MULTI PMS (2), Pavement Preservation Colorado Phase 2
156.08 Nighttime Operations. Amend as follows:
Add the following after the first paragraph:
Nighttime operations are allowed within the work hours specified under Subsection 108.01(a).
Comply with posted speed limits during daylight operations, and operate at speeds 5 mph less than the posted speed limits during nighttime operations.
Add the following:
During nighttime operations, use downcast lighting and fixture shielding to prevent light from extending beyond work area. Submit a site specific lighting plan demonstrating that the lighting minimizes the impact on the surrounding landscape.
156.09 Traffic Control Supervisor. Amend as follows:
Add the following after the first sentence:
Provide a separate traffic control supervisor while performing work simultaneously within two separate parks.
Add the following:
(l) Transport personnel, construction signs, barricades, drums, cones, tubular markers, and other traffic control devices.
(m) Prepare a Traffic Control Plan (TCP) that meets the requirements of Subsection 156.04.
(n) Keep Park visitors out of active construction areas and in designated public pathways.
(o) The traffic control supervisor will not be permitted to operate a pilot car, work as a flagger, laborer, or operator, except to relieve flaggers or pilot car drivers for short periods of time (i.e., a lunch or rest room break), but will be onsite and available at all times to perform the duties as described in this Section.