FINAL 506-20-204 Modernize Hospital Finishes SOW.pdf
PDF 443 KB Posted
- Attached to
- Z1DA--Modernize Hospital Finishes 506-20-204
- Solicitation number
- 36C25021B0037
About this file
This memorandum outlines the scope of work for the 506-20-204 Modernize Hospital Finishes project at the Ann Arbor VA Medical Center. The project involves renovating and modernizing hospital finishes in the main corridors of Buildings 1E and 1W, including new flooring, wall finishes, handrails, wayfinding elements, and selective ceiling replacement across 4,793 square feet. The work will be completed in phases with normal construction hours from 6:00PM to 5:30AM Monday through Sunday to avoid disrupting medical center operations during administrative hours. The contractor must furnish all labor, materials, equipment, and supervision to complete the project according to drawings, specifications, manufacturer recommendations, and applicable codes and standards. Submittals and shop drawings must be provided to the contracting officer's representative for approval.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25021B0037 0002.docx | DOCX document | |
| S04 - Sign-In Sheet Pre-Bid 506-20-204 4-28-2021.pdf | ||
| S04 - Pre-Bid Site Visit Agenda 506-20-204.pdf | ||
| 36C25021B0037 0001.docx | DOCX document | |
| Wage determination MI20210100 - 2-26-2021.pdf | ||
| 506-20-204 Drawings.pdf | ||
| 506-20-204 Project Specifications.pdf | ||
| 36C25021B0037.docx | DOCX document | |
| RFI Form 506-20-204.docx | DOCX document | |
| Contractor EMR Certification Form 2021.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
506-20-204 Modernize Hospital Finishes - Construction
Department of Memorandum Veterans Affairs
Date: March 21, 2021
From: Facility Engineering Section
Subj: 506-20-204 Modernize Hospital Finishes - Construction
To: Contracting Officer
SCOPE AND WORK REQUIRED
Furnish all necessary labor, tools, miscellaneous materials, equipment, and supervision as specified in drawings and specifications to complete the 506-20-204 Modernize Hospital Finishes Project at the Ann Arbor VA Medical Center, Ann Arbor, Michigan.
The project consists of the renovation and modernization of hospital finishes in the main corridors of Building 1E and Building 1W. The renovations will result in new flooring, wall finishes, handrails, wayfinding elements and selective ceiling replacement. The project will be completed in phases and the total area of work is 4,793 square feet.
All work performed shall be fully documented by the Contractor. Construction shall be performed in compliance with manufacturer’s recommendations and all applicable Codes, and VAMC Ann Arbor.
Perform all work without disruption to Medical Center operations. Normal administrative hours: 8:00 a.m. - 4:30 p.m. Monday thru Friday (Excluding Federal Holidays). Normal working hours shall be between 6:00PM – 5:30 AM Monday - Sunday. Authorization to work other than normal working hours will be requested in advance for evaluation and approval by the COR and Contracting. All construction areas to be open for normal business hours.
Provide all construction and safety barriers, temporary dust partitions, as required by VAMC Ann Arbor.
Construction areas to be cleaned before opening each day.
Provide walk off mats into building if required.
Contractor to provide own dumpsters.
Provide submittals and shop drawings to COR for approvals.
c/o Facilities Engineering Section (001F-E) VAMC Ann Arbor 2215 Fuller Rd.
Ann Arbor, MI 48105