506-20-204 Drawings.pdf

PDF 6 MB Posted

Attached to
Z1DA--Modernize Hospital Finishes 506-20-204
Solicitation number
36C25021B0037
Issued by

About this file

This federal solicitation seeks proposals for the modernization of hospital finishes project at the Ann Arbor VA Medical Center in Ann Arbor, Michigan. The scope of work includes renovating and updating flooring, wall finishes, handrails, wayfinding elements, and selective ceiling replacement across approximately 4,793 square feet of the main corridors in Buildings 1E and 1W. Contractors will be responsible for furnishing all necessary labor, materials, equipment, and supervision to complete the project in phases, in compliance with applicable codes and standards and without disrupting medical center operations. Normal work hours will be between 6:00PM to 5:30AM Monday through Sunday, though authorization may be granted for additional hours. Construction areas must remain open and accessible during standard administrative hours and be cleaned daily.

View the file

Other files

File Type Posted
36C25021B0037 0002.docx DOCX document
S04 - Sign-In Sheet Pre-Bid 506-20-204 4-28-2021.pdf PDF
S04 - Pre-Bid Site Visit Agenda 506-20-204.pdf PDF
36C25021B0037 0001.docx DOCX document
Wage determination MI20210100 - 2-26-2021.pdf PDF
506-20-204 Project Specifications.pdf PDF
FINAL 506-20-204 Modernize Hospital Finishes SOW.pdf PDF
36C25021B0037.docx DOCX document
RFI Form 506-20-204.docx DOCX document
Contractor EMR Certification Form 2021.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FU

LLE

R C

O U

R T

FULLER ROAD

LOCATION MAP

T500

WALK

CONC.

600 E. Michigan Avenue, Suite B

Kalamazoo, MI 49008

P: 269.927.0144 www.7GenAE.com

2850 Eisenhower Ave, Suite 310

Alexandria, VA 22314

P: 202.617.8485 www.alliance.us.com

2 3 4 5 6 7 8 9

2 3 4 5 6 7 8 91

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANTS ARCHITECT/ENGINEERS

DRAWING TITLE:

APPROVED: PROJECT DIRECTOR LOCATION:

PROJECT TITLE:

DATE: CHECKED: DRAWN:

PROJECT NUMBER:

BUILDING NUMBER:

DRAWING NUMBER:

DWG. ___ OF ___

7GAE PROJECT NO.: 219021

Office of

Construction and Facilities

Management

VA FORM 08-6231

o n e e ig h th i n c h o n e o e q u a rt e r in c h o th re e e ig h th s in c h o e h a lf i n c h o e q u a rt e rs i n c h o e i n c h o e a n d o n e h a lf i n c h e s o e i n c h e s o

6 "

Department of Veterans Affairs28

BLDG. 1

100% BID DOCUMENTS

GI001

506-20-204

VA ANN ARBOR MEDICAL CENTER

MAY 8, 2020 JRB SLS

COVER SHEET MODERNIZE HOSPITAL

FINISHES

PROJECT TEAM DRAWING SHEET INDEX

ARCHITECTURE/ELECTRICAL ENGINEERING:

OWNER:

PH: 269.927.0144

ALLIANCE | 7GAE JV

KALAMAZOO, MI 49007

600 E. MICHIGAN AVENUE, SUITE B

OFFICE OF CONSTRUCTION AND

FACILITIES MANAGEMENT

DEPARTMENT OF VETERANS AFFAIRS

MEDICAL CENTER

ANN ARBOR, MI 48105

2215 FULLER ROAD

PROJECT NO. 506-20-204 VA ANN ARBOR MODERNIZE HOSPITAL FINISHES

VA ANN ARBOR HEALTHCARE SYSTEM

DEPARTMENT OF VETERANS AFFAIRS

ANN ARBOR, MICHIGAN

100% BID DOCUMENTS

PH: 202.617.8485

ALEXANDRIA, VA 22314

2850 EISENHOWER AVE, SUITE 310

DESCRIPTIONSHEET ISSUE DATE

GI001 COVER SHEET MAY 8, 2020

GI002 GENERAL INFORMATION & SYMBOL LEGEND MAY 8, 2020

GC101 FIRST FLOOR PHASING PLAN - COMPOSITE MAY 8, 2020

GC201 FIRST FLOOR PLAN - PHASE 1 MAY 8, 2020

GC202 FIRST FLOOR PLAN - PHASE 2 MAY 8, 2020

GC203 FIRST FLOOR PLAN - PHASE 3 MAY 8, 2020

GC204 FIRST FLOOR PLAN - PHASE 4 MAY 8, 2020

GC205 FIRST FLOOR PLAN - PHASE 5 MAY 8, 2020

GC206 FIRST FLOOR PLAN - PHASE 6 MAY 8, 2020

AD101A FIRST FLOOR DEMOLITION PLAN - AREA A MAY 8, 2020

AD101B FIRST FLOOR DEMOLITION PLAN - AREA B MAY 8, 2020

AD121A FIRST FLR. REFLECTED CLNG. DEMO PLAN - AREA A MAY 8, 2020

AD121B FIRST FLOOR REFLECTED CLNG. DEMO PLAN - AREA B MAY 8, 2020

AI101 FIRST FLOOR PLAN MAY 8, 2020

AI101A FIRST FLOOR PLAN - AREA A MAY 8, 2020

AI101B FIRST FLOOR PLAN - AREA B MAY 8, 2020

AC121A FIRST FLOOR REFLECTED CEILING PLAN - AREA A MAY 8, 2020

AC121B FIRST FLOOR REFLECTED CEILING PLAN - AREA B MAY 8, 2020

AI411A FIRST FLOOR EQUIPMENT PLAN - AREA A MAY 8, 2020

AI411B FIRST FLOOR EQUIPMENT PLAN - AREA B MAY 8, 2020

AI420 INTERIOR ELEVATIONS MAY 8, 2020

AI421 INTERIOR ELEVATIONS MAY 8, 2020

AI500 INTERIOR DETAILS MAY 8, 2020

AI520 INTERIOR DETAILS MAY 8, 2020

AW101 INTERIOR SIGNAGE MAY 8, 2020

ID001 INTERIOR FINISH KEY & SCHEDULE MAY 8, 2020

ID101A FIRST FLOOR FINISH PLAN - AREA A MAY 8, 2020

ID101B FIRST FLOOR FINISH PLAN - AREA B MAY 8, 2020

PROJECT LOCATION

PROJECT LOCATION

ANN ARBOR, MICHIGAN

NORTH

REVISIONS DATE

DEDUCTIVE ALTERNATES

ALTERNATE #1 PHASE 6 - 252 SF

ALTERNATE #2 PHASE 5 - 1,014 SF

A300

A320

A420

A500

ARCHITECTURAL SYMBOLS & PLAN INDICATORS

ABBREVIATIONSBARRIER-FREE DESIGN INFORMATION

ROOMNAME

XXX

A

A

A

A

8'-0"

TOP OF STEEL

ELEV. 10'-0"

A200

TITLE

SCALE X" = 1'-0"

OBSTRUCTED APPROACH

UNOBSTRUCTED APPROACH

TYP. CODE REGULATED MOUNTING HEIGHTS

SCALE: NONE

TYP. EQUIPMENT MOUNTING HEIGHTS

SCALE: NONE

ELEVATION INDICATION

SHEET NO.

ELEVATION NUMBER

SECTION INDICATOR

ENLARGED PLAN OR

ELEVATION

PROPOSED SPOT

EXISTING SPOT

ELEVATION

100.57'

100.57'

STRUCTURAL SPAN

ROOF TRUSSES

FLOOR JOIST OR

RAMP

@ 16" O.C.

2 x 12

1" per 12"

SLOPE UP

REVISION TAG W/

REVISION NUMBER

KEYNOTE TAG

WINDOW TAG W/

WINDOW TYPE

INDICATOR

WALL SECTION CUT

COLUMN LINE

WALL TYPES

ELEVATION

BUILDING SECTION CUT

SHEET LOCATION

DETAIL NUMBER

TYPICAL

DIMENSIONING

SET-BACK LINE

PROPERTY LINE

EXISTING

CONTOUR

TOPOGRAPHY

CONTOUR

100'

100'

TOPOGRAPHY

PROPOSED

SECTIONS & DETAILS

TYPICAL TITLE FOR

DOOR NUMBER

DOOR TAG W/

ROOM NUMBER

ROOM NAME/

NORTH ARROW

60" DIAMETER CLEAR

WHEELCHAIR TURNING

SPACE - REFER TO PLAN

- REFER TO PLAN

AND GROUND SPACE

30" x 48" CLEAR FLOOR

CEILING HEIGHT TAG

GENERAL NOTES:

ACCESSIBLE CONTROLS, OPERATING

MECHANISMS & HARDWARE SHALL COMPLY

WITH SECTIONS 1109.13 OF THE IBC AND

SECTION 309 OF ICC/ANSI A117.1.

ACCESSIBLE SIGNAGE FURNISHED BY OWNER,

SHALL COMPLY WITH SECTIONS 1110 OF THE

IBC AND SECTION 703 OF ICC/ANSI A117.1.

PORTABLE FIRE EXTINGUISHERS TO BE

PROVIDED IN ACCORDANCE WITH THE 2000

ICC INTERNATIONAL FIRE CODE. MBC (906.1).

RECEPTACLE

LIGHT

SWITCH

HVAC

CONTROLS

FIRE

ALARM

FEC

LESS THAN 40#

FEC

GREATER THEN 40#

TEL

PP

RH/CH

GBX

SH1

CL

OT

SPH

CRK SND

PT

SD

HS

XR COM4 MR

CRBG

WP

TP SNR

4'-4"

NOTE: ITEMS SHOWN ON THIS SHEET ARE NOT

NECESSARILY INCLUDED IN THIS

PROJECT.

TV

MOUNTING HEIGHT GENERAL NOTES:

1. REFER TO SHEET AI411A & AI411B FOR

EQUIPMENTABBREVIATIONS & LOCATIONS.

2. REFER TO INTERIOR ELEVATIONS FOR

ADDITIONAL INFORMATION.

3. ITEMS ON THIS SHEET ARE NOT NECESSARILY

INCLUDED IN THIS PROJECT.

4. CONTRACTOR TO VERIFY ALL EQUIPMENT

MOUNTING HEIGHTS WITH OWNER.

5. REFER TO MECHANICAL/ELECTRICAL

DRAWINGS FOR DEVICE MOUNTING

HEIGHTS.

XXXNORTH

M A

X

IF

B

A R

R

IE

R F

R E E

M

IN

" 4

" 5

M A

X

M A

X

M A

X

SIDE FRONT

M

A X

M

A X

20" - 25"

M

A X

FRONT

M

A X

20" MAX

SIDE

SIDE FRONT

M

IN

M

A X

M

IN

M

A X

@ AT

A/C AIR CONDITIONIN/AIR CONDITIONER

ACOUS ACOUSTICAL

AD AREA DRAIN, AUTOMATIC DAMPER

ADJ ADJUST, ADJUSTABLE

ALUM ALUMINUM

A.P. ACCESS PANEL

ACT ACOUSTICAL CEILING

B BASE

BAR BARRIER

BD BOARD

B.F. BARRIER FREE

BG BUMPER GUARD

BKT BRACKET

BLDG BUILDING

BLKG BLOCKING

BOTT BOTTOM

C TO C CENTER TO CENTER

CAB CABINET

C.C.T. CUBICAL CURTAIN TRACK

C.E. COLUMN ENCLOSURE

C.G. CORNER GUARD

CIR CIRCLE

CIR CIRCUIT

CL CLOCK

C.L. CENTER LINE, CLEARANCES

CLG CEILING

C.J. CONTROL JOINT

CLKG CAULKING

CLO CLOSET

C.M.T. CERAMIC MOSAIC TILE

C.M.U. CONCRETE MASONRY UNIT

C.O. CLEANOUT

COL COLUMN

COM4

CONC CONCRETE

CONT CONTINUOUS

CORR CORRIDOR

CPT CARPET

CR CARD READER

CRK COAT RACK

C.S.S. CLINICAL SERVICE SINK

C.T. CERAMIC TILE

CTR CENTER

CUR CURTAIN

C.U.H. CABINET UNIT HEATER

DEMO DEMOLITION, DEMOLISH

DEPT DEPARTMENT

D.F. DRINKING FOUNTAIN

DIA, D DIAMETER

DIM DIMENSION

DN DOWN

DR DRAIN

DS DOWNSPOUT

ELECT ELECTRICAL

ELEV ELEVATION

ENTR ENTRANCE

EQ EQUAL

E.P. ELECTRICAL PANEL

EXH EXHAUST

EXP EXPOSED

EXSIST EXISTING, EXSIST'G

EXT EXTERIOR

E.W. EACH WAY

F.A. FIRE ALARM

F.D. FIRE DAMPER OR FLOOR DRAIN

F.E. FIRE EXTINGUISHER

F.E.C. FIRE EXTINGUISHER CABINET

FIN FINISH

FL, FLR FLOOR FINISH

FLG, FLRG FLOORING, FLOOR'G

FURN FURNITURE, FURNACE

F.W.C. FABRIC WALL COVERING

FT FEET, FOOT

GALV GALVANIZE(D)

G.B. GRAB BARS

GBX GLOVE BOX, TRIPPLE

GL GLASS

G.S.B. GYPSUM SHEATHING BOARD

G.WB GYPSUM WALLBOARD

GYP. BD GYPSUM BOARD

HS HAND SANITIZER DISPENSER, WATERLESS

1.D. INSIDE DIAMETER

INSUL INSULATION

IN INCH(ES)

JAN JANITOR'S CLOSET

H.M. HOLLOW METAL

HORIZ HORIZONTAL

HR HANDRAIL

HT HEIGHT

HW HEADWALL

LAM LAMINATED

LF LINEAL FEET

LKR LOCKER

MAS MASONRY

MAT'L MATERIAL

MAX MAXIMUM

MECH MECHANICAL

MANUF MANUFACTURED, MANUFACTURER

MIN MINIMUM

MLD'G MOLDING

MMC MOBILE MEDICAL CABINET

M.S. MOP SINK

MTL METAL

MON MONITOR

MR MOP RACK

N NORTH

NAT NATURAL

N.I.C. NOT IN CONTRACT

NORM NORMAL

N.T.S. NOT TO SCALE

O.C. ON CENTER

OPN'G OPENING

O, O2 OXYGEN

P PAINT

PLAST. PLASTIC

PNT PAINT

PREFAB PREFABRICATED

PT PAPER TOWEL DISPENSER

PLYWD PLYWOOD, PLYW'D

R RADIUS

R.A. RETURN AIR

REQ'D REQUIRED

RM ROOM

S SINK, SOUTH, SHINGLE

S.A. SUPPLY AIR

SAN SANITARY

SCC SCOPE CABINET

SD SOAP DISPENSER

S.D. SMOKE DAMPER

SECT SECTION

SH1 SHARPS DISPOSAL CONTAINER, WALL MOUNT

SHWR SHOWER

SIM SIMILAR

SND SANITARY NAPKIN DISPENSER

SNR SANITARY NAPKIN RECEPTACLE

SPEC SPECIFICATION

SPH SPHYGMOMANOMETER, WALL MOUNT

SQ SQUARE

S.S. SERVICE SINK, STAINLESS STEEL

STD STANDARD

STOR STORAGE

SUSP SUSPEND(ED)

SYM SYMBOL, SYMMETRICAL

TOIL TOILET

TEL TELEPHONE

TP TOILET PAPER DISPENSER

TYP TYPICAL

TV TELEVISION

UNFIN UNFINISHED

UTIL UTILITY

VAC VACUUM

V.A.V. VARIABLE AIR VOLUME

V.C.T. VINYL COMPOSITION TILE

V.D. VOLUME DAMPER

VERT VERTICAL

V.I.F. VERIFY IN FIELD

V.T. VINYL TILE

V.W.C. VINYL WALL COVERING

W/ WITH

W.C. WATER CLOSET

WD WOOD

WNDW WINDOW

W. HTR WATER HEATER

W/O WITHOUT

WP WALL PROTECTION

XR X-RAY VIEW BOX

M

A X

2"

TYP. SIGNAGE MOUNTING HEIGHTS & LOCATIONS

SCALE: NONE

IN

A X

RH/CH

"1' - 6"

3 1/8"

1/2" MAX DW JOINT

2 LAYERS FIRE

RATED DRYWALL

USG #93 CONTROL

JOINT (BOTH SIDES)

DOUBLE JAMB

STUDS (AT DOORS)

FIRE RATED DRYWALL

1/2" MAX DW JOINT

SINGLE LAYER DRYWALL USG #93 CONTROL

JOINT (BOTH SIDES)

UNDERSIDE OF

EXISTING DECK

1 HR RATED TEMPORARY

PARTITION. HI-IMPACT TYPE

'X' 5/8" GYP. BOARD ON

3-5/8" METAL STUDS, 16"

O.C. FINISH OCCUPIED SIDE

PER ROOM FINISH

SCHEDULE

NOTE:

PLASTER TAPE ALL GYP. BD.

JOINTS; SECURE ALL TAPE

WITH RAM-TACK HIGH TACK

SPRAY OR EQUAL;

CONTRACTOR TO PROVIDE

FINISH WALL ON OCCUPIED

SIDE TO GIVE FINISHED

APPEARANCE; REFER TO

PHASING PLANS FOR

ADDITIONAL INFORMATION

OCCUPIED SIDERENOVATION SIDE

3 5/8" DEEP SLOTTED

METAL DEFLECTION

TRACK FASTENED TO

DECK @ 2'-0" O.C.

FIRE-RATED

COMPRESSIBLE

INSULATION

FIRE-RATED SEAL

PERIMETER, BOTH

SIDES OF WALL

MECHANICALLY

FASTEN BOTTOM

TRACK TO FLOOR

FIRE-RATED SEAL

PERIMETER, BOTH

SIDES OF WALL

FIRE-RATED

COMPRESSIBLE

INSULATION

600 E. Michigan Ave, Suite B

Kalamazoo, MI 49007

P: 269.927.0144 www.7GenAE.com

2850 Eisenhower Ave, Suite 310

Alexandria, VA 22314

P: 202.617.8485 www.alliance.us.com

2 3 4 5 6 7 8 9

2 3 4 5 6 7 8 91

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANTS ARCHITECT/ENGINEERS

DRAWING TITLE:

APPROVED: PROJECT DIRECTOR LOCATION:

PROJECT TITLE:

DATE: CHECKED: DRAWN:

PROJECT NUMBER:

BUILDING NUMBER:

DRAWING NUMBER:

DWG. ___ OF ___

7GAE PROJECT NO.: 219021

Office of

Construction and Facilities

Management

VA FORM 08-6231

o n e e ig h th i n c h o e q u a rt e r in c h o e e ig h th s in c h o e h a lf i n c h o e q u a rt e rs i n c h o e i n c h o e a n d o n e h a lf i n c h e s o e i n c h e s o

6 "

Department of Veterans Affairs28

BLDG. 1

GI002

506-20-204

VA ANN ARBOR MEDICAL CENTER

MAY 8, 2020 JRB STL

GENERAL INFORMATION &

SYMBOL LEGEND

MODERNIZE HOSPITAL

FINISHES

SCALE: 1 1/2" = 1'-0"GI002

TYP. WALL CONTROL JOINT01

SCALE: 1 1/2" = 1'-0"GI002

TYP. RATED WALL CONTROL JOINT02

SCALE: 1 1/2" = 1'-0"GI002

TEMP. WALL CONSTRUCTION03

REVISIONS DATE

UP

UP

UP

5 6

DEDUCTIVE ALTERNATE #2

DEDUCTIVE ALTERNATE #1

PHASING LEGEND

PHASE 1 - 510 SF

(AFTER HOURS -

SEE GENERAL

NOTE 8)

PHASE 3 - 1,136 SF

(AFTER HOURS -

SEE GENERAL

NOTE 8)

PHASE 2 - 767 SF

(AFTER HOURS -

SEE GENERAL

NOTE 8)

PHASE 5 - 1,014 SF

PHASE 4 - 1,114 SF

(AFTER HOURS -

SEE GENERAL

NOTE 8)

AREA NOT IN

CONTRACT

CONSTRUCTION DEBRIS

REMOVAL PATH

EGRESS PATH

PHASE 6 - 252 SF

(AFTER HOURS -

SEE GENERAL

NOTE 8)

SHEET PRINTING NOTES

1. THIS SHEET TO BE PRINTED IN COLOR ONLY AS A BLACK AND WHITE

PRINT WILL LOSE KEY INFORMATION.

2. ANY SHEET DELIVERED TO CONTRACTOR/ SUB-CONTRACTORS TO

BE PRINTED IN COLOR.

600 E. Michigan Ave, Suite B

Kalamazoo, MI 49007

P: 269.927.0144 www.7GenAE.com

2850 Eisenhower Ave, Suite 310

Alexandria, VA 22314

P: 202.617.8485 www.alliance.us.com

2 3 4 5 6 7 8 9

2 3 4 5 6 7 8 91

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANTS ARCHITECT/ENGINEERS

DRAWING TITLE:

APPROVED: PROJECT DIRECTOR LOCATION:

PROJECT TITLE:

DATE: CHECKED: DRAWN:

PROJECT NUMBER:

BUILDING NUMBER:

DRAWING NUMBER:

DWG. ___ OF ___

7GAE PROJECT NO.: 218047

Office of

Construction and Facilities

Management

VA FORM 08-6231

o n e e ig h th i n c h o e q u a rt e r in c h o e e ig h th s in c h o e h a lf i n c h o e q u a rt e rs i n c h o e i n c h o e a n d o n e h a lf i n c h e s o e i n c h e s o

6 "

Department of Veterans Affairs28

BUILDING 1

100% BID DOCUMENTS

GC101

506-20-204

VA ANN ARBOR MEDICAL CENTER

MAY 8, 2020 JRB SLS

FIRST FLOOR PHASING PLAN

- COMPOSITE

MODERNIZE HOSPITAL

FINISHES

NORTH

SCALE: 1/16" = 1'-0"

PROPOSED FIRST FLOOR PLAN

A115

ENT

TREATMENT

A116

HAC

A117

ENT EXAM A119

ENT EXAM

A121

ENT EXAM

A123

ENT EXAM

A146B

CLEAN

A146D

INTAKE /

VITALSA146E

SOILED SCOPE

A146F

ALCOVE

A146A

RECEPTION

C1-107

CORRIDOR

B183

LOBBY

C1-104

CORRIDOR

C1-109

CORRIDOR

C137

MEN'S TOILET

STAFF OFFICE

B152

EXAM

B152A

EXAM

B137

EXAM

STAFF OFFICE

ELEC.

STAIR #3

B112

TREATMENT

B107

EYE CLINIC

WAITING

B109

PROCEDURE

RM.

B185C

HSKP

B130a

CHECKOUT

A150

STAFF

WORKROOM

A156

STAFF

WORKROOM

B133

ADMIN

A120

AUDIOLOGY

WAITING

ROOM

C1-29A

SERVICE

ELEVATOR

LOBBY

A146

COMM.

STAIR #1

A143

MEN'S TOILET

A144

WOMEN'S

TOILET

A145

ELEC.

B100A

PASSAGE

A113

ELEC

A133

STAIR

S-13

STOP AT

OUTSIDE

CORNERS

PHASING GENERAL NOTES

1. PHASING IS TO BE DONE IN SEQUENCE ACCORDING TO PLANS

GC201-GC206.

2. PHASING DRAWINGS SHALL BE USED IN CONJUNCTION WITH

ENTIRE SET OF CONSTRUCTION DRAWINGS. DO NOT REMOVE ANY

ITEMS WITHOUT VERIFYING AND COORDINATING WITH ALL

GENERAL TRADES AS TO HOW THEY RELATE TO THE OVERALL

PROJECT.

3. ALL CONSTRUCTION ENTRY DOORS ARE TO USE VA STANDARD

DOOR HARDWARE AND KEYED ALIKE WITH VA STANDARD

LOCKSETS.

4. ALL CONSTRUCTION ENTRANCE DOORS ARE TO REMAINED

LOCKED AT ALL TIMES.

5. ALL CONSTRUCTION ENTRANCES ARE REQUIRED TO HAVE STICKY

WALK-OFF MATS ON INSIDE AND OUTSIDE OF WORKSPACE.

6. CONTRACTOR TO REFER TO SHEET GI002 FOR TEMPORARY WALL

TYPE INFORMATION.

7. CONTRACTOR TO REFER TO DEMOLITION SHEETS AD101A, AD101B,

AD121A, & AD121B FOR ADDITIONAL INFORMATION ON

DEMOLITION INTENT & EXTENT.

8. AFTER HOURS WORK TO TAKE PLACE BETWEEN 6:00 PM - 5:30 AM,

MONDAY - FRIDAY, ALL DAY SATURDAY & SUNDAY.

9. TEMPORARY WALL REMOVAL TO TAKE PLACE AFTER STANDARD

OPERATING HOURS.

10. ANY WORK TO BE COMPLETED ABOVE NOISE LEVELS INDICATED

IN SPECIFICATIONS SHALL BE DONE AFTER HOURS AND

COORDINATED WITH THE CONTRACTING OFFICER'S

REPRESENTATIVE (COR) AT NO PREMIUM COST TO THE

GOVERNMENT.

11. IF HAZARDOUS MATERIAL IS ENCOUNTERED INSIDE EXISTING

WALLS AND/OR AREAS NOT VISIBLE PRIOR TO DEMOLITION,

CONTRACTOR SHALL CONTACT OWNER FOR ABATEMENT.

12. IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO

ENSURE ALL BUILDING AND CONSTRUCTION CODES ARE MET FOR

EACH PHASE PRIOR TO OCCUPANCY BEING GRANTED.

PHASE 1 DESCRIPTION

THIS SECTION OF CORRIDOR C1-107 SHALL REMAIN OPEN TO TRAFFIC

DURING NORMAL BUSINESS HOURS; ALL DEMO AND NEW WORK IS

REQUIRED TO TAKE PLACE AFTER OPERATIONAL HOURS.

CONTRACTOR IS TO PROVIDE DUST SEPARATION FOR THE

CONSTRUCTION AREA AT THE BEGINNING OF EACH SHIFT; AT THE

END OF EACH SHIFT, CONTRACTOR IS TO REMOVE DUST

SEPARATION AND CLEAN AREA AS REQUIRED; PROVIDE STICKY

WALK-OFF MATS AT ENTRANCE TO CONSTRUCTION AREA;

PROVIDE CONSTRUCTION SIGNAGE "DANGER - CONSTRUCTION

AREA, AUTHORIZED PERSONNEL ONLY"

DEMOLITION:

• REMOVE WALL FINISHES & EQUIPMENT INCLUDING THE EXISTING WALL

PROTECTION, HANDRAIL, & CRASH RAIL.

• ELIMINATE EXISTING WALL SCONCES & REMOVE ASSOCIATED WIRING

BACK TO NEAREST ELECTRICAL PANEL.

• PATCH & REPAIR ADJACENT SURFACES AFFECTED BY DEMOLITION AS

REQUIRED TO PREPARE FOR NEW CONSTRUCTION AND/OR NEW

FINISHES.

• REMOVE EXISTING LAY-IN CEILING & ALL CEILING-MOUNTED ITEMS

FOR REINSTALLATION INTO NEW CEILING.

CONSTRUCTION:

• PAINT ALL GYP. WALLS & CEILINGS

• LAY NEW RESILIENT FLOOR TILE

• INSTALL NEW WALL PROTECTION WAINSCOT

• INSTALL NEW HANDRAILS & CORNER GUARDS

• INSTALL NEW LAY-IN CEILING & ASSOCIATED CEILING-MOUNTED

EQUIPMENT.

PHASING LEGEND

PHASE 1 - 510 SF

(AFTER HOURS -

SEE GENERAL

NOTE 8)

PHASE 3 - 1,136 SF

(AFTER HOURS -

SEE GENERAL

NOTE 8)

PHASE 2 - 767 SF

(AFTER HOURS -

SEE GENERAL

NOTE 8)

PHASE 5 - 1,014 SF

PHASE 4 - 1,114 SF

(AFTER HOURS -

SEE GENERAL

NOTE 8)

AREA NOT IN

CONTRACT

CONSTRUCTION DEBRIS

REMOVAL PATH

EGRESS PATH

PHASE 6 - 252 SF

(AFTER HOURS -

SEE GENERAL

NOTE 8)

SHEET PRINTING NOTES

1. THIS SHEET TO BE PRINTED IN COLOR ONLY AS A BLACK AND WHITE

PRINT WILL LOSE KEY INFORMATION.

2. ANY SHEET DELIVERED TO CONTRACTOR/ SUB-CONTRACTORS TO

BE PRINTED IN COLOR.

600 E. Michigan Ave, Suite B

Kalamazoo, MI 49007

P: 269.927.0144 www.7GenAE.com

2850 Eisenhower Ave, Suite 310

Alexandria, VA 22314

P: 202.617.8485 www.alliance.us.com

2 3 4 5 6 7 8 9

2 3 4 5 6 7 8 91

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANTS ARCHITECT/ENGINEERS

DRAWING TITLE:

APPROVED: PROJECT DIRECTOR LOCATION:

PROJECT TITLE:

DATE: CHECKED: DRAWN:

PROJECT NUMBER:

BUILDING NUMBER:

DRAWING NUMBER:

DWG. ___ OF ___

7GAE PROJECT NO.: 218047

Office of

Construction and Facilities

Management

VA FORM 08-6231

o n e e ig h th i n c h o e q u a rt e r in c h o e e ig h th s in c h o e h a lf i n c h o e q u a rt e rs i n c h o e i n c h o e a n d o n e h a lf i n c h e s o e i n c h e s o

6 "

Department of Veterans Affairs28

BUILDING 1

100% BID DOCUMENTS

GC201

506-20-204

VA ANN ARBOR MEDICAL CENTER

MAY 8, 2020 JRB SLS

FIRST FLOOR PLAN - PHASE 1 MODERNIZE HOSPITAL

FINISHES

NORTH

SCALE: 1/8" = 1'-0"

FIRST FLOOR PLAN - PHASE 1

A115

ENT

TREATMENT

A116

HAC

A117

ENT EXAM

A119

ENT EXAM

A121

ENT EXAM

A123

ENT EXAM

A124

SOILED

A146B

CLEAN

A146D

INTAKE /

VITALS

A146E

SOILED SCOPE

A146F

ALCOVE

A146A

RECEPTION

C1-104

CORRIDOR

C1-107

CORRIDOR

C137

MEN'S TOILET

STAFF OFFICE

B152

EXAM

B152A

EXAM

B107

EYE CLINIC

WAITING

B109

PROCEDURE

RM.

S-13

B100A

PASSAGE

A145

ELEC.

A144

WOMEN'S

TOILET

A143

MEN'S TOILET

C1-104

CORRIDOR

C1-29A

SERVICE

ELEVATOR

LOBBY

A146

COMM.

B130a

CHECKOUT

B133

ADMIN

STAIR #1

A120

AUDIOLOGY

WAITING

ROOM

A150

STAFF

WORKROOM

A156

STAFF

WORKROOM

A154

WOMEN'S

TOILET

A157

MEN'S TOILET

A155

ELEC. ROOM

C1-109

CORRIDOR

C1-109A

CORRIDOR

PHASING GENERAL NOTES

1. PHASING IS TO BE DONE IN SEQUENCE ACCORDING TO PLANS

GC201-GC206.

2. PHASING DRAWINGS SHALL BE USED IN CONJUNCTION WITH

ENTIRE SET OF CONSTRUCTION DRAWINGS. DO NOT REMOVE ANY

ITEMS WITHOUT VERIFYING AND COORDINATING WITH ALL

GENERAL TRADES AS TO HOW THEY RELATE TO THE OVERALL

PROJECT.

3. ALL CONSTRUCTION ENTRY DOORS ARE TO USE VA STANDARD

DOOR HARDWARE AND KEYED ALIKE WITH VA STANDARD

LOCKSETS.

4. ALL CONSTRUCTION ENTRANCE DOORS ARE TO REMAINED

LOCKED AT ALL TIMES.

5. ALL CONSTRUCTION ENTRANCES ARE REQUIRED TO HAVE STICKY

WALK-OFF MATS ON INSIDE AND OUTSIDE OF WORKSPACE.

6. CONTRACTOR TO REFER TO SHEET GI002 FOR TEMPORARY WALL

TYPE INFORMATION.

7. CONTRACTOR TO REFER TO DEMOLITION SHEETS AD101A, AD101B,

AD121A, & AD121B FOR ADDITIONAL INFORMATION ON

DEMOLITION INTENT & EXTENT.

8. AFTER HOURS WORK TO TAKE PLACE BETWEEN 6:00 PM - 5:30 AM,

MONDAY - FRIDAY, ALL DAY SATURDAY & SUNDAY.

9. TEMPORARY WALL REMOVAL TO TAKE PLACE AFTER STANDARD

OPERATING HOURS.

10. ANY WORK TO BE COMPLETED ABOVE NOISE LEVELS INDICATED

IN SPECIFICATIONS SHALL BE DONE AFTER HOURS AND

COORDINATED WITH THE CONTRACTING OFFICER'S

REPRESENTATIVE (COR) AT NO PREMIUM COST TO THE

GOVERNMENT.

11. IF HAZARDOUS MATERIAL IS ENCOUNTERED INSIDE EXISTING

WALLS AND/OR AREAS NOT VISIBLE PRIOR TO DEMOLITION,

CONTRACTOR SHALL CONTACT OWNER FOR ABATEMENT.

12. IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO

ENSURE ALL BUILDING AND CONSTRUCTION CODES ARE MET FOR

EACH PHASE PRIOR TO OCCUPANCY BEING GRANTED.

PHASE 2 DESCRIPTION

THIS SECTION OF CORRIDOR C1-104 SHALL REMAIN OPEN TO TRAFFIC

DURING NORMAL BUSINESS HOURS; ALL DEMO AND NEW WORK IS

REQUIRED TO TAKE PLACE AFTER OPERATIONAL HOURS.

CONTRACTOR IS TO PROVIDE DUST SEPARATION FOR THE

CONSTRUCTION AREA AT THE BEGINNING OF EACH SHIFT; AT THE

END OF EACH SHIFT, CONTRACTOR IS TO REMOVE DUST

SEPARATION AND CLEAN AREA AS REQUIRED; PROVIDE STICKY

WALK-OFF MATS AT ENTRANCE TO CONSTRUCTION AREA; PROVIDE

CONSTRUCTION SIGNAGE "DANGER - CONSTRUCTION AREA,

AUTHORIZED PERSONNEL ONLY"

DEMOLITION:

• EXISTING MARBLE WALL PANELING TO REMAIN IN PLACE. REMOVE ALL

OTHER WALL FINISHES & EQUIPMENT INCLUDING THE EXISTING WALL

• PATCH & REPAIR ADJACENT SURFACES AFFECTED BY DEMOLITION AS

REQUIRED TO PREPARE FOR NEW CONSTRUCTION AND/OR NEW

FINISHES.

CONSTRUCTION:

• PAINT ALL GYP. WALLS & CEILINGS

• LAY NEW RESILIENT FLOOR TILE

• INSTALL NEW WALL PROTECTION WAINSCOT

• INSTALL NEW HANDRAILS & CORNER GUARDS

PHASING LEGEND

PHASE 1 - 510 SF

(AFTER HOURS -

SEE GENERAL

NOTE 8)

PHASE 3 - 1,136 SF

(AFTER HOURS -

SEE GENERAL

NOTE 8)

PHASE 2 - 767 SF

(AFTER HOURS -

SEE GENERAL

NOTE 8)

PHASE 5 - 1,014 SF

PHASE 4 - 1,114 SF

(AFTER HOURS -

SEE GENERAL

NOTE 8)

AREA NOT IN

CONTRACT

CONSTRUCTION DEBRIS

REMOVAL PATH

EGRESS PATH

PHASE 6 - 252 SF

(AFTER HOURS -

SEE GENERAL

NOTE 8)

SHEET PRINTING NOTES

1. THIS SHEET TO BE PRINTED IN COLOR ONLY AS A BLACK AND WHITE

PRINT WILL LOSE KEY INFORMATION.

2. ANY SHEET DELIVERED TO CONTRACTOR/ SUB-CONTRACTORS TO

BE PRINTED IN COLOR.

600 E. Michigan Ave, Suite B

Kalamazoo, MI 49007

P: 269.927.0144 www.7GenAE.com

2850 Eisenhower Ave, Suite 310

Alexandria, VA 22314

P: 202.617.8485 www.alliance.us.com

2 3 4 5 6 7 8 9

2 3 4 5 6 7 8 91

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANTS ARCHITECT/ENGINEERS

DRAWING TITLE:

APPROVED: PROJECT DIRECTOR LOCATION:

PROJECT TITLE:

DATE: CHECKED: DRAWN:

PROJECT NUMBER:

BUILDING NUMBER:

DRAWING NUMBER:

DWG. ___ OF ___

7GAE PROJECT NO.: 218047

Office of

Construction and Facilities

Management

VA FORM 08-6231

o n e e ig h th i n c h o e q u a rt e r in c h o e e ig h th s in c h o e h a lf i n c h o e q u a rt e rs i n c h o e i n c h o e a n d o n e h a lf i n c h e s o e i n c h e s o

6 "

Department of Veterans Affairs28

BUILDING 1

100% BID DOCUMENTS

GC202

506-20-204

VA ANN ARBOR MEDICAL CENTER

MAY 8, 2020 JRB SLS

FIRST FLOOR PLAN - PHASE 2 MODERNIZE HOSPITAL

FINISHES

NORTH

SCALE: 1/8" = 1'-0"

FIRST FLOOR PLAN - PHASE 2

UP

A114

PROCEDURE

A115

ENT

TREATMENT

A116

HAC

A117

ENT EXAM

A119

ENT EXAM

A121

ENT EXAM

A123

ENT EXAM

A124

SOILED

A146B

CLEAN

A146D

INTAKE /

VITALS

A146E

SOILED SCOPE

A146F

ALCOVE

A146A

RECEPTION

A133

STAIR

A113

ELEC

C1-104

CORRIDOR

C1-109

CORRIDOR

C1-107

CORRIDOR

C137

MEN'S TOILET

A144

WOMEN'S

TOILET

A143

MEN'S TOILET

STAIR #1

B107

EYE CLINIC

WAITING

B109

PROCEDURE

RM.

STAIR #3

A120

AUDIOLOGY

WAITING

ROOM

C1-29A

SERVICE

ELEVATOR

LOBBY

A150

STAFF

WORKROOM

A156

STAFF

WORKROOM

A154

WOMEN'S

TOILET

A157

MEN'S TOILET

B100A

PASSAGE

A180

WAITING

A170

TREATMENT

A172

NURSE PRACT.

A174

PATIENT ED.

ELEC.

B152

EXAM

B152A

EXAM

STAFF OFFICE

STAFF OFFICE

S-13

B112

TREATMENT

B111

CORRIDOR

A145

ELEC.

A146

COMM.

B130a

CHECKOUT

B133

ADMIN

A155

ELEC. ROOM

B137

EXAM

PHASE 3 DESCRIPTION

THIS SECTION OF CORRIDOR C1-104 & C1-109 SHALL REMAIN OPEN TO

TRAFFIC DURING NORMAL BUSINESS HOURS; ALL DEMO AND NEW WORK

IS REQUIRED TO TAKE PLACE AFTER OPERATIONAL HOURS.

CONTRACTOR IS TO PROVIDE DUST SEPARATION FOR THE

CONSTRUCTION AREA AT THE BEGINNING OF EACH SHIFT; AT THE

END OF EACH SHIFT, CONTRACTOR IS TO REMOVE DUST

SEPARATION AND CLEAN AREA AS REQUIRED; PROVIDE STICKY

WALK-OFF MATS AT ENTRANCE TO CONSTRUCTION AREA; PROVIDE

CONSTRUCTION SIGNAGE "DANGER - CONSTRUCTION AREA,

AUTHORIZED PERSONNEL ONLY"

DEMOLITION:

• EXISTING MARBLE WALL PANELING TO REMAIN IN PLACE. REMOVE ALL

• PATCH & REPAIR ADJACENT SURFACES AFFECTED BY DEMOLITION AS

REQUIRED TO PREPARE FOR NEW CONSTRUCTION AND/OR NEW

FINISHES.

CONSTRUCTION:

• PAINT ALL GYP. WALLS & CEILINGS

• LAY NEW RESILIENT FLOOR TILE

• INSTALL NEW WALL PROTECTION WAINSCOT

• INSTALL NEW HANDRAILS & CORNER GUARDS

PHASING GENERAL NOTES

1. PHASING IS TO BE DONE IN SEQUENCE ACCORDING TO PLANS

GC201-GC206.

2. PHASING DRAWINGS SHALL BE USED IN CONJUNCTION WITH

ENTIRE SET OF CONSTRUCTION DRAWINGS. DO NOT REMOVE ANY

ITEMS WITHOUT VERIFYING AND COORDINATING WITH ALL

GENERAL TRADES AS TO HOW THEY RELATE TO THE OVERALL

PROJECT.

3. ALL CONSTRUCTION ENTRY DOORS ARE TO USE VA STANDARD

DOOR HARDWARE AND KEYED ALIKE WITH VA STANDARD

LOCKSETS.

4. ALL CONSTRUCTION ENTRANCE DOORS ARE TO REMAINED

LOCKED AT ALL TIMES.

5. ALL CONSTRUCTION ENTRANCES ARE REQUIRED TO HAVE STICKY

WALK-OFF MATS ON INSIDE AND OUTSIDE OF WORKSPACE.

6. CONTRACTOR TO REFER TO SHEET GI002 FOR TEMPORARY WALL

TYPE INFORMATION.

7. CONTRACTOR TO REFER TO DEMOLITION SHEETS AD101A, AD101B,

AD121A, & AD121B FOR ADDITIONAL INFORMATION ON

DEMOLITION INTENT & EXTENT.

8. AFTER HOURS WORK TO TAKE PLACE BETWEEN 6:00 PM - 5:30 AM,

MONDAY - FRIDAY, ALL DAY SATURDAY & SUNDAY.

9. TEMPORARY WALL REMOVAL TO TAKE PLACE AFTER STANDARD

OPERATING HOURS.

10. ANY WORK TO BE COMPLETED ABOVE NOISE LEVELS INDICATED

IN SPECIFICATIONS SHALL BE DONE AFTER HOURS AND

COORDINATED WITH THE CONTRACTING OFFICER'S

REPRESENTATIVE (COR) AT NO PREMIUM COST TO THE

GOVERNMENT.

11. IF HAZARDOUS MATERIAL IS ENCOUNTERED INSIDE EXISTING

WALLS AND/OR AREAS NOT VISIBLE PRIOR TO DEMOLITION,

CONTRACTOR SHALL CONTACT OWNER FOR ABATEMENT.

12. IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO

ENSURE ALL BUILDING AND CONSTRUCTION CODES ARE MET FOR

EACH PHASE PRIOR TO OCCUPANCY BEING GRANTED.

PHASING LEGEND

PHASE 1 - 510 SF

(AFTER HOURS -

SEE GENERAL

NOTE 8)

PHASE 3 - 1,136 SF

(AFTER HOURS -

SEE GENERAL

NOTE 8)

PHASE 2 - 767 SF

(AFTER HOURS -

SEE GENERAL

NOTE 8)

PHASE 5 - 1,014 SF

PHASE 4 - 1,114 SF

(AFTER HOURS -

SEE GENERAL

NOTE 8)

AREA NOT IN

CONTRACT

CONSTRUCTION DEBRIS

REMOVAL PATH

EGRESS PATH

PHASE 6 - 252 SF

(AFTER HOURS -

SEE GENERAL

NOTE 8)

SHEET PRINTING NOTES

1. THIS SHEET TO BE PRINTED IN COLOR ONLY AS A BLACK AND WHITE

PRINT WILL LOSE KEY INFORMATION.

2. ANY SHEET DELIVERED TO CONTRACTOR/ SUB-CONTRACTORS TO

BE PRINTED IN COLOR.

600 E. Michigan Ave, Suite B

Kalamazoo, MI 49007

P: 269.927.0144 www.7GenAE.com

2850 Eisenhower Ave, Suite 310

Alexandria, VA 22314

P: 202.617.8485 www.alliance.us.com

2 3 4 5 6 7 8 9

2 3 4 5 6 7 8 91

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANTS ARCHITECT/ENGINEERS

DRAWING TITLE:

APPROVED: PROJECT DIRECTOR LOCATION:

PROJECT TITLE:

DATE: CHECKED: DRAWN:

PROJECT NUMBER:

BUILDING NUMBER:

DRAWING NUMBER:

DWG. ___ OF ___

7GAE PROJECT NO.: 218047

Office of

Construction and Facilities

Management

VA FORM 08-6231

o n e e ig h th i n c h o e q u a rt e r in c h o e e ig h th s in c h o e h a lf i n c h o e q u a rt e rs i n c h o e i n c h o e a n d o n e h a lf i n c h e s o e i n c h e s o

6 "

Department of Veterans Affairs28

BUILDING 1

100% BID DOCUMENTS

GC203

506-20-204

VA ANN ARBOR MEDICAL CENTER

MAY 8, 2020 JRB SLS

FIRST FLOOR PLAN - PHASE 3 MODERNIZE HOSPITAL

FINISHES

NORTH

SCALE: 1/8" = 1'-0"

FIRST FLOOR PLAN - PHASE 3

A121

ENT EXAM

A123

ENT EXAM

A146B

CLEAN

A146D

INTAKE /

VITALS

A146A

RECEPTION

C1-109A

CORRIDOR

C1-104

CORRIDOR

C1-109

CORRIDOR

C1-107

CORRIDOR

C137

MEN'S TOILET

A144

WOMEN'S

TOILET

A143

MEN'S TOILET

STAIR #1

B107

EYE CLINIC

WAITING

B109

PROCEDURE

RM.

A120

AUDIOLOGY

WAITING

ROOM

C1-29A

SERVICE

ELEVATOR

LOBBY

A150

STAFF

WORKROOM

A156

STAFF

WORKROOM

A154

WOMEN'S

TOILET

A157

MEN'S TOILET

B100A

PASSAGE

A180

WAITING

A170

TREATMENT

A172

NURSE PRACT.

A174

PATIENT ED.

B152

EXAM

B152A

EXAM

STAFF OFFICE

STAFF OFFICE

S-13

B112

TREATMENT

B111

CORRIDOR

A145

ELEC.

A146

COMM.

B130a

CHECKOUT

B133

ADMIN

A155

ELEC. ROOM

PHASING GENERAL NOTES

1. PHASING IS TO BE DONE IN SEQUENCE ACCORDING TO PLANS

GC201-GC206.

2. PHASING DRAWINGS SHALL BE USED IN CONJUNCTION WITH

ENTIRE SET OF CONSTRUCTION DRAWINGS. DO NOT REMOVE ANY

ITEMS WITHOUT VERIFYING AND COORDINATING WITH ALL

GENERAL TRADES AS TO HOW THEY RELATE TO THE OVERALL

PROJECT.

3. ALL CONSTRUCTION ENTRY DOORS ARE TO USE VA STANDARD

DOOR HARDWARE AND KEYED ALIKE WITH VA STANDARD

LOCKSETS.

4. ALL CONSTRUCTION ENTRANCE DOORS ARE TO REMAINED

LOCKED AT ALL TIMES.

5. ALL CONSTRUCTION ENTRANCES ARE REQUIRED TO HAVE STICKY

WALK-OFF MATS ON INSIDE AND OUTSIDE OF WORKSPACE.

6. CONTRACTOR TO REFER TO SHEET GI002 FOR TEMPORARY WALL

TYPE INFORMATION.

7. CONTRACTOR TO REFER TO DEMOLITION SHEETS AD101A, AD101B,

AD121A, & AD121B FOR ADDITIONAL INFORMATION ON

DEMOLITION INTENT & EXTENT.

8. AFTER HOURS WORK TO TAKE PLACE BETWEEN 6:00 PM - 5:30 AM,

MONDAY - FRIDAY, ALL DAY SATURDAY & SUNDAY.

9. TEMPORARY WALL REMOVAL TO TAKE PLACE AFTER STANDARD

OPERATING HOURS.

10. ANY WORK TO BE COMPLETED ABOVE NOISE LEVELS INDICATED

IN SPECIFICATIONS SHALL BE DONE AFTER HOURS AND

COORDINATED WITH THE CONTRACTING OFFICER'S

REPRESENTATIVE (COR) AT NO PREMIUM COST TO THE

GOVERNMENT.

11. IF HAZARDOUS MATERIAL IS ENCOUNTERED INSIDE EXISTING

WALLS AND/OR AREAS NOT VISIBLE PRIOR TO DEMOLITION,

CONTRACTOR SHALL CONTACT OWNER FOR ABATEMENT.

12. IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO

ENSURE ALL BUILDING AND CONSTRUCTION CODES ARE MET FOR

EACH PHASE PRIOR TO OCCUPANCY BEING GRANTED.

PHASE 4 DESCRIPTION

THIS SECTION OF CORRIDOR C1-109 & C1-109A SHALL REMAIN OPEN TO

TRAFFIC DURING NORMAL BUSINESS HOURS; ALL DEMO AND NEW WORK

IS REQUIRED TO TAKE PLACE AFTER OPERATIONAL HOURS.

CONTRACTOR IS TO PROVIDE DUST SEPARATION FOR THE

CONSTRUCTION AREA AT THE BEGINNING OF EACH SHIFT; AT THE

END OF EACH SHIFT, CONTRACTOR IS TO REMOVE DUST

SEPARATION AND CLEAN AREA AS REQUIRED; PROVIDE STICKY

WALK-OFF MATS AT ENTRANCE TO CONSTRUCTION AREA;

PROVIDE CONSTRUCTION SIGNAGE "DANGER - CONSTRUCTION

AREA, AUTHORIZED PERSONNEL ONLY"

DEMOLITION:

• EXISTING MARBLE WALL PANELING TO REMAIN IN PLACE. REMOVE ALL

• PATCH & REPAIR ADJACENT SURFACES AFFECTED BY DEMOLITION AS

REQUIRED TO PREPARE FOR NEW CONSTRUCTION AND/OR NEW

FINISHES.

CONSTRUCTION:

• PAINT ALL GYP. WALLS & CEILINGS

• LAY NEW RESILIENT FLOOR TILE

• INSTALL NEW WALL PROTECTION WAINSCOT

• INSTALL NEW HANDRAILS & CORNER GUARDS

PHASING LEGEND

PHASE 1 - 510 SF

(AFTER HOURS -

SEE GENERAL

NOTE 8)

PHASE 3 - 1,136 SF

(AFTER HOURS -

SEE GENERAL

NOTE 8)

PHASE 2 - 767 SF

(AFTER HOURS -

SEE GENERAL

NOTE 8)

PHASE 5 - 1,014 SF

PHASE 4 - 1,114 SF

(AFTER HOURS -

SEE GENERAL

NOTE 8)

AREA NOT IN

CONTRACT

CONSTRUCTION DEBRIS

REMOVAL PATH

EGRESS PATH

PHASE 6 - 252 SF

(AFTER HOURS -

SEE GENERAL

NOTE 8)

SHEET PRINTING NOTES

1. THIS SHEET TO BE PRINTED IN COLOR ONLY AS A BLACK AND WHITE

PRINT WILL LOSE KEY INFORMATION.

2. ANY SHEET DELIVERED TO CONTRACTOR/ SUB-CONTRACTORS TO

BE PRINTED IN COLOR.

600 E. Michigan Ave, Suite B

Kalamazoo, MI 49007

P: 269.927.0144 www.7GenAE.com

2850 Eisenhower Ave, Suite 310

Alexandria, VA 22314

P: 202.617.8485 www.alliance.us.com

2 3 4 5 6 7 8 9

2 3 4 5 6 7 8 91

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANTS ARCHITECT/ENGINEERS

DRAWING TITLE:

APPROVED: PROJECT DIRECTOR LOCATION:

PROJECT TITLE:

DATE: CHECKED: DRAWN:

PROJECT NUMBER:

BUILDING NUMBER:

DRAWING NUMBER:

DWG. ___ OF ___

7GAE PROJECT NO.: 218047

Office of

Construction and Facilities

Management

VA FORM 08-6231

o n e e ig h th i n c h o e q u a rt e r in c h o e e ig h th s in c h o e h a lf i n c h o e q u a rt e rs i n c h o e i n c h o e a n d o n e h a lf i n c h e s o e i n c h e s o

6 "

Department of Veterans Affairs28

BUILDING 1

100% BID DOCUMENTS

GC204

506-20-204

VA ANN ARBOR MEDICAL CENTER

MAY 8, 2020 JRB SLS

FIRST FLOOR PLAN - PHASE 4 MODERNIZE HOSPITAL

FINISHES

NORTH

SCALE: 1/8" = 1'-0"

FIRST FLOOR PLAN - PHASE 4

S5-1

STAIR 5

C1-109A

CORRIDOR

A154

WOMEN'S

TOILET

A157

MEN'S TOILET

A170

TREATMENT

A172

NURSE PRACT.

A174

PATIENT ED.

A155

ELEC. ROOM

A180

WAITING

A175

A176

NURSE

MANAGER

A175A

EXIST. ELEC

A178

EXIST. HVAC

C1-110

CORRIDOR

A180

MAIN

COMPUTER

ROOM

F101

MECHANICAL

ROOM

F100

OT

F100a

OT OFFICE

F107

OT STORAGE

F105

SOILED UTILITY

F111

CHAPEL

STAIR #1

C212

CORRIDOR

F113

LOCKER

ROOM AND

BATHROOM

C221

CORRIDOR

C219

ALCOVE

GI002UTILIZE EXISTING DOORS AS

TEMP. CONSTRUCTION BARRIER

DEDUCTIVE ALTERNATE #2 DEDUCTIVE ALTERNATE #1

PHASING GENERAL NOTES

1. PHASING IS TO BE DONE IN SEQUENCE ACCORDING TO PLANS

GC201-GC206.

2. PHASING DRAWINGS SHALL BE USED IN CONJUNCTION WITH

ENTIRE SET OF CONSTRUCTION DRAWINGS. DO NOT REMOVE ANY

ITEMS WITHOUT VERIFYING AND COORDINATING WITH ALL

GENERAL TRADES AS TO HOW THEY RELATE TO THE OVERALL

PROJECT.

3. ALL CONSTRUCTION ENTRY DOORS ARE TO USE VA STANDARD

DOOR HARDWARE AND KEYED ALIKE WITH VA STANDARD

LOCKSETS.

4. ALL CONSTRUCTION ENTRANCE DOORS ARE TO REMAINED

LOCKED AT ALL TIMES.

5. ALL CONSTRUCTION ENTRANCES ARE REQUIRED TO HAVE STICKY

WALK-OFF MATS ON INSIDE AND OUTSIDE OF WORKSPACE.

6. CONTRACTOR TO REFER TO SHEET GI002 FOR TEMPORARY WALL

TYPE INFORMATION.

7. CONTRACTOR TO REFER TO DEMOLITION SHEETS AD101A, AD101B,

AD121A, & AD121B FOR ADDITIONAL INFORMATION ON

DEMOLITION INTENT & EXTENT.

8. AFTER HOURS WORK TO TAKE PLACE BETWEEN 6:00 PM - 5:30 AM,

MONDAY - FRIDAY, ALL DAY SATURDAY & SUNDAY.

9. TEMPORARY WALL REMOVAL TO TAKE PLACE AFTER STANDARD

OPERATING HOURS.

10. ANY WORK TO BE COMPLETED ABOVE NOISE LEVELS INDICATED

IN SPECIFICATIONS SHALL BE DONE AFTER HOURS AND

COORDINATED WITH THE CONTRACTING OFFICER'S

REPRESENTATIVE (COR) AT NO PREMIUM COST TO THE

GOVERNMENT.

11. IF HAZARDOUS MATERIAL IS ENCOUNTERED INSIDE EXISTING

WALLS AND/OR AREAS NOT VISIBLE PRIOR TO DEMOLITION,

CONTRACTOR SHALL CONTACT OWNER FOR ABATEMENT.

12. IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO

ENSURE ALL BUILDING AND CONSTRUCTION CODES ARE MET FOR

EACH PHASE PRIOR TO OCCUPANCY BEING GRANTED.

PHASE 5 DESCRIPTION

INSTALL TEMPORARY CONSTRUCTION WALLS PRIOR TO ANY DEMOLITION.

ALL TEMPORARY CONSTRUCTION WALLS ARE TO BE 1-HR RATED &

CONSTRUCTED OF NON-COMBUSTIBLE MATERIALS AND SHALL BE

SMOKE & DUST TIGHT; WALLS ARE TO BE 3-5/8" METAL STUDS W/ TYPE

'X' GYP. BD. ON BOTH SIDES (REFER TO DETAIL 03/GI002); PROVIDE

3'-0" X 7'-0" ACCESS DOOR; PROVIDE STICKY WALK-OFF MATS AT

ENTRANCE TO CONSTRUCTION AREA; PROVIDE CONSTRUCTION

SIGNAGE "DANGER - CONSTRUCTION AREA, AUTHORIZED

PERSONNEL ONLY". TEMPORARY DOOR SHALL INCLUDE LOCKING

HARDWARE TO MATCH VA FACILITY HARDWARE STANDARDS.

MAIN IT ROOM A180 & MECHANICAL ROOM F101 SHALL REMAIN

ACCESSIBLE IN THE EVENT OF A MAINTENANCE EMERGENCY

DEMOLITION:

• PATCH & REPAIR ADJACENT SURFACES AFFECTED BY DEMOLITION AS

REQUIRED TO PREPARE FOR NEW CONSTRUCTION AND/OR NEW

FINISHES.

• REMOVE EXISTING LAY-IN CEILING & ALL CEILING-MOUNTED ITEMS

FOR REINSTALLATION INTO NEW CEILING.

CONSTRUCTION:

• PAINT ALL GYP. WALLS & CEILINGS

• LAY NEW RESILIENT FLOOR TILE & WALL BASE

• APPLY NEW WALL PROTECTION WAINSCOT

• INSTALL NEW HANDRAILS & CORNER GUARDS

• REINSTALL SIGNAGE OR OTHER EXISTING WALL-MOUNTED ITEMS IN

THEIR EXISTING LOCATIONS.

• INSTALL NEW LAY-IN CEILING & ASSOCIATED CEILING-MOUNTED

EQUIPMENT.

PHASING LEGEND

PHASE 1 - 510 SF

(AFTER HOURS -

SEE GENERAL

NOTE 8)

PHASE 3 - 1,136 SF

(AFTER HOURS -

SEE GENERAL

NOTE 8)

PHASE 2 - 767 SF

(AFTER HOURS -

SEE GENERAL

NOTE 8)

PHASE 5 - 1,014 SF

PHASE 4 - 1,114 SF

(AFTER HOURS -

SEE GENERAL

NOTE 8)

AREA NOT IN

CONTRACT

CONSTRUCTION DEBRIS

REMOVAL PATH

EGRESS PATH

PHASE 6 - 252 SF

(AFTER HOURS -

SEE GENERAL

NOTE 8)

SHEET PRINTING NOTES

1. THIS SHEET TO BE PRINTED IN COLOR ONLY AS A BLACK AND WHITE

PRINT WILL LOSE KEY INFORMATION.

2. ANY SHEET DELIVERED TO CONTRACTOR/ SUB-CONTRACTORS TO

BE PRINTED IN COLOR.

600 E. Michigan Ave, Suite B

Kalamazoo, MI 49007

P: 269.927.0144 www.7GenAE.com

2850 Eisenhower Ave, Suite 310

Alexandria, VA 22314

P: 202.617.8485 www.alliance.us.com

2 3 4 5 6 7 8 9

2 3 4 5 6 7 8 91

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANTS ARCHITECT/ENGINEERS

DRAWING TITLE:

APPROVED: PROJECT DIRECTOR LOCATION:

PROJECT TITLE:

DATE: CHECKED: DRAWN:

PROJECT NUMBER:

BUILDING NUMBER:

DRAWING NUMBER:

DWG. ___ OF ___

7GAE PROJECT NO.: 218047

Office of

Construction and Facilities

Management

VA FORM 08-6231

o n e e ig h th i n c h o e q u a rt e r in c h o e e ig h th s in c h o e h a lf i n c h o e q u a rt e rs i n c h o e i n c h o e a n d o n e h a lf i n c h e s o e i n c h e s o

6 "

Department of Veterans Affairs28

BUILDING 1

100% BID DOCUMENTS

GC205

506-20-204

VA ANN ARBOR MEDICAL CENTER

MAY 8, 2020 JRB SLS

FIRST FLOOR PLAN - PHASE 5 MODERNIZE HOSPITAL

FINISHES

NORTH

SCALE: 1/8" = 1'-0"

FIRST FLOOR PLAN - PHASE 5

S5-1

STAIR 5

C1-109A

CORRIDOR

A154

WOMEN'S

TOILET

A157

MEN'S TOILET

A170

TREATMENT

A172

NURSE PRACT.

A174

PATIENT ED.

A155

ELEC. ROOM

A180

WAITING

A175

A176

NURSE

MANAGER

A175A

EXIST. ELEC

A178

EXIST. HVAC

C1-110

CORRIDOR

A180

MAIN

COMPUTER

ROOM

F101

MECHANICAL

ROOM

F100

OT

F100a

OT OFFICE

F107

OT STORAGE

F105

SOILED UTILITY

F111

CHAPEL

STAIR #1

C212

CORRIDOR

F113

LOCKER

ROOM AND

BATHROOM

C221

CORRIDOR

C219

ALCOVE

DEDUCTIVE ALTERNATE #1

PHASING GENERAL NOTES

1. PHASING IS TO BE DONE IN SEQUENCE ACCORDING TO PLANS

GC201-GC206.

2. PHASING DRAWINGS SHALL BE USED IN CONJUNCTION WITH

ENTIRE SET OF CONSTRUCTION DRAWINGS. DO NOT REMOVE ANY

ITEMS WITHOUT VERIFYING AND COORDINATING WITH ALL

GENERAL TRADES AS TO HOW THEY RELATE TO THE OVERALL

PROJECT.

3. ALL CONSTRUCTION ENTRY DOORS ARE TO USE VA STANDARD

DOOR HARDWARE AND KEYED ALIKE WITH VA STANDARD

LOCKSETS.

4. ALL CONSTRUCTION ENTRANCE DOORS ARE TO REMAINED

LOCKED AT ALL TIMES.

5. ALL CONSTRUCTION ENTRANCES ARE REQUIRED TO HAVE STICKY

WALK-OFF MATS ON INSIDE AND OUTSIDE OF WORKSPACE.

6. CONTRACTOR TO REFER TO SHEET GI002 FOR TEMPORARY WALL

TYPE INFORMATION.

7. CONTRACTOR TO REFER TO DEMOLITION SHEETS AD101A, AD101B,

AD121A, & AD121B FOR ADDITIONAL INFORMATION ON

DEMOLITION INTENT & EXTENT.

8. AFTER HOURS WORK TO TAKE PLACE BETWEEN 6:00 PM - 5:30 AM,

MONDAY - FRIDAY, ALL DAY SATURDAY & SUNDAY.

9. TEMPORARY WALL REMOVAL TO TAKE PLACE AFTER STANDARD

OPERATING HOURS.

10. ANY WORK TO BE COMPLETED ABOVE NOISE LEVELS INDICATED

IN SPECIFICATIONS SHALL BE DONE AFTER HOURS AND

COORDINATED WITH THE CONTRACTING OFFICER'S

REPRESENTATIVE (COR) AT NO PREMIUM COST TO THE

GOVERNMENT.

11. IF HAZARDOUS MATERIAL IS ENCOUNTERED INSIDE EXISTING

WALLS AND/OR AREAS NOT VISIBLE PRIOR TO DEMOLITION,

CONTRACTOR SHALL CONTACT OWNER FOR ABATEMENT.

12. IT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR TO

ENSURE ALL BUILDING AND CONSTRUCTION CODES ARE MET FOR

EACH PHASE PRIOR TO OCCUPANCY BEING GRANTED.

PHASING LEGEND

PHASE 1 - 510 SF

(AFTER HOURS -

SEE GENERAL

NOTE 8)

PHASE 3 - 1,136 SF

(AFTER HOURS -

SEE GENERAL

NOTE 8)

PHASE 2 - 767 SF

(AFTER HOURS -

SEE GENERAL

NOTE 8)

PHASE 5 - 1,014 SF

PHASE 4 - 1,114 SF

(AFTER HOURS -

SEE GENERAL

NOTE 8)

AREA NOT IN

CONTRACT

CONSTRUCTION DEBRIS

REMOVAL PATH

EGRESS PATH

PHASE 6 - 252 SF

(AFTER HOURS -

SEE GENERAL

NOTE 8)

PHASE 6 DESCRIPTION

INSTALL TEMPORARY CONSTRUCTION WALLS PRIOR TO ANY DEMOLITION.

CONTRACTOR IS TO PROVIDE DUST SEPARATION FOR THE

CONSTRUCTION AREA AT THE BEGINNING OF EACH SHIFT; AT THE

END OF EACH SHIFT, CONTRACTOR IS TO REMOVE DUST

SEPARATION AND CLEAN AREAS AS REQUIRED; PROVIDE STICKY

WALK-OFF MATS AT ENTRANCE TO CONSTRUCTION AREA; PROVIDE

CONSTRUCTION SIGNAGE "DANGER - CONSTRUCTION AREA,

AUTHORIZED PERSONNEL ONLY"

ALL TEMPORARY CONSTRUCTION WALLS ARE TO BE 1-HR RATED &

CONSTRUCTED OF NON-COMBUSTIBLE MATERIALS AND SHALL BE

SMOKE & DUST TIGHT; WALLS ARE TO BE 3-5/8" METAL STUDS W/ TYPE

'X' GYP. BD. ON BOTH SIDES (REFER TO DETAIL 03/GI002); PROVIDE

3'-0" X 7'-0" ACCESS DOOR; PROVIDE STICKY WALK-OFF MATS AT

ENTRANCE TO CONSTRUCTION AREA; PROVIDE CONSTRUCTION

SIGNAGE "DANGER - CONSTRUCTION AREA, AUTHORIZED

PERSONNEL ONLY"

DEMOLITION:

• PATCH & REPAIR ADJACENT SURFACES AFFECTED BY DEMOLITION AS

REQUIRED TO PREPARE FOR NEW CONSTRUCTION AND/OR NEW

FINISHES.

• REMOVE EXISTING LAY-IN CEILING & ALL CEILING-MOUNTED ITEMS

FOR REINSTALLATION INTO NEW CEILING.

CONSTRUCTION:

• PAINT ALL GYP. WALLS & CEILINGS

• LAY NEW RESILIENT FLOOR TILE & WALL BASE

• APPLY NEW WALL PROTECTION WAINSCOT

• INSTALL NEW HANDRAILS & CORNER GUARDS

• REINSTALL SIGNAGE OR OTHER EXISTING WALL-MOUNTED ITEMS IN

THEIR EXISTING LOCATIONS.

• INSTALL NEW LAY-IN CEILING & ASSOCIATED CEILING-MOUNTED

EQUIPMENT.

SHEET PRINTING NOTES

1. THIS SHEET TO BE PRINTED IN COLOR ONLY AS A BLACK AND WHITE

PRINT WILL LOSE KEY INFORMATION.

2. ANY SHEET DELIVERED TO CONTRACTOR/ SUB-CONTRACTORS TO

BE PRINTED IN COLOR.

600 E. Michigan Ave, Suite B

Kalamazoo, MI 49007

P: 269.927.0144 www.7GenAE.com

2850 Eisenhower Ave, Suite 310

Alexandria, VA 22314

P: 202.617.8485 www.alliance.us.com

2 3 4 5 6 7 8 9

2 3 4 5 6 7 8 91

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANTS ARCHITECT/ENGINEERS

DRAWING TITLE:

APPROVED: PROJECT DIRECTOR LOCATION:

PROJECT TITLE:

DATE: CHECKED: DRAWN:

PROJECT NUMBER:

BUILDING NUMBER:

DRAWING NUMBER:

DWG. ___ OF ___

7GAE PROJECT NO.: 218047

Office of

Construction and Facilities

Management

VA FORM 08-6231

o n e e ig h th i n c h o e q u a rt e r in c h o e e ig h th s in c h o e h a lf i n c h o e q u a rt e rs i n c h o e i n c h o e a n d o n e h a lf i n c h e s o e i n c h e s o

6 "

Department of Veterans Affairs28

BUILDING 1

100% BID DOCUMENTS

GC206

506-20-204

VA ANN ARBOR MEDICAL CENTER

MAY 8, 2020 JRB SLS

FIRST FLOOR PLAN - PHASE 6 MODERNIZE HOSPITAL

FINISHES

NORTH

SCALE: 1/8" = 1'-0"

FIRST FLOOR PLAN - PHASE 6

UP

1W-L

1W-I

1W-I

1W-18

1W-17

1W-16

1W-15

1W-L

1W-14

1W-P

1W-P

1W-O1W-M

1W-M

1W-N

1W-N

1W-K'

1E-1

1W-Q

1W-Q

1W-R

1W-R

1W-S

1W-S1W-J

1W- 5 1W- 5

1W-6 1W-6

1W-4'

1W-7'

1W-J'

1W-4

A121

ENT EXAM

A123

ENT EXAM

A146B

CLEAN

A146D

INTAKE /

VITALS

A146A

RECEPTION

C1-104

CORRIDOR

C1-109A

CORRIDOR

C1-110

CORRIDOR

C1-109

CORRIDOR

PROTECT

EXIST. MARBLE

TO REMAIN

1W-9

1W-10

1W-11

1W-12

1W-13

1W-T

1W-K 1W-N'1W-M'

1W-N.8 1W-P.2

1W-P' 1W-T'

1W-U

1W-8'

H1 H1H1H1

C1-107

CORRIDOR

S5-1

STAIR 5

C137

MEN'S TOILET

A144

WOMEN'S

TOILET

A143

MEN'S TOILET

STAIR #1

B107

EYE CLINIC

WAITING

B109

PROCEDURE

RM.

STAIR #3

A120

AUDIOLOGY

WAITING

ROOM

C1-29A

SERVICE

ELEVATOR

LOBBY

A150

STAFF

WORKROOM

A156

STAFF

WORKROOM

A154

WOMEN'S

TOILET

A157

MEN'S TOILET

B100A

PASSAGE

A180

WAITING

A170

TREATMENT

A172

NURSE PRACT.

A174

PATIENT ED.

A176

NURSE

MANAGER

A175

ELEC.

B152

EXAM

B152A

EXAM

STAFF OFFICE

STAFF OFFICE

S-13

B112

TREATMENT

B111

CORRIDOR

A145

ELEC.

A146

COMM.

B130a

CHECKOUT

B133

ADMIN

A155

ELEC. ROOM

B137

EXAM

A175A

EXIST. ELEC

A178

EXIST. HVAC

PROTECT

EXIST.

MARBLE TO

REMAIN

1 2

2 4

PROTECT EXIST.

MARBLE AND WALL

MURAL TO REMAIN

PROTECT EXIST.

MARBLE TO REMAIN

4 4

4 4

1 2 3

1 2 3

1 2 3

1 2 3 31 2

31 2

1 2 3

1 2 3

1 2 3

1 2 3

1 2 3

3 3 3

PROTECT EXIST.

MARBLE TO REMAIN

PROTECT EXIST. DRINKING

FOUNTAIN TO REMAIN

1 2 3

PROTECT EXIST.

MARBLE TO REMAIN

REMOVE EXISTING ACRYLIC

WALL PANEL; AND

REINSTALL FIRE ALARM PULL

1. ALL DEMOLITION WORK REQUIRED IS NOT NECESSARILY LIMITED TO WHAT IS SHOWN ON THE

DEMOLITION PLANS. THE INTENT IS TO REMOVE ALL MATERIALS AND ITEMS AS REQUIRED TO

FACILITATE NEW CONSTRUCTION.

2. CONTRACTORS ARE TO VERIFY FIELD CONDITIONS, IF CONDITIONS DO NOT REFLECT WHAT IS NOTED

IN THE CONTRACT DOCUMENTS, THE CONTRACTOR IS TO NOTIFY THE ARCHITECT.

3. THIS PLAN IS TO BE USED IN CONJUNCTION WITH THE ENTIRE SET OF CONSTRUCTION DOCUMENTS.

DO NOT REMOVE ANY ITEMS WITHOUT VERIFYING AND COORDINATING WITH ALL GENERAL TRADES

AS TO HOW THEY RELATE TO THE OVERALL PROJECT.

4. CONTRACTOR IS RESPONSIBLE FOR PROVIDING DUMPSTERS. LOCATION OF DUMPSTERS TO BE

DETERMINED BY OWNER WITH CONTRACTORS INPUT.

5. CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL DEMOLISHED MATERIALS. DO NOT ALLOW

MATERIALS AND DEBRIS GENERATED BY DEMOLITION ACTIVITIES TO ACCUMULATE ON THE JOBSITE.

REMOVE DAILY AND DISPOSE OF IN A LEGAL MANNER. ONSITE SALE OR BURNING OF REMOVED

ITEMS IS NOT PERMITTED.

6. THE CONTRACTOR MUST TAKE ALL NECESSARY PRECAUTIONS TO ENSURE THE SAFETY OF THE PUBLIC

AND/OR WORKMEN ON THE SITE TO PREVENT ACCIDENTS OR INJURY TO ANY PERSON ON, ABOUT

OR ADJACENT TO THE PREMISES. THE CONTRACTOR SHALL COMPLY WITH ALL LAWS, ORDINANCES, CODES AND REGULATIONS PERTAINING TO SAFETY AND THE PREVENTION OF ACCIDENTS.

7. THE CONTRACTOR MUST MAINTAIN ADEQUATE SUPPORT, INSULATION, WATERPROOFING,

EMERGENCY LIGHTING, SECURITY, ALARMS, ETC. FOR ALL OR PART OF ITEMS WHICH ARE TO

REMAIN.

8. THE OWNER RESERVES THE RIGHTS TO ANY REMOVED MATERIALS OR ITEMS. CONTRACTOR TO

COORDINATE WITH OWNER.

9. DO NOT CUT AND/OR PATCH STRUCTURAL ELEMENTS IN A MANNER THAT COULD CHANGE THEIR

LOAD-CARRYING CAPACITY OR LOAD-DEFLECTION RATIO.

10. PATCH/REPAIR OR REPLACE ALL AREAS DAMAGED BY DEMOLITION, REWORK AS REQUIRED,

PREPARE FOR NEW CONSTRUCTION AS REQUIRED. BRICK OR BLOCK PATCHING SHALL BE TOOTHED-

IN TO MATCH EXISTING COURSING PATTERN.

11. WHERE WALLS & CEILINGS ARE TO BE REMOVED, ALL ITEMS THAT FALL WITH THE WALLS &/OR

CEILINGS ARE TO BE REMOVED OR REROUTED.

12. CONSTRUCTION AREAS TO BE COMPLETELY SEPARATED FROM OCCUPIED AREAS WITH A ONE-HOUR

FIRE RATED ASSEMBLY, AND WITH SUITABLE DUST BARRIER. TAKE CARE THAT CONSTRUCTION DUST IS

NOT TRANSMITTED TO OCCUPIED AREAS BY MECHANICAL SYSTEM.

13. IF HAZARDOUS MATERIALS ARE ENCOUNTERED DURING DEMOLITION, CONTRACTOR SHALL

CONTACT OWNER FOR ABATEMENT.

14. WHERE WALLS OR ITEMS ATTACHED TO SPRAY APPLIED FIRE PROOFING ARE REMOVED, THE

CONTRACTOR SHALL PATCH THE FIRE RATED SYSTEM AS REQUIRED TO MAINTAIN THE FIRE RATING OF

THE SYSTEM.

15. REMOVE, REPLACE, PATCH, AND REPAIR MATERIALS AND SURFACES CUT OR DAMAGED DURING

DEMOLITION, BY METHODS AND WITH MATERIALS SO AS NOT TO VOID EXISTING WARRANTIES.

16. CLEAN AREAS AND SPACES WHERE CUTTING AND PATCHING ARE PERFORMED.

17. CONTRACTOR TO SALVAGE ALL ROOM SIGNS FOR REUSE. COORDINATE WITH OWNER NEW SIGN

LOCATIONS.

AREA NOT IN CONTRACT

GENERAL DEMO NOTES

REMOVE EXISTING WALL-MOUNTED HANDRAIL COMPLETE INCLUDING MOUNTING BRACKET,

CONNECTOR AND FASTENERS. PATCH AND REPAIR WALL SURFACE TO REMAIN IN PREPARATION FOR

NEW WORK.

REMOVE EXISTING WALL PANEL WAINSCOT COMPLETE INCLUDING MOUNTING BRACKET, AND

FASTENERS. PATCH AND REPAIR WALL SURFACE TO REMAIN IN PREPARATION FOR NEW WORK.

WHERE EXISTING ELECTRICAL WALL OUTLETS ARE LOCATED IN PANEL; REINSTALL AND RELOCATE

OUTLET AND COVER PLATE TO NEW FINISH MATERIALS, AND PROVIDE NEW JUNCTION BOX AS

REQUIRED.

REMOVE EXISTING BUMPER GUARDS COMPLETE INCLUDING MOUNTING BRACKET, CONNECTOR

AND FASTENERS. PATCH AND REPAIR WALL SURFACE TO REMAIN IN PREPARATION FOR NEW WORK.

REMOVE EXISTING CORNER GUARDS COMPLETE INCLUDING MOUNTING BRACKET, AND FASTENERS.

PATCH AND REPAIR WALL SURFACE TO REMAIN IN PREPARATION FOR NEW WORK.

REMOVE EXISTING WALL FINISHES, WALL PROTECTION, WALL BASE, & ALL ITEMS ATTACHED TO THE

WALLS ;INCLUDING, BUT NOT LIMITED TO: HAND SANITIZIZER, SIGNAGE, ARTWORK, ETC. RETURN

ARTWORK TO COR. STORE ITEMS FOR REINSTALLATION BY CONTRACTOR. PATCH & REPAIR EXPOSED

SURFACES TO REMAIN AS REQUIRED FOR NEW CONSTRUCTION AND/OR NEW FINISHES.

REMOVE EXISTING FLOORING & FLOOR FINISHES INCLUDING ALL ADHESIVES, SETTING MATERIALS

DOWN TO EXISTING SUBSTRATE (FLOOR FINISHES INCLUDE, BUT NOT LIMITED TO: CARPET TILE, LVT, VCT, ETC.). GRIND CONCRETE FLOORS AS REQUIRED TO PROVIDE A SMOOTH & UNIFORM SURFACE

FOR NEW FINISHES.

REMOVE & RELOCATE EXISTING WALL MOUNTED MAIL BOX. COORDINATE RELOCATION OF

MAILBOX W. VA COR TO ENSURE FEDERAL POSTAL GUIDELINES ARE FOLLOWED. PATCH AND REPAIR

WALL TO PROVIDE A SMOOTH & UNIFORM SURFACE FOR NEW FINISHES.

ABATE & REMOVE EXISTING LEAD WALL PAINT AROUND EXTERIOR WINDOW SYSTEM. CONTRACTOR

TO PATCH & REPAIR SURFACES TO REMAIN AS REQUIRED TO RECEIVE NEW CONSTRUCTION AND/OR

NEW FINISHES. DISPOSE OF MATERIALS IN ACCORDANCE TO SPECIFICATIONS.

DEMOLITION KEY NOTES

H1

1. COORDINATE ALL REMOVAL OF HAZARDOUS MATERIALS WITH DEMOLITION

PLAN.

2. REFER TO SPECIFICATION SECTION 02 83 33.13 - LEAD BASED PAINT

REMOVAL & DISPOSAL FOR ADDITIONAL INFORMATION AND

REQUIREMENTS.

3. NOT ALL HAZARDOUS MATERIALS MAY BE VISIBLE PRIOR TO DEMOLITION.

ANY HAZARDOUS MATERIALS THAT ARE DISCOVERED DURING DEMOLITION

ARE TO BE HANDLED AND REMOVED PER SPECIFICATION REQUIREMENTS.

GENERAL HAZARDOUS MATERIAL NOTES

600 E. Michigan Ave, Suite B

Kalamazoo, MI 49007

P: 269.927.0144 www.7GenAE.com

2850 Eisenhower Ave, Suite 310

Alexandria, VA 22314

P: 202.617.8485 www.alliance.us.com

2 3 4 5 6 7 8 9

2 3 4 5 6 7 8 91

A

B

C

D

E

F

A

B

C

D

E

F

CONSULTANTS ARCHITECT/ENGINEERS

DRAWING TITLE:

APPROVED: PROJECT DIRECTOR LOCATION:

PROJECT TITLE:

DATE: CHECKED: DRAWN:

PROJECT NUMBER:

BUILDING NUMBER:

DRAWING NUMBER:

DWG. ___ OF ___

7GAE PROJECT NO.: 218047

Office of

Construction and Facilities

Management

VA FORM 08-6231

o n e e ig h th i n c h o e q u a rt e r in c h o e e ig h th s in c h o e h a lf i n c h o e q u a rt e rs i n c h o e i n c h o e a n d o n e h a lf i n c h e s o e i n c h e s o

6 "

Department of Veterans Affairs28

BUILDING 1

100% BID DOCUMENTS

AD101A

506-20-204

VA ANN ARBOR MEDICAL CENTER

MAY 8, 2020 JRB STL

FIRST FLOOR DEMOLITION

PLAN - AREA A

MODERNIZE HOSPITAL

FINISHES

NORTH

SCALE: 1/8" = 1'-0"

FIRST FLOOR DEMOLITION PLAN - UNIT A

C1-110

CORRIDOR

C212

CORRIDOR

C221

CORRIDOR

C219

ALCOVE

28I-2 28I-2.5 28I-9 28I-1028I-828I-728I-628I-528I-428I-3

28I-A

28I-B

28I-D

28I-C

28I-F

28I-G

28I-H

28I-K

1W-U

H1 H1 H1

C1-11E

BRIDGE

F100

OT

F101

MECHANICAL

ROOM

F111

CHAPEL

F105

SOILED UTILITY

F107

OT STORAGE

STAIR #1

F113

LOCKER

ROOM AND

BATHROOM

MEN'S TOILET

OFFICE

F100a

OT OFFICE

A180

MAIN

COMPUTER

ROOM

1 1 1 1

4 4

4 4

4 4 4

DEDUCTIVE ALTERNATE #2

DEDUCTIVE ALTERNATE #1

1. ALL DEMOLITION WORK REQUIRED IS NOT NECESSARILY LIMITED TO WHAT IS SHOWN ON THE

DEMOLITION PLANS. THE INTENT IS TO REMOVE ALL MATERIALS AND ITEMS AS REQUIRED TO

FACILITATE NEW CONSTRUCTION.

2. CONTRACTORS ARE TO VERIFY FIELD CONDITIONS, IF CONDITIONS DO NOT REFLECT WHAT IS NOTED

IN THE CONTRACT DOCUMENTS, THE CONTRACTOR IS TO NOTIFY THE ARCHITECT.

3. THIS PLAN IS TO BE USED IN CONJUNCTION WITH THE ENTIRE SET OF CONSTRUCTION DOCUMENTS.

DO NOT REMOVE ANY ITEMS WITHOUT VERIFYING AND COORDINATING WITH ALL GENERAL TRADES

AS TO HOW THEY RELATE TO THE OVERALL PROJECT.

4. CONTRACTOR IS RESPONSIBLE FOR PROVIDING DUMPSTERS. LOCATION OF DUMPSTERS TO BE

DETERMINED BY OWNER WITH CONTRACTORS INPUT.

5. CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL DEMOLISHED MATERIALS. DO NOT ALLOW

MATERIALS AND DEBRIS GENERATED BY DEMOLITION ACTIVITIES TO ACCUMULATE ON THE JOBSITE.

REMOVE DAILY AND DISPOSE OF IN A LEGAL MANNER. ONSITE SALE OR BURNING OF REMOVED

ITEMS IS NOT PERMITTED.

6. THE CONTRACTOR MUST TAKE ALL NECESSARY PRECAUTIONS TO ENSURE THE SAFETY OF THE PUBLIC

AND/OR WORKMEN ON THE SITE TO PREVENT ACCIDENTS OR INJURY TO ANY PERSON ON, ABOUT

OR ADJACENT TO THE PREMISES. THE CONTRACTOR SHALL COMPLY WITH ALL LAWS, ORDINANCES, CODES AND REGULATIONS PERTAINING TO SAFETY AND THE PREVENTION OF ACCIDENTS.

7. THE CONTRACTOR MUST MAINTAIN ADEQUATE SUPPORT, INSULATION, WATERPROOFING,

EMERGENCY LIGHTING, SECURITY, ALARMS, ETC. FOR ALL OR PART OF ITEMS WHICH ARE TO

REMAIN.

8. THE OWNER RESERVES THE RIGHTS TO ANY REMOVED MATERIALS OR ITEMS. CONTRACTOR TO

COORDINATE WITH OWNER.

9. DO NOT CUT AND/OR PATCH STRUCTURAL ELEMENTS IN A MANNER THAT COULD CHANGE THEIR

LOAD-CARRYING CAPACITY OR LOAD-DEFLECTION RATIO.

10. PATCH/REPAIR OR REPLACE ALL AREAS DAMAGED BY DEMOLITION, REWORK AS REQUIRED,

PREPARE FOR NEW CONSTRUCTION AS REQUIRED. BRICK OR BLOCK PATCHING SHALL BE TOOTHED-

IN TO MATCH EXISTING COURSING PATTERN.

11. WHERE WALLS & CEILINGS ARE TO BE REMOVED, ALL ITEMS THAT FALL WITH THE WALLS &/OR

CEILINGS ARE TO BE REMOVED OR REROUTED.

12. CONSTRUCTION AREAS TO BE COMPLETELY SEPARATED FROM OCCUPIED AREAS WITH A ONE-HOUR

FIRE RATED ASSEMBLY, AND WITH SUITABLE DUST BARRIER. TAKE CARE THAT CONSTRUCTION DUST IS

NOT TRANSMITTED TO OCCUPIED AREAS BY MECHANICAL SYSTEM.

13. IF HAZARDOUS MATERIALS ARE ENCOUNTERED DURING DEMOLITION, CONTRACTOR SHALL

CONTACT OWNER FOR ABATEMENT.

14. WHERE WALLS OR ITEMS ATTACHED TO SPRAY APPLIED FIRE PROOFING ARE REMOVED, THE

CONTRACTOR SHALL PATCH THE FIRE RATED SYSTEM AS REQUIRED TO MAINTAIN THE FIRE RATING OF

THE SYSTEM.

15. REMOVE, REPLACE, PATCH, AND REPAIR MATERIALS AND SURFACES CUT OR DAMAGED DURING

DEMOLITION, BY METHODS AND WITH MATERIALS SO AS NOT TO VOID EXISTING WARRANTIES.

16. CLEAN AREAS AND SPACES WHERE CUTTING AND PATCHING ARE PERFORMED.

17. CONTRACTOR TO SALVAGE ALL ROOM SIGNS FOR REUSE. COORDINATE WITH OWNER NEW SIGN

LOCATIONS.

AREA NOT IN CONTRACT

GENERAL DEMO NOTES

REMOVE EXISTING WALL-MOUNTED HANDRAIL COMPLETE INCLUDING MOUNTING BRACKET,

CONNECTOR AND FASTENERS. PATCH AND REPAIR WALL SURFACE TO REMAIN IN PREPARATION FOR

NEW WORK.

REMOVE EXISTING WALL PANEL WAINSCOT COMPLETE INCLUDING MOUNTING BRACKET, AND

FASTENERS. PATCH AND REPAIR WALL SURFACE TO REMAIN IN PREPARATION FOR NEW WORK.

WHERE EXISTING ELECTRICAL WALL OUTLETS ARE LOCATED IN PANEL; REINSTALL AND RELOCATE

OUTLET AND COVER PLATE TO NEW FINISH MATERIALS, AND PROVIDE NEW JUNCTION BOX AS

REQUIRED.

REMOVE EXISTING BUMPER GUARDS COMPLETE INCLUDING MOUNTING BRACKET, CONNECTOR

AND FASTENERS. PATCH AND REPAIR WALL SURFACE TO REMAIN IN PREPARATION FOR NEW WORK.

REMOVE EXISTING CORNER GUARDS COMPLETE INCLUDING MOUNTING BRACKET, AND FASTENERS.

PATCH AND REPAIR WALL SURFACE TO REMAIN IN PREPARATION FOR NEW WORK.

REMOVE EXISTING WALL FINISHES, WALL PROTECTION, WALL BASE, & ALL ITEMS ATTACHED TO THE

WALLS ;INCLUDING, BUT NOT LIMITED TO: HAND SANITIZIZER, SIGNAGE, ARTWORK, ETC. RETURN

ARTWORK TO COR. STORE ITEMS FOR REINSTALLATION BY CONTRACTOR. PATCH & REPAIR EXPOSED

SURFACES TO REMAIN AS REQUIRED FOR NEW CONSTRUCTION AND/OR NEW FINISHES.

REMOVE EXISTING FLOORING & FLOOR FINISHES INCLUDING ALL ADHESIVES, SETTING MATERIALS

DOWN TO EXISTING SUBSTRATE (FLOOR FINISHES INCLUDE, BUT NOT LIMITED TO: CARPET TILE, LVT, VCT, ETC.). GRIND CONCRETE FLOORS AS REQUIRED TO PROVIDE A SMOOTH & UNIFORM SURFACE

FOR NEW FINISHES.

REMOVE & RELOCATE EXISTING WALL MOUNTED MAIL BOX. COORDINATE RELOCATION OF

MAILBOX W. VA COR TO ENSURE FEDERAL POSTAL GUIDELINES ARE FOLLOWED. PATCH AND REPAIR

WALL TO PROVIDE A SMOOTH & UNIFORM SURFACE FOR NEW FINISHES.

ABATE & REMOVE EXISTING LEAD…

This is the start of the file's text. The full file is on GovTribe.