Fillable_Excel_-_Exhibit_B-1_-_Rate_Sheet.xlsx
XLSX spreadsheet 266 KB Posted
- Attached to
- C5613085-D Emergency Generator Services
- Solicitation number
- 0000038083
- Issued by
- California
About this file
This is an Excel rate sheet (Exhibit B-1) for the California Department of Corrections and Rehabilitation (CDCR) Master Agreement C5613085-D for Emergency Generator Services across 35 correctional facilities and youth centers statewide. The contract encompasses comprehensive maintenance, inspection, and repair services for generators ranging from 10 KW to 2500 KW in capacity, along with associated equipment such as fire pumps, load banks, and sewage pumps. Services required include annual maintenance inspections, quarterly maintenance inspections, one-time services, load bank testing, normal business hour repairs, outside business hour repairs at 1.5x the hourly rate, and emergency call repairs. Estimated repair service hours vary significantly by facility, ranging from 20 hours annually at the smallest locations to 1,236 hours at California Medical Facility. Bidders may submit bids for one or more locations but must provide rates for all service line items within each selected location; failure to provide dollar amounts for any item may result in rejection of the bid for that location.
Pricing must be submitted in U.S. currency with all costs inclusive of labor, materials, supplies, transportation, permits, licenses, taxes, and fees. Estimated parts and generator replacement costs range from $20,000 to $750,000 depending on facility size, with each location including a 25 percent line item for as-needed unforeseeable services calculated from the sum of all service rates. Bidders may offer early payment discounts of at least one percent with a minimum of $50 on invoices paid within 30 days; in case of a tie in bids, the lowest responsible bid with the highest discount shall prevail, and if discounts also tie, the award shall be determined by public coin toss. No guarantee exists that any services will actually be requested under this agreement, as quantities listed represent state estimates only and the state reserves the right to increase or omit portions of work as deemed necessary.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid_Package.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary
EMERGENCY GENERATOR SERVICES
Electronic bid packages include an Excel version of this Rate Sheet (Exhibit B-1) in addition to the PDF file in order to assist bidders in computing accurate totals. Bidders should download the Excel version and complete ALL highlighted cells.
The Contractor will be compensated for services performed in accordance with the rates specified on the Exhibit B-1, Rate Sheet which shall include all labor, personnel, transportation (including travel and per diem), materials, supplies, tools, any necessary equipment, permits, licenses, taxes, fees, shipping/freight charges, and every other item of expense necessary (unless otherwise specified herein) to provide the identified services.
Bidders may bid on one or more locations. Bidders are not required to bid on all locations; however, bidders must include a rate for all items within that location. Failure to indicate a dollar amount (blank cell) on any item may be grounds to reject the entire bid for that location. A zero dollar amount ($0.00 or $ -) listed for any and/or all items shall be interpreted and understood by the State to mean that the bidder will perform any such services at NO COST to the State.
Any and all services performed outside the scope of this Agreement shall be at the sole risk and expense of the Contractor. All prices and notations must be printed in ink or typewritten. All prices must be bid in U.S. currency and shall encompass every item of expense necessary to perform the services.
Quantities and services listed on the Exhibit B-1, Rate Sheet are the State's estimates only and are offered as a basis for the comparison of bids. The State does not expressly or by implication agree that the actual amount of work will correspond therewith and reserves the right to increase/omit portions of the work as may be deemed necessary or advisable by the State.
Each participating location’s total basis of award includes a Rate Sheet line item totaling 25% of the sum of the bidder’s service rate(s) to allow for additional as-needed, unforeseeable services. As-needed services will be payable at the applicable service rate(s) on the Exhibit B-1, Rate Sheet.
All CDCR estimated quantities and Contractor provided rates are for the entire term of this Agreement.
| Contractor may offer a discount on invoices paid within thirty (30) days of receipt. Discount offered must be at least one percent and a minimum of $50.00. |
| Discount offered on invoices paid within 30 days of receipt = |
| In the event of a tie, absent other determining factors, the lowest responsible bid with the highest discount shall prevail. IF the highest discounts also tie, the awarded bidder shall be determined by a public coin toss. |
There are no guarantees that any services will be requested from this agreement.
California Department of Corrections and Rehabilitation (CDCR) Rate Sheet &"Arial,Regular"Bid Number C5613085-D Exhibit B-1
Rate Sheet Bid Number C5610028-D Exhibit B-1 Addendum 1
&"Arial,Regular"Page &P of &N
Page &P of &N
ASP
AVENAL STATE PRISON (ASP)
| A. ANNUAL MAINTENANCE/INSPECTION SERVICES | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 1200 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 15.6 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 250KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| TOTAL FOR LINE A | $ - 0 |
| B. QUARTERLY MAINTENANCE/INSPECTION SERVICES | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 1200 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| 15.6 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| 250 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| TOTAL FOR LINE B | $ - 0 |
| C. ONE-TIME SERVICE | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 1200 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| 15.6 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| 250 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| TOTAL FOR LINE C | $ - 0 |
| D. LOAD BANK TESTING | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 1200 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 15.6 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 250 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| TOTAL FOR LINE D | $ - 0 |
| E. NORMAL BUSINESS HOUR REPAIR SERVICE | ||||
| Rate per Hour | Estimated Hours | Total | ||
| X | 75 | $ - 0 |
| F. OUTSIDE NORMAL BUSINESS HOUR REPAIR SERVICES | |||||
| Rate per Hour | Estimated Hours | Total | |||
| Calculation: Repair Hourly Rate times 1.5 | X | 20 | HOURLY X 1.5 | $ - 0 |
| G. EMERGENCY CALL REPAIR SERVICES | ||||
| Rate per Hour | Estimated Hours | Total | ||
| X | 20 | $ - 0 |
H. Estimated Parts/Generator Replacement for Entire Contract Term $ 500,000.00
I. As Needed Services (25%) $ - 0
TOTAL BASIS OF AWARD FOR ASP (A+B+C+D+E+F+G+H+I) $ - 0
Rate Sheet &"Arial,Regular"Bid Number C5613085-D
Rate Sheet Bid Number C5610028-D Exhibit B-1 Addendum 1
&"Arial,Regular"Page &P of &N
Page &P of &N
CAL
CALIPATRIA STATE PRISON (CAL)
| A. ANNUAL MAINTENANCE/INSPECTION SERVICES | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 2000 KW Generator | X | 2 | X | 3 | = | $ - 0 | |
| 100 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 20 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 80 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| Fire Pump | X | 1 | X | 3 | = | $ - 0 | |
| Load Bank | X | 1 | X | 3 | = | $ - 0 | |
| TOTAL FOR LINE A | $ - 0 |
| B. QUARTERLY MAINTENANCE/INSPECTION SERVICES | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 2000 KW Generator | X | 2 | X | 12 | = | $ - 0 | |
| 100 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| 20 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| 80 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| Fire Pump | X | 1 | X | 12 | = | $ - 0 | |
| TOTAL FOR LINE B | $ - 0 |
| C. ONE-TIME SERVICE | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 2000 KW Generator | X | 2 | X | 1 | = | $ - 0 | |
| 100 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| 20 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| 80 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| Fire Pump | X | 1 | X | 1 | = | $ - 0 | |
| TOTAL FOR LINE C | $ - 0 |
| D. LOAD BANK TESTING | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 2000 KW Generator | X | 2 | X | 3 | = | $ - 0 | |
| 100 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 20 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 80 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| TOTAL FOR LINE D | $ - 0 |
| E. SOURCE TESTING | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 2000 KW Generator | X | 2 | X | 3 | = | $ - 0 | |
| 100 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 80 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| TOTAL FOR LINE D | $ - 0 |
| F. NORMAL BUSINESS HOUR REPAIR SERVICE | ||||
| Rate per Hour | Estimated Hours | Total | ||
| X | 300 | $ - 0 |
| G. OUTSIDE NORMAL BUSINESS HOUR REPAIR SERVICES | |||||
| Rate per Hour | Estimated Hours | Total | |||
| Calculation: Repair Hourly Rate times 1.5 | X | 50 | HOURLY X 1.5 | $ - 0 |
| H. EMERGENCY CALL REPAIR SERVICES | ||||
| Rate per Hour | Estimated Hours | Total | ||
| X | 50 | $ - 0 |
I. Estimated Parts/Generator Replacement for Entire Contract Term $ 500,000.00
J. As Needed Services (25%) $ - 0
TOTAL BASIS OF AWARD FOR CAL (A+B+C+D+E+F+G+H+I+J) $ - 0
Rate Sheet &"Arial,Regular"Bid Number C5613085-D
Rate Sheet Bid Number C5610028-D Exhibit B-1 Addendum 1
&"Arial,Regular"Page &P of &N
Page &P of &N
CCC
CALIFORNIA CORRECTIONAL CENTER (CCC) - (Closed – under the authority of High Desert State Prison (HDSP)
| A. ANNUAL MAINTENANCE/INSPECTION SERVICES | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 2000 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 600 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 375 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 12.5 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 100 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 60 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 45 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| TOTAL FOR LINE A | $ - 0 |
| B. QUARTERLY MAINTENANCE/INSPECTION SERVICES | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 2000 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| 600 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| 375 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| 12.5 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| 100 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| 60 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| 45 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| TOTAL FOR LINE B | $ - 0 |
| C. ONE-TIME SERVICE | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 2000 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| 600 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| 375 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| 12.5 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| 100 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| 60 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| 45 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| TOTAL FOR LINE C | $ - 0 |
| D. LOAD BANK TESTING | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 2000 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 600 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 375 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 12.5 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 100 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 60 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 45 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| TOTAL FOR LINE D | $ - 0 |
| E. NORMAL BUSINESS HOUR REPAIR SERVICE | ||||
| Rate per Hour | Estimated Hours | Total | ||
| X | 300 | $ - 0 |
| F. OUTSIDE NORMAL BUSINESS HOUR REPAIR SERVICES | |||||
| Rate per Hour | Estimated Hours | Total | |||
| Calculation: Repair Hourly Rate times 1.5 | X | 50 | HOURLY X 1.5 | $ - 0 |
| G. EMERGENCY CALL REPAIR SERVICES | ||||
| Rate per Hour | Estimated Hours | Total | ||
| X | 50 | $ - 0 |
H. Estimated Parts/Generator Replacement for Entire Contract Term $ 500,000.00
I. As Needed Services (25%) $ - 0
TOTAL BASIS OF AWARD FOR CCC (A+B+C+D+E+F+G+H+I) $ - 0
Rate Sheet &"Arial,Regular"Bid Number C5613085-D
Rate Sheet Bid Number C5610028-D Exhibit B-1 Addendum 1
&"Arial,Regular"Page &P of &N
Page &P of &N
CCI
CALIFORNIA CORRECTIONAL INSTITUTION (CCI)
| A. ANNUAL MAINTENANCE/INSPECTION SERVICES | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 664KW 480V Generator | X | 2 | X | 3 | = | $ - 0 | |
| 500KW 4160V Generator | X | 1 | X | 3 | = | $ - 0 | |
| 2000KW 4160V Generator | X | 1 | X | 3 | = | $ - 0 | |
| 100KW 480V Generator | X | 1 | X | 3 | = | $ - 0 | |
| 407KW 480V Generator | X | 1 | X | 3 | = | $ - 0 | |
| 30KW 480V Generator | X | 1 | X | 3 | = | $ - 0 | |
| 15KW 480V Generator | X | 1 | X | 3 | = | $ - 0 | |
| 12.5KW 480V Generator | X | 1 | X | 3 | = | $ - 0 | |
| 13.4KW 480V Generator | X | 1 | X | 3 | = | $ - 0 | |
| TOTAL FOR LINE A | $ - 0 |
| B. QUARTERLY MAINTENANCE/INSPECTION SERVICES | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 664KW 480V Generator | X | 2 | X | 12 | = | $ - 0 | |
| 500KW 4160V Generator | X | 1 | X | 12 | = | $ - 0 | |
| 2000KW 4160V Generator | X | 1 | X | 12 | = | $ - 0 | |
| 100KW 480V Generator | X | 1 | X | 12 | = | $ - 0 | |
| 407KW 480V Generator | X | 1 | X | 12 | = | $ - 0 | |
| 30KW 480V Generator | X | 1 | X | 12 | = | $ - 0 | |
| 15KW 480V Generator | X | 1 | X | 12 | = | $ - 0 | |
| 12.5KW 480V Generator | X | 1 | X | 12 | = | $ - 0 | |
| 13.4KW 480V Generator | X | 1 | X | 12 | = | $ - 0 | |
| TOTAL FOR LINE B | $ - 0 |
| C. ONE-TIME SERVICE | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 664KW 480V Generator | X | 2 | X | 1 | = | $ - 0 | |
| 500KW 4160V Generator | X | 1 | X | 1 | = | $ - 0 | |
| 2000KW 4160V Generator | X | 1 | X | 1 | = | $ - 0 | |
| 100KW 480V Generator | X | 1 | X | 1 | = | $ - 0 | |
| 407KW 480V Generator | X | 1 | X | 1 | = | $ - 0 | |
| 30KW 480V Generator | X | 1 | X | 1 | = | $ - 0 | |
| 15KW 480V Generator | X | 1 | X | 1 | = | $ - 0 | |
| 12.5KW 480V Generator | X | 1 | X | 1 | = | $ - 0 | |
| 13.4KW 480V Generator | X | 1 | X | 1 | = | $ - 0 | |
| TOTAL FOR LINE C | $ - 0 |
| D. LOAD BANK TESTING | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 664KW 480V Generator | X | 2 | X | 3 | = | $ - 0 | |
| 500KW 4160V Generator | X | 1 | X | 3 | = | $ - 0 | |
| 2000KW 4160V Generator | X | 1 | X | 3 | = | $ - 0 | |
| 100KW 480V Generator | X | 1 | X | 3 | = | $ - 0 | |
| 407KW 480V Generator | X | 1 | X | 3 | = | $ - 0 | |
| 30KW 480V Generator | X | 1 | X | 3 | = | $ - 0 | |
| TOTAL FOR LINE D | $ - 0 |
| E. NORMAL BUSINESS HOUR REPAIR SERVICE | ||||
| Rate per Hour | Estimated Hours | Total | ||
| X | 240 | $ - 0 |
| F. OUTSIDE NORMAL BUSINESS HOUR REPAIR SERVICES | |||||
| Rate per Hour | Estimated Hours | Total | |||
| Calculation: Repair Hourly Rate times 1.5 | X | 72 | HOURLY X 1.5 | $ - 0 |
| G. EMERGENCY CALL REPAIR SERVICES | ||||
| Rate per Hour | Estimated Hours | Total | ||
| X | 72 | $ - 0 |
H. Estimated Parts/Generator Replacement for Entire Contract Term $ 500,000.00
I. As Needed Services (25%) $ - 0
TOTAL BASIS OF AWARD FOR CCI (A+B+C+D+E+F+G+H+I) $ - 0
Rate Sheet &"Arial,Regular"Bid Number C5613085-D
Rate Sheet Bid Number C5610028-D Exhibit B-1 Addendum 1
&"Arial,Regular"Page &P of &N
Page &P of &N
CCWF
CENTRAL CALIFORNIA WOMEN'S FACILITY (CCWF)
| A. ANNUAL MAINTENANCE/INSPECTION SERVICES | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 1000 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 400 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 500 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 125 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 50 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 15 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| Fire Pump | X | 1 | X | 3 | = | $ - 0 | |
| TOTAL FOR LINE A | $ - 0 |
| B. QUARTERLY MAINTENANCE/INSPECTION SERVICES | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 1000 KW Generator | X | 2 | X | 12 | = | $ - 0 | |
| 400 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| 500 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| 125 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| 50 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| 15 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| Fire Pump | X | 1 | X | 12 | = | $ - 0 | |
| TOTAL FOR LINE B | $ - 0 |
| C. ONE-TIME SERVICE | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 1000 KW Generator | X | 2 | X | 1 | = | $ - 0 | |
| 400 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| 500 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| 125 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| 50 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| 15 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| Fire Pump | X | 1 | X | 1 | = | $ - 0 | |
| TOTAL FOR LINE C | $ - 0 |
| D. LOAD BANK TESTING | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 1000 KW Generator | X | 2 | X | 3 | = | $ - 0 | |
| 400 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 500 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 125 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 50 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 15 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| Fire Pump | X | 1 | X | 3 | = | $ - 0 | |
| TOTAL FOR LINE D | $ - 0 |
| E. ENGINEERING AND DESIGN SERVICES | |||||||
| Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| Generator design and engineering Services | X | 8 | X | 100 | = | $ - 0 |
| F. NORMAL BUSINESS HOUR REPAIR SERVICE | ||||
| Rate per Hour | Estimated Hours | Total | ||
| X | 100 | $ - 0 |
| G. OUTSIDE NORMAL BUSINESS HOUR REPAIR SERVICES | |||||
| Rate per Hour | Estimated Hours | Total | |||
| Calculation: Repair Hourly Rate times 1.5 | X | 100 | HOURLY X 1.5 | $ - 0 |
| H. EMERGENCY CALL REPAIR SERVICES | ||||
| Rate per Hour | Estimated Hours | Total | ||
| X | 100 | $ - 0 |
I. Estimated Parts/Generator Replacement for Entire Contract Term $ 500,000.00
J. As Needed Services (25%) $ - 0
TOTAL FOR CCWF (A+B+C+D+E+F+G+H+I+J) $ - 0
Rate Sheet &"Arial,Regular"Bid Number C5613085-D
Rate Sheet Bid Number C5610028-D Exhibit B-1 Addendum 1
&"Arial,Regular"Page &P of &N
Page &P of &N
CEN
CENTINELA STATE PRISON (CEN)
| A. ANNUAL MAINTENANCE/INSPECTION SERVICES | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 2000 KW Generator | X | 3 | X | 3 | = | $ - 0 | |
| 200 KW Generator | X | 2 | X | 3 | = | $ - 0 | |
| 15 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| Load Bank | X | 1 | X | 3 | = | $ - 0 | |
| Fire Pump | X | 1 | X | 3 | = | $ - 0 | |
| TOTAL FOR LINE A | $ - 0 |
| B. QUARTERLY MAINTENANCE/INSPECTION SERVICES | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 2000 KW Generator | X | 3 | X | 12 | = | $ - 0 | |
| 200 KW Generator | X | 2 | X | 12 | = | $ - 0 | |
| 15 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| Fire Pump | X | 1 | X | 12 | = | $ - 0 | |
| TOTAL FOR LINE B | $ - 0 |
| C. ONE-TIME SERVICE | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 2000 KW Generator | X | 3 | X | 3 | = | $ - 0 | |
| 200 KW Generator | X | 2 | X | 3 | = | $ - 0 | |
| 15 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| Fire Pump | X | 1 | X | 3 | = | $ - 0 | |
| TOTAL FOR LINE C | $ - 0 |
| D. LOAD BANK TESTING | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 2000 KW Generator | X | 3 | X | 3 | = | $ - 0 | |
| 200 KW Generator | X | 2 | X | 3 | = | $ - 0 | |
| TOTAL FOR LINE D | $ - 0 |
| E. EXHAUST EMISSION SOURCE TEST | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 2000 KW Generator | X | 3 | X | 1 | = | $ - 0 | |
| TOTAL FOR LINE E | $ - 0 |
| F. NORMAL BUSINESS HOUR REPAIR SERVICE | ||||
| Rate per Hour | Estimated Hours | Total | ||
| X | 200 | $ - 0 |
| G. OUTSIDE NORMAL BUSINESS HOUR REPAIR SERVICES | |||||
| Rate per Hour | Estimated Hours | Total | |||
| Calculation: Repair Hourly Rate times 1.5 | X | 75 | HOURLY X 1.5 | $ - 0 |
| H. EMERGENCY CALL REPAIR SERVICES | ||||
| Rate per Hour | Estimated Hours | Total | ||
| X | 50 | $ - 0 |
I. Estimated Parts/Generator Replacement for Entire Contract Term $ 750,000.00
J. As Needed Services (25%) $ - 0
TOTAL BASIS OF AWARD FOR CEN (A+B+C+D+E+F+G+H+I+J) $ - 0
Rate Sheet &"Arial,Regular"Bid Number C5613085-D
Rate Sheet Bid Number C5610028-D Exhibit B-1 Addendum 1
&"Arial,Regular"Page &P of &N
Page &P of &N
CHCF
CALIFORNIA HEALTH CARE FACILITY (CHCF)
| A. ANNUAL MAINTENANCE/INSPECTION SERVICES | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 15 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 2 MW Generator | X | 6 | X | 3 | = | $ - 0 | |
| 218 HP Generator | X | 1 | X | 3 | = | $ - 0 | |
| TOTAL FOR LINE A | $ - 0 |
| B. QUARTERLY MAINTENANCE/INSPECTION SERVICES | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 15 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| 2 MW Generator | X | 6 | X | 12 | = | $ - 0 | |
| 218 HP Generator | X | 1 | X | 12 | = | $ - 0 | |
| TOTAL FOR LINE B | $ - 0 |
| C. ONE-TIME SERVICE | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 15 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| 2 MW Generator | X | 6 | X | 1 | = | $ - 0 | |
| 218 HP Generator | X | 1 | X | 1 | = | $ - 0 | |
| TOTAL FOR LINE C | $ - 0 |
| D. LOAD BANK TESTING | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 15 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 2 MW Generator | X | 6 | X | 3 | = | $ - 0 | |
| 218 HP Generator | X | 1 | X | 3 | = | $ - 0 | |
| TOTAL FOR LINE D | $ - 0 |
| E. NORMAL BUSINESS HOUR REPAIR SERVICE | ||||
| Rate per Hour | Estimated Hours | Total | ||
| X | 100 | $ - 0 |
| F. OUTSIDE NORMAL BUSINESS HOUR REPAIR SERVICES | |||||
| Rate per Hour | Estimated Hours | Total | |||
| Calculation: Repair Hourly Rate times 1.5 | X | 60 | HOURLY X 1.5 | $ - 0 | |
| 1 | |||||
| G. EMERGENCY CALL REPAIR SERVICES | |||||
| Rate per Hour | Estimated Hours | Total | |||
| X | 60 | $ - 0 |
H. Estimated Parts/Generator Replacement for Entire Contract Term $ 500,000.00
I. As Needed Services (25%) $ - 0
TOTAL BASIS OF AWARD FOR CHCF (A+B+C+D+E+F+G+H+I) $ - 0
Rate Sheet &"Arial,Regular"Bid Number C5613085-D
Rate Sheet Bid Number C5610028-D Exhibit B-1 Addendum 1
&"Arial,Regular"Page &P of &N
Page &P of &N
CIM
CALIFORNIA INSTITUTION FOR MEN (CIM)
| A. ANNUAL MAINTENANCE/INSPECTION SERVICES | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 600 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 350 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 250 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 100 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 80 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 60 KW Generator | X | 2 | X | 3 | = | $ - 0 | |
| 20 KW Generator | X | 5 | X | 3 | = | $ - 0 | |
| 15 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 10 KW Generator | X | 4 | X | 3 | = | $ - 0 | |
| Fire Pump | X | 1 | X | 3 | = | $ - 0 | |
| Water Pump | X | 1 | X | 3 | = | $ - 0 | |
| TOTAL FOR LINE A | $ - 0 |
| B. QUARTERLY MAINTENANCE/INSPECTION SERVICES | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 600 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| 350 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| 250 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| 100 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| 80 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| 60 KW Generator | X | 2 | X | 12 | = | $ - 0 | |
| 20 KW Generator | X | 5 | X | 12 | = | $ - 0 | |
| 15 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| 10 KW Generator | X | 4 | X | 12 | = | $ - 0 | |
| Fire Pump | X | 1 | X | 12 | = | $ - 0 | |
| Water Pump | X | 1 | X | 12 | = | $ - 0 | |
| TOTAL FOR LINE B | $ - 0 |
| C. ONE-TIME SERVICE | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 600 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| 350 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| 250 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| 100 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| 80 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| 60 KW Generator | X | 2 | X | 1 | = | $ - 0 | |
| 20 KW Generator | X | 5 | X | 1 | = | $ - 0 | |
| 15 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| 10 KW Generator | X | 4 | X | 1 | = | $ - 0 | |
| Fire Pump | X | 1 | X | 1 | = | $ - 0 | |
| Water Pump | X | 1 | X | 1 | = | $ - 0 | |
| TOTAL FOR LINE C | $ - 0 |
| D. LOAD BANK TESTING | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 600 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 350 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 250 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 100 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 80 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 60 KW Generator | X | 2 | X | 3 | = | $ - 0 | |
| 20 KW Generator | X | 5 | X | 3 | = | $ - 0 | |
| 15 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 10 KW Generator | X | 4 | X | 3 | = | $ - 0 | |
| Fire Pump | X | 1 | X | 3 | = | $ - 0 | |
| Water Pump | X | 1 | X | 3 | = | $ - 0 | |
| TOTAL FOR LINE D | $ - 0 |
| E. NORMAL BUSINESS HOUR REPAIR SERVICE | ||||
| Rate per Hour | Estimated Hours | Total | ||
| X | 1160 | $ - 0 |
| F. OUTSIDE NORMAL BUSINESS HOUR REPAIR SERVICES | |||||
| Rate per Hour | Estimated Hours | Total | |||
| Calculation: Repair Hourly Rate times 1.5 | X | 580 | HOURLY X 1.5 | $ - 0 |
| G. EMERGENCY CALL REPAIR SERVICES | ||||
| Rate per Hour | Estimated Hours | Total | ||
| X | 580 | $ - 0 |
H. Estimated Parts/Generator Replacement for Entire Contract Term $ 500,000.00
I. As Needed Services (25%) $ - 0
TOTAL BASIS OF AWARD FOR CIM (A+B+C+D+E+F+G+H+I) $ - 0
Rate Sheet &"Arial,Regular"Bid Number C5613085-D
Rate Sheet Bid Number C5610028-D Exhibit B-1 Addendum 1
&"Arial,Regular"Page &P of &N
Page &P of &N
CIW
CALIFORNIA INSTITUTUION FOR WOMEN (CIW)
| A. ANNUAL MAINTENANCE/INSPECTION SERVICES | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 1200 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 750 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 500KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 73 HP Diesel Sewage Pump | X | 2 | X | 3 | = | $ - 0 | |
| Fire Pump | X | 1 | X | 3 | = | $ - 0 | |
| TOTAL FOR LINE A | $ - 0 |
| B. QUARTERLY MAINTENANCE/INSPECTION SERVICES | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 1200 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| 750 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| 500KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| 73 HP Diesel Sewage Pump | X | 2 | X | 12 | = | $ - 0 | |
| Fire Pump | X | 1 | X | 12 | = | $ - 0 | |
| TOTAL FOR LINE B | $ - 0 |
| C. ONE-TIME SERVICE | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 1200 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| 750 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| 500KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| 73 HP Diesel Sewage Pump | X | 2 | X | 1 | = | $ - 0 | |
| Fire Pump | X | 1 | X | 1 | = | $ - 0 | |
| TOTAL FOR LINE C | $ - 0 |
| D. LOAD BANK TESTING | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 1200 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 750 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 500KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 73 HP Diesel Sewage Pump | X | 2 | X | 3 | = | $ - 0 | |
| Fire Pump | X | 1 | X | 3 | = | $ - 0 | |
| TOTAL FOR LINE D | $ - 0 |
| E. NORMAL BUSINESS HOUR REPAIR SERVICE | ||||
| Rate per Hour | Estimated Hours | Total | ||
| X | 500 | $ - 0 |
| F. OUTSIDE NORMAL BUSINESS HOUR REPAIR SERVICES | |||||
| Rate per Hour | Estimated Hours | Total | |||
| Calculation: Repair Hourly Rate times 1.5 | X | 50 | HOURLY X 1.5 | $ - 0 |
| G. EMERGENCY CALL REPAIR SERVICES | ||||
| Rate per Hour | Estimated Hours | Total | ||
| X | 50 | $ - 0 |
H. Estimated Parts/Generator Replacement for Entire Contract Term $ 500,000.00
I. As Needed Services (25%) $ - 0
TOTAL BASIS OF AWARD FOR CIW (A+B+C+D+E+F+G+H+I) $ - 0
Rate Sheet &"Arial,Regular"Bid Number C5613085-D
Rate Sheet Bid Number C5610028-D Exhibit B-1 Addendum 1
&"Arial,Regular"Page &P of &N
Page &P of &N
CMC
CALIFORNIA MEN'S COLONY (CMC)
| A. ANNUAL MAINTENANCE/INSPECTION SERVICES | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 2000 KW Generator | X | 3 | X | 3 | = | $ - 0 | |
| 800 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 600 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 500 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 125 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 30 KW Generator | X | 4 | X | 3 | = | $ - 0 | |
| 15 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 12 KW Generator | X | 6 | X | 3 | = | $ - 0 | |
| 10 KW Generator | X | 3 | X | 3 | = | $ - 0 | |
| TOTAL FOR LINE A | $ - 0 |
| B. QUARTERLY MAINTENANCE/INSPECTION SERVICES | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 2000 KW Generator | X | 3 | X | 12 | = | $ - 0 | |
| 800 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| 600 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| 500 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| 125 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| 30 KW Generator | X | 4 | X | 12 | = | $ - 0 | |
| 15 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| 12 KW Generator | X | 6 | X | 12 | = | $ - 0 | |
| 10 KW Generator | X | 3 | X | 12 | = | $ - 0 | |
| TOTAL FOR LINE B | $ - 0 |
| C. ONE-TIME SERVICE | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 2000 KW Generator | X | 3 | X | 1 | = | $ - 0 | |
| 800 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| 600 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| 500 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| 125 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| 30 KW Generator | X | 4 | X | 1 | = | $ - 0 | |
| 15 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| 12 KW Generator | X | 6 | X | 1 | = | $ - 0 | |
| 10 KW Generator | X | 3 | X | 1 | = | $ - 0 | |
| TOTAL FOR LINE C | $ - 0 |
| D. LOAD BANK TESTING | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 2000 KW Generator | X | 3 | X | 3 | = | $ - 0 | |
| 800 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 600 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 500 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 125 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 30 KW Generator | X | 4 | X | 3 | = | $ - 0 | |
| 15 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 12 KW Generator | X | 6 | X | 3 | = | $ - 0 | |
| 10 KW Generator | X | 3 | X | 3 | = | $ - 0 | |
| TOTAL FOR LINE D | $ - 0 |
| E. NORMAL BUSINESS HOUR REPAIR SERVICE | ||||
| Rate per Hour | Estimated Hours | Total | ||
| X | 500 | $ - 0 |
| F. OUTSIDE NORMAL BUSINESS HOUR REPAIR SERVICES | |||||
| Rate per Hour | Estimated Hours | Total | |||
| Calculation: Repair Hourly Rate times 1.5 | X | 50 | HOURLY X 1.5 | $ - 0 |
| G. EMERGENCY CALL REPAIR SERVICES | ||||
| Rate per Hour | Estimated Hours | Total | ||
| X | 50 | $ - 0 |
H. Estimated Parts/Generator Replacement for Entire Contract Term $ 500,000.00
I. As Needed Services (25%) $ - 0
TOTAL BASIS OF AWARD FOR CMC (A+B+C+D+E+F+G+H+I) $ - 0
Rate Sheet &"Arial,Regular"Bid Number C5613085-D
Rate Sheet Bid Number C5610028-D Exhibit B-1 Addendum 1
&"Arial,Regular"Page &P of &N
Page &P of &N
CMF
CALIFORNIA MEDICAL FACILITY (CMF)
| A. ANNUAL MAINTENANCE/INSPECTION SERVICES | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 2080 KW Generator | X | 3 | X | 3 | = | $ - 0 | |
| 2000 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 900 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 750 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 400 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 350 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 300 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 200 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 100 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 12 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| TOTAL FOR LINE A | $ - 0 |
| B. QUARTERLY MAINTENANCE/INSPECTION SERVICES | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 2080 KW Generator | X | 3 | X | 12 | = | $ - 0 | |
| 2000 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| 900 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| 750 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| 400 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| 350 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| 300 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| 200 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| 100 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| 12 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| TOTAL FOR LINE B | $ - 0 |
| C. ONE-TIME SERVICE | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 2080 KW Generator | X | 3 | X | 1 | = | $ - 0 | |
| 2000 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| 900 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| 750 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| 400 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| 350 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| 300 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| 200 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| 100 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| 12 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| TOTAL FOR LINE C | $ - 0 |
| D. LOAD BANK TESTING | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 2080 KW Generator | X | 3 | X | 3 | = | $ - 0 | |
| 2000 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 900 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 750 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 400 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 350 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 300 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 200 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 100 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 12 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| TOTAL FOR LINE D | $ - 0 |
| E. NORMAL BUSINESS HOUR REPAIR SERVICE | ||||
| Rate per Hour | Estimated Hours | Total | ||
| X | 1236 | $ - 0 |
| F. OUTSIDE NORMAL BUSINESS HOUR REPAIR SERVICES | |||||
| Rate per Hour | Estimated Hours | Total | |||
| Calculation: Repair Hourly Rate times 1.5 | X | 250 | HOURLY X 1.5 | $ - 0 |
| G. EMERGENCY CALL REPAIR SERVICES | ||||
| Rate per Hour | Estimated Hours | Total | ||
| X | 250 | $ - 0 |
| H. COMPUTER AND CONTROL SCREEN REPAIR/REPLACE | ||||
| Rate per Hour | Estimated Hours | Total | ||
| X | 100 | $ - 0 |
I. Estimated Parts/Generator Replacement for Entire Contract Term $ 500,000.00
J. As Needed Services (25%) $ - 0
TOTAL BASIS OF AWARD FOR CMF (A+B+C+D+E+F+G+H+I+J) $ - 0
Rate Sheet &"Arial,Regular"Bid Number C5613085-D
Rate Sheet Bid Number C5610028-D Exhibit B-1 Addendum 1
&"Arial,Regular"Page &P of &N
Page &P of &N
COR
CALIFORNIA STATE PRISON, CORCORAN (COR)
| A. ANNUAL MAINTENANCE/INSPECTION SERVICES | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 1100 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 1000 KW Generator | X | 3 | X | 3 | = | $ - 0 | |
| 250 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 12.5 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 20 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 10 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| Fire Pump | X | 1 | X | 3 | = | $ - 0 | |
| TOTAL FOR LINE A | $ - 0 |
| B. QUARTERLY MAINTENANCE/INSPECTION SERVICES | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 1100 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| 1000 KW Generator | X | 3 | X | 12 | = | $ - 0 | |
| 250 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| 12.5 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| 20 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| 10 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| Fire Pump | X | 1 | X | 12 | = | $ - 0 | |
| TOTAL FOR LINE B | $ - 0 |
| C. ONE-TIME SERVICE | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 1100 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| 1000 KW Generator | X | 3 | X | 1 | = | $ - 0 | |
| 250 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| 12.5 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| 20 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| 10 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| Fire Pump | X | 1 | X | 1 | = | $ - 0 | |
| TOTAL FOR LINE C | $ - 0 |
| D. LOAD BANK TESTING | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 1100 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 1000 KW Generator | X | 3 | X | 3 | = | $ - 0 | |
| 250 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 12.5 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 20 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 10 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| Fire Pump | X | 1 | X | 3 | = | $ - 0 | |
| TOTAL FOR LINE D | $ - 0 |
| E. NORMAL BUSINESS HOUR REPAIR SERVICE | ||||
| Rate per Hour | Estimated Hours | Total | ||
| X | 140 | $ - 0 |
| F. OUTSIDE NORMAL BUSINESS HOUR REPAIR SERVICES | |||||
| Rate per Hour | Estimated Hours | Total | |||
| Calculation: Repair Hourly Rate times 1.5 | X | 100 | HOURLY X 1.5 | $ - 0 |
| G. EMERGENCY CALL REPAIR SERVICES | ||||
| Rate per Hour | Estimated Hours | Total | ||
| X | 100 | $ - 0 |
H. Estimated Parts/Generator Replacement for Entire Contract Term $ 550,000.00
I. As Needed Services (25%) $ - 0
TOTAL BASIS OF AWARD FOR COR (A+B+C+D+E+F+G+H+I) $ - 0
Rate Sheet &"Arial,Regular"Bid Number C5613085-D
Rate Sheet Bid Number C5610028-D Exhibit B-1 Addendum 1
&"Arial,Regular"Page &P of &N
Page &P of &N
CRC
CALIFORNIA REHABILITATION CENTER (CRC)
| A. ANNUAL MAINTENANCE/INSPECTION SERVICES | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 2000 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 80 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| TOTAL FOR LINE A | $ - 0 |
| B. QUARTERLY MAINTENANCE/INSPECTION SERVICES | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 2000 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| 80 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| TOTAL FOR LINE B | $ - 0 |
| C. ONE-TIME SERVICE | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 2000 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| 80 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| TOTAL FOR LINE C | $ - 0 |
| D. LOAD BANK TESTING | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 2000 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 80 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| TOTAL FOR LINE D | $ - 0 |
| E. NORMAL BUSINESS HOUR REPAIR SERVICE | ||||
| Rate per Hour | Estimated Hours | Total | ||
| X | 20 | $ - 0 |
| F. OUTSIDE NORMAL BUSINESS HOUR REPAIR SERVICES | |||||
| Rate per Hour | Estimated Hours | Total | |||
| Calculation: Repair Hourly Rate times 1.5 | X | 20 | HOURLY X 1.5 | $ - 0 |
| G. EMERGENCY CALL REPAIR SERVICES | ||||
| Rate per Hour | Estimated Hours | Total | ||
| X | 20 | $ - 0 |
H. Estimated Parts/Generator Replacement for Entire Contract Term $ 500,000.00
I. As Needed Services (25%) $ - 0
TOTAL BASIS OF AWARD FOR CRC (A+B+C+D+E+F+G+H+I) $ - 0
Rate Sheet &"Arial,Regular"Bid Number C5613085-D
Rate Sheet Bid Number C5610028-D Exhibit B-1 Addendum 1
&"Arial,Regular"Page &P of &N
Page &P of &N
CTC
RICHARD A. MCGEE CORRECTIONAL TRAINING CENTER (CTC)
| A. ANNUAL MAINTENANCE/INSPECTION SERVICES | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 300 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| TOTAL FOR LINE A | $ - 0 |
| B. QUARTERLY MAINTENANCE/INSPECTION SERVICES | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 300 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| TOTAL FOR LINE B | $ - 0 |
| C. ONE-TIME SERVICE | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 300 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| TOTAL FOR LINE C | $ - 0 |
| D. LOAD BANK TESTING | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 300 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| TOTAL FOR LINE D | $ - 0 |
| E. NORMAL BUSINESS HOUR REPAIR SERVICE | ||||
| Rate per Hour | Estimated Hours | Total | ||
| X | 500 | $ - 0 |
| F. OUTSIDE NORMAL BUSINESS HOUR REPAIR SERVICES | |||||
| Rate per Hour | Estimated Hours | Total | |||
| Calculation: Repair Hourly Rate times 1.5 | X | 50 | HOURLY X 1.5 | $ - 0 |
| G. EMERGENCY CALL REPAIR SERVICES | ||||
| Rate per Hour | Estimated Hours | Total | ||
| X | 50 | $ - 0 |
H. Estimated Parts/Generator Replacement for Entire Contract Term $ 100,000.00
I. As Needed Services (25%) $ - 0
TOTAL BASIS OF AWARD FOR ASP (A+B+C+D+E+F+G+H+I) $ - 0
Rate Sheet &"Arial,Regular"Bid Number C5613085-D
Rate Sheet Bid Number C5610028-D Exhibit B-1 Addendum 1
&"Arial,Regular"Page &P of &N
Page &P of &N
CTF
CORRECTIONAL TRAINING FACILITY (CTF)
| A. ANNUAL MAINTENANCE/INSPECTION SERVICES | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 1500 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 1500 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 300 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| TOTAL FOR LINE A | $ - 0 |
| B. QUARTERLY MAINTENANCE/INSPECTION SERVICES | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 1500 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| 1500 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| 300 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| TOTAL FOR LINE B | $ - 0 | ||||||
| CTF | |||||||
| C. ONE-TIME SERVICE | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 1500 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| 1500 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| 300 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| TOTAL FOR LINE C | $ - 0 |
| D. LOAD BANK TESTING | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 1500 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 1500 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 300 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| TOTAL FOR LINE D | $ - 0 |
| E. NORMAL BUSINESS HOUR REPAIR SERVICE | ||||
| Rate per Hour | Estimated Hours | Total | ||
| X | 500 | $ - 0 |
| F. OUTSIDE NORMAL BUSINESS HOUR REPAIR SERVICES | |||||
| Rate per Hour | Estimated Hours | Total | |||
| Calculation: Repair Hourly Rate times 1.5 | X | 50 | HOURLY X 1.5 | $ - 0 |
| G. EMERGENCY CALL REPAIR SERVICES | ||||
| Rate per Hour | Estimated Hours | Total | ||
| X | 50 | $ - 0 |
H. Estimated Parts/Generator Replacement for Entire Contract Term $ 80,000.00
I. As Needed Services (25%) $ - 0
TOTAL BASIS OF AWARD FOR CTF (A+B+C+D+E+F+G+H+I) $ - 0
Rate Sheet &"Arial,Regular"Bid Number C5613085-D
Rate Sheet Bid Number C5610028-D Exhibit B-1 Addendum 1
&"Arial,Regular"Page &P of &N
Page &P of &N
CVSP
CHUCKAWALLA VALLEY STATE PRISON - (Closed – under the authority of Ironwood State Prison (ISP)
| A. ANNUAL MAINTENANCE/INSPECTION SERVICES | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 900 KW Generator | X | 2 | X | 3 | = | $ - 0 | |
| 750 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 450 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 350 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| TOTAL FOR LINE A | $ - 0 |
| B. QUARTERLY MAINTENANCE/INSPECTION SERVICES | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 900 KW Generator | X | 2 | X | 12 | = | $ - 0 | |
| 750 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| 450 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| 350 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| TOTAL FOR LINE B | $ - 0 |
| C. ONE-TIME SERVICE | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 900 KW Generator | X | 2 | X | 1 | = | $ - 0 | |
| 750 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| 450 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| 350 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| TOTAL FOR LINE C | $ - 0 |
| D. LOAD BANK TESTING | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 900 KW Generator | X | 2 | X | 3 | = | $ - 0 | |
| 750 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 450 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 350 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| TOTAL FOR LINE D | $ - 0 |
| E. NORMAL BUSINESS HOUR REPAIR SERVICE | ||||
| Rate per Hour | Estimated Hours | Total | ||
| X | 100 | $ - 0 |
| F. OUTSIDE NORMAL BUSINESS HOUR REPAIR SERVICES | |||||
| Rate per Hour | Estimated Hours | Total | |||
| Calculation: Repair Hourly Rate times 1.5 | X | 80 | HOURLY X 1.5 | $ - 0 |
| G. EMERGENCY CALL REPAIR SERVICES | ||||
| Rate per Hour | Estimated Hours | Total | ||
| X | 40 | $ - 0 |
H. Estimated Parts/Generator Replacement for Entire Contract Term $ 110,000.00
I. As Needed Services (25%) $ - 0
TOTAL BASIS OF AWARD FOR CVSP (A+B+C+D+E+F+G+H+I) $ - 0
Rate Sheet &"Arial,Regular"Bid Number C5613085-D
Rate Sheet Bid Number C5610028-D Exhibit B-1 Addendum 1
&"Arial,Regular"Page &P of &N
Page &P of &N
DVI
DEUEL VOCATIONAL INSTITUTION (DVI)
| A. ANNUAL MAINTENANCE/INSPECTION SERVICES | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 2 MW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 1 MW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 550 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 350 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 250 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 200 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 125 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 45 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 15 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 10 KW Generator | X | 2 | X | 3 | = | $ - 0 | |
| TOTAL FOR LINE A | $ - 0 |
| B. QUARTERLY MAINTENANCE/INSPECTION SERVICES | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 2 MW Generator | X | 1 | X | 12 | = | $ - 0 | |
| 1 MW Generator | X | 1 | X | 12 | = | $ - 0 | |
| 550 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| 350 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| 250 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| 200 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| 125 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| 45 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| 15 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| 10 KW Generator | X | 2 | X | 12 | = | $ - 0 | |
| TOTAL FOR LINE B | $ - 0 |
| C. ONE-TIME SERVICE | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 2 MW Generator | X | 1 | X | 1 | = | $ - 0 | |
| 1 MW Generator | X | 1 | X | 1 | = | $ - 0 | |
| 550 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| 350 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| 250 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| 200 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| 125 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| 45 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| 15 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| 10 KW Generator | X | 2 | X | 1 | = | $ - 0 | |
| TOTAL FOR LINE C | $ - 0 |
| D. LOAD BANK TESTING | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 2 MW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 1 MW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 550 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 350 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 250 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 200 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 125 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 45 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 15 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 10 KW Generator | X | 2 | X | 3 | = | $ - 0 | |
| TOTAL FOR LINE D | $ - 0 |
| E. NORMAL BUSINESS HOUR REPAIR SERVICE | ||||
| Rate per Hour | Estimated Hours | Total | ||
| X | 100 | $ - 0 |
| F. OUTSIDE NORMAL BUSINESS HOUR REPAIR SERVICES | |||||
| Rate per Hour | Estimated Hours | Total | |||
| Calculation: Repair Hourly Rate times 1.5 | X | 50 | HOURLY X 1.5 | $ - 0 |
| G. EMERGENCY CALL REPAIR SERVICES | ||||
| Rate per Hour | Estimated Hours | Total | ||
| X | 50 | $ - 0 |
H. Estimated Parts/Generator Replacement for Entire Contract Term $ 50,000.00
I. As Needed Services (25%) $ - 0
TOTAL BASIS OF AWARD FOR DVI (A+B+C+D+E+F+G+H+I) $ - 0
Rate Sheet &"Arial,Regular"Bid Number C5613085-D
Rate Sheet Bid Number C5610028-D Exhibit B-1 Addendum 1
&"Arial,Regular"Page &P of &N
Page &P of &N
FSP
FOLSOM STATE PRISON (FSP)
| A. ANNUAL MAINTENANCE/INSPECTION SERVICES | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 2500 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 400 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 250 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 200 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 52 KW Generator | X | 2 | X | 3 | = | $ - 0 | |
| 50 KW Generator | X | 2 | X | 3 | = | $ - 0 | |
| 20 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 10 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| TOTAL FOR LINE A | $ - 0 |
| B. QUARTERLY MAINTENANCE/INSPECTION SERVICES | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 2500 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| 400 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| 250 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| 200 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| 52 KW Generator | X | 2 | X | 12 | = | $ - 0 | |
| 50 KW Generator | X | 2 | X | 12 | = | $ - 0 | |
| 20 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| 10 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| TOTAL FOR LINE B | $ - 0 |
| C. ONE-TIME SERVICE | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 2500 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| 400 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| 250 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| 200 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| 52 KW Generator | X | 2 | X | 1 | = | $ - 0 | |
| 50 KW Generator | X | 2 | X | 1 | = | $ - 0 | |
| 20 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| 10 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| TOTAL FOR LINE C | $ - 0 |
| D. LOAD BANK TESTING | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 2500 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 400 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 250 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 200 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 52 KW Generator | X | 2 | X | 3 | = | $ - 0 | |
| 50 KW Generator | X | 2 | X | 3 | = | $ - 0 | |
| 20 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 10 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| TOTAL FOR LINE D | $ - 0 |
| E. NORMAL BUSINESS HOUR REPAIR SERVICE | ||||
| Rate per Hour | Estimated Hours | Total | ||
| X | 500 | $ - 0 |
| F. OUTSIDE NORMAL BUSINESS HOUR REPAIR SERVICES | |||||
| Rate per Hour | Estimated Hours | Total | |||
| Calculation: Repair Hourly Rate times 1.5 | X | 50 | HOURLY X 1.5 | $ - 0 |
| G. EMERGENCY CALL REPAIR SERVICES | ||||
| Rate per Hour | Estimated Hours | Total | ||
| X | 50 | $ - 0 |
H. Estimated Parts/Generator Replacement for Entire Contract Term $ 150,000.00
I. As Needed Services (25%) $ - 0
TOTAL BASIS OF AWARD FOR FSP (A+B+C+D+E+F+G+H+I) $ - 0
Rate Sheet &"Arial,Regular"Bid Number C5613085-D
Rate Sheet Bid Number C5610028-D Exhibit B-1 Addendum 1
&"Arial,Regular"Page &P of &N
Page &P of &N
HDSP
HIGH DESERT STATE PRISON (HDSP)
| A. ANNUAL MAINTENANCE/INSPECTION SERVICES | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 1750 KW Generator | X | 4 | X | 3 | = | $ - 0 | |
| 300 KW Generator | X | 2 | X | 3 | = | $ - 0 | |
| 12.5 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| Fire Pump-Diesel Eng. | X | 1 | X | 3 | = | $ - 0 | |
| TOTAL FOR LINE A | $ - 0 |
| B. QUARTERLY MAINTENANCE/INSPECTION SERVICES | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 1750 KW Generator | X | 4 | X | 12 | = | $ - 0 | |
| 300 KW Generator | X | 2 | X | 12 | = | $ - 0 | |
| 12.5 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| Fire Pump-Diesel Eng. | X | 1 | X | 12 | = | $ - 0 | |
| TOTAL FOR LINE B | $ - 0 |
| C. ONE-TIME SERVICE | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 1750 KW Generator | X | 4 | X | 1 | = | $ - 0 | |
| 300 KW Generator | X | 2 | X | 1 | = | $ - 0 | |
| 12.5 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| Fire Pump-Diesel Eng. | X | 1 | X | 1 | = | $ - 0 | |
| TOTAL FOR LINE C | $ - 0 |
| D. LOAD BANK TESTING | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 1750 KW Generator | X | 4 | X | 3 | = | $ - 0 | |
| 300 KW Generator | X | 2 | X | 3 | = | $ - 0 | |
| 12.5 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| Fire Pump-Diesel Eng. | X | 1 | X | 0 | = | $ - 0 | |
| TOTAL FOR LINE D | $ - 0 |
| E. NORMAL BUSINESS HOUR REPAIR SERVICE | ||||
| Rate per Hour | Estimated Hours | Total | ||
| X | 500 | $ - 0 |
| F. OUTSIDE NORMAL BUSINESS HOUR REPAIR SERVICES | |||||
| Rate per Hour | Estimated Hours | Total | |||
| Calculation: Repair Hourly Rate times 1.5 | X | 50 | HOURLY X 1.5 | $ - 0 |
| G. EMERGENCY CALL REPAIR SERVICES | ||||
| Rate per Hour | Estimated Hours | Total | ||
| X | 50 | $ - 0 |
H. Estimated Parts/Generator Replacement for Entire Contract Term $ 75,000.00
I. As Needed Services (25%) $ - 0
TOTAL BASIS OF AWARD FOR HDSP (A+B+C+D+E+F+G+H+I) $ - 0
Rate Sheet &"Arial,Regular"Bid Number C5613085-D
Rate Sheet Bid Number C5610028-D Exhibit B-1 Addendum 1
&"Arial,Regular"Page &P of &N
Page &P of &N
ISP
IRONWOOD STATE PRISON (ISP)
| A. ANNUAL MAINTENANCE/INSPECTION SERVICES | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 2000 KW Generator | X | 3 | X | 3 | = | $ - 0 | |
| 350 KW Generator | X | 2 | X | 3 | = | $ - 0 | |
| 300 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 120 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 12.5 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| TOTAL FOR LINE A | $ - 0 |
| B. QUARTERLY MAINTENANCE/INSPECTION SERVICES | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 2000 KW Generator | X | 3 | X | 12 | = | $ - 0 | |
| 350 KW Generator | X | 2 | X | 12 | = | $ - 0 | |
| 300 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| 120 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| 12.5 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| TOTAL FOR LINE B | $ - 0 |
| C. ONE-TIME SERVICE | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 2000 KW Generator | X | 3 | X | 1 | = | $ - 0 | |
| 350 KW Generator | X | 2 | X | 1 | = | $ - 0 | |
| 300 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| 120 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| 12.5 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| TOTAL FOR LINE C | $ - 0 |
| D. LOAD BANK TESTING | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 2000 KW Generator | X | 3 | X | 3 | = | $ - 0 | |
| 350 KW Generator | X | 2 | X | 3 | = | $ - 0 | |
| 300 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 120 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 12.5 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| TOTAL FOR LINE D | $ - 0 |
| E. NORMAL BUSINESS HOUR REPAIR SERVICE | ||||
| Rate per Hour | Estimated Hours | Total | ||
| X | 300 | $ - 0 |
| F. OUTSIDE NORMAL BUSINESS HOUR REPAIR SERVICES | |||||
| Rate per Hour | Estimated Hours | Total | |||
| Calculation: Repair Hourly Rate times 1.5 | X | 25 | HOURLY X 1.5 | $ - 0 |
| G. EMERGENCY CALL REPAIR SERVICES | ||||
| Rate per Hour | Estimated Hours | Total | ||
| X | 75 | $ - 0 |
H. Estimated Parts/Generator Replacement for Entire Contract Term $ 200,000.00
I. As Needed Services (25%) $ - 0
TOTAL BASIS OF AWARD FOR ISP (A+B+C+D+E+F+G+H+I) $ - 0
Rate Sheet &"Arial,Regular"Bid Number C5613085-D
Rate Sheet Bid Number C5610028-D Exhibit B-1 Addendum 1
&"Arial,Regular"Page &P of &N
Page &P of &N
KVSP
KERN VALLEY STATE PRISON (KVSP)
| A. ANNUAL MAINTENANCE/INSPECTION SERVICES | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 2000 KW Generator | X | 2 | X | 3 | = | $ - 0 | |
| 480 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 20 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| Fire Pump | X | 1 | X | 3 | = | $ - 0 | |
| TOTAL FOR LINE A | $ - 0 |
| B. QUARTERLY MAINTENANCE/INSPECTION SERVICES | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 2000 KW Generator | X | 2 | X | 12 | = | $ - 0 | |
| 480 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| 20 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| Fire Pump | X | 1 | X | 12 | = | $ - 0 | |
| TOTAL FOR LINE B | $ - 0 |
| C. ONE-TIME SERVICE | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 2000 KW Generator | X | 2 | X | 1 | = | $ - 0 | |
| 480 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| 20 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| Fire Pump | X | 1 | X | 1 | = | $ - 0 | |
| TOTAL FOR LINE C | $ - 0 |
| D. LOAD BANK TESTING | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 2000 KW Generator | X | 2 | X | 3 | = | $ - 0 | |
| 480 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 20 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| TOTAL FOR LINE D | $ - 0 |
| E. NORMAL BUSINESS HOUR REPAIR SERVICE | ||||
| Rate per Hour | Estimated Hours | Total | ||
| X | 80 | $ - 0 |
| F. OUTSIDE NORMAL BUSINESS HOUR REPAIR SERVICES | |||||
| Rate per Hour | Estimated Hours | Total | |||
| Calculation: Repair Hourly Rate times 1.5 | X | 15 | HOURLY X 1.5 | $ - 0 |
| G. EMERGENCY CALL REPAIR SERVICES | ||||
| Rate per Hour | Estimated Hours | Total | ||
| X | 100 | $ - 0 |
H. Estimated Parts/Generator Replacement for Entire Contract Term $ 500,000.00
I. As Needed Services (25%) $ - 0
TOTAL BASIS OF AWARD FOR KVSP (A+B+C+D+E+F+G+H+I) $ - 0
Rate Sheet &"Arial,Regular"Bid Number C5613085-D
Rate Sheet Bid Number C5610028-D Exhibit B-1 Addendum 1
&"Arial,Regular"Page &P of &N
Page &P of &N
LAC
CALIFORNIA STATE PRISON, LOS ANGELES COUNTY (LAC)
| A. ANNUAL MAINTENANCE/INSPECTION SERVICES | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 2000 KW Generator | X | 2 | X | 3 | = | $ - 0 | |
| 200 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 20 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 12.5 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 10 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| TOTAL FOR LINE A | $ - 0 |
| B. QUARTERLY MAINTENANCE/INSPECTION SERVICES | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 2000 KW Generator | X | 2 | X | 12 | = | $ - 0 | |
| 200 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| 20 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| 12.5 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| 10 KW Generator | X | 1 | X | 12 | = | $ - 0 | |
| TOTAL FOR LINE B | $ - 0 |
| C. ONE-TIME SERVICE | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 2000 KW Generator | X | 2 | X | 1 | = | $ - 0 | |
| 200 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| 20 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| 12.5 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| 10 KW Generator | X | 1 | X | 1 | = | $ - 0 | |
| TOTAL FOR LINE C | $ - 0 |
| D. LOAD BANK TESTING | |||||||
| Equipment Description | Unit Cost | X | Estimated Quantity of Equipment | X | Estimated Quantity of Service | = | Total |
| 2000 KW Generator | X | 2 | X | 3 | = | $ - 0 | |
| 200 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 20 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 12.5 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| 10 KW Generator | X | 1 | X | 3 | = | $ - 0 | |
| TOTAL FOR LINE D | $ - 0 |
| E. NORMAL BUSINESS HOUR REPAIR SERVICE | ||||
| Rate per Hour | Estimated Hours | Total | ||
| X | 160 | $ - 0 |