FileNo.472-17436.TAP_NCF_Wastewater System Improvements Specs FINAL Part 4.pdf

PDF 3 MB Posted

Attached to
472/17436. TAP; Newberry CF - Wastewater Improvements Project
Solicitation number
RFQ - 171 - 230000000296
Issued by
Luce County, Michigan

About this file

This document contains specifications for the UV GRP Cured-In-Place Pipe (CIPP) portion of a wastewater system improvements project at the Newberry Correctional Facility in Luce County, Michigan. The project is being managed by the Michigan Department of Technology, Management and Budget (DTMB). The document outlines the requirements for the CIPP liner material, installation procedures, submittals, testing, and measurement and payment. It also includes information on special working conditions and procedures required for projects at correctional facilities.

The project involves the rehabilitation of sanitary sewer pipelines using a UV-cured fiberglass reinforced polymer CIPP liner. Key requirements include minimum physical properties for the liner, qualifications for the manufacturer and installer, procedures for cleaning and inspecting the existing pipes, lateral reinstatement, and final testing and acceptance. The document also specifies measurement and payment terms for the CIPP work. This is part of a larger wastewater system improvements project at the correctional facility, with the overall contract details provided separately.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

[M12-00279-S]

UV GRP Cured-In-Place Pipe 33 31 60 - 1

SECTION 33 31 60

UV GRP CURED-IN-PLACE PIPE (CIPP)

(Alternate 2 of 2 CIPP methods, See Specification Section 33 31 50)

PART 1 GENERAL

1.1 SECTION INCLUDES

A. Cured in Place Pipe rehabilitation operations.

B. Video Inspection Televising Report (see Specification Section 33 31 50 attachment)

1.2 RELATED SECTIONS

A. Section 33 05 15 - Manholes and Structures B. Section 33 31 00 - Sanitary Utility Sewerage Piping C. Section 33 31 50 - Cured-In-Place Pipe (CIPP) ALTERNATIVE METHOD

1.3 UNIT PRICE – BASIS OF MEASUREMENT

A. Section 01 20 00 – Measurement and Payment

1.4 INTENT

A. It is the intent of this specification to provide for the reconstruction of pipelines and conduits by the installation of a resin-impregnated fiberglass material tube (“Liner”) which when cured shall extend the full length of the original pipe and provide a structurally sound, smooth, joint less and watertight pipe. The resin shall be cured using ultraviolet light within the tube. The Cured-In-Place Pipe (CIPP) will be continuous and tight fitting.

1.5 REFERENES

A. ASTM F2019 Standard Practice for Rehabilitation of Existing Pipelines and Conduits by the Pulled in Place Installation of Glass Reinforced Plastic (GRP) Cured-in-Place Resin Pipe (CIPP)

B. ASTM F1216 Standard Practice for Rehabilitation of Existing Pipelines and Conduits by the Inversion and Curing of a Resin-Impregnated Tube

C. ASTM F1743 Standard Practice for Rehabilitation of Existing Pipelines and Conduits by the Pull In and Inflate and Curing of a Resin-Impregnated Tube.

D. ASTM D543 Test Method for Resistance of Plastics to Chemical Reagents

E. ASTM D578 Standard Specification Glass Fiber Strands

F. ASTM D638 Standard Test Method for Tensile Properties of Plastics

33 31 60 - 2

G. ASTM D790 Standard Test Methods for Flexural Properties of Unreinforced and Reinforced Plastics and Electrical Insulating Materials

H. ASTM D2122 Standard 1 Test Method for Determining Dimensions of Thermoplastic Pipe and Fittings

I. ASTM D3567 Standard Practice for Determining Dimensions of “Fiberglass” (Glass- Fiber-Reinforced Thermosetting Resin) Pipe and Fittings

J. ASTM D5813 Standard Specification for Cured-in Place Thermosetting Resin Sewer Pipe

1.6 PRODUCT, MANUFACTURER/INSTALLER QUALIFICATION REQUIREMENTS

A. Since sewer products are intended to have a 50-year design life, and in order to minimize the Owner’s risk, only proven products with substantial successful long-term track records will be approved. Products and Installers must meet all of the following criteria to be deemed Commercially Acceptable:

B. The “Manufacturer” must have a minimum 500,000 linear feet of successfully installed liner in the United States of America with the same product being used on this project . The installing contractor must be trained and certified by the UV GRP manufacturer and have documented experience with a fiberglass UV cured liner.

C. For each method of installation and curing used on this project, the Cured-In-Place- Pipe Lining (CIPPL) work shall be supervised by a foreman having previously supervised a minimum of 50,000 linear feet of CIPPL using a similar resin and flexible tube and using the specific method of installation and curing method proposed.

D. The manufacturer of the glass reinforced tube, including wet out, of the CIPPL shall have been performing this same type of work with ultra violet cured glass reinforced pipe (UV GRP) for a minimum of five years and previously wet-out at least 500,000 linear feet of this same technology. If the Contractor does not have 50,000 linear feet of CIPPL experience with the UV curing system being used, then a manufacturer’s onsite representative must be present during installations of the CIPP system until such time the owner is confident in the contractors ability. The Contractor is to provide the Engineer with the manufacturer representative’s work experience for approval. Work shall not begin prior to the Engineer’s approval of the manufacturer’s onsite representative.

E. The Contractor shall provide five (5) references of completed projects of similar installations.

PART 2 PRODUCTS

2.1 MATERIALS

A. Fiberglass liner – At the time of manufacture, each lot of glass fiber tube liner shall be

33 31 60 - 3 inspected for defects. At the time of delivery, the liner shall be homogeneous throughout, uniform in color, free of cracks, holes, foreign materials, blisters, and deleterious faults.

1. The ENGINEER may at any time direct the manufacturer to obtain compound samples and prepare test specimens in accordance with the latest applicable ASTM standards.

B. Cured-in Place Pipe – The glass fiber tubing shall include an exterior and interior film that protects and contains the polyester, vinylester or ortho based resin used in the liner.

The exterior film shall be provided with a UV light blocker foil.

C. Tube

1. The wet out Tube shall have a uniform thickness that when compressed at installation pressures will meet or exceed the Design thickness.

2. The Tube shall be sized such that when installed, will tightly fit the internal circumference and length of the original pipe.

3. The glass fiber Tube shall be saturated with the appropriate resin using a resin bath system to allow for the lowest possible amount of air entrapment. An inner and outer material will be added that are both impervious to airborne styrene, with the outer material also having UV blocking characteristics. If required by the liner manufacturer, the inner membrane will be removed after the installation and curing processes are completed.

4. The wall color of the interior pipe surface of CIPP after installation shall be a light reflective color so that a clear detailed examination with closed circuit television inspection equipment may be made.

5. The liner should be seamless in its cured state to ensure homogenous physical properties around the circumference of the cured liner.

D. Resin

1. The resin system shall be polyester, vinylester, or orthothalic (either ppg or npg grade) depending on the choice of the engineer, with a catalyst system that when properly cured within the tube composite meets the physical properties of:

a. Flexural Modulus (minimum) 725,000 psi

b. Flexural Strength (minimum) 15,000 psi

c. Long term E-modulus 675,000 psi

d. Long term tensile bending strength 13,500 psi

2. The resin used with this product shall use UV light to cure the pipe. The liquid UV resin shall saturate the tube and produce a properly cured liner, which is resistant to abrasion due to solids, grit, and sand.

3. Polyester, vinyl ester and catalyst system shall comply with the following requirements and when properly cured meet the requirements of ASTM F1216.

Resins created from recycled materials are not allowed.

E. Adheres to ASTM F 2019-11 (or latest edition)

33 31 60 - 4

2.2 GENERAL CORROSION REQUIREMENTS

A. The UV GRP cured-in-place pipe system shall utilize resins which will withstand the corrosive effect of the existing residential, commercial, and industrial effluents, liquids and/or gases.

2.3 DELIVERY, STORAGE, AND HANDLING

A. Care shall be taken in shipping, handling and storage to avoid damaging the liner. Any liner damaged in shipment shall be replaced as directed by the OWNER at no additional cost to OWNER.

B. While stored, the CIPPL shall be adequately supported and protected. The UV Cure GRP CIPPL shall be stored in a manner as recommended by the manufacturer and as approved by the ENGINEER.

2.4 QUALITY CONTROL

A. No change of material, design values, or procedures as developed before bidding the contract may be made during the course of the Work without the prior written approval of the ENGINEER.

B. All liner to be installed under this Work may be inspected at the manufacturer’s plant(s) and wet-out facility for compliance with these Specifications by OWNER or ENGINEER. The CONTRACTOR shall require the wet-out facility's cooperation in these inspections. The cost of inspection will be the responsibility of the OWNER.

C. At the time of manufacture, inspect each lot of liner for defects. At the time of delivery, the liner shall be homogeneous throughout, uniform in color, free of cracks, holes, foreign materials, blisters, or deleterious faults.

D. The liner manufacturer facility shall have a Quality Management System registered with the current ISO 9001 standard.

E. The wet out of the liner must be done in an indoor environmentally controlled manufacturing setting. No onsite wet out will be allowed. OWNER or ENGINEER may inspect this facility at the manufacturer’s plant(s) for compliance with these Specifications.

PART 3. EXECUTION

3.1 INSTALLATION RESPONSIBILITIES FOR INCIDENTAL ITEMS

A. See Attachment for CIPP Details at the end of Section 33 31 50.

B. It shall be the responsibility of the Contractor to locate and designate all manhole access points open and accessible for the work. The Owner shall provide rights-of-access to these locations. If a street must be closed to traffic because of the orientation of the

33 31 60 - 5 sewer, the Contractor shall institute the actions necessary to provide access for the mutually agreed time period. The Contractor may purchase water from the local water utility for cleaning, installation and other process related work items requiring water. The Contractor is responsible for complete coordination with the water utility.

C. Cleaning of Sewer Lines - The Contractor, shall clean/remove all internal debris out of the sewer line that will interfere with the installation of CIPP. It shall be the Contractors responsibility to remove and dispose of this debris offsite at a municipal sewage treatment facility or licensed landfill. Any hazardous waste material encountered during this project will be considered as a changed condition.

D. Bypassing Sewage - The Contractor, when required, shall provide for the flow of sewage around the section or sections of pipe designated for repair. Plugging the line at an existing upstream manhole and pumping the flow into a downstream manhole or adjacent system shall create the bypass. The pump(s) and bypass line(s) shall be of adequate capacity to accommodate the sewage flow. The Owner may require a detail of the bypass plan to be submitted.

E. Inspection of Pipelines - Inspection of pipelines shall be performed by experienced personnel trained in locating breaks, obstacles and service connections using close circuit television (CCTV) inspection techniques. The pipeline interior shall be carefully inspected to determine the location of any conditions that may prevent proper installation of CIPP. These shall be noted and corrected. A videotape and suitable written log for each line section shall be produced and delivered to the Owner.

F. Line Obstructions - It shall be the responsibility of the Contractor to clear the line of obstructions such as solids and roots that will prevent the insertion of CIPP. If pre-installation inspection reveals an obstruction such as a protruding service connection, dropped joint, or a collapse that will prevent the installation process, that was not evident on the pre-bid video and it cannot be removed by conventional sewer cleaning equipment, then the Contractor shall make a point repair excavation to uncover and remove or repair the obstruction. Such excavation shall be approved in writing by the Owner's representative prior to the commencement of the work and shall be paid for by the sewer replacement bid items.

G. Public Notification - The Contractor shall make every effort to maintain sewer service usage throughout the duration of the project. In the event that a connection will be out of service, the longest period of no service shall be 8 hours. A public notification program shall be implemented, and shall as a minimum, require the Contractor to be responsible for contacting each home or business connected to the sanitary sewer and informing them of the work to be conducted, and when the sewer will be off-line. The Contractor shall also provide the following:

1. Written notice to be delivered to each home or business the day prior to the beginning of work being conducted on the section, and a local telephone number of the Contractor they can call to discuss the project or any potential problems.

2. Personal contact with any home or business, which cannot be reconnected within the time stated in the written notice.

33 31 60 - 6

H. The Contractor shall be responsible for confirming the locations of all branch service (lateral) connections prior to installing the CIPP.

3.2 INSTALLATION OF GLASS FIBER TUBING

A. The approved system must utilize an outer and inner film to ensure that the liner remains intact during the insertion process and to protect the resin at all times during the installation and curing process from water and debris contamination, and resin migration.

B. A constant tension winch should be used, as specified by the liner manufacturer, to pull the glass fiber liner into position in the pipe. The liner shall have a longitudinal fiberglass reinforcement band which runs the entire length of the liner ensuring that the pulling force is transferred to the band and not the fiberglass liner. Once inserted, end plugs shall be used to cap each end of the glass fiber liner to prepare for pressurizing the liner. The end plugs shall be secured to prevent them from being expelled due to pressure. Liner restraints shall be used in manholes.

C. A slip sheet shall be installed on the bottom one third to one half of the pipe prior to liner insertion (if it is not already part of the manufactured outer film of the liner), for the purpose of protecting the liner during insertion and reduce the drag, or as recommended by the liner manufacturer.

D. The glass fiber liner shall be cured with UV light sources at a constant inner pressure.

When inserting the curing equipment in the liner, care shall be taken to not damage the inner film material.

E. The UV light sources shall be assembled according to the manufacturer’s specifications for the liner diameter. For the liner to achieve the required water tightness and specified mechanical properties, the following parameters must be controlled during the entire curing process, giving the Engineer a record of the curing parameters over every segment of the entire length of the liner. This demonstrates that the entire liner is cured properly.

The recording shall include:

1. Curing speed

2. Light source working & wattage

3. Inner air pressure

4. Curing temperatures

5. Date and time

6. Length of liner

F. This shall be accomplished using a computer and database that are tamper proof. During the curing process, infrared sensors shall be used to record curing data that will be submitted to the Engineer with a post CCTV inspection.

G. The optimal curing speed, or travel speed of the energized UV light sources, is determined for each length of liner based on liner diameter, liner thickness, and exothermic reaction temperature. Curing speed shall be as recommended by the manufacturer and determined by contractor based on various site specific field

33 31 60 - 7 conditions.

H. If the liner is manufactured with a removable inner film, the inner film material shall be removed and discarded after curing to provide optimal quality of the final product.

3.3 SUBMITTALS

A. UV GRP Cured-In-Place Pipe - CONTRACTOR shall submit the following:

1. Summary table of CIPP material properties, including short-term flexural modulus of elasticity, 50-year flexural modulus of elasticity, short-term flexural strength (bending stress), 50-year flexural strength (bending stress), and chemical resistance. Certified test reports shall be submitted verifying each value as described below.

2. Independent third party certified laboratory test reports demonstrating that the exact resin/liner combination to be used for this project meets the requirements for initial structural properties and chemical resistance (performed in accordance with ASTM F1216).

3. Independent third party certified laboratory test reports demonstrating that the exact resin and liner to be used for this project has been tested for long-term flexural modulus of elasticity and long-term flexural strength (i.e. 10,000 hour creep testing performed in accordance with ASTM 2990 or DIN 761 for design conditions applicable to this project). When filled resins are proposed, complementary data of the same data for unfilled resin shall also be provided. If the data submitted is not for the exact liner to be used on this project, submit a detailed description of the physical properties of both the liner used in the test and the liner to be used for this project to demonstrate that the two liners are comparable in terms of physical properties.

4. Test shall be performed for 10,000 hours under test conditions and loadings described below. The data points from 1,000 hours to 10,000 hours, or such other time period as determined by the ENGINEER based on the curve or slope of the plotted data, of the Long-term Flexural Modulus shall be extrapolated using a Microsoft Excel log log scale linear regression analysis to determine the minimum service life performance of the resin-tube.

5. Testing shall be conducted at:

a. Temperature 21°C to 25°C

b. Relative humidity: 50% minimum

c. Load: Load shall be calculated at 0.25% of the short term E-modulus as tested per ASTM D790 or ISO 178, or as approved by ENGINEER.

6. The name of the liner and resin manufacturer, the location of the facility where each was manufactured, and a list of appurtenant materials and accessories to be furnished.

7. Structural design calculations and specification data sheets listing all parameters used in the liner design and thickness calculations based on Appendix X1 of ASTM F2019 for each pipe segment with less than 10% ovality. If the ovality is 10% or greater, use either the ASCE or the WRc Sewerage Rehabilitation Manual, Type II Design, Section 5.3.2.iii for non-round pipe.

8. The quality management system for the wet-out facility must be registered in

33 31 60 - 8 accordance with and conform to the current ISO 9001 standard. It must ensure that proper materials and amounts are used in the resin saturation process and in liner shipping and storage. At a minimum, the quality control documentation shall include resin lot numbers, volumes of resin, catalyst, enhancers, date of wet-out, storage /transportation controls, and quality assurance procedures.

9. Installation quality control plan, including bypass pumping plans, mainline sewer cleaning plans, cleanliness requirements, liner shot plan and sequence, liner installation standard procedures (including, but not limited to, minimum / maximum allowable installation pressures and speeds certified by the liner manufacturer), intermediate manhole exposed liner restraining method, light train sizing, temperature monitoring plan, odor control procedure, and plan to manage flow to/from laterals during lining.

10. Curing schedule for each lining segment.

11. Available standard written warranty from the manufacturer.

12. The submittal of a Company’s Health and Safety Program and all required documents to demonstrate and prove that all employees are Confined Space Entry trained and Rescue trained as well. A site specific Health and Safety Program will be created and submitted for review. All CONTRACTOR employees shall have all training documents submitted prior to work commencing for review.

3.4 REINSTATEMENT OF BRANCH CONNECTIONS

A. It is the intent of these specifications that viable branch connections to buildings be re-opened without excavation, utilizing a remotely controlled cutting device, monitored by a CCTV. The Contractor shall certify a minimum of two complete functional cutters plus key spare components are on the job site before each installation or are in the immediate area of the jobsite and can be quickly obtained. Unless otherwise directed by the Owner or his authorized representative, all laterals will be reinstated. No additional payment will be made for excavations for the purpose of reopening connections and the Contractor will be responsible for all costs and liability associated with such excavation and restoration work.

B. Existing sewer service connections shall be reinstated through the use of a closed-circuit television camera and a remote-controlled (robotic) cutting device: Inactive sewer service connections shall not be cut. The exact location and number of service connections shall be determined from TV tapes and/or in the field. It shall be the Contractor’s responsibility to accurately field locate all existing service connections. The Contractor shall reconnect all service connections to the lined pipe. Experienced operators shall make connections so that no blind attempts or holes are made in the liner pipe. The Contractor shall be responsible for restoring/correcting without any delay, all missed or faulty reconnections, as well as for any damage caused to property owners for not reconnecting the services soon enough or for not giving notice to the owners. All existing service connections shall be reconnected by remote TV controlled cutting device.

All service connections shall be fully opened (95% to 100%) within 24 hours. No partial cuts shall be permitted over a weekend or overnight. When the service connection is reestablished, the invert of the service connection shall match the bottom of the reinstated service opening. The service shall be reinstated from a minimum of 95 percent to a maximum of 100 percent of internal diameter of the original service connection. The

33 31 60 - 9 sewer service connection cuts shall be uniform and brushed to remove burrs and sharp edges. After all service laterals have been cut, the line section shall be flushed and all coupons from the re-established laterals retrieved. These retrieved coupons shall be properly disposed and not washed down the line. The contractor shall be held responsible for service back-ups caused by accumulated coupons and liner material left in the sewer.

3.5 CLEANING SEWERS

A. Internal debris shall be removed from the existing pipeline. All roots, debris and protruding service connections shall be removed. Pipes shall be cleaned with hydraulically powered equipment, high-velocity jet cleaners, or mechanically powered equipment. This equipment shall be capable of sufficiently cleaning and clearing the existing pipe. During the sewer cleaning operations, satisfactory precautions shall be taken in the use of cleaning equipment to prevent additional damage to the existing pipe

3.6 TELEVISION INSPECTION

A. After the sewer section to be lined is thoroughly cleaned, inspection shall be made with a color pan and tilt, 360° rotating head camera specifically designed and constructed for sewer inspection. Each sewer to be televised shall be field investigated to determine the need for plugging to eliminate flow from the line section. Lighting for the camera shall provide a clear picture of the entire periphery of the existing sewer. If the television inspection shows any areas where the sewer inside diameter may be deflected, decreased, or obstructed, the Engineer will coordinate a point repair. The Contractor shall carefully inspect the interior of the pipeline to determine the location of any conditions that may prevent proper installation of the impregnated tube. These conditions may include protruding service taps, collapsed or crushed pipe, and reductions in the cross-sectional area of more than 40%. The Contractor shall note these conditions so that they can be corrected. The original pipeline shall be cleared of these obstructions at the contracted unit price. Protruding taps or service connections which will obstruct or hinder the insertion of the liner, shall be removed to allow the liner to pass through. If inspection reveals an obstruction that cannot be removed by conventional sewer cleaning equipment, then a point repair excavation shall be recommended to remove or repair the obstruction.

The Engineer shall be notified immediately when the Contractor has determined the need for a point repair.

B. Upon completion of the liner installation the CONTACTOR shall perform a television inspection to document the as-built condition. The CONTRACTOR shall provide two copies of as-built inspection to the OWNER in digital format for review and acceptance by the OWNER.

3.7 CLEAN-UP

A. Upon acceptance of the installation work and testing, the Contractor shall restore the project area affected by the operations to a condition at least equal to that existing prior to the work.

33 31 60 - 10

B. The Contractor shall take special care to remove scrap pieces (4 inches or larger) of CIPP material in the mains after installation which could cause sewer line blockages or sewer pump problems. The Contractor is responsible for removal of scrap debris as an incidental cost of CIPP per lineal foot.

3.8 SAFETY

A. The Contractor shall carry out his operations in strict accordance with all applicable OSHA Standards. Particular attention is drawn to those safety requirements involving work on elevated platforms and entry into a confined space. It shall be the Contractor's responsibility to familiarize himself with OSHA Standards and Regulations pertaining to all aspects of this type of work. All equipment used on this project should be safe to operate and designed to eliminate manhole entry. If manhole entry is required, all OSHA guidelines for confined space entry shall be followed.

3.9 NOTIFICATION OF RESIDENTS

A. Prior to starting work, it is the responsibility of the Contractor to notify all residents that the lining process could affect. This notification shall consist of written information that outlines the CIPP process and timing of the project. This notification must be given a minimum of forty-eight (48) hours in advance of work in a given neighborhood.

3.10 BYPASS SEWAGE FLOW

A. Main lines shall be kept in service by bypassing sewage flow around the section or sections of sewer to be lined. The bypass shall be made by plugging the existing upstream manhole or adjacent sewer system. Pump and bypass lines shall be of adequate capacity and size to accommodate the flow without sewer backup. Sewer service connections within the section to be lined shall be temporarily taken out of service by the Contractor to permit relining. The operation of bypass pumping shall be considered incidental to the work. If sewage backup occurs and enters buildings, the Contractor shall be wholly responsible for cleanup, repair, and property damage costs and claims.

3.11 ACCESSIBILITY OF WATER FOR CLEANING

A. The Contractor is required to obtain a portable water meter from the local water department having jurisdiction in the area where lines are being cleaned/lined. All fresh water necessary for performance of work under this contract shall be obtained from approved fire hydrants and metered accordingly per the requirements of the local water department. Requirements of the local water department shall be strictly followed. The water department may require an initial meter deposit. It is the responsibility of the Contractor to make these arrangements prior to start of this project.

3.12 FIT AND FINISH

A. The finished liner shall be continuous over the entire length of the sewer section. The finished liner shall tightly conform to the walls of the existing (host) sewer main;

therefore, it is the Contractor's responsibility to verify the section lengths and pipe dimensions. No gap or annular space between the finished liner and the existing (host)

33 31 60 - 11 sewer main shall be visible at the manhole, sewer service connection, or other exposed points within the finished lined section. The finished liner shall be homogeneous throughout and free of any wrinkles, protrusions, holes, cracks, foreign material, blisters, or other deleterious faults or defects, which in the opinion of the Engineer, will affect the liner's structural integrity, hydraulic performance, future maintenance access, and overall line performance.

PART 4. MEASUREMENT AND PAYMENT

4.1 MEASUREMENT

A. Measurement of CIPP liner shall be by the number of feet, measured from center-to center of manholes.

4.2 PAYMENT

A. Payment for all inspections and cleaning is included with the contract unit price of the corresponding pay item.

B. Payment for accepted quantities shall be made at the contract prices and paid in monthly progress payments for all work performed in that month.

4.3 WARRANTY

A. All lining work shall be fully guaranteed by the CONTRACTOR for a period of 1 year from the date of Final Acceptance unless otherwise stipulated in writing by the OWNER prior to the date of Conditional Acceptance. During this period, all serious defects discovered by the OWNER or ENGINEER shall be removed and replaced by the CONTRACTOR in a satisfactory manner at no cost to the OWNER. In addition, the OWNER may conduct independent television inspections, at its own expense, of the lining Work at any time prior to the completion of the guarantee period.

Bidding and Contract Document (R 02/22) Project Name: Wastewater System Improvements – MDOC Newberry Correctional Facility File No. 472/17436.TAP

01-18

APPENDIX I

GLOSSARY

Bidding and Contract Document (R 02/22) Project Name: Wastewater System Improvements – MDOC Newberry Correctional Facility File No. 472/17436.TAP

GLOSSARY

Activity−An element in the Progress Schedule establishing a requisite step, or the time and resources required, for completing the part of the Work associated with that Activity.

Addenda−Written instruments that are used by the Owner and/or Professional to incorporate interpretations or clarifications, modifications and other information into the Bidding Documents. An Addendum issued after Bid opening to those Bidders who actually submitted a Bid, for the purpose of re-bidding the Work without re-advertising, is referred to as a post-Bid Addendum.

Agency- Any unit, section, division, department or other instrumentality of the State that benefits from the Work.

Alternate−Refers to work specified in the Bidding Documents for which the Bidder must bid a Bid Price.

Apparent Low Bidders: Those Bidders whose Base Bid, when added to those specific Alternates the Owner intends to accept, yields the three lowest sums of Bid and Alternates. Additional Bidders may be considered Apparent Low Bidders if their Bid, when added to those specific Alternates the Owner intends to accept, yields a sum within 10% of the lowest of the Apparent Low Bidder’s sum. If a qualified disabled veteran meets the requirements of the contract solicitation, provides acceptable responses to both Part One and Part Two of the Best Value Construction Bidder Evaluation to achieve a Best Value recommendation and with the veteran’s preference is the lowest responsive, responsible, best value Bidder it is considered the Apparent Low Bidder.

Archaeological Feature−Any prehistoric or historic deposit of archaeological value, as determined by a representative of a State agency that is duly authorized to evaluate such findings and render such judgments. An Archaeological Feature deposit may include, but is not limited to Indian habitations, ceremonial sites, abandoned settlements, treasure trove, artifacts or other objects with intrinsic archaeological value and that relate to the history and culture of the State of Michigan. The Archaeological Features are listed under Section 00800 Supplementary Conditions.

Authorized Technical Data−Information and data contained in a report of exploration and tests of subsurface conditions. Also, any physical data (dimension, location, conditions, etc.) contained in those Drawings of physical conditions of existing surface and subsurface facilities.

Best Value-The bids will be evaluated for best value based on price and qualitative components that may include but are not limited to technical design, technical approach, quality of proposed personnel, and management plans, per PA 430 of 2012.

Bid−Written offer by a Bidder for the Work, as specified, which designates the Bidder’s Base Bid and Bid Prices for all Alternates.

The term Bid includes a re-bid.

Bidder−The Person acting directly, or through an authorized representative, who submits a Bid directly to the Owner.

Bidding Documents−The proposed Contract Documents as advertised, and all Addenda issued before execution of the Contract.

Bid Price− The Bidder’s price for a lump sum item of work, or the product of the Bidder’s unit price for an item of Unit Price Work times the quantity given on the Bid Form for that item.

Bid Security−Security serving as a guarantee that the Bidder will conform to all conditions.

Bidding Requirements−The Advertisement, Instructions to Bidders, Supplementary Instructions, Information for Bidders, Bid Form, Bid Form Attachments and qualification submittals, as advertised and as modified by Addenda, and any other Section included within Division 0 of the Bidding Documents for the purpose of governing bidding and award of the Contract.

Board−The Administrative Board of the State of Michigan.

Bond− Security furnished by the Contractor, as required by the Contract Documents.

Business Day−Any Day except Saturdays, Sundays and holidays observed by the Owner.

Bulletin−A request used by the Owner to describe a change in the Work under consideration by the Owner and to request the Contractor to submit a proposal for the corresponding adjustment in Contract Price and/or Contract Time, if any.

Calendar Day−Every day shown on the calendar, Saturdays, Sundays and holidays included.

Cash Allowance−An Owner-specified sum included within the Contract Price to reimburse the Contractor for the actual purchase/furnished cost of materials and/or equipment or other designated items, as specifically provided in the Contract Documents. Although the scope (e.g., the required quantity) of any Work covered by a Cash Allowance is sufficiently detailed in the Contract Documents for the purposes of bidding the required labor costs, Subcontract costs, construction equipment costs and general conditions costs and Fee, it is understood that the required materials, equipment or other designated items are of uncertain purchase cost at the time of Bid or are yet to be specified in more detail by the Professional as to quality, appearance, durability, finish and such other necessary features affecting purchase price.

Change Order−A written order issued and signed by the Owner, which amends the Contract Documents for changes in the Work or an adjustment in Contract Price and/or Contract Time, or both.

Contract Award−The official action of the Board, the Director-SFA or the Director-DCD awarding the Contract to the Contractor.

Contract Documents−Written and graphic documents that form the legal agreement between the Owner and the Contractor, consisting of this document, completed Bid and Contract forms, terms and conditions of the contract, specifications, drawings, addenda, Notice of Award, Notice-to-Proceed and contract change orders.

Contract Price−The total compensation, including authorized adjustments, payable by the Owner to the Contractor (subject to provisions for Unit Price Work).

Contract Times−The Contract Times for the entire Work are the periods allowed, including authorized adjustments, for Substantial Completion and final completion of the Work. The Contract Times for a designated portion of the Work are the periods allowed for Substantial Completion and final completion of any such portion of the Work, as specified in the Contract Documents.

Contractor−Business enterprise with which the Owner has entered into the Contract.

Correction Period−Period during which the Contractor must, in accordance with the Contract Documents, (a) correct or, if rejected, remove and replace Defective Work, and (b) maintain warranties for materials and equipment in full force and effect.

Cost of the Work Involved−The sum of all costs that would be, or actually were, necessarily incurred by the Contractor in providing any Work Involved with the related change, less the costs that would be, or would have been, incurred by the Contractor to provide such Work without the related change.

Defective−As determined by the Professional, an adjective which when referring to or when applied to the term “Work” refers to (a) Work not conforming to the Contract Documents or not meeting the requirements of an inspection, test or approval, or (b) Work itemized in a Punch List which the Contractor fails to complete or correct within a reasonable time after issuance of the Punch List by the Professional.

Delay−Any act or omission or other event that in any manner adversely affects or alters the schedule, progress or completion of all or any part of the Work. Delay is a generic term intended to include deferral, stoppage, slow down, interruption and extended performance, and all related hindrance, rescheduling, disruption, interference, inefficiency and productivity and production losses.

Department (DTMB)−Department of Technology, Management and Budget of the State of Michigan.

Director is the Director of the Department.

Director-SFA is the Director of DTMB State Facilities Administration.

Director-DCD is the Director of DTMB State Facilities Administration, Design and Construction Division.

Division−Each of the numbered, distinct parts (starting with Division 0) into which the Specifications are divided.

Drawings−Part of the Contract Documents showing the Work. Drawings must neither serve nor be used as Shop Drawings.

Emergency−A condition affecting the safety or protection of persons, or the Work, or property at or adjacent to the site.

State Facilities Administration (SFA)-Entity in the Department responsible for design, construction, and operations and maintenance of facilities.

Fee for the Work Involved (Fee)−An established, percentage mark-up on the Cost of the Work Involved which is allowed to the Contractor for (a) reasonable administrative costs, and (b) negotiated, reasonable profit on the Cost of the Work Involved.

Hazardous Material−Asbestos containing materials (ACMs), Polychlorinated biphenyls (PCBs), petroleum products, such construction materials as paint thinners, solvents, gasoline, oil, etc., and any other like material the manufacture, use, treatment, storage, transportation or disposal of which is regulated by federal, State or local Laws governing the protection of public health, natural resources or the environment.

Invitation To Bid (ITB) -The solicitation document presenting the terms and conditions that will become part of the Contract when the Bid is accepted.

Law(s)−Means federal, State and local statutes, ordinances, orders, rules and/or regulations.

MCL−The Michigan Compiled Laws of the State of Michigan.

Means and Methods−Includes means, methods, techniques, sequences and/or procedures applicable to the Work.

Notice of Award−Written notice accepting the Bid to the lowest responsive, responsible Bidder and designating the Contract Price (and establishing the Alternates accepted by the Owner).

Notice-to-Proceed−Written notice issued by the Project Director directing the Contractor to commence the construction activities and establishing the start date of the Contract Time.

On-Site Inspection–The Professional’s on-site examination of the Contractor’s completed or in progress Work to determine and verify to the Project Director that the quantity and quality of all Work complies with the requirements of the Contract Documents.

Owner−The State of Michigan, with whom the Contractor has entered into the Contract and for whom the Work is to be provided.

Owner Field Representative−A State employee or consultant, acting collaboratively with the Project Director, providing on-site, periodic observation and documentation of the Work for compliance with the Contract Documents.

Partial Use−Use by the Owner of a designated portion of the Work before accomplishing Substantial Completion of the entire Work. Partial Use does not mean Substantial Completion of the portion of the Work placed in use by the Owner.

Person−Individuals, partnerships, corporations, receivers, trustees, joint ventures or any other legal entity and any combinations of any of them.

Political Subdivision−Any county, city, village or other local unit of the State, including any agency, department or instrumentality of any such county, city, village or other local unit.

Post−Bid Submittal−A Qualification Submittal required of the Bidder selected under Section 00100 - 22 before Contract Award, and which is used by the Owner in the evaluation of the Bid of the selected Bidder.

Professional Services Contractor (PSC or Professional)−The individual or business entity who has the authority to practice the design disciplines required by the Contract Documents. An Agency with appropriate licensing may replace the PSC in their role if a consultant is not used.

Project−The total construction, which includes the Work and possibly other work completed by others, as indicated in the Contract Documents.

Project Director-Designated State employee(s) (a) Responsible for directing and supervising the Professional’s services during the period allowed for completion of the Work; and/or (b) Acting as representative for the Owner and for the enforcement of the Contract Documents, approving payment to the Contractor and coordinating the activities of the State, Owner, Professional and Contractor.

Project Schedule−Work Schedule that shows the Contractor's approach to planning, scheduling and execution of the Work and that accurately portrays completed Work as to sequencing and timing, as provided in the Contract Documents.

Project Specifications−The Contract Documents organized into Divisions. "Technical Specifications" means Divisions of the Specifications consisting of technical descriptions of materials, equipment, construction systems, standards and workmanship.

Provisionary Allowance−An amount included within the Contract Price to reimburse the Contractor for the cost to furnish and perform Work that is uncertain because, for example, it is indeterminate in scope and may not be shown or detailed in the Contract Documents.

Punch List−A list of minor items to be completed or corrected by the Contractor, any one of which do not materially impair the use of the Work for its intended purpose.

Qualified Disabled Veteran (QDV)-QDV as defined by Public Act 22 of 2010, MCL 18.1241.3 and supported by a DD214 Proof of Service and Discharge, a Veterans Administration rating decision letter, proof of disability (if the disability is not indicated on the DD214), and appropriate legal documents setting forth the 51% natural persons QDV ownership.

Record Documents−Drawings, Specifications, Addenda, Change Orders, Change Authorizations, Bulletins, inspection, test and approval reports, photographs, written clarifications and interpretations and all other documents recording, or annotated to show, all revisions and deviations between the as-built installation and the Contract Documents, all approved Submittals and all clarifications and interpretations.

Records−Books, reports, documents, electronic data, and other evidence relating to the bidding, award and furnishing and performance of the Work.

Recycled Material−Recycled paper products, structural materials made from recycled plastics, re-refined lubricating oils, reclaimed solvents, recycled asphalt and concrete, recycled glass products, re-treaded tires, ferrous metals containing recycled scrap metals and all other materials that contain (a) waste materials generated by a business or consumer, (b) materials that have served their intended purpose, and/or (c) materials that have been separated from solid waste for collection, recycling and disposition in the percentage determined by the State as provided by Law.

Request for Payment−The form provided by the Owner (Payment Request DTMB-0440) to be used by the Contractor in requesting payment for Work completed, which must enclose all supporting information required by the Contract Documents.

Schedule of Values−A schedule of pay items, which subdivides the Work into its various parts and which details, for each itemized part, cost and pricing information required for making payments for Work performed. The sum of all pay item costs in the Schedule of Values must equal the Contract Price for the Work.

Shop Drawings−Includes drawings, diagrams, illustrations, standard schedules, performance charts, instructions and other data prepared by or for the Contractor to illustrate some part of the Work, or by a Supplier and submitted by the Contractor to illustrate items of material or equipment.

Soil Erosion and Sedimentation Control–The planning, design and installation of appropriate Best Management Practices designed and engineered specifically to reduce or eliminate the off-site migration of soils via water runoff, wind, vehicle tracking, etc.

Soil erosion and sedimentation control in the State of Michigan is regulated under The Natural Resources Environmental Protection Act; Soil Erosion and Sedimentation Control, 1994 PA 451, Part 91, as amended, MCL 324.9101 et seq. Soil erosion and sedimentation control associated with this Contract is monitored and enforced by the DTMB-SFA.

State−The State of Michigan in its governmental capacity, including its departments, divisions, agencies, boards, offices, commissions, officers, employees and agents. Non-capitalized references to a state refer to a state other than the State of Michigan.

State Construction Code−The Michigan State Construction Code Act, 1972 PA 230, as amended, MCL 125.1501 et seq.

Subcontractor−A Person having an agreement with the Contractor to provide labor at the site and furnishing materials and/or equipment for incorporation into the Work.

Submittals−Includes technical Submittals, Progress Schedules and those other documents required for submission by the Contract Documents. The term "technical Submittal" includes Shop Drawings, brochures, samples, Operation and Maintenance (O&M) Manuals, test procedures and any other Submittal the Contract Documents require the Contractor to submit to demonstrate how the items covered, after installation or incorporation into the Work, will conform to the information given in the Contract Documents and be compatible with the design of the completed Work as a functioning whole as indicated in the Contract Documents.

Substantial Completion−The Work, or a portion of the Work designated in the Contract Documents as eligible for separate Substantial Completion, has been completed in accordance with the Contract Documents as determined by the PSC, to the extent that the Owner can use or occupy the entire Work, or the designated portion of the Work, for the use intended without any outstanding, concurrent Work at the site, except as may be required to complete or correct Punch List items.

Supplier−A manufacturer or fabricator, or a distributor, material man or vendor representing a manufacturer or fabricator, who has an agreement with the Contractor to furnish materials and/or equipment.

Underground Utilities−Pipelines, piping, conduit, duct, cables, wells, tanks, tunnels and appurtenances, or other similar facilities, installed underground to convey or support conveyance of potable water, sprinkler or irrigation water, fire protection systems, electricity, gases, steam, petroleum products, sewerage and drainage removal, telephone, communications, cable TV, traffic or control systems.

Unit Price Work−Work involving specified quantities (i.e., related Work quantities) which when performed is measured by the Professional and paid using the measured quantities and unit prices contained in the Contract Documents. Performance of Unit Price Work for undefined quantities is contingent upon conditions encountered at the site, as determined and authorized by the Professional.

Unit Price Work, Specified−Work of specified and defined quantities (i.e., quantities are detailed in, and can be taken-off from, the Contract Documents) that when performed is measured by the Professional and paid based on the measured quantities and unit prices contained in the Contract Documents.

Work (as in “the Work,” "the entire Work”)−The entire completed Construction required by the Contract Documents. The Work results from furnishing and performing all services, obligations, responsibilities, management, supervision, labor, materials, equipment, construction equipment, general conditions, permits, taxes, patent fees and royalties, testing, inspection and approval responsibilities, warranties, temporary facilities, small tools, field supplies, Bonds, insurance, mobilization, close-out, overhead and all connections, devices and incidental items of any kind or nature required and/or made necessary by the Contract Documents.

Work Involved, any Work Involved−Existing or prospective Work (a) reflected in any notice, proposal or claim, or (b) reflected in changes ordered or in process, or (c) affected by Delay.

APPENDIX II

SPECIAL WORKING CONDITIONS

DEPARTMENT OF CORRECTIONS

The Work comprising this Project will be performed at a State of Michigan Correctional Facility and the Contractor/Professional must comply with the following special working rules, adopted December 1, 1975, as amended by the Michigan Department of Corrections.

1. Contractor/Professional must submit a LEIN request consisting of name, driver’s license number, social security number, birth date, and additional information when requested, on all persons to be employed on the Project site. Such form (Vendor/Contractor LEIN Request, CAJ-1037) must be submitted directly to the Department of Corrections Designee for approval before any person's appearance at the site for Work assignments. These employees will be required to attend Contractor/Professional orientation prior to any on site activity.

2. Contractor/Professional will be allowed to work within or on Correctional Facility confines for an eight (8) hour shift as designated by the facility.

This is the start of the file's text. The full file is on GovTribe.