File set up_Review.docx
DOCX document 20 KB Posted
- Attached to
- #21-KR3 Electronic Document Management System
- Solicitation number
- #21-KR3
- Issued by
- Spokane County, Spokane City, Spokane Valley City, Washington
About this file
The provided document appears to be a set of files related to a design consultant solicitation and a construction project for a state and local government agency. The files contain various materials such as scopes of work, project descriptions, bid documents, meeting minutes, and project management forms. The related state and local contract opportunity is for an Electronic Document Management System (EDMS) solicitation issued by Eastern Washington University (EWU) to replace its network shared drive and storage of large files. The EDMS solicitation is open to the state of Washington and Spokane County. The document set provides a comprehensive overview of the design and construction process, including pre-design studies, design development, bidding, construction, and closeout activities.
The pricing terms, funding sources, and other financial details are not explicitly stated in the provided information. However, the document set suggests a thorough project management process involving multiple stakeholders, including the design consultant, construction contractor, and various government authorities having jurisdiction.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 06014b_r1.doc | DOC document | |
| 21-KR3 EDMS RFQQ.pdf | ||
| 21-KR3 EDMS RFQQ.pdf.crdownload | CRDOWNLOAD file | |
| Addendum posted 6-15-21.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Design
Consultant Solicitation Project Team Form A/E Consultant Solicitation (RFQ) A/E Agreement NTE A/E Agreement ASEA A/E Agreement CSSS A/E Agreement Proposal A/E Amendment A/E Amendment Proposal A/E Consultant Invoice A/E Correspondence AHJ Correspondence EWU Correspondence Pre-Design Study Review Submittals & comments Value engineering Constructability review Meeting minutes Meeting Agendas Standards Specifications Drawing Sketches Design Schedules Cost Estimates Schematic Design Design Development Construction Documents Geotechnical Report VE Study Constructability Review
Bidding Solicitation/Ad Meeting Minutes Pre-Con Agenda Pre-Con Attendance list Advertisement for Bid General Conditions Supplemental Conditions Specifications (all Div 000 - xxx) Drawings (bid set) Addenda Plan Holders List Bids Bid Tabulation Payment Bond Performance Bond Due Diligence Checklist Relocations Surveys & Reports Miscellaneous
Award Contract Award notification Contract Execution Procedures Contractor Project Team Form Retainage Form Retainage Bond Bond Waiver Certificate of Insurance
NTP
Construction Contract Change Order Proposal Change Orders Requests for Information Contractor Invoices Intent Statements Clarification Drawings Construction-Schedules Contractor Correspondence Meeting Minutes Meeting Agendas Field Observation Reports Photographs Construction Submittals Special Inspection & Testing NREC Review & Inspection Commissioning Purchase Orders Fire Alarm System Information Systems
Close Out Substantial Completion letter Final Acceptance letter Notice of Completion Warranty letter DOR Lien Notice LNI Lien Notice ESD Lien Notice Post-Construction
AiM Project Structure
| AiM Building ID: | XXXX | |
| Building Acronym: | 3-4 alpha all caps | |
| Project Number: | CPXXXX | |
| Consultant Number: | PSXXXX | |
| Consultant Invoice: | CIXXXX | |
| Contractor Number: | CSXXXX | |
| Payment Application: | PAXXXX |
Document Types:
AutoCAD (.dwg) Excel (.xls) Word (.doc) Adobe (.pdf) Structured Query Language (.sql)
File details come from the government source that posted it. Updated .