FFG-62 Industry Day Presentation.pdf
PDF 3 MB Posted
- Attached to
- Design-Bid-Build, FFG-62 Land Based Engineering Site, Philadelphia Navy Yard Annex, Philadelphia, PA
- Solicitation number
- Not on record
About this file
This document is an industry day presentation for the Design-Bid-Build, FFG-62 Land Based Engineering Site (LBES) repair project at the Philadelphia Navy Yard Annex in Philadelphia, PA. The presentation provides an overview of the project, including the scope of work, construction schedule, and anticipated work environment. Key details include modifications to Building B77H, such as a new pile-supported foundation and slab, interior platforms, a control house, and utility infrastructure improvements. Site improvements are also planned, such as demolition of Building B480 and new/replacement utilities. The project will be procured through full and open competition using a best value trade-off evaluation. The Navy plans to issue the RFP in May 2024, with proposals due in July 2024 and contract award in November 2024. The project will be completed in four milestones, with the control house and southeast site portions scheduled for earlier completion. Environmental permits have been or will be obtained by the Navy prior to award.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Industry Day Sign-in Sheet.pdf | ||
| Attachment 1 - PLA Questionnaire.docx | DOCX document | |
| FFG-62 Industry Day Flyer.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Live! Hotel Philadelphia
900 Packer Ave Philadelphia, PA 19148
10 April 2024
Industry Day
FFG-62 Land Based Engineering Site (LBES) Repair Package
Agenda Time Action Presenter
0900 Opening Remarks NAVFAC PM
0905 Introductions All
0910 Ground Rules NAVFAC Contracting Officer
0920 Project Presentation NAVFAC Design Team (WRA)
1015 Questions NAVFAC Contracting Officer
1100 Adjourn
Presenter: NAVFAC and NSWCPD/PMS-515 Leadership
Opening Remarks
Presenter: All
Introductions
Presenter: NAVFAC Contracting Officer
Ground Rules
Ground Rules
• This meeting is informational and for planning purposes only.
• This is not a Request For Proposal (RFP). Discussions today will not be evaluated in response to any future requests for proposals.
• Do not provide the Government with proprietary information, trade secrets, or any other information deemed source selection sensitive, or information that you do not want disseminated to the public.
• A record of all discussions will be made. If you have not already done so, please sign the acknowledgement / sign in sheet, indicating your understanding and consent to the government making publicly available a summary without attribution of everything discussed today.
• Effort that any contractor/entity expends on this effort is at its own time, risk, and expense.
• Hold all questions until the end of the presentation.
• Everything you see today is a DRAFT and is subject to change.
Industry Day Goals
• To notify the Industry of the upcoming solicitation for the FFG-62
LBES Repair construction project.
• Inform Industry of the scope, timeline, and possible construction challenges for the project.
• Solicit private sector input to help shape the project procurement.
Project Solicitation Details
• Acquisition Strategy
• Full and Open Competition
• Best Value Trade Off
• Labor Agreement required per the FAR
Presenter: NAVFAC Design Team
Project Presentation
Project Location
FFG-62 LBES REPAIR
PROJECT SITE
B77 COMPLEX
N
Primary Project Area
N
Project Presentation Project Location
S-Lot – Designated area for
Contractor construction trailer(s), Material Storage and Staging
B77 Complex Primary Work Area
• Ability to avoid conflict with other active construction projects in the project area.
• Building B77H and the
B77 Complex will be occupied during construction.
• Construction activities from current and future projects.
• 2nd Shift work anticipated.
Project Presentation Anticipated Work Environment
B77 Complex
• B77H Modifications
• Site/Utility Improvements
• Construction Completion Milestones
Project Presentation Project Overview
B77H Google Earth View
• Primary area of work: 40,000SF
• Pile Supported Foundation and
Slab
• FFG-62 Early Demolition project
Project Presentation B77H Modifications
Foundation Plan
B77H Modifications
First Floor Plan
• Two Interior Platforms
• Control House
• Two Exterior Platforms (above
Part A and Part E)
• Cooling Water Trench
• Utility Infrastructure
• Existing Lab
B77H Modifications
N N
Foundation Plan First Floor Plan
Key Plan
B77H Cross Section Looking North
B77H Modifications
B77H Modifications
Control House Cross Section Looking North
• Control House
• 7,500SF
• 2 Levels
• Steel framing extends through roof to support platform above
B77H Modifications
3D View Looking Northeast
B77H Modifications
3D View Looking Southwest
Control House – Interior Image
Control House – Interior Image
Project Presentation B77H Modifications
• Fire Alarm and Protection
Improvements
• Demolish and replace existing.
• Includes B756 (FA Only), B670, B485, B77H
• Mass Notification
• Existing platforms ~16,000SF
• Existing offices ~60,000SF
• Roof ~ 140,000SF
Fire Alarm / Protection - B77 Complex
Project Presentation Site Improvements
• Southeast site
• B480 demolition
• Fire service to B485
• Temporary pump house
• New/existing utilities
• Southwest site (not shown)
Southeast Site Plan
Project Presentation Site Improvements
• B480 demolition
• 2 story
• ~6,000SF
Photo – B480 Exterior B480 – Floor Plan
Project Presentation Const. Completion Milestones
Milestones have been established to allow partial occupancy and outfitting activities to begin.
• Milestone 1: Control House
• Milestone 2: Southeast Site
• Milestone 3: Primary Work Area
• Milestone 4: Remainder
N
MILESTONE 3 MILESTONE 1
MILESTONE 2
• Permits Acquired by Navy prior to Award
▪ Philadelphia Water Department
• Post-Construction Stormwater Management Approval
▪ PA Department of Environmental Protection
• NPDES Permit for Stormwater Discharges Associated with
Construction Activities
• Contractor required to submit Co-Permittee
Acknowledgement Form to PADEP for operational control of NPDES Permit
▪ Title IV Operating Permit – Major Source
• All soil taken off site must be handled, tested, and disposed of in compliance with federal, state and local regulatory requirements.
Environmental / Permitting
• Issue RFP May 2024
• Contractor Site Visit TBD
• Receive Proposals July 2024
• Award Construction Contract November 2024
• Milestone Construction PoP
• M1 – Control House 550 days after NTP
• M2 – Southeast Site 245 days after NTP
• M3 – Primary Work Area 850 days after NTP
• M4 – Remaining 1000 days after NTP
Tentative Project Schedule
Presenter: Contracting Officer
Questions
Additional questions can be submitted in writing to:
brittany.n.cristelli.civ@us.navy.mil
Adjourn
| Slide 1: FFG-62 Land Based Engineering Site (LBES) Repair Package |
| Slide 2: Agenda |
| Slide 3: Opening Remarks |
| Slide 4: Introductions |
| Slide 5: Ground Rules |
| Slide 6: Ground Rules |
| Slide 7: Industry Day Goals |
| Slide 8: Project Solicitation Details |
| Slide 9: Project Presentation |
| Slide 10: Project Presentation Project Location |
| Slide 11: Project Presentation Project Location |
| Slide 12: Project Presentation Anticipated Work Environment |
| Slide 13: Project Presentation Project Overview |
| Slide 14: Project Presentation B77H Modifications |
| Slide 15: Project Presentation B77H Modifications |
| Slide 16: Project Presentation B77H Modifications |
| Slide 17: Project Presentation B77H Modifications |
| Slide 18: Project Presentation B77H Modifications |
| Slide 19: Project Presentation B77H Modifications |
| Slide 20: Project Presentation B77H Modifications |
| Slide 21: Project Presentation B77H Modifications |
| Slide 22: Project Presentation B77H Modifications |
| Slide 23: Project Presentation B77H Modifications |
| Slide 24: Project Presentation Site Improvements |
| Slide 25: Project Presentation Site Improvements |
| Slide 26: Project Presentation Const. Completion Milestones |
| Slide 27: Project Presentation Environmental / Permitting |
| Slide 28: Project Presentation Tentative Project Schedule |
| Slide 29: Questions |
| Slide 30: Adjourn |
File details come from the government source that posted it. Updated .