Fence_Pic_2.pdf
PDF 1 MB Posted
- Attached to
- GRU Administration Building Security Fence
- Solicitation number
- RFP 2026-042
- Issued by
- Alachua County, Glencoe CDP, Florida
About this file
This is a Request for Proposal (RFP) document issued by Gainesville Regional Utilities (GRU), a Florida-based utility agency, for the installation of a comprehensive perimeter security fence system at its Administrative Building located at 301 SE 4th Avenue in Gainesville, Florida. The project scope includes approximately 6 feet of black aluminum industrial-grade fencing around the property perimeter, four custom vehicular gates and four pedestrian gates with padlock access, two high-cycle barrier arms with commercial-grade card readers at the primary entrance, and complete integration with GRU's existing Lenel OnGuard access control platform. The project objectives are to establish a hardened perimeter that deters unauthorized entry and pre-operational surveillance, ensure 24/7 operational continuity during elevated threat periods, streamline access management for authorized employees while controlling visitor flow, and protect executive parking areas and critical infrastructure entry points. Proposals are due by 2:00 PM on Tuesday, March 17, 2026, via the GRU e-Procurement Portal, with questions required by 4:00 PM on Monday, March 9, 2026. The project must be completed within six weeks of commencement, with a firm deadline of July 31, 2026.
Award will be made using a best-value methodology with evaluation weights of 35 percent for Price, 25 percent for Technical Approach, 15 percent for Contractor Experience and Qualifications, 15 percent for Project Schedule, 5 percent for Safety Program and Record, and 5 percent for Warranty and Maintenance Support. Contractors must submit pricing as a firm total lump sum cost including all materials, labor, equipment, permitting, and warranty; provide a 5 percent bid bond payable to the City of Gainesville d/b/a Gainesville Regional Utilities; and if awarded, furnish performance and payment bonds equal to 100 percent of the contract price. The RFP does not specify set-aside designations or restrict organizational types eligible to respond. GRU has identified three certified subcontractors qualified for Lenel OnGuard integration—Convergint Inc., Security101, and WW Gay Fire - Sciens Corp.—though prime contractors may utilize other qualified subcontractors. All labor must be warranted for a minimum of one year, with manufacturer's warranties applying to materials. Contractors must maintain liability insurance with minimum coverages of $1,000,000 combined single limit for general liability, $500,000 combined single limit for automobile liability, and statutory workers' compensation. Payment terms are net 30 days from receipt of correct invoice.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| GRU_Administration_Building_Security_Fence_(Addendum_#4_Revision).pdf | ||
| GRU_Administration_Building_Security_Fence.pdf | ||
| AdminBuildingFencePlan.png | PNG image | |
| Fence_Pic_4.pdf | ||
| Fence_Pic_3.pdf | ||
| Fence_Pic_2.pdf | ||
| Fence_Pic_1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .