FEMA_Procurement_States_Factsheet_-_fy25-_USE_ME.pdf

PDF 111 KB Posted

Attached to
Hurricane Ian HMGP Buyout - H1277 - 4673-037-R
Solicitation number
PD 25-26.071
Issued by
Escambia County, Florida

About this file

This document is a FEMA Procurement Fact Sheet issued in December 2025 that outlines federal procurement standards applicable to states, the District of Columbia, U.S. territories, and their agencies when purchasing under FEMA awards and disaster declarations issued on or after October 1, 2024. The fact sheet provides comprehensive guidance on procurement requirements that states must follow as direct recipients or pass-through entities of FEMA grant funding. Key procurement standards address competition methods, conflicts of interest, cost or price analyses, bonding requirements, domestic preferences, and Build America, Buy America Act compliance. States must either follow their own documented policies and procedures for non-federal purchases or adhere to Federal Procurement Standards outlined in 2 C.F.R. 200.317-200.327 if they lack existing policies. The document emphasizes that failure to comply with these standards may result in FEMA remedies, including denial of full reimbursement or recovery of obligated funds.

The fact sheet establishes additional mandatory requirements for state procurements, including prohibitions on contracting with suspended or debarred contractors listed on SAM.gov, requirements that all contract costs be necessary, allocable, reasonable, adequately documented, and allowable under 2 C.F.R. 200.403, and mandatory maintenance of written conflict of interest rules for procurement professionals. States must include specific contract clauses in purchase orders and contracts as described in Appendix II of 2 C.F.R. Part 200, with clause requirements varying by dollar amount and type of goods or services procured. The document further addresses procurement of recovered materials under the Solid Waste Disposal Act and prohibitions on expending FEMA funds for covered telecommunications equipment or services. Assistance for state procurement questions is available through the Procurement Disaster Assistance Team (PDAT) and state administrative agency contacts.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FEMA Fact Sheet – Procurement Under Grants: States

December 2025 1

Purchasing Under a FEMA Award: States When purchasing under a Federal Emergency Management Agency (FEMA) award, recipients and subrecipients must follow the Federal Procurement Standards outlined in 2 C.F.R. §§ 200.317 – 200.327. This fact sheet provides information on the Federal Procurement Standards applicable to states, the District of Columbia, U.S. territories, and their agencies and instrumentalities when purchasing under FEMA awards and disaster declarations issued on or after Oct. 1, 2024.

States The Federal Procurement Standards define a state as: any state of the United States, the District of Columbia, the Commonwealth of Puerto Rico, the U.S. Virgin Islands, Guam, American Samoa, the Commonwealth of the Northern Mariana Islands, and any agency or instrumentality thereof exclusive of local governments (see 2 C.F.R. 200.1 “State”).

NOTE: If purchasing under FEMA awards or disaster declarations issued between Nov. 11, 2020 and Sept. 30, 2024, please see Code of Federal Regulations, Title 2, Grants and Agreements- January 2020 and the FY21 Procurement Disaster Assistance Team (PDAT) Field Manual for information on applicable Federal Procurement Standards. For more information on the Oct. 1, 2024, Office of Management and Budget (OMB) revisions to the Federal Procurement Standards, please refer to “Guidance for Federal Financial Assistance” and the 2024 OMB Revisions Fact Sheet.

Applicable Federal Procurement Standards All recipients and subrecipients must comply with the Federal Procurement Standards found in 2 C.F.R. §§ 200.317

– 200.327 for FEMA awards and disasters declared on or after Oct. 1, 2024. Usually, states are the direct recipient of the FEMA grant funding, serving as a pass-through entity that makes subawards to other eligible subrecipients.

Failure to follow these rules puts recipients and subrecipients at risk of not receiving their full reimbursement for work done under the FEMA award or having obligated funds taken back by FEMA.

NOTE: FEMA may apply remedies if a state does not comply with the Federal Procurement Standards, as appropriate, in accordance with its authorities found at 2 C.F.R. § 200.339. Additionally, all recipients and subrecipients must ensure compliance with the Cost Principles at 2 C.F.R. Part 200 Subpart E, including the requirement to ensure that costs are reasonable, as defined in 2 C.F.R. § 200.404.

https://www.ecfr.gov/on/2024-10-01/title-2/subtitle-A/chapter-II/part-200/subpart-D/subject-group-ECFR45ddd4419ad436d https://www.ecfr.gov/on/2024-10-01/title-2/subtitle-A/chapter-II/part-200/subpart-D/subject-group-ECFR45ddd4419ad436d https://www.ecfr.gov/on/2024-10-01/title-2/part-200#p-200.1(State) https://www.ecfr.gov/on/2024-10-01/title-2/part-200#p-200.1(State) https://www.govinfo.gov/content/pkg/CFR-2020-title2-vol1/pdf/CFR-2020-title2-vol1.pdf https://www.fema.gov/sites/default/files/documents/fema_PDAT-field-manual_102021.pdf https://www.fema.gov/sites/default/files/documents/fema_PDAT-field-manual_102021.pdf https://www.federalregister.gov/documents/2024/04/22/2024-07496/guidance-for-federal-financial-assistance https://www.fema.gov/sites/default/files/documents/fema_pdat-omb-revisions_factsheet_fy24.pdf https://www.fema.gov/sites/default/files/documents/fema_pdat-omb-revisions_factsheet_fy24.pdf https://www.ecfr.gov/on/2024-10-01/title-2/section-200.339 https://www.ecfr.gov/on/2024-10-01/title-2/subtitle-A/chapter-II/part-200/subpart-E https://www.ecfr.gov/on/2024-10-01/title-2/section-200.404

Procurement Under Grants: States Fact Sheet

Learn more at fema.gov/grants/procurement December 2025 2

Procurement by States (2 C.F.R. § 200.317) When conducting procurement transactions under a federal award, states must follow their own policies and procedures used for non-federal purchases, as outlined in 2 C.F.R. § 200.317. If a state does not have its own documented policies and procedures, it must follow the Federal Procurement Standards at 2 C.F.R. §§ 200.318 –

200.327. These standards include provisions for competition, methods of procurement, conflicts of interest, cost or price analyses, bonding requirements, and other rules. For comprehensive information on each rule and for the State and Indian Tribe Checklist, please see the Procurement Under Grants Policy Guide (PUGPG).

Domestic Preferences (2 C.F.R. § 200.322) States should, to the greatest extent practicable under its FEMA award, provide a preference for the purchase of goods, products, or materials produced in the United States (including but not limited to iron, aluminum, steel, cement and other manufactured products). The requirements of this section must be included in all subawards including all contracts and purchase orders for work or products under this award. This standard also provides specific definitions for “Produced in the United States” and “manufactured products” that states should review.

Build America, Buy America Act (2 C.F.R. Part 184) Under the Build America, Buy America Act (BABAA), federal financial assistance for “infrastructure” projects can only be provided if all iron, steel, manufactured products, and construction materials used in the project are produced in the United States. The Code of Federal Regulations (C.F.R.) at 2 C.F.R. Part 184 provides guidance to federal agencies on implementing these domestic preference requirements.

FEMA’s Buy America Preference in FEMA Financial Assistance Programs for Infrastructure Policy offers detailed guidance on FEMA’s implementation of BABAA requirements for recipients and subrecipients of applicable FEMA grant programs. Additional information, including trainings and resources on BABAA, can be found on FEMA’s Buy America Preference webpage.

NOTE: Not all FEMA grant programs are subject to BABAA. For instance, many of FEMA's disaster programs are not subject to the requirements, including but not limited to, the Public Assistance Program, Hazard Mitigation Grant Program, and Fire Mitigation Assistance Grant Program. For a full list of FEMA programs not subject to BABAA, please visit Programs and Definitions.

Procurement of Recovered Materials (2 C.F.R. § 200.323) A recipient or subrecipient that is a state agency or agency of a political subdivision of a state and its contractors must comply with Section 6002 of the Solid Waste Disposal Act. A political subdivision is the unit of government that the state determines to have met the state’s legislative definition of a political subdivision. See Environmental Protection Agency’s Comprehensive Guide Program.

Contract Provisions (2 C.F.R. § 200.327) State purchase orders and other contracts must include applicable contract clauses as described in Appendix II of 2 C.F.R. Part 200. Some clauses are required depending on the dollar amount of the purchase, while others may be https://www.ecfr.gov/on/2024-10-01/title-2/section-200.317 https://www.ecfr.gov/on/2024-10-01/title-2/subtitle-A/chapter-II/part-200/subpart-D/subject-group-ECFR45ddd4419ad436d https://www.ecfr.gov/on/2024-10-01/title-2/subtitle-A/chapter-II/part-200/subpart-D/subject-group-ECFR45ddd4419ad436d https://www.fema.gov/sites/default/files/documents/fena_gpd_procurement-under-grants-policy-guide_fiscal-year-2025.pdf#page=25 https://www.ecfr.gov/current/title-2/subtitle-A/chapter-I/part-184 https://www.fema.gov/sites/default/files/documents/fema_gpd-babaa-policy_042024.pdf https://www.fema.gov/grants/policy-guidance/buy-america/ https://www.fema.gov/grants/policy-guidance/buy-america/ https://www.fema.gov/grants/policy-guidance/buy-america/programs-definitions#not-subject https://www.ecfr.gov/current/title-40/chapter-I/subchapter-I/part-247 https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program https://www.ecfr.gov/on/2024-10-01/title-2/subtitle-A/chapter-II/part-200/appendix-Appendix%20II%20to%20Part%20200 https://www.ecfr.gov/on/2024-10-01/title-2/subtitle-A/chapter-II/part-200/appendix-Appendix%20II%20to%20Part%20200

Procurement Under Grants: States Fact Sheet

Learn more at fema.gov/grants/procurement December 2025 3 required depending on the goods or services being procured. States can find a list of required clauses and sample language for some clauses in the Contract Provisions Guide.

Additional Rules for State Procurements In addition to the Federal Procurement Standards found at 2 C.F.R. § 200.317, there are other important sections of 2 C.F.R. Part 200 that apply to states when considering purchasing under a FEMA award. These include:

States may not award contracts to contractors that are suspended or debarred as listed on SAM.gov (see 2 C.F.R. § 200.213);

States must ensure all contract costs are necessary, allocable, reasonable, adequately documented, and otherwise allowable (see 2 C.F.R. § 200.403);

FEMA requires all recipients and subrecipients, including states, to maintain written conflict of interest rules, including organizational conflicts of interest rules, governing the actions of their procurement professionals and disclose any potential conflict of interest to FEMA in writing (see Chapter 2 of the Procurement Under Grants Policy Guide (PUGPG)); and

States are prohibited from contracting for covered telecommunications equipment or services (see 2 C.F.R. §

200.216 and Prohibitions on Expending FEMA Award Funds for Covered Telecommunications Equipment or Services Policy).

Further Assistance Additional assistance regarding purchasing under a FEMA award can be accessed by visiting the Procurement Disaster Assistance Team (PDAT) website or by contacting one of the points of contact listed below:

State Emergency Management Agency (Disaster Grants): www.fema.gov/emergency-management-agencies

State Administrative Agency (Non-Disaster Grants): www.fema.gov/grants/preparedness/about/state-administrative-agency-contacts

Contact PDAT: FEMA-GPD-PDAT@fema.dhs.gov; make sure to copy your FEMA grant program point of contact when emailing PDAT.

Signature

Printed Name

Date https://www.fema.gov/sites/default/files/documents/fema_contract-provisions-guide_fy24.pdf https://www.ecfr.gov/on/2024-10-01/title-2/subtitle-A/chapter-II/part-200/appendix-Appendix%20II%20to%20Part%20200 https://www.ecfr.gov/on/2024-10-01/title-2/section-200.213 https://www.ecfr.gov/on/2024-10-01/title-2/section-200.213 https://www.ecfr.gov/on/2024-10-01/title-2/subtitle-A/chapter-II/part-200/subpart-E/subject-group-ECFRea20080eff2ea53/section-200.403 https://www.fema.gov/sites/default/files/documents/fena_gpd_procurement-under-grants-policy-guide_fiscal-year-2025.pdf#page=21 https://www.fema.gov/sites/default/files/documents/fena_gpd_procurement-under-grants-policy-guide_fiscal-year-2025.pdf#page=21 https://www.ecfr.gov/on/2024-10-01/title-2/section-200.216 https://www.ecfr.gov/on/2024-10-01/title-2/section-200.216 https://www.fema.gov/sites/default/files/documents/fema_policy-405-143-1-prohibition-covered-services-equipment-gpd.pdf https://www.fema.gov/sites/default/files/documents/fema_policy-405-143-1-prohibition-covered-services-equipment-gpd.pdf https://www.fema.gov/grants/procurement https://www.fema.gov/grants/procurement http://www.fema.gov/emergency-management-agencies http://www.fema.gov/grants/preparedness/about/state-administrative-agency-contacts http://www.fema.gov/grants/preparedness/about/state-administrative-agency-contacts

Purchasing Under a FEMA Award: States
States
Applicable Federal Procurement Standards
Procurement by States (2 C.F.R. § 200.317)
Domestic Preferences (2 C.F.R. § 200.322)
Build America, Buy America Act (2 C.F.R. Part 184)
Procurement of Recovered Materials (2 C.F.R. § 200.323)
Contract Provisions (2 C.F.R. § 200.327)
Additional Rules for State Procurements
Further Assistance

File details come from the government source that posted it. Updated .