FDOT_Permit_2025H59400117.pdf
PDF 24 MB Posted
- Attached to
- Gravity R/R Replacement Package 3
- Solicitation number
- Y25-796
- Issued by
- Orange County, Orlando City, Florida
About this file
This is a Florida Department of Transportation (FDOT) Utility Permit for Orange County Utilities, involving a sewer infrastructure replacement project along Silver Star Road in Orange County, Florida. The permit authorizes the removal and replacement of approximately 152 linear feet of 8-inch Vitrified Clay Sewer with PVC pipe, including replacement of 3 existing manholes and service lateral connections. The work is to be completed before the start of a related FDOT project (Project 445696-2) with a let date of 8/27/25 and construction start date of 12/27/25. The permit was approved on 5/1/2025, with a requested start date of 7/20/2025 and 75 calendar days allocated for completion.
The associated state and local contract opportunity is for the "Gravity R/R Replacement Package 3" project, with an estimated cost of $4,844,506.00. Sealed bids will be accepted electronically through the OpenGov e-Procurement Platform until 4:00 pm EST on Tuesday, September 16, 2025. Potential bidders must create a free account on the platform and submit their responses electronically. Questions about the solicitation must be submitted through the platform's question and answer module by Monday, August 25, 2025, at 5:00 pm EST. Technical support for the electronic bidding process is available through chat, email, and phone during specified hours.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Rule 14-46.001 F.A.C.
FLORIDA DEPARTMENT OF TRANSPORTATION December 14, 2016
UTILITY PERMIT
PERMIT NO:__________________________________
STATE ROAD INFORMATION
County: Section: State Road No: Beginning Mile Post: Ending Mile Post:
APPLICANT INFORMATION
The Utility Agency Owner (UAO) shall be identified in this Applicant Information Box. When the UAO is a City or County and desires to have the Utility Builder make a joint permit applicant, as prescribed in Section 2.1(4) of the 2017 Utility Accommodation Manual (UAM), the Utility Builder shall also be identified in this Applicant Information Box. A Utility Builder alone cannot apply for a utility permit without the City or County adding them as a joint applicant.
Utility Agency/Owner (UAO) Utility Builder (only applicable when the UAO is a City or County) Name: _____________________________________ Name: ______________________________________
Contact Person: _____________________________________ Contact Person: ______________________________________ Address: _____________________________________ Address: ______________________________________
City: _____________________________________ City: ______________________________________ State: _____ State: _____ Zip: _________ Zip: _________
Telephone: _____________________________________ Telephone: ______________________________________ Email: ____________________________________ Email: ______________________________________
WORK DESCRIPTION
The Applicant(s) requests permission from the Florida Department of Transportation (FDOT) to construct, operate, and maintain the utilities as described below and as depicted in the incorporated documentation.
Utility Work No: ___________________________
Additional sheets are attached and are incorporated into this permit Yes No For FDEP certification, the FDOT agency report is attached in accordance with UAM Section 2.4.1 (13) Yes No
TRAFFIC CONTROL (TCP)
The TCP will comply with the following 600 series index(es) ________________________________________________________________________ A TCP has been attached and incorporated into this permit application in compliance with UAM Section 2.4.2.
MOT Technician’s contact information (may be supplied at the two (2) business day notification to FDOT):
Name: ________________________________ Telephone ________________________ Email: _______________________________
COMMENCEMENT OF WORK
The UAO and/or Utility Builder shall commence actual construction in good faith within sixty (60) calendar days after approval of the permit application. If the beginning date is more than sixty (60) calendar days from the date of approval, the UAO and/or Utility Builder must review the permit with the FDOT Approving Engineer listed to make sure no changes have occurred to the transportation facility that would affect the permit’s continued approval. The UAO and/or Utility Builder shall make good faith efforts to expedite the work and complete the work within the calendar days indicated.
Anticipated Start Date: ___________________ Calendar days needed to completed: ________
Orange
(407) 256-9694 ext. ______
Florida
SR 438
Orange County Utilities (David.Arms)
7/20/2025
6.139
9150 Curry Ford Rd
600, 613, 616, 623
32825
Remove and replace approximately 152 LF of 8-inch Vitrified Clay Sewer with PVC, including replacement of 3 existing manholes, and service lateral connection. The sewer is to be removed and replaced in the same location. Refer to MOT plans for restricted work times, weekends only. Also, please refer to Approved Permit No 2019-H-593-00376 uploaded with permit application for further information.
2025-H-594-00117
75250000
Orange County Utilities (David.Arms)
Orlando
David.Arms@ocfl.net
6.480
Approved 2025-H-594-00117 Lorraine Edwards
5/1/2025
Florida Department of Transportation
UTILITY PERMIT
December 14, 2016
PERMIT NO:_________________________________
APPLICANT SIGNATURE
By the below signature(s) the UAO and/or Utility Builder agree(s) to construct, operate, and maintain the work as noted in the above Work Description, shown in plans and incorporated documents, in compliance with the UAM, all instructions noted in the FDOT Special Instructions Box, and special instructions incorporated into this permit. The UAO and/or Utility Builder declares, the location of all existing utilities that it owns or has an interest in, both aerial and underground, are accurately shown on the plans of the work areas. In accordance with UAM Section 2.8, the UAO and/or Utility Builder further declares that a letter of notification was delivered to the owners of other facilities within the work areas and that those listed below are the only facility owners known to be involved or potentially impacted by the proposed work.
Date Notified: Name of other facility owners (attach additional sheets if necessary).
Utility Agency/Owner Utility Builder (when applicable)
Signature: ____________________________ Date: ________________ Signature:___________________________ Date: _______________ Name (printed): _____________________________________________ Name (printed): __________________________________________ Title: ______________________________________________________ Title: ___________________________________________________
FDOT PROJECT INFORMATION
Pursuant to UAM Section 2.1(10), the utility work is within FDOT projects listed below and must have a Utility Work Schedule for each project approved prior to commencement of work within the FDOT project limits:
FDOT SPECIAL INSTRUCTIONS
In accordance with UAM Section 2.7, FDOT incorporates the below and attached special instructions into this permit.
Additional FDOT Special Instructions are attached and incorporated into this permit. Yes No
PERMIT APPROVAL
By signature below, FDOT gives permission to the UAO and /or Utility Builder to construct, operate, and maintain the utilities indicated in this Utility Permit in compliance with the UAM, all incorporated documents, and special instructions. Any changes to the approved work must be approved by the FDOT’s Approving Engineer and attached and incorporated into this permit in accordance with UAM Section 2.11.
Approving Engineer: _____________________________________________ Date: _______________ Name: _____________________________________________
Title:______________________________________________
Notification of Utility Work to be provided to: Telephone _____________________ or Email: _____________________________
An FDOT Representative is required to be present on the worksite prior to commencement of work. Yes No Rep. Name: _____________________________ Telephone _____________________ Email: _____________________________
5/1/2025
1. No Lane Closures on the Eastbound 7 AM to 9 AM and No Lane Closures Restrictions on the Westbound.
2. Project 445696-2 let date is 8/27/25, and it starts on 12/27/25. OCU needs to complete this work before construction begins. Please, contact claudette.vilarson@dot.state.fl.us before the final asphalt repair.
3. Permittee must initiate work in OSP prior of sending work start notice.
4. Permittee shall contact D5-OrlandoInspection@dot.state.fl.us o ... (see special instructions cont. page)
3/25/2025
(321) 319-8157 ext. ______ darnel.dastine@dot.state.fl.us
Lorraine Edwards
Lorraine Edwards (digital signature) claudette.vilarson@dot.state.fl.us
DAVID ARMS (digital signature)
AT&T Distribution10/29/2024 CenturyLink10/29/2024 Charter Communications10/29/2024 Comcast10/29/2024 Crown Castle10/29/2024
DAVID ARMS
3213198128
Claudette Vilarson
OPERATIONS PROGRAM ENGINEER
2025-H-594-00117
There are NO FDOT constructions (proposed or underway).
This work is NOT related to an approved Utility Work Schedule.
Approved 2025-H-594-00117
Florida Department of Transportation
UTILITY PERMIT
December 14, 2016
PERMIT NO:_________________________________
CERTIFICATION
I, the undersigned UAO and/or Utility Builder, hereby CERTIFY that the utilities were constructed and inspected in compliance with the UAM all incorporated documents, and special instructions. Pursuant to UAM Section 2.11, all changes have been approved by the FDOT’s Approving Engineer and incorporated into this permit along with all other material certifications, test results, bore logs, approved plans changes, as-built plans or other required documentation.
I also CERTIFY that work began on ________________ and was completed on ________________ and that the area was left in as good or better condition than when the work began.
Utility Agency/Owner Utility Builder (when applicable)
Signature: ____________________________ Date _________________ Signature:___________________________ Date ________________ Name (printed): _____________________________________________ Name (printed): ____________________________________________ Title: ______________________________________________________ Title: ____________________________________________________
FINAL INSPECTION OF WORK
The work was inspected and found to be in non-compliance as noted below:
All issues of non-compliance listed above have been brought into compliance and/or FDOT has no outstanding issues that need to be addressed by the UAO and/or Utility Builder. However, this final inspection does not release the UAO and/or Utility Builder of their continuing responsibilities pursuant to Rule 14-46.001, the UAM, all incorporated documents, and special instructions.
FDOT Inspector: _____________________________________________ Date: _______________ Name: _____________________________________________
Title: ______________________________________________
2025-H-594-00117
Approved 2025-H-594-00117 continuation page
PERMIT NO.:
STATE ROAD INFORMATION:
NAME OF OTHER FACILITY OWNERS / DATE NOTIFIED:
FDOT PROJECT INFORMATION:
THE WORK WAS INSPECTED AND FOUND TO BE IN NON-COMPLIANCE AS NOTED BELOW:
Facility Name: Duke Energy (Distribution), Date Notified: 10/29/2024, Facility Name: Duke Energy (Fiber), Date Notified:
10/29/2024, Facility Name: MCI (Verizon Business), Date Notified: 10/29/2024, Facility Name: Orange County Public Works, Date Notified: 10/29/2024, Facility Name: OUC Electric, Date Notified: 10/29/2024, Facility Name: OUC Water, Date Notified:
10/29/2024, Facility Name: Summit Broadband, Date Notified: 10/29/2024, Facility Name: TECO Peoples Gas, Date Notified:
10/29/2024, Facility Name: Uniti Fiber, Date Notified: 10/29/2024, Facility Name: Zayo Group (FKA Lightwave, LLC), Date Notified: 10/29/2024
There are NO FDOT constructions (proposed or underway).
This work is NOT related to an approved Utility Work Schedule.
2025-H-594-00117
Approved 2025-H-594-00117
PERMIT NO.:
The complete special instructions could not fit in the space allotted on Page 2 of the Utility Permit so they are displayed below.
Special FDOT Instructions special instructions continuation page
1.No Lane Closures on the Eastbound 7 AM to 9 AM and No Lane Closures Restrictions on the Westbound.
2.Project 445696-2 let date is 8/27/25, and it starts on 12/27/25. OCU needs to complete this work before construction begins. Please, contact claudette.vilarson@dot.state.fl.us before the final asphalt repair.
3.Permittee must initiate work in OSP prior of sending work start notice.
4.Permittee shall contact D5-OrlandoInspection@dot.state.fl.us of FDOT Orlando Operations, at (321) 319-8100, at least two business days prior to starting work to provide notice thereof, and provide the following information:
a)Contractor Company b)Person to contact in the field, Name and a Phone Number c)Person responsible for MOT, Name and a Phone Number d)Anticipated Time and date work start
5. FDOT ITS Note:
Non-located / unmarked FDOT ITS facilities, including fiber optic communication and traffic control signal loops/devices, may exist within the project limits; make temporary repairs to any damage to a facility within four (4) hours of the occurrence. If assistance is required regarding ITS facilities, contact the FDOT Traffic Operations ITS Manager at (386) 943-5000 or Jennifer Sardonini at 386-785-3764.
6.It is the responsibility of the project engineer to ensure there are no FDOT ITS infrastructure conflicts, inclusive of field verifying exact locations. (ITS Infrastructure may not be included in 811.) Conflicts that require relocation should be coordinated with Daniel Simpson – 386-785-3980 for approval.
7.Coordinate with Local Maintaining agencies to ensure there are no impacts to any local fiber that may be in the area.
8.All work performed within the FDOT right-of-way shall be in accordance with the Latest editions of the FDOT Design Standards, the Latest edition of the Specifications for Road and Bridge Construction, and the 2017 Utility Accommodation Manual.
2025-H-594-00117
Approved 2025-H-594-00117
Approved 2025-H-594-00117
ORANGE COUNTY UTILITIES
ENGINEERING DIVISION
9150 CURRY FORD RD.
ORLANDO, FL 32825
Gravity R/R Replacement Package 3
Loca�on 2 - Silver Star Road
Existing AT&T 30-4" Transite Ducts
Approved 2025-H-594-00117 Lorraine Edwards
5/1/2025 nhunter PolyLine jjardell Line nhunter Callout Remove & Replace Exist. 8" Sanitary Sewer nhunter Polygon nhunter Callout Existing AT&T 30-4" Transite Ducts nhunter PolyLine nhunter PolyLine nhunter PolyLine nhunter Polygon nhunter Callout Existing AT&T Vault nhunter Callout Existing AT&T 30-4" PVC Ducts nhunter Callout Existing AT&T 30-4" PVC Ducts nhunter Callout Existing 8" Sanitary Sewer nhunter PolyLine nhunter Callout Existing 6" Water Main nhunter PolyLine nhunter Callout Remove and Replace Manhole nhunter Callout Remove and Replace Manhole nhunter Callout Remove and Replace Manhole jjardell Polygon jjardell Polygon nhunter Callout Existing AT&T 30-4"Transite Ducts jjardell Text Box Silver Star Rd looking West to Pine Hills Rd jjardell Text Box Silver Star Rd looking West to Pine Hills Rd jjardell Ellipse jjardell Ellipse jjardell Ellipse jjardell Ellipse jjardell Line jjardell Line jjardell Polygon jjardell Polygon jjardell Polygon nhunter Callout Existing 6" Water Main jjardell Text Box Exist. AT&T Vault (25’Lx13’Wx13’D) jjardell Callout Remove & Replace Exist. 8" Sanitary Sewer jjardell PolyLine jjardell Text Box Approx. R/W jjardell Line nhunter Callout Existing 2" Gas Main nhunter PolyLine nhunter PolyLine nhunter Callout Existing 3/4" Gas Main
ORANGE COUNTY UTILITIES
ENGINEERING DIVISION
9150 CURRY FORD RD.
ORLANDO, FL 32825
Gravity R/R Replacement Package 3
Loca�on 2 - Silver Star Road
Approved 2025-H-594-00117 Lorraine Edwards
5/1/2025 jjardell Line jjardell Text Box Approx. R/W jjardell Line nhunter PolyLine nhunter PolyLine nhunter Callout Existing 8" Sanitary Sewer nhunter PolyLine nhunter Callout Existing 8" Sanitary Sewer nhunter PolyLine nhunter Callout Existing 6" Water Main nhunter PolyLine nhunter Callout Existing 6" Water Main nhunter PolyLine nhunter Callout Remove and Replace Manhole nhunter Callout Existing AT&T 30-4" Transite Ducts jjardell Text Box Silver Star Rd looking East to Homestead Rd jjardell Text Box Silver Star Rd looking East to Homestead Rd jjardell Callout Remove & Replace Exist. 8" Sanitary Sewer jjardell Ellipse jjardell Polygon jjardell Polygon jjardell Callout Existing AT&T 30-4" Transite Ducts jjardell Text Box Approx. R/W nhunter PolyLine nhunter Callout Existing 2" Gas Main nhunter Callout Existing 2" Gas Main nhunter PolyLine nhunter PolyLine
/1
/2
:1
:0
A
M
R E
V
IS
IO
N DESCRIPTION:
REVISION
LAST
ofSTANDARD PLANS
FY 2025-26 SHEETINDEX
DETOUR
DETOUR
DETOUR
DETOUR
DETOUR
DETOUR
R9-11AL
PEDESTRIAN DETOUR
(See Note 4)
R9-10
(See Notes 4 and 5)
Advance Closure LCD
(See Notes 4 and 5)
Advance Closure LCD
AHEAD
WORK
ROAD
W20-1F
AHEAD
WORK
ROAD
CROSS HERE
AHEAD
SIDEWALK CLOSED
CROSS HERE
AHEAD
SIDEWALK CLOSED
CLOSED
SIDEWALK
USE OTHER SIDE
SIDEWALK CLOSED
USE OTHER SIDE
SIDEWALK CLOSED
21102-660
SIDEWALK CLOSURE
11/01/20
M4-9BR
M4-9BL
M4-9BL
M4-9BR
R9-11AR
M4-9BL
M4-9BR
(See Note 4)
R9-10
(See Note 4)
R9-9
W20-1F
SYMBOLS:
Work Area
NOTES:
facilities (e,g,, transit stops, residences, or business entrances).
5. Omit the Advance Closure LCD if it blocks access to other pedestrian in accordance with the manufacturer's instructions.
4. "Sidewalk Closed" signs (R9-XX) may be mounted on pedestrian LCDs panel to the surface of the sidewalk.
maintain a minimum 7’ clearance from the bottom of the sign
3. For post mounted signs located near or adjacent to a sidewalk,
2. Place pedestrian LCDs across the full width of the closed sidewalk.
closed crosswalks.
1. Cover or deactivate pedestrian traffic signal display(s) controlling
Work Zone Sign
Lane Identification and Direction of Traffic
Pedestrian Longitudinal Channelizing Device (LCD)
Approved 2025-H-594-00117
/1
/2
:1
:1
A
M
R E
V
IS
IO
N DESCRIPTION:
REVISION
LAST
ofSTANDARD PLANS
FY 2025-26 SHEETINDEX
C C
Existing Sidewalk
Existing Sidewalk
Temporary Barrier
6" White
W20-1F
AHEAD
WORK
ROAD
W20-1F
AHEAD
WORK
ROAD
W20-5
AHEAD
CLOSED
RIGHT LANE
Note 4)
(See General
MOT-13-06
PRESENT
WHEN WORKERS
DOUBLED
SPEEDING FINES
W4-2
ROAD WORK
END
(See Note 4)
G20-2
Existing Sidewalk
6" White
W20-1F
AHEAD
WORK
ROAD
W20-5
AHEAD
CLOSED
RIGHT LANE
Note 4)
(See General
MOT-13-06
PRESENT
WHEN WORKERS
DOUBLED
SPEEDING FINES
W4-2
ROAD WORK
END
(See Note 4)
G20-2
M in
C C
22102-660
SIDEWALK CLOSURE
11/01/23
PEDESTRIAN SPECIAL DETOUR
(Temporary Barrier Shown, Low Profile Barrier Similar)
PEDESTRIAN DIVERSION - OPTION 1
(Work Zone Speed 45 mph or Less)
PEDESTRIAN DIVERSION - OPTION 2
100'
100'
B XLXXXX
X
B XLXXXX
Merge
Arrow Board Mode:
Merge
Arrow Board Mode:
SYMBOLS:
NOTES:
Temporary Pedestrian Way
Work Area
Pedestrian Longitudinal Channelizing Device (LCD)
Work Zone Sign
Channelizing Device (See Index 102-600)
Lane Identification and Direction of Traffic
Arrow Board
Crash Cushion
Plans or as approved by an Engineer.
5. Pedestrian Diversion Option 2 may only be used when called for in the hours or less.
distances, may be omitted when the work operation will be in place for 24 and "End Road Work" signs (G20-2), along with associated work zone sign
4. The "Speeding Fines Doubled When Workers Present" signs (MOT-13-06) for curb ramps diverting pedestrian traffic into a closed lane.
requirements of Index 522-002. Detectable warnings are not required
3. When temporary pedestrian ways require curb ramps, meet the
5' in width at intervals not to exceed 200'.
Provide a 5' x 5' passing space for temporary pedestrian ways less than of 0.02, except where space restrictions warrant a minimum width of 4'.
2. Provide a 5' wide temporary pedestrian way with a maximum cross-slope
See Index 102-600 for "L", "B", "X", channelizing device spacing values.
X = Work Zone Sign Distance
B = Buffer Length
1. L = Taper Length
Approved 2025-H-594-00117
| General Construction Operations |
| 102-660- Sidewalk Closure |
| 102-660-1of2 |
| 102-660-2of2 |
File details come from the government source that posted it. Updated .