Q_&_A_Waterpipe_Physical_Design.docx

DOCX document 13 KB Posted

Attached to
RFP for Investigation into Waterpipe Physical Design Parameters Effects on HPHC Yields in Smoke and Charcoal Emissions
Solicitation number
FDA-19-RFP-1209909
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTIONS AND ANSWERS FDA-19-RFP-1209909

Question:Page 22 indicates there are only 2 volumes but page 24 notes a Volume #3, Subcontracting Plan. Is this plan to be provided separately as its own Volume or as an attachment to the Technical Proposal (Volume 1). Regardless, is there a page limit for this part?
Answer:Subcontracting Plan is Volume 3 and its separate from the other volumes. There is no page limit. Please fill out SB subcontracting plan.
Question:Table 3 indicates six conditions for varying the waterpipe hose length, whereas the text has only the first five (it does not list 3 m). Can you please confirm which conditions you want tested for Task 10.1?

Answer: Yes, we do want the six conditions so please include 3m for Task 10.1.

File details come from the government source that posted it.