This is a Contract Data Requirements List (DD Form 1423) establishing data submission requirements for a First Article Test/Inspection Report under contract FD20202600453-00 with the U.S. Air Force 417 SCMS (Supply Chain Management Squadron) at Hill Air Force Base, Utah.

The contractor must submit a Government Testing report documenting all dimensions, tolerances, and inspection readings for the first article item in a two-column format comparing specified measurements with actual obtained readings. Materials utilized in manufacturing must be identified and certified as conforming to applicable requirements, accompanied by copies of material purchase requests. Material processing activities—including finish requirements such as plating, heat treatment, welding, inspecting, anodize, and painting—must be identified, certified as conforming to requirements, and supported by purchase orders if accomplished at facilities other than the contractor's facility. Additional requirements as specified in the Technical Data Package must also be addressed. The test report assisting in first article testing shall be submitted concurrently with the first article item and included in the first article asset container. Distribution is authorized to U.S. Government Agencies only for test and evaluation purposes as of March 1, 2024, with other requests referred to 417 SCMS. The submission frequency is per contract requirements, with copies submitted in both draft and final reproduction formats to the designated addressee at Building 849, Hill AFB, UT 84056-5713.

View the file

Other files

File Type Posted
MQR.pdf PDF
Pkg_SOW.pdf PDF
EDL.pdf PDF
SPRHA126R0453.pdf PDF
SPI.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNCLASSIFIED B

CONTRACT DATA REQUIREMENTS LIST

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A □ TOP D™ C8J OTHER Procurement

D.SYSTEM/ITEM

I

E. CONTRACT/PR NO. F. CONTRACTOR

First Article

1. DATA ITEM NO. 2.. TITl.E OF DATA ITEM 3. SUBTITl.E

AOOl Test/Inspection Repons Government Testing

14. AUTHORITY (Data Acquisition Documenl No.)

5. CONTRACT REFERENCE 6. REQUIRING OFACE

Dl-NDTI-80809B INPUT CONTRACT H 417 SCMS

7. DD250 REQ 9. DIST STATEMENT 10. FREQUENCY 12.. DATE OF FIRST SUBMISSION 14. DISTRIBl/TION

SD REQUIRED 1 b.COPIES Per contract re,qs is.APP CODE B 11. AS OF DATE 13. DATE OF SUBSEQUENT a. ADDRESSEE Final

SUBMISSION Draft /A Per contract reqs NIA Reg Repro

16. REMARKS f82029 1

IBLOCK 4: �09 MXSS/MXDEB

!Contractor format acceptable. Paragraph 10.23.3 ofDI-NDTI-80809B is clarified as follows: IBldg. 849 Attn:

a. All dimensions and tolerances specified on the manufacturing data shall be listed in one column with INon Accountable Bay lthe actual corresponding reading obtained from the inspection of the pans listed in another column.

b. Materials utilized in the manufacture of the FIRST ARTICLE item shall be identified and certified Hill AFB, UT

!along with a copy of material purchase requests as conforming to applicable data requirements. �056-5713

c. Material processing, including finish requirements (plating, heat treatment, welding, inspecting, ianodize, painting, etc.) utilized in the manufacture of the FIRST ARTICLE item shall be identified and !Certified as conforming to applicable requirements. A copy of the purchase order certifying the process iaccomplished at other than contractor facility shall be included.

cl Other requirements (as necessary) as called out within the Technical Data Package.

IBLOCK 9:

IDistnlrution authorized to U.S. Government Agencies only, test and evaluation, 1 March 2024. Other !requests for this document shall be referred to 417 SCMS.

!BLOCKS 10, 11, 12, and 13:

!Report to assist in the FIRST ARTICLE testing by the Government shall be submitted concurrently with ithe FIRST ARTICLE item. Subject test report shall be included in FIRST ARTICLE asset container.

IFOB:

IDESTINATIO

IINSPECTIO /ACCEPTANCE:

IDESTINATIO

add continuation 15.TOTAL r

G. PREPARED BY H. SIGNED ON 20240308 I. APPROVED BY J. SIGNED ON 20240308

!Lori Grygier GRYGIER.LORID .._...,�,.., Brad Martin �lARTIN.BRAD. _., iLeadIM,417 SCMS/GUMD EBBIE..1231508100 ... __,..,..,._,:.•• Principal Engineer, 417 SCMS/GUEA R 1256609564

,"'-41n.�ffl�

»)lfl.1"4.",#70/I

DD FORM 1423, FEB 2024

I Show Attachment Bar

UNCLASSIFIED [:]

PREVIOUS EDITION MAY BE USED.

�7. PRICE GROUP

SP

�8.ESTIMATED

TOTAL PRICE

0.00

Page 1 of2

Text1: 0001AA
Text2: FD20202600453-00
Text3:

File details come from the government source that posted it. Updated .