This is a First Article Requirements form (AFMC IMT 260) dated 08 APR 2026 establishing testing and approval requirements for Oxygen Tank Assemblies. The requirement involves 19 units of Lot/Item 1 as part of the production quantity, with CAGE/Reference Number 05167/36200111 and NSN 1336011287253ES. The first articles will serve as a manufacturing standard and must be manufactured at the Meggitt-Simi Valley facility where production units will be produced.
Testing will be conducted by the contractor at the Meggitt Safety Systems (Pacific Scientific) facility in Simi Valley, California, with detailed requirements specified in Document #R-3529 "ATP for HTL PN 36200111 Tank Assembly-Oxygen" and MIL-STD-810G. The test plan must be submitted per DD Form 1423 ELIN with contractor notification to AFLCMC/EBHJ due 30 days prior to testing. A comprehensive test report must be delivered 15 calendar days from contract date and forwarded to Devin Swanson at AFLCMC/EBHJ (Hill AFB, UT 84056), with government written approval/disapproval due 15 days after receipt. The estimated government testing/inspection evaluation cost is $5,000. All 19 first article units will be expended in testing, with residual components retained by the contractor pending disposition instructions. First article testing will not be waived. Delivery and approval of the first article report must be accomplished prior to production unit delivery. Testing includes 100% non-destructive testing, temperature shock, temperature-altitude-humidity testing, burst, flatten, all-fire, and functional firing tests at high and low temperatures per LATP requirements, with post-fire marginality of success testing on select units.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA821326R3045.pdf | ||
| 11_CDRLS.pdf | ||
| 6_SPI_011287253.pdf | ||
| 4_CADPAD_Item_Marking_Instruction.pdf | ||
| 2_REPSHIP.pdf | ||
| 9_ID.pdf | ||
| 10_EDL.pdf | ||
| 7_ES7034.docx | DOCX document | |
| 1_AIR_SPEC.pdf | ||
| 3_ADC_SOW.docx | DOCX document | |
| 5_PHST_SOW.pdf | ||
| 8_JQR.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FIRST ARTICLE REQUIREMENTS 1. DATE
08 APR 2026(AFMCI 23-110, AFMCDAFI 20-102, and FAR, Subpart 9.3) (additional instructions on page 3)
2. PR / MIPR NUMBER 3. CAGE / REFERENCE NUMBER
05167 / 36200111
4. NSN
1336011287253ES
5. FIRST ARTICLE QUANTITY
THE FIRST ARTICLE IS 19 UNIT(S) OF LOT / ITEM 1
AND WILL BE: X PART OF PRODUCTION QUANTITY IN ADDITION TO PRODUCTION QUANTITY
6. ARTICLES
X WILL WILL NOT SERVE AS A MANUFACTURING STANDARD
7. LONG LEAD TIME ITEMS
X REQUIRED NOT REQUIRED
(See FAR 52.209-3 OR -4, alternate II)
8. SPECIAL REQUIREMENT/PRODUCTION FACILITIES (See FAR 52.209-3 OR -4 Alternate I)
X REQUIRED NOT REQUIRED
"The First Article offered must be manufactured at the facilities in which that item is to be produced under the contract, or if the First Article is a component not manufactured by the contractor, such component must be manufactured at the facilities in which the component is to be produced for the contract. A certification to this effect must accompany each First Article which is offered."
9. TEST / INSPECTION REQUIREMENTS
A. X CONTRACTOR TESTING
GOVERNMENT TESTING
Performance or other characteristics which the First Articles must meet are
First article testing will prove out production at the Meggitt-Simi Valley facility for Oxygen Tank Assemblies
B. The detailed technical requirements for First Article approval tests are contained in
Document #R-3529 "ATP for HTL PN 36200111 Tank Assembly-Oxygen" and MIL-STD-810G
(Cite Spec and Para number)
C. X TEST PLAN REQUIRED
(3) Number of days for government approval / disapproval days.
(1) DD Form 1423 ELIN
(2) Delivery due calendar days from date of contract.
D. Contractor's notification to ACO and
AFLCMC/EBHJ
(Requesting Activity) of test time and location due 30 days prior to start of testing.
E. X TEST REPORT REQUIRED
(3) Forwarded to
Devin Swanson
AFLCMC/EBHJ
6044 Dogwood Ave.
Hill AFB, UT 84056
(4) Government written notice of approval / disapproval due
(2) Due
(1) DD Form 1423 ELIN days after receipt of contractor's report.15 calendar days from date contract.
AFMC IMT 260, 20230316, V-5,
Version 5Generated by PRPS using Jasper Reports on 01 Jul 2026
PREVIOUS EDITION IS OBSOLETE
Prescribed by: AFMCI23-110 see CDRL B001 see CDRL B001
F. FIRST ARTICLE DELIVERY
(1) Due within calendar days from date contract.
(2) Notify calendar days prior to shipment.
(3) Delivered to government at
N/A-First Article units will be retained by the contractor for testing-No delivery required
(Set Forth Consignee and Address)
(4) Government written notice of approval / disapproval within days after receipt of first article package.
G. Estimated cost of government testing / inspection evaluation.
$5,000.0000
10. DISPOSITION OF FIRST ARTICLES
Approved First Articles will be forwarded to
X 19 (insert quantity) First Articles will be expended in testing. Residual components of disapproved First Articles will be returned to the contractor
X will be retained by Contractor pending disposition instructions from the contractor.
First Articles will be installed on aircraft/equipment to determine proper fit/function. Approved article will remain on the aircraft/equipment and will not be forwarded to USAF Supply, but will be considered part of the contract quantity.
Disapproved First Articles will be returned to the contractor will be retained by pending disposition instructions from the contractor.
On purchase requests designated as direct shipments the following disposition will apply. (NOTE: Always applicable on Foreign Military Sales (FMS)).
a. Approved First Articles will be returned to the contractor for shipment with production item.
b. Disposition of disapproved First Articles will remain the same as marked above.
Other Disposition:
11. CONDITION(S) FOR WAIVER OF FIRST ARTICLE APPROVAL
a. Offerors who have previously furnished production quantities of the same or similar article to the prime contractor for delivery to the Government, DoD, Air Force.
b. Offerors currently in production of the same or similar article for a Government, DoD, Air Force contract and who have received First Article approval under the existing contract.
c. X Offerors who have previously furnished production quantities of the same or similar articles to the Government, DoD, X Air Force, provided articles thus furnished, have exhibited satisfactory performance in service in the opinion of the Air Force.
d. X Provided not more than 60 months have elapsed since completion of the contract.
e. First Article testing will not be waived.
f. See Remarks in block 12 below.
NOTE TO BUYER: UNDER CONDITIONS A AND C ABOVE, THE COGNIZANT ENGINEERING ACTIVITY WILL DECIDE WHETHER OR NOT THE ITEM HAS EXHIBITED SATISFACTORY PERFORMANCE IN SERVICE AND PREPARE AND RETAIN SUPPORTING DOCUMENTATION TO FULLY JUSTIFY THIS DECISION. THE BUYER MUST SOLICIT DUAL PRICES (That is, both with and without requirement for first article approval) AND MUST FURNISH THE COGNIZANT ENGINEERING ACTIVITY WITH THE FOLLOWING INFORMATION ON THE PREVIOUSLY SUPPLIED ARTICLE:
A. PROCURING OFFICE B. CONTRACT NUMBER C. DATE OF CONTRACT D. SPECIFICATION NUMBER AND REVISION
AFLCMC/EBHJ Williams Research Corporation Specification 29625
AFMC IMT 260, 20230316, V-5,
Version 5Generated by PRPS using Jasper Reports on 01 Jul 2026
PREVIOUS EDITION IS OBSOLETE
Prescribed by: AFMCI23-110
12. REMARKS
Swanson, Devin DNAME: 08 APR 2026DATE:
First article units will be built using the same equipment, tooling, procedures and operations as previous lot except where new tooling or procedures are required.
Delivery and approval of first article report must be accomplished prior to delivery of production units.
* THIS FIRST ARTICLE QUANTITY OUTLINED WITHIN SHALL BE IN ADDITION TO THE LAT SAMPLE REQUIREMENTS FOR THE FIRST LOT DELIVERED, AS PART OF THIS CONTRACT.
Tests to be included in the FAT/LAT are:
-All required 100% non-destructive testing per the LATP requirements (19 units) -Temperature Shock (17 FAT units) Per MIL-STD-810G, Method 503.5, -65°F to +160°F @6°/sec.; Amb-Cold-Hot-Amb; 2 cycles -Temperature, Altitude, Humidity (17 FAT units) Per MIL-STD-810G, Method 520.3, -65°F to +160°F, RH up to 100%, Pressure 15.4 to 0.84 psig, No vibration or electrical stress -Burst (1 FAT unit) per LATP requirements; unit to have been through Temp Shock and TH&A -Flatten (1 FAT unit) per LATP requirements -All-Fire (1 FAT unit) per LATP requirements -Functional firing High (+160°F) Temperature (8 FAT post environment units) per LATP requirements -Functional firing Low (-65°F) Temperature (8 FAT units post environment units) per LATP requirements -Post fire Marginality of Success (2 FAT units) 1 ea from Hot and Cold per LATP requirements
Monk, David BNAME: 02 DEC 2015DATE:
First article units will be built using the same equipment, tooling, procedures and operations as previous lot except where new tooling or procedures are required.
Delivery and approval of first article report must be accomplished prior to delivery of production units.
*This first article will take the place of LAT testing for first lot delivered as part of this contract.
Tests to be included in the FAT/LAT are:
-All required 100% non-destructive testing per the LATP requirements (19 units) -Temperature Shock (17 FAT units) Per MIL-STD-810G, Method 503.5, -65°F to +160°F @6°/sec.; Amb-Cold-Hot-Amb; 2 cycles -Temperature, Altitude, Humidity (17 FAT units) Per MIL-STD-810G, Method 520.3, -65°F to +160°F, RH up to 100%, Pressure 15.4 to 0.84 psig, No vibration or electrical stress.
-Burst (1 FAT unit) per LATP requirements; unit to have been through Temp Shock and TH&A.
-Flatten (1 FAT unit) per LATP requirements -All-Fire (1 FAT unit) per LATP requirements -Functional firing High (+160°F) Temperature (8 FAT post environment units) per LATP requirements.
-Functional firing Low (-65°F) Temperature (8 FAT units post environment units) per LATP requirements.
-Post fire Marginality of Success (2 FAT units) 1 ea from Hot and Cold per LATP requirements
13. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR APPROVING
(Name, Organization, Phone)
Swanson, Devin
AFLCMC/EBHJ
801-777-6106
777-6106
14. COGNIZANT ENG ORGANIZATION RESPONSIBLE FOR CONDUCTING
TEST (Name, Organization, Phone)
Meggitt Safety Systems (Pacific Scientific)
1785 Voyager Ave, Simi Valley, CA 93063-3363
(805)584-4100
AFMC IMT 260, 20230316, V-5,
Version 5Generated by PRPS using Jasper Reports on 01 Jul 2026
PREVIOUS EDITION IS OBSOLETE
Prescribed by: AFMCI23-110
File details come from the government source that posted it. Updated .