This file is an attachment containing contractual requirements for the rework and repair of nonconforming material, effective January 2012. The clause establishes definitions and procedures for two distinct processes: rework, which reprocesses nonconforming material to achieve complete conformance with drawings, specifications, or contract requirements; and repair, which reprocesses nonconforming material using approved procedures to bring it into usable condition while acknowledging that it may not fully conform to all applicable requirements.

The clause mandates that contractors document both rework and repair procedures with associated inspection protocols and submit them to the Government Quality Assurance Representative (QAR) for review prior to implementation, with rework procedures subject to QAR disapproval. Repair procedures must be submitted on DD Form 1694 (Request for Deviation/Waiver) to the Contracting Officer for written approval. All submissions must include a description of the cause of nonconformances and preventive actions to avoid recurrence. The rework or repair procedure must include reinspection provisions that supersede Technical Data Package requirements to ensure the Government receives assurance that items meet reprocessing standards. This requirement flows down through the supply chain to contractors, suppliers, vendors, and subcontractors.

View the file

Other files

File Type Posted
10_EDL.pdf PDF
1_AIR_SPEC.pdf PDF
FAT_260.pdf PDF
3_ADC_SOW.docx DOCX document
FA821326R3045.pdf PDF
11_CDRLS.pdf PDF
6_SPI_011287253.pdf PDF
4_CADPAD_Item_Marking_Instruction.pdf PDF
2_REPSHIP.pdf PDF
9_ID.pdf PDF
5_PHST_SOW.pdf PDF
8_JQR.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 5

(ES7034)

REWORK AND REPAIR OF NONCONFORMING MATERIAL

Jan 2012 (version)

(a) Rework and Repair are defined as follows:

(1) Rework - The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.

(2) Repair - The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications or contract requirements.

(b) Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to the Government Quality Assurance Representative (QAR) for review prior to implementation. Rework procedures are subject to the QAR's disapproval.

(c) Repair procedures shall be documented by the Contractor and submitted on a Request for Deviation/Waiver, DD Form 1694, to the Contracting Officer for review and written approval prior to implementation.

(d) Whenever the Contractor submits a repair or rework procedure for Government review, the submission shall also include a description of the cause for the nonconformances and a description of the action taken or to be taken to prevent recurrence.

(e) The rework or repair procedure shall also contain a provision for reinspection which will take precedence over the Technical Data Package requirements and shall, in addition, provide the Government assurance that the reworked or repaired items have met reprocessing requirements.

(f) Rework and repair is a supply chain flow-down requirement that applies to contractors and their suppliers, vendors or subcontractors.

(End of clause)