This is a Job Specification document for repair and preservation work on a 25UB1308 Utility Boat (FAS-34) operated by COMFLEACT SASEBO OPS. The contract is identified by ICN N6105826PRPR934, Revision A01, with an anticipated award date of August 1, 2026, a Performance of Work (POP) start date of September 1, 2026, and a POP end date of December 15, 2026. The production completion date is November 30, 2026. The work location is the contractor's yard within Sasebo Bay, Sasebo Harbor Limit, Japan.

The scope includes repair and preservation of a Metal Shark, LLC utility boat measuring 27 feet 5 inches in length with an 8 feet 6 inch beam and 5,537-pound light ship weight. Specific work items include replacement of 4 square feet of aluminum alloy bow plate (3/16 inch thickness, AL5086 H116 per ASTM B928), fabrication and installation of a new AFT cabin curtain (48 inches wide by 78 inches high), re-upholstering a cabin seat with artificial leather per A-A-59517, replacement of 55 linear feet of rubber fender with 4.5-inch height, installation of two new windshield wipers and motors, replacement of one zinc anode on the transom, preservation of 580 square feet of underwater hull and related surfaces (with black finish per SSPC-SP-17), preservation of 220 square feet of structural surfaces and deck areas (with Haze Gray finish per SSPC-SP-17), and installation of 170 square feet of nonskid peel-and-stick deck covering. All work must comply with referenced standards including 0900-LP-060-4010 (boat hull fabrication and welding), MIL-STD-2003B (electrical installation), and MIL-STD-1310H(NAVY) (shipboard bonding and grounding). The contractor is responsible for waste disposal in accordance with Japanese law, and CFAS PORT OPERATION will handle engine removal and installation. Final inspections include operational testing of the windshield wipers and visual inspection of the completed work with witness points at critical stages for S130 and CFAS Operations personnel.

View the file

Other files

File Type Posted
N6264926Q03740003.pdf PDF
N6264926Q03740002.pdf PDF
Drawing FAS-33-34.zip ZIP file
N6264926Q03740001.pdf PDF
N6264926Q0374.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ship/HULL NO. Ship/HULL NAME ICN: Rev: Key Op:

FAS-34 COMFLEACT SASEBO OPS

JON:

N6105826PRPR934 A01

TITLE:

25UB1308 Boat (FAS-34); repair/preserve

JOB SPECIFICATION

Anticipated Award Date: Production Completion Date:

POP Start Date: POP End Date:

PREPARED BY: CODE

T.SATO H ST

APPROVED BY:

�41/l

CODE

$.MURAKAMI S225

CONCURRED BY:

S.MOROOKA

ASSIST PLANNER'S NAME:

D.AKAMINE

ASSIST PLANNER'S NAME:

ASSIST PLANNER'S NAME:

DESCRIPTION:

JSN(S): 2024OPS009

S/F CONTACT: M.KAWABATA / MMC TRAN, AN.T

Approved by S300/S900

Work Completed

S/Force: Rate:

Ship Supt: Date:

WORK CERTIFICATION SIGNATURES

COMPLETION OF WORK REVIEW:

A J�

CODE

S231

CODE

E AK

CODE

CODE

CASREP#

CWP#

Date:

Date:

SRF CONTROL NO.:

BADGE NO.: SHOP/CODE:

PREPARING ACTIVITY:

SASEBO

DATE

3/29/2024

CCNS#

Avl: FY24

LWC:

PHONE: DATE:

06/09/2026

08/01/2026

09/01/2026 11/30/2026 12/15/2026

Shin/HULL NO. Ship/HULL NAME ICN: Rev: Key Op:

JON:

N6105826PRPR934 A01

TITLE:

25UB1308 Boat (FAS-34); repair/preserve

1. SCOPE:

1.1 Title: 25UB1308 Boat (FAS-34); repair/preserve

1.2 Location of Work:

1.2.1 Contractor's yard

1.3 Identification: Quantity (One), 25UB1308 Utility Boat, Principal Dimension as Follows

Manufacturer Length Over All

Beam with RUB Rail Height Light Ship Weight Installed Power

METAL SHARK, LLC.

27 Feet - 5 Inch 8 Feet - 6 Inch 9 Feet - 9 Inch 5,537 Pound

230 HP

1.3.1 A Total of (4 SF) of Bow Plate, 3/16 Inch Thickness Aluminum Alloy

1.3.2 Quantity (One AY), AFT Curtain (Size: 48 Inch Width by 78 Inch Height) for Cabin Access

1.3.3 Quantity (One EA), Seat in Front of Cabin

1.3.4 A Total of (55 LF) of Rubber Fender (4-1/2 Inch Height) on Hull

1.3.5 Quantity (2 EA), Windshield Wiper and Motor, P/N: 539324 and

30991

1.3.6 Quantity (One EA), Zinc Anode on Transom

1.3.7 A Total of (580 SF) of Preservation Area of Aluminum Alloy Boat for Underwater Hull, Freeboard, Cabin, Bulwark, Main Deck, Engine Guard, Tow Post Safety Screen and Deck Fitting

1.3.8 A Total of (220 SF) of Preservation Area of Aluminum Alloy Boat for Structure Member, Main Deck, Bulwark, Transom and Step for Nonskid (Peel and Stick) Deck Covering

1.3.9 A Total of (170 SF) of Nonskid (Peel and Stick) Deck Covering on Main Deck, Top of Bulwark, Top of Generator/Engine Starting Battery Compartment and Step

2, REFERENCES:

2.1

2.2

Standard Items (FY26)

25C-100-001, General Arrangement Outboard Profile

Shio/HULL NO. Shio/HULL NAME

JON:

ICN: Rev: Key Op:

FAS-34 COMFLEACT SASEBO OPS N6105826PRPR934

TITLE:

25UB1308 Boat (FAS-34); repair/preserve

2.3 25C-100-002, Hull Lines

2.4 25C-100-003, Hull Structure

2.5 25C-150-001, Console

2.6 25C-l 70-001, Doors and Hatches

2.7 25C-180-001, Engine Guard

2.8 25C-200-001, Propulsion Equipment

2.9 25C-560-001, Steering System

2.10 25C-580-001, AFT Tow Post

2 .11 25C-580-002, AFT Tow Post Safety Screen

2.12 25C-600-001, Dive Door

2 .13 25C-610-001, Hoisting Fittings

2.14 25C-630-001, Cleats and Handrails

2.15 25C-300-001, DC Electrical Schematic

2.16 25C-300-002, DC Electrical Components

2.17 25C-400-001, Dash Arrangement

2.18 803-0921865, Cathodic Protection, Hull Zinc Protection

2.19 MIL-STD-2003B, Electric Plant Installation Standard Methods for Surface Ship.s and Submarines

A01

2.20 MIL-STD-1310H(NAVY), Shipboard Bonding, Grounding, and Other Techniques for Electromagnetic Compatibility, Electromagnetic Pulse (EMP)

Mitigation, and Safety

2.21 0900-LP-060-4010 Chg-2, Fabrication, Welding and Inspection of Metal Boat and Craft Hulls

3. REQUIREMENTS:

3.1 Hoist and set the boat listed in 1.3 on the blocks (either in land or a barge) in contractor's yard to accomplish repair and preservation work.

3.1.1 Im.mediately after the boat has been set on the blocks, remove marine growth and clean entire underwater hull using fresh water.

Shio/HULL NO. Shio/HULL NAME ICN: Rev: Key Op:

FAS-34 COMFLEACT SASEBO OPS N6105826PRPR934 A01

TITLE:

25UB1308 Boat (FAS-34); repair/preserve

3.1.2 Bounce the boat necessary to preserve the underwater hull.

3.1.3 Remove each existing zinc anode listed in 1.3.6 for

preservation work, using ENCLOSURE (Al for guidance.

3.1.4 Disconnect mechanically and remove each electrical cable from foundation and cable hanger to facilitate preservation work and install the same upon completion of preservation work.

3.1.5 Upon completion of repair and preservation work, and after approval of CFAS PORT OPERATION, lower or return the boat onto water.

3.2 Remove each damaged section, fabricate and install each new plate listed in 1.3.1 out of new 0.1875 inch thick aluminum alloy plate AL5086 H116 conforming to ASTM 8928, using 2.2 through 2.4 for guidance.

(I) "VISUAL"

3.2.1 Accomplish the requirements of 2.21 including Sections 6 through 8 for welding and visual (VT) inspection using 5X magnifying glass.

(I) (G) "PT"

3.2.1.1 Accomplish liquid penetrant (PT) inspection in

accordance with Sections 6 through 8 of 2.21. -S130 (See NOTE 4.2)

3.3 Accomplish the requirements for repair of miscellaneous equipment of the boat listed in 1.3 as follows, using 2.2 through 2.14 and ENCLOSURE (A) for guidance.

3.3.1 Remove each existing, template from existing, fabricate and install new curtain listed in 1.3.2 out of each new marine fabric or Equal with each new fastener.

3.3.2 Remove each existing and re-upholster seat listed in 1.3.3 out of new artificial leather conforming to A-A-59517 Class One or Equal with cushion.

3.3.3 Remove each existing, fabricate and install new rubber fender listed in 1.3.4 out of new rubber sheet conforming to MIL-PRF-900 with each new fastener and existing retainer plate.

3.3.3.1 Clean each existing surface of retainer plate.

3.3.4 Remove each existing and install new windshield wiper and motor listed in 1.3.5, using 2.15 through 2.17 for guidance.

3.3.4.1 Adjust and align each arm and blade of each new

windshield wiper.

3.3.4.2 Connect and verify connections.

Shin/HULL NO. Shin/HULL NAME I ICN:

N6105826PRPR934

Rev: Key Op:

FAS-34 COMFLEACT SASEBO OPS A01

TITLE:

25UB1308 Boat (FAS-34); repair/preserve

3.3.4.3 Cable installation, penetration, connection, cable

tag, wire marking and cable way must be in accordance with 2.19. Install channel rubber between electrical cable surfaces and banding straps. The channel rubber must conform to MIL-PRF-6855, Class 2, Grade 60.

2.20.

3.3.4.4 Bonding and grounding must be in accordance with

3.4 Accomplish the requirements of 009-32 of 2.1, including Table One, Line 13, Columns A (SSPC-SP 17), B and E (Finish Color: Black) for underwater hull, Table 2 Line 53, Columns A (SSPC-SP-17), B and G for each surface area listed in 1.3.7, using manufacture's instruction for guidance. An aluminum oxide abrasive blast media must not be used. -S130 (See NOTE 4.3)

3.4.1 Power tool clean each narrow area to SSPC-SP-11 where blast nozzle cannot reach.

3.4.1.1 Power tool clean each narrow area to SSPC-SP-3 where

power tool in 3.4.1 cannot reach.

3.4.1.2 Hand tool clean each narrow area to SSPC-SP-2 where

power tool in 3.4.1.1 cannot reach.

3.4.2 Each boat number must be same as original.

3.5 Accomplish the requirements of 009-32 of 2.1, including Table 2, One system out of Line 61 or 62, Columns A (SSPC-SP-17), B and E (Haze Gray) for each surface area listed in listed in 1.3.8 and 1.3.9, using manufacture instruction for guidance. An aluminum oxide abrasive blast media must not be used. -S130 (See NOTE 4.4)

3.5.1 Power tool clean each narrow area to SSPC-SP-11 where blast nozzle cannot reach.

3.5.1.1 Power tool clean each narrow area to SSPC-SP-3 where

power tool in 3.5.1 cannot reach.

3.5.1.2 Hand tool clean each narrow area to SSPC-SP-2 where

power tool in 3.5.1.1 cannot reach.

3.5.2 Accomplish the requirements of 009-26 of 2.1, including ATTACHMENT G for new nonskid (peel and stick) deck covering.

3.6 Install each new zinc anode listed in 1.3.6 with new fastener, using

2.18 and ENCLOSURE (A) for guidance.

3.6.1 Zinc anode must not be painted.

3.7 Accomplish the requirements of 009-32 of 2.1 for cleaning and preservation of each new and disturbed surface to match surrounding areas.

Shio/HULL NO. Shio/HULL NAME ICN: Rev: Key Op:

JON:

N6105826PRPR934 A01

TITLE:

25UB1308 Boat (FAS-34); repair/preserve

(V) (G) "OPERATIONAL TEST"

3.8 Accomplish an operational test of each new windshield wiper and motor listed in 1.3.5 to verify correct operation, using 2.15 for guidance. -CFAS OPS, S130 (See NOTE 4.5)

(V) (G) "FINAL INSPECTION"

3.9 Accomplish a visual inspection of the boat listed in 1.3.1 to ensure completion of this work including surface cleanliness. -CFAS OPS, S130 (See

NOTE 4.5)

4. NOTES:

4.1 Initial Condition - Require repair and preservation for 250B1308 utility boat (FAS-34) at CFAS Port Operation.

4.2 S130 will witness "PT INSPECTION" of 3.2.1.1 as (I) (G) check point.

4. 3 Sl30 will witness "CLEANLINESS", "SURFACE PROFILE", "CONDUCTIVITY MEASUREMENT", "SURFACE PREPARATION" and "COATING INSPECTION FOR EACH COAT" of 009-32 as (I) (G) check point for 3.4 of this work item. The other inspection will be complied with 009-32.

4. 4 S130 will witness "CLEANLINESS", "SURFACE PROFILE", CONDUCTIVITY MEASUREMENT", "SURFACE PREPARATION" and "COATING INSPECTION FOR EACH COAT" of 009-32, and "VISUAL INSPECTION" 3.9.15 of 009-26 as (I) (G) check point for 3.5 of this work item. The other inspection will be complied with 009-32.

4.5 S130 will witness "OPERATIONAL TEST" of 3.8 and "FINAL INSPECTION" of

3.9 as (V) (G) check point.

4.6 CFAS PORT OPERATION will deliver the utility boat to contractor's yard located within SASEBO BAY (limit to Sasebo Harbor Limit) and will pick it up upon completion.

4.7 CFAS PORT OPERATION will remove each engine from the boat and install them.

4.8 SQ.FT. is approximate. Offer is responsible to determine actual SQ.FT for preservation work.

4.9 The contractor will dispose of all industrial waste generated by this job in accordance with Japanese Law Relative to Disposal and Cleaning of Waste. All paperwork associated with disposal must be provided to CFAS PORT

OPERATION.

4.10 If you have any further questions on this repair and preservation work, contact M.Kawabata or MMC Tran (CFAS PORT OPERATION, DNS:252-2364)

Shin/HULL NO. Shin/HULL NAME i lCN: Rev: Key Op:

FAS-34 COMFLEACT SAS EBO OPS

JON: i

N6105826PRPR934 A01

TITLE:

25UB1308 Boat (FAS-34); repair/preserve

4.10.1 Each drawing listed in this work item will be provided by CFAS

PORT OPERATION.

4.11 0900-LP-060-4010 in 2.21 may be used when the requirement calls for the use of TO300-AU-SPN-010 under the Standard ELM-235061.

5. GOVERNMENT FURNISHED MATERIAL (GEM) :

5 .1 None.

Ship/HULL NO. Ship/HULL NAME

TITLE:

25UB1308 Boat (FAS-34); repair/preserve

Seat Listed in 1.3.3

JON:

ICN:

N6105826PRPR934

_ ___i�---l

.o

ENCLOSURE (A) 111

Rev: Key Op:

A01

2026-06-09T14:38:21+0900
KAWABATA.MASASHIGE.1620613173

File details come from the government source that posted it. Updated .