This is a Job Specification document for repair and preservation work on a 25UB1308 Utility Boat (FAS-34) operated by COMFLEACT SASEBO OPS. The contract is identified by ICN N6105826PRPR934, Revision A01, with an anticipated award date of August 1, 2026, a Performance of Work (POP) start date of September 1, 2026, and a POP end date of December 15, 2026. The production completion date is November 30, 2026. The work location is the contractor's yard within Sasebo Bay, Sasebo Harbor Limit, Japan.
The scope includes repair and preservation of a Metal Shark, LLC utility boat measuring 27 feet 5 inches in length with an 8 feet 6 inch beam and 5,537-pound light ship weight. Specific work items include replacement of 4 square feet of aluminum alloy bow plate (3/16 inch thickness, AL5086 H116 per ASTM B928), fabrication and installation of a new AFT cabin curtain (48 inches wide by 78 inches high), re-upholstering a cabin seat with artificial leather per A-A-59517, replacement of 55 linear feet of rubber fender with 4.5-inch height, installation of two new windshield wipers and motors, replacement of one zinc anode on the transom, preservation of 580 square feet of underwater hull and related surfaces (with black finish per SSPC-SP-17), preservation of 220 square feet of structural surfaces and deck areas (with Haze Gray finish per SSPC-SP-17), and installation of 170 square feet of nonskid peel-and-stick deck covering. All work must comply with referenced standards including 0900-LP-060-4010 (boat hull fabrication and welding), MIL-STD-2003B (electrical installation), and MIL-STD-1310H(NAVY) (shipboard bonding and grounding). The contractor is responsible for waste disposal in accordance with Japanese law, and CFAS PORT OPERATION will handle engine removal and installation. Final inspections include operational testing of the windshield wipers and visual inspection of the completed work with witness points at critical stages for S130 and CFAS Operations personnel.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N6264926Q03740003.pdf | ||
| N6264926Q03740002.pdf | ||
| Drawing FAS-33-34.zip | ZIP file | |
| N6264926Q03740001.pdf | ||
| N6264926Q0374.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ship/HULL NO. Ship/HULL NAME ICN: Rev: Key Op:
FAS-34 COMFLEACT SASEBO OPS
JON:
N6105826PRPR934 A01
TITLE:
25UB1308 Boat (FAS-34); repair/preserve
JOB SPECIFICATION
Anticipated Award Date: Production Completion Date:
POP Start Date: POP End Date:
PREPARED BY: CODE
T.SATO H ST
APPROVED BY:
�41/l
CODE
$.MURAKAMI S225
CONCURRED BY:
S.MOROOKA
ASSIST PLANNER'S NAME:
D.AKAMINE
ASSIST PLANNER'S NAME:
ASSIST PLANNER'S NAME:
DESCRIPTION:
JSN(S): 2024OPS009
S/F CONTACT: M.KAWABATA / MMC TRAN, AN.T
Approved by S300/S900
Work Completed
S/Force: Rate:
Ship Supt: Date:
WORK CERTIFICATION SIGNATURES
COMPLETION OF WORK REVIEW:
A J�
CODE
S231
CODE
E AK
CODE
CODE
CASREP#
CWP#
Date:
Date:
SRF CONTROL NO.:
BADGE NO.: SHOP/CODE:
PREPARING ACTIVITY:
SASEBO
DATE
3/29/2024
CCNS#
Avl: FY24
LWC:
PHONE: DATE:
06/09/2026
08/01/2026
09/01/2026 11/30/2026 12/15/2026
Shin/HULL NO. Ship/HULL NAME ICN: Rev: Key Op:
JON:
N6105826PRPR934 A01
TITLE:
25UB1308 Boat (FAS-34); repair/preserve
1. SCOPE:
1.1 Title: 25UB1308 Boat (FAS-34); repair/preserve
1.2 Location of Work:
1.2.1 Contractor's yard
1.3 Identification: Quantity (One), 25UB1308 Utility Boat, Principal Dimension as Follows
Manufacturer Length Over All
Beam with RUB Rail Height Light Ship Weight Installed Power
METAL SHARK, LLC.
27 Feet - 5 Inch 8 Feet - 6 Inch 9 Feet - 9 Inch 5,537 Pound
230 HP
1.3.1 A Total of (4 SF) of Bow Plate, 3/16 Inch Thickness Aluminum Alloy
1.3.2 Quantity (One AY), AFT Curtain (Size: 48 Inch Width by 78 Inch Height) for Cabin Access
1.3.3 Quantity (One EA), Seat in Front of Cabin
1.3.4 A Total of (55 LF) of Rubber Fender (4-1/2 Inch Height) on Hull
1.3.5 Quantity (2 EA), Windshield Wiper and Motor, P/N: 539324 and
30991
1.3.6 Quantity (One EA), Zinc Anode on Transom
1.3.7 A Total of (580 SF) of Preservation Area of Aluminum Alloy Boat for Underwater Hull, Freeboard, Cabin, Bulwark, Main Deck, Engine Guard, Tow Post Safety Screen and Deck Fitting
1.3.8 A Total of (220 SF) of Preservation Area of Aluminum Alloy Boat for Structure Member, Main Deck, Bulwark, Transom and Step for Nonskid (Peel and Stick) Deck Covering
1.3.9 A Total of (170 SF) of Nonskid (Peel and Stick) Deck Covering on Main Deck, Top of Bulwark, Top of Generator/Engine Starting Battery Compartment and Step
2, REFERENCES:
2.1
2.2
Standard Items (FY26)
25C-100-001, General Arrangement Outboard Profile
Shio/HULL NO. Shio/HULL NAME
JON:
ICN: Rev: Key Op:
FAS-34 COMFLEACT SASEBO OPS N6105826PRPR934
TITLE:
25UB1308 Boat (FAS-34); repair/preserve
2.3 25C-100-002, Hull Lines
2.4 25C-100-003, Hull Structure
2.5 25C-150-001, Console
2.6 25C-l 70-001, Doors and Hatches
2.7 25C-180-001, Engine Guard
2.8 25C-200-001, Propulsion Equipment
2.9 25C-560-001, Steering System
2.10 25C-580-001, AFT Tow Post
2 .11 25C-580-002, AFT Tow Post Safety Screen
2.12 25C-600-001, Dive Door
2 .13 25C-610-001, Hoisting Fittings
2.14 25C-630-001, Cleats and Handrails
2.15 25C-300-001, DC Electrical Schematic
2.16 25C-300-002, DC Electrical Components
2.17 25C-400-001, Dash Arrangement
2.18 803-0921865, Cathodic Protection, Hull Zinc Protection
2.19 MIL-STD-2003B, Electric Plant Installation Standard Methods for Surface Ship.s and Submarines
A01
2.20 MIL-STD-1310H(NAVY), Shipboard Bonding, Grounding, and Other Techniques for Electromagnetic Compatibility, Electromagnetic Pulse (EMP)
Mitigation, and Safety
2.21 0900-LP-060-4010 Chg-2, Fabrication, Welding and Inspection of Metal Boat and Craft Hulls
3. REQUIREMENTS:
3.1 Hoist and set the boat listed in 1.3 on the blocks (either in land or a barge) in contractor's yard to accomplish repair and preservation work.
3.1.1 Im.mediately after the boat has been set on the blocks, remove marine growth and clean entire underwater hull using fresh water.
Shio/HULL NO. Shio/HULL NAME ICN: Rev: Key Op:
FAS-34 COMFLEACT SASEBO OPS N6105826PRPR934 A01
TITLE:
25UB1308 Boat (FAS-34); repair/preserve
3.1.2 Bounce the boat necessary to preserve the underwater hull.
3.1.3 Remove each existing zinc anode listed in 1.3.6 for
preservation work, using ENCLOSURE (Al for guidance.
3.1.4 Disconnect mechanically and remove each electrical cable from foundation and cable hanger to facilitate preservation work and install the same upon completion of preservation work.
3.1.5 Upon completion of repair and preservation work, and after approval of CFAS PORT OPERATION, lower or return the boat onto water.
3.2 Remove each damaged section, fabricate and install each new plate listed in 1.3.1 out of new 0.1875 inch thick aluminum alloy plate AL5086 H116 conforming to ASTM 8928, using 2.2 through 2.4 for guidance.
(I) "VISUAL"
3.2.1 Accomplish the requirements of 2.21 including Sections 6 through 8 for welding and visual (VT) inspection using 5X magnifying glass.
(I) (G) "PT"
3.2.1.1 Accomplish liquid penetrant (PT) inspection in
accordance with Sections 6 through 8 of 2.21. -S130 (See NOTE 4.2)
3.3 Accomplish the requirements for repair of miscellaneous equipment of the boat listed in 1.3 as follows, using 2.2 through 2.14 and ENCLOSURE (A) for guidance.
3.3.1 Remove each existing, template from existing, fabricate and install new curtain listed in 1.3.2 out of each new marine fabric or Equal with each new fastener.
3.3.2 Remove each existing and re-upholster seat listed in 1.3.3 out of new artificial leather conforming to A-A-59517 Class One or Equal with cushion.
3.3.3 Remove each existing, fabricate and install new rubber fender listed in 1.3.4 out of new rubber sheet conforming to MIL-PRF-900 with each new fastener and existing retainer plate.
3.3.3.1 Clean each existing surface of retainer plate.
3.3.4 Remove each existing and install new windshield wiper and motor listed in 1.3.5, using 2.15 through 2.17 for guidance.
3.3.4.1 Adjust and align each arm and blade of each new
windshield wiper.
3.3.4.2 Connect and verify connections.
Shin/HULL NO. Shin/HULL NAME I ICN:
N6105826PRPR934
Rev: Key Op:
FAS-34 COMFLEACT SASEBO OPS A01
TITLE:
25UB1308 Boat (FAS-34); repair/preserve
3.3.4.3 Cable installation, penetration, connection, cable
tag, wire marking and cable way must be in accordance with 2.19. Install channel rubber between electrical cable surfaces and banding straps. The channel rubber must conform to MIL-PRF-6855, Class 2, Grade 60.
2.20.
3.3.4.4 Bonding and grounding must be in accordance with
3.4 Accomplish the requirements of 009-32 of 2.1, including Table One, Line 13, Columns A (SSPC-SP 17), B and E (Finish Color: Black) for underwater hull, Table 2 Line 53, Columns A (SSPC-SP-17), B and G for each surface area listed in 1.3.7, using manufacture's instruction for guidance. An aluminum oxide abrasive blast media must not be used. -S130 (See NOTE 4.3)
3.4.1 Power tool clean each narrow area to SSPC-SP-11 where blast nozzle cannot reach.
3.4.1.1 Power tool clean each narrow area to SSPC-SP-3 where
power tool in 3.4.1 cannot reach.
3.4.1.2 Hand tool clean each narrow area to SSPC-SP-2 where
power tool in 3.4.1.1 cannot reach.
3.4.2 Each boat number must be same as original.
3.5 Accomplish the requirements of 009-32 of 2.1, including Table 2, One system out of Line 61 or 62, Columns A (SSPC-SP-17), B and E (Haze Gray) for each surface area listed in listed in 1.3.8 and 1.3.9, using manufacture instruction for guidance. An aluminum oxide abrasive blast media must not be used. -S130 (See NOTE 4.4)
3.5.1 Power tool clean each narrow area to SSPC-SP-11 where blast nozzle cannot reach.
3.5.1.1 Power tool clean each narrow area to SSPC-SP-3 where
power tool in 3.5.1 cannot reach.
3.5.1.2 Hand tool clean each narrow area to SSPC-SP-2 where
power tool in 3.5.1.1 cannot reach.
3.5.2 Accomplish the requirements of 009-26 of 2.1, including ATTACHMENT G for new nonskid (peel and stick) deck covering.
3.6 Install each new zinc anode listed in 1.3.6 with new fastener, using
2.18 and ENCLOSURE (A) for guidance.
3.6.1 Zinc anode must not be painted.
3.7 Accomplish the requirements of 009-32 of 2.1 for cleaning and preservation of each new and disturbed surface to match surrounding areas.
Shio/HULL NO. Shio/HULL NAME ICN: Rev: Key Op:
JON:
N6105826PRPR934 A01
TITLE:
25UB1308 Boat (FAS-34); repair/preserve
(V) (G) "OPERATIONAL TEST"
3.8 Accomplish an operational test of each new windshield wiper and motor listed in 1.3.5 to verify correct operation, using 2.15 for guidance. -CFAS OPS, S130 (See NOTE 4.5)
(V) (G) "FINAL INSPECTION"
3.9 Accomplish a visual inspection of the boat listed in 1.3.1 to ensure completion of this work including surface cleanliness. -CFAS OPS, S130 (See
NOTE 4.5)
4. NOTES:
4.1 Initial Condition - Require repair and preservation for 250B1308 utility boat (FAS-34) at CFAS Port Operation.
4.2 S130 will witness "PT INSPECTION" of 3.2.1.1 as (I) (G) check point.
4. 3 Sl30 will witness "CLEANLINESS", "SURFACE PROFILE", "CONDUCTIVITY MEASUREMENT", "SURFACE PREPARATION" and "COATING INSPECTION FOR EACH COAT" of 009-32 as (I) (G) check point for 3.4 of this work item. The other inspection will be complied with 009-32.
4. 4 S130 will witness "CLEANLINESS", "SURFACE PROFILE", CONDUCTIVITY MEASUREMENT", "SURFACE PREPARATION" and "COATING INSPECTION FOR EACH COAT" of 009-32, and "VISUAL INSPECTION" 3.9.15 of 009-26 as (I) (G) check point for 3.5 of this work item. The other inspection will be complied with 009-32.
4.5 S130 will witness "OPERATIONAL TEST" of 3.8 and "FINAL INSPECTION" of
3.9 as (V) (G) check point.
4.6 CFAS PORT OPERATION will deliver the utility boat to contractor's yard located within SASEBO BAY (limit to Sasebo Harbor Limit) and will pick it up upon completion.
4.7 CFAS PORT OPERATION will remove each engine from the boat and install them.
4.8 SQ.FT. is approximate. Offer is responsible to determine actual SQ.FT for preservation work.
4.9 The contractor will dispose of all industrial waste generated by this job in accordance with Japanese Law Relative to Disposal and Cleaning of Waste. All paperwork associated with disposal must be provided to CFAS PORT
OPERATION.
4.10 If you have any further questions on this repair and preservation work, contact M.Kawabata or MMC Tran (CFAS PORT OPERATION, DNS:252-2364)
Shin/HULL NO. Shin/HULL NAME i lCN: Rev: Key Op:
FAS-34 COMFLEACT SAS EBO OPS
JON: i
N6105826PRPR934 A01
TITLE:
25UB1308 Boat (FAS-34); repair/preserve
4.10.1 Each drawing listed in this work item will be provided by CFAS
PORT OPERATION.
4.11 0900-LP-060-4010 in 2.21 may be used when the requirement calls for the use of TO300-AU-SPN-010 under the Standard ELM-235061.
5. GOVERNMENT FURNISHED MATERIAL (GEM) :
5 .1 None.
Ship/HULL NO. Ship/HULL NAME
TITLE:
25UB1308 Boat (FAS-34); repair/preserve
Seat Listed in 1.3.3
JON:
ICN:
N6105826PRPR934
_ ___i�---l
.o
ENCLOSURE (A) 111
Rev: Key Op:
A01
| 2026-06-09T14:38:21+0900 | |
| KAWABATA.MASASHIGE.1620613173 |
File details come from the government source that posted it. Updated .