FAS33 SPEC.pdf
PDF 1 MB Posted
- Attached to
- FAS-33 Overhaul
- Solicitation number
- N6264926Q0373
About this file
This is a Job Specification document for repair and preservation work on a 25UB1307 Boat (Metal Shark, LLC model) assigned to COMFLEACT SASEBO OPS, Ship/Hull No. FAS-33. The anticipated award date is 08/01/2026, with work performance spanning 09/01/2026 through 12/15/2026 (production completion 11/30/2026). The work is being prepared by D. Miyazaki and approved by S. Murakami, with the preparing activity located in Sasebo. The contract is identified as ICN N6105826PRPR932 (Rev A01) and is funded in FY24.
The work scope includes comprehensive repair and preservation of a 27-foot 5-inch aluminum alloy boat with 5,537 lbs light weight and 230 HP installed power. Specific tasks include: blasting and coating 580 SF of underwater hull surfaces to SSPC-SP 17 specification with black finish; preserving 220 SF of structural aluminum surfaces; applying 170 SF of nonskid peel-and-stick deck covering in haze gray; installing a new zinc anode on the transom; replacing AFT cabin curtain (48" W x 78" H) with new marine fabric; re-upholstering a cabin seat with artificial leather conforming to A-A-59517; fabricating and installing new rubber fender (55 LF, 4.5" height) with MIL-PRF-900F rubber; and replacing two windshield wipers and motors (P/N 539324 and 30991) with cable installation per MIL-STD-2003B and bonding per MIL-STD-1310H(NAVY). The contractor must perform work at its yard location within Sasebo Bay, with CFAS PORT OPERATION responsible for boat delivery, engine removal/installation, and final pickup. No government-furnished materials are provided. The contractor must dispose of all industrial waste per Japanese law and obtain S130 witness inspections for cleanliness, surface profile, conductivity, surface preparation, and coating inspections at designated checkpoints.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N6264926Q03730003.pdf | ||
| N6264926Q03730001.pdf | ||
| Drawing FAS-33-34.zip | ZIP file | |
| N6264926Q03730002.pdf | ||
| N6264926Q0373.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Shio/HULL NO. Ship/HULL NAME Rev: Key Op:
FAS-33 COMFLEACT SASEBO OPS
JON:
ICN:
N6105826PRPR932 A01
TITLE:
25UB1307 Boat (FAS-33); repair/preserve
Anticipated Award Date:
POP Start Date:
PREPARED BY:
D.MIYAZAKI
APPROVED BY:
S.MURAKAMI
CONCURRED BY:
S.MOROOKA
ASSIST PLANNER'S NAME:
D.AKAMINE
ASSIST PLANNER'S NAME:
ASSIST PLANNER'S NAME:
DESCRIPTION:
JSN{S): 2024OPS008
S/F CONTACT: M.KAWABATA /MMC TRAN, AN.T
Approved by S300/S900
Work Completed
S/Force:
SHIPSUPT: Date:
JOB SPECIFICATION
Production Completion Date:
POP End Date:
CODE
H Ml
--5]!,t_ l
CODE
S225
A,fO
CODE
S231
, CODE
E AK
CODE
CODE
CASREP#
CWP#
Date:
Rate: Date:
SRF CONTROL NO.:
WORK CERTIFICATION SIGNATURES
COMPLETION OF WORK REVIEW:
I
BADGE NO.: SHOP/CODE:
PREPARING ACTIVITY:
SASEBO
DATE
3/28/2024
CCNS#
AVL: FY24
LWC:
PHONE: DATE:
06/09/2026
08/01/2026 09/01/2026
11/30/2026 12/15/2026
Shio/HULL NO. Shio/HULL NAME I ICN:
JON: N6105826PRPR932
Rev: Key Op:
FAS-33 COMFLEACT SASEBO OPS
TITLE:
25UB1307 Boat (FAS-33); repair/preserve
l. SCOPE:
1.1 Title: 25081307 Boat (FAS-33); repair/preserve
1.2 Location of Work:
1.2.1 Contractor's Yard
1. 3 Identification:
1.3.1 Quantity (One EA), 25081307 Boat, Principal Dimension as Follows
MFR
Length (Overall) Beam with Rub Rail Height Light Weight Installed Power
METAL SHARK, LLC
27 Feet - 5 Inch
8 Feet - 6 Inch 9 Feet - 9 Inch
5,537 LBS
230 HP
1.3.2 A Total of (580 SF), Preservation Area of Aluminum
A01
Alloy Boat for Underwater Hull, Freeboard, Cabin, Bulwark, Main Deck, Engine Guard, Tow Post Safet Screen and Deck Fitting
1.3.3 A Total of (220 SF), Preservation Area of Aluminum
Alloy Boat for Structure Member, Main Deck, Bulwark, Transom and Step for Nonskid (Peel and Stick) Deck Covering
1.3.4 A Total of (170 SF), Nonskid (Peel and Stick) Deck Covering on Main Deck, Top of Bulwark, Top of Generator/Engine Starting Battery Compartment and Step
1.3.5 Quantity (One EA), Zinc Anode on Transom
1.3.6 Quantity (One EA), AFT Curtain (Size: 48 Inch Width by 78 Inch Height) for Cabin Access
1.3.7 Quantity (One EA), Seat in Front of Cabin
1.3.8 A Total of (55 LF), Rubber Fender (4-1/2 Inch Height)
on Hull
1.3.9 Quantity (2 EA), Windshield Wiper and Motor, P/N: 539324 and 30991
2. REFERENCES:
2.1
2.2
Standard Items (FY26)
25C-100-001, General Arrangement Outboard Profile
Shin/HULL NO. Shin/HULL NAME I Rev: Key Op:
JON: FAS-33 COMFLEACT SASEBO OPS
TITLE:
25UB1307 Boat (FAS-33); repair/preserve
2.3 25C-100-003, Hull Structure
2.4 25C-150-001, Console
2.5 25C-170-001, Doors and Hatches
2.6 25C-180-001, Engine Guard
2.7 25C-200-001, Propulsion Equipment
2.8 25C-580-001, AFT Tow Post
ICN:
N6105826PRPR932
2.9 25C-580-002, AFT Tow Post Safety Screen
2 .10 25C-600-001, Dive Door
2 .11 25C-610-001, Hoisting Fittings
2.12 25C-630-001, Cleats and Handrails
2.13 803-921865, Cathodic Protection, Hull Zinc Protection
2.14 25C-300-001, DC Electrical Schematic
2.15 25C-300-002, DC Electrical Components
2.16 25C-400-001, Dash Arrangement
I
2.17 MIL-STD-2003B, Electric Plant Installation Standard Methods for Surface Ships and Submarines
A01
2.18 MIL-STD-1310H(NAVY), Shipboard Bonding, Grounding, and Other Techniques for Electromagnetic Compatibility, Electromagnetic Pulse(EMP) Mitigation, and Safety
3. REQUIREMENTS:
3.1 Hoist and set the boat listed in 1.3.1 on the blocks (either in land or a barge) in contractor's yard to accomplish repair and preservation work.
3.1.1 Immediately after the boat has been set on the blocks, remove marine growth and clean entire underwater hull using fresh water.
3.1.2 Bounce the boat necessary to preserve the underwater hull.
3.1.3 Remove each existing zinc anode listed in 1.3.5 for
preservation work.
3.1.4 Disconnect mechanically and remove each electrical cable from foundation and cable hanger to facilitate preservation work and install the same upon completion of preservation work.
Shin/HULL NO. Shin/HULL NAME 1 ICN: Rev: Key Op:
JON: I N6105826PRPR932 FAS-33 COMFLEACT SASEBO OPS A01
TITLE:
25UB1307 Boat (FAS-33); repair/preserve
3.1.5 Upon completion of repair and preservation work, and after approval of CFAS PORT OPERATION, lower or return the boat onto water.
3.2 Accomplish the requirements for repair of the boat listed in 1.3.1 as follows, using 2.2 through 2.12 and ENCLOSURE (Al for guidance.
3.2.1 Remove each existing, template, fabricate and install new curtain listed in 1.3.6 out of new marine fabric or Equal with each new fastener.
3.2.2 Remove each existing and re-upholster seat listed in 1.3.7 out of new artificial leather conforming to A-A-59517 Class One or Equal with cushion.
3.2.3 Remove each existing, fabricate and install new rubber fender listed in 1.3.8 out of new rubber sheet conforming to MIL-PRF-900F with each new fastener and existing retainer plate.
3.2.3.1 Clean each existing surface of retainer plate.
3.2.4 Remove each existing and install new windshield wiper and motor listed in 1.3.9, using 2.14 through 2.16 for guidance.
3.2.4.1 Adjust and align each arm and blade of each new
windshield wiper.
3.2.4.2 Connect and verify connections.
3.2.4.3 Cable installation, penetration, connection, cable
tag, wire marking and cable way must be in accordance with 2.17. Install channel rubber between electrical cable surfaces and banding straps. The channel rubber must conform to MIL-PRF-6855F, Class 2, Grade 60.
3.2.4.4 Bonding and grounding must be in accordance with
2.18.
(V) (G) "OPERATIONAL TEST"
3.2.4.5 Accomplish an operational test of each new windshield wiper and motor to verify correct operation, using 2.14 for guidance. -CFAS
OPS, Sl30
3.3 Accomplish the requirements of 009-32 of 2.1, including Table One, Line 13, Columns A (SSPC-SP 17), B and E (Finish color; Black), for underwater hull, Table 2, Line 53, Columns A (SSPC-SP 17), B and G for each surface area listed in 1.3.2, using manufacture's instruction for guidance. An aluminum oxide abrasive blast media must not be used. -S130 (See NOTE 4.3)
3.3.1 Power tool clean each narrow area to SSPC-SP-11 where blast nozzle cannot reach.
Shio/HULL NO. Shio/HULL NAME ICN: Rev: Key Op:
JON: N6105826PRPR932 A01
TITLE:
25UB1307 Boat (FAS-33); repair/preserve
3.3.1.1 Power tool clean each narrow area to SSPC-SP-3 where
power tool in 3.3.1 cannot reach.
3.3.1.2 Hand tool clean each narrow area to SSPC-SP-2 where
power tool in 3.3.1.1 cannot reach.
3.3.2 Each boat number must be same as original.
3.4 Accomplish the requirements of 009-32 of 2.1, including Table 2, One system out of Line 61 or 62, Columns A (SSPC-SP 17), B and E (Haze Gray) for each surface area listed in 1.3.3 and 1.3.4, using rnanufacture's instruction for guidance. An aluminum oxide abrasive blast media must not be used. -S130
( See NOTE 4 . 4)
3.4.1 Power tool clean each narrow area to SSPC-SP-11 where blast nozzle cannot reach.
3.4.1.1 Power tool clean each narrow area to SSPC-SP-3 where
power tool in 3.4.1 cannot reach.
3.4.1.2 Hand tool clean each narrow area to SSPC-SP-2 where
power tool in 3.4.1.1 cannot reach.
3.4.2 Accomplish the requirements of 009-26 of 2.1 including
ATTACHMENT G, for new nonskid (peel and stick) deck covering.
3.5 Install each new zinc anode listed in 1.3.5 with new fasteners, using
2.13 for guidance.
3.5.1 Zinc anode must not be painted.
3.6 Accomplish the requirements of 009-32 of 2.1 for cleaning and preservation of each new and disturbed surface to match surrounding area.
(V) (G) "FINAL INSPECTION"
3.7 Accomplish a visual inspection of the boat listed in 1.3.1 to ensure completion of this work including surface cleanliness. -CFAS OPS, S130
(See NOTE 4.2)
4. NOTES:
4.1 Initial Condition - Require preservation and repair for 25081307 Boat
(FAS-33).
4. 2 S130 will witness "OPERATIONAL TEST" of 3. 2. 4. 5 and "FINAL INSPECTION" of 3.7 as (V) (G) check point.
4. 3 S130 will witness "CLEANLINESS", "SURFACE PROFILE", CONDUCTIVITY MEASUREMENT", "SURFACE PREPARATION" and "COATING INSPECTION FOR EACH COAT" of
Shio/HULL NO. Shio/HULL NAME
TITLE:
25UB1307 Boat (FAS-33); repair/preserve
'ICN:
JoN: IN6105826PRPR932
I Rev:
i
Key Op:
A01
009-32 as (I) (GI check point for 3.3 of this work item. The other inspection will be complied with 009-32.
4. 4 Sl30 will witness "CLEANLINESS", "SURFACE PROFILE", CONDUCTIVITY MEASUREMENT", "SURFACE PREPARATION" and "COATING INSPECTION FOR EACH COAT" of
009-32, and "VISUAL INSPECTION" 3.9.15 of 009-26 as (I) (G) check point for 3.4 of this work item. The other inspection will be complied with 009-32.
4.5 CFAS PORT OPERATION will deliver the boat to contractor's yard located within SASEBO BAY (limit to Sasebo Harbor Limit) and will pick it up upon completion.
4.6 CFAS PORT OPERATION will remove each engine from the boat and install them.
4.7 SQ.FT. is approximate. Offer is responsible to determine actual SQ.FT for preservation work.
4.8 The contractor will dispose of all industrial waste generated by this job in accordance with Japanese Law Relative to Disposal and Cleaning of Waste. All paperwork associated with disposal shall be provided to CFAS PORT
OPERATION.
4.9 If you have any question on this matter, contact with M. Kawabata or MMC Tran
(CFAS OPS, 0956-50-2364
4.9.1 Each drawing listed in this work item will be provided by CFAS
PORT OPERATION.
5. GOVERNMENT FURNISHED MATERIAL (GEM)
5 .1 None.
Shio/HULL NO. Ship/HULL NAME
TITLE:
25UB1307 Boat (FAS-33); repair/preserve
Seat Listed in 1.3.7
JON:
ICN:
N6105826PRPR932
----1}----
____ .,,.o
ENCLOSURE (A) 1/1
Rev: Key Op:
A01
| 2026-06-09T14:37:57+0900 | |
| KAWABATA.MASASHIGE.1620613173 |
File details come from the government source that posted it. Updated .