This Addendum No. 1, dated July 24, 2026, from the Massachusetts Department of Transportation (MassDOT) Highway Division modifies the contract documents for the Fall River Bridge Preservation project (F-02-065), Fourth Street over I-195, with proposals due July 28, 2026 at 2:00 p.m. The addendum transmits substantive changes to multiple contract documents, including revisions to the Table of Contents (Document 00010), Notice to Contractors (Document 00102), complete replacement of Supplemental Specifications (Document 00715 with 20 pages), Price Adjustment for Structural Steel and Reinforcing Steel (Document 00813 with 4 pages), Project Utility Coordination Form (Document A00808 with 6 pages), and a revision to page 8 of the bid items form (Document B00420). Key technical modifications include new sections on traffic signal detection systems, vehicle detection systems, pedestrian detectors with accessible pedestrian signal (APS) pushbutton assemblies, power pedestals, connected work zone notification system devices with location markers and connected arrow boards, milled rumble strips with multiple type classifications, and revised payment items and measurement methods for these components. The project involves utility coordination with Liberty Gas for installation and abandonment of gas main lines, with a 7-calendar-day advance notification requirement and 30-day notice-to-proceed for utility work, plus seasonal restrictions prohibiting gas line installations from November 15 to March 15.
Price adjustments apply to unfabricated structural steel and reinforcing steel based on the U.S. Department of Labor Bureau of Labor Statistics Producer Price Index (PPI Series ID WPU101702), with the base price index set at 370.1 and adjustments triggered only when variances exceed 5% of base prices. The contract establishes base prices for 32 categories of steel materials ranging from $0.52 per pound for AREA 140 LB Rail to $4.61 per pound for stainless steel types, with adjustments paid under separate pay items (999.449 and 999.457 for structural steel; 999.466 and 999.467 for reinforcing steel). Temporary traffic control items included in the bid schedule total 1,705 units across multiple categories, including 10 portable breakaway barricades, 250 linear feet of temporary barrier, 320 days of truck-mounted attenuator, 110 days of temporary illumination, 625 linear feet of painted temporary paving markings, 30 linear feet of taped markings, 170 square feet of pavement marking removal, 210 days of portable rumble strips, and 150 days of Type C arrow board service. The contract requires a Proposal Guaranty equal to 5% of the bid value and is subject to prevailing wage rates as determined by the Massachusetts Department of Labor and Workforce Development.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 614090 - Bid Tabulations.pdf | ||
| 614090 Bid Items List.txt | TXT text file | |
| A00808-614090.pdf | ||
| BIDS OPENED - Tuesday - July 28-2026~1.pdf | ||
| A00875-614090.pdf | ||
| Link to Bid Opening 7-28-2026~2.pdf | ||
| 614090 - Plan Holders List 7-27-2026.pdf | ||
| A00803-614090.pdf | ||
| A00804-614090.pdf | ||
| A00801-614090.pdf | ||
| 614090 - Notice to Contractors.pdf | ||
| A00820-614090.pdf | ||
| 614090 - Plan Holders List 7-15-2026.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ten Park Plaza, Suite 4160, Boston, MA 02116 Tel: 857-368-4636, TTY: 857-368-0655 www.mass.gov/massdot
Proposal No. 614090-134822 July 24, 2026
ADDENDUM NO. 1
To Prospective Bidders and Others on:
FALL RIVER
Bridge Preservation, F-02-065, Fourth Street over I-195
THIS PROPOSAL TO BE OPENED AND READ: TUESDAY, JULY 28, 2026 at 2:00 P.M.
Transmitting changes to the Contract Documents as follows:
QUESTIONS AND RESPONSES: One page.
DOCUMENT 00010: Revised page 1.
DOCUMENT 00102: Revised page 2.
DOCUMENT 00715: Deleted document in its entirety.
Inserted new document (20 pages).
DOCUMENT 00813: Deleted document in its entirety.
Inserted new document (4 pages).
DOCUMENT A00808: Deleted document in its entirety.
Inserted new document (6 pages).
DOCUMENT B00420: Revised page 8.
Take note of the above, substitute the revised pages for the originals, delete the documents indicated, insert the new documents in the proper order, and acknowledge Addendum No. 1 in your Expedite Proposal file before submitting your bid.
Very truly yours, Eric M. Cardone, P.E.
Construction Contracts Engineer
EMC/mac cc: Albin Napit, Project Manager
THIS PAGE INTENTIONALLY LEFT BLANK
Proposal No. 614090-134822
FALL RIVER
Bridge Preservation, F-02-065, Fourth Street over I-195
Questions and Responses Addendum No. 1, July 24, 2026
Traffic Signal Technologies LLC email dated Tuesday, July 21, 2026
Question 1) There is an FMU called out in the specifications for this project, but no equipment for traffic signals otherwise. I just want to make sure that I’m not missing anything.
Response 1) Refer to the Scope of Work in Document A00801, Special Provisions, for the traffic signal work included in the Contract. The traffic signal work is limited to the items identified therein. No additional traffic signal work is included.
Massachusetts Department Of Transportation Highway Division
00010 - 1
DOCUMENT 00010
TABLE OF CONTENTS
DOCUMENT 00010
TABLE OF CONTENTS ........................................................................................................... 00010-1 through 2
DOCUMENT 00102
NOTICE TO CONTRACTORS ................................................................................................. 00102-1 through 2
DOCUMENT 00210
REQUIREMENTS OF MASSACHUSETTS GENERAL
LAWS CHAPTER 30, SECTION 39R; CHAPTER 30, SECTION 39O .................................. 00210-1 through 4
DOCUMENT 00331
LOCUS MAP ............................................................................................................................. 00331-1 through 2
DOCUMENT 00439
CONTRACTOR PROJECT EVALUATION FORM ................................................................ 00439-1 through 2
DOCUMENT 00440
SUBCONTRACTOR PROJECT EVALUATION FORM ........................................................ 00440-1 through 2
DOCUMENT 00710
GENERAL CONTRACT PROVISIONS................................................................................... 00710-1 through 2
DOCUMENT 00715
① SUPPLEMENTAL SPECIFICATIONS .................................................................................. 00715-1 through 20
DOCUMENT 00718
SPECIAL PROVISION FOR PARTICIPATION BY MINORITY OR WOMEN'S
BUSINESS ENTERPRISES AND SERVICE- DISABLED VETERAN- OWNED
BUSINESS ENTERPRISES .................................................................................................... 00718-1 through 10
DOCUMENT 00761
SPECIAL PROVISIONS FOR CERTIFICATION REGARDING DEBARMENT,
SUSPENSION, INELIGIBILITY AND VOLUNTARY EXCLUSION ................................... 00761-1 through 4
DOCUMENT 00811
MONTHLY PRICE ADJUSTMENT FOR HOT MIX ASPHALT
(HMA) MIXTURES ................................................................................................................... 00811-1 through 2
DOCUMENT 00812
MONTHLY PRICE ADJUSTMENT FOR DIESEL FUEL AND GASOLINE ........................ 00812-1 through 2
DOCUMENT 00813
PRICE ADJUSTMENT FOR STRUCTURAL STEEL
AND REINFORCING STEEL .................................................................................................. 00813-1 through 4
DOCUMENT 00814
PRICE ADJUSTMENT FOR PORTLAND CEMENT CONCRETE MIXES .......................... 00814-1 through 2
DOCUMENT 00820
THE COMMONWEALTH OF MASSACHUSETTS
SUPPLEMENTAL EQUAL EMPLOYMENT OPPORTUNITY,
NON-DISCRIMINATION AND AFFIRMATIVE ACTION PROGRAM ............................... 00820-1 through 6
DOCUMENT 00821
ELECTRONIC REPORTING REQUIREMENTS
CIVIL RIGHTS PROGRAM AND CERTIFIED PAYROLL ................................................... 00821-1 through 2
DOCUMENT 00859
CONTRACTOR/SUBCONTRACTOR CERTIFICATION FORM .......................................... 00859-1 through 2
① Addendum No. 1, July 24, 2026
00102 - 2
NOTICE TO CONTRACTORS (Continued)
All parties who wish to have access to information plans and specification must send a “Request for Informational Documents” to MassDOTBidDocuments@dot.state.ma.us.
A Proposal Guaranty in the amount of 5% of the value of the bid is required.
This project is subject to the schedule of prevailing wage rates as determined by the Commissioner of the Massachusetts Department of Labor and Workforce Development, and the Division of Occupational Safety.
PRICE ADJUSTMENTS
① This Contract contains price adjustments for hot mix asphalt and Portland cement mixtures, diesel fuel, and gasoline. For reference the base prices are as follows: liquid asphalt $712.50 per ton, Portland cement $452.13 per ton, diesel fuel $3.911 per gallon, and gasoline $3.136 per gallon, and Steel Base Price Index 370.1. MassDOT posts the Price Adjustments on their Highway Division’s website at https://www.mass.gov/massdot-contract-price-adjustments
This Contract contains Price Adjustments for steel. See Document 00813 - PRICE ADJUSTMENT FOR STRUCTURAL STEEL AND REINFORCING STEEL for their application and base prices.
MassDOT projects are subject to the rules and regulations of the Architectural Access Board (521 CMR 1.00 et seq.)
Prospective bidders and interested parties can access this information and more via the internet at
WWW.COMMBUYS.COM.
BY: Phillip Eng, Interim MassDOT Secretary Jonathan L. Gulliver, Undersecretary and Highway Administrator
SATURDAY, JUNE 20, 2026
mailto:MassDOTBidDocuments@dot.state.ma.us https://www.mass.gov/massdot-contract-price-adjustments http://www.commbuys.com/
Massachusetts Department of Transportation Highway Division
00715 - 1
DOCUMENT 00715
| SUPPLEMENTAL | SPECIFICATIONS | |
| JUNE | 30, | 2026 |
| The | 2026 | Standard | Specifications | for | Highways | and | Bridges | are | amended | by | the | following | modifications, |
| additions | and | deletions. | These | Supplemental | Specifications | prevail | over | those | published | in | the | Standard |
Specifications.
| The | Specifications | Committee | has | issued | these | Supplemental | Specifications | for | inclusion | into | each | |||
| proposal | until | such | time | as | they | are | updated | or | incorporated | into | the | next | Standard | Specifications. |
Contractors are cautioned that these Supplemental Specifications are dated and will change as they are updated.
DIVISION I
GENERAL REQUIREMENTS AND COVENANTS
| SECTION | 5.00: | CONTROL | OF | WORK | |||||||||||
| Subsection | 5.03: | Conformity | with | Plans | and | Specifications | |||||||||
| Change | the | MGL | reference | in | the | first | sentence | to | Chapter | 30, | Section | 39I | (from | Section | 39L). |
DIVISION II
CONSTRUCTION DETAILS
SECTION 200: DRAINAGE
SUBSECTION 227: DRAINAGE SYSTEM SEDIMENT
| Subsection | 227.30, | Method | of | Measurement | |
| Change | the | subsection | number | to | 227.80 |
| Subsection | 227.31, | Basis | of | Payment | |
| Change | the | subsection | number | to | 227.81 |
| Subsection | 227.31, | Payment | Items | ||
| Change | the | subsection | number | to | 227.82 |
| SECTION | 400: | SUB‐BASE, | BASE | COURSE, | SHOULDERS, |
| PAVEMENT | AND | BERMS |
SUBSECTION 430: CEMENT CONCRETE BASE COURSE
| Subsection | 430.40: | General | ||||||
| Change | Applied | Crack | Sealer | to | Hot | Applied | Crack | Sealer. |
Addendum No. 1, July 24, 2026
00715 - 2
SUBSECTION 476: CEMENT CONCRETE PAVEMENT
| Subsection | 476.20: | Materials | ||||||||||||||
| Delete | Preformed | Bituminous | Joint | Filler | for | Concrete | ‐ | M3.05.5 | and | add | the | following | in | M | number | sequence: |
Preformed Expansion Joint Filler M9.14.0
SUBSECTION 477: MILLED RUMBLE STRIPS
| Subsection | 477: | Milled | Rumble | Strips | |
| Replace | this | subsection | with | the | following: |
DESCRIPTION
477.20: General
| The | work | consists | of | constructing | rumble | strips | on | roadways | by | milling | grooves | into | finished | surfaces. | Milled | |||||
| Rumble | Strips | are | categorized | as | Type | A, | Type | B, | Type | C, | or | Type | D. | Type | A | are | rectangular | milled | grooves | at |
| regular | intervals | in | the | paved | surface, | Type | B | rumble | strips | are | rectangular | grooves | at | regular | intervals | with | ||||
| designed | gaps | between | intervals | to | accommodate | bicyclists, | and | Type | C | and | Type | D | rumble | strips | form | |||||
| continuous | grooves | in | the | paved | surface | in | the | form | of | a | vertical | sinusoidal | wave | pattern. |
CONSTRUCTION METHODS
477.61: Equipment
The equipment shall self‐align with the slope of the roadway surface and/or any irregularities in the roadway surface.
| The | Contractor | shall | demonstrate | to | the | Engineer | the | ability | to | achieve | the | desired | groove | without | tearing | or |
| snagging | the | roadway | surface | prior | to | beginning | the | work. |
477.62: Installation of Rumble Strips
Rumble strips shall be installed in accordance with the locations, dimensions, and Type shown on the plans.
| Type | A | and | Type | B | rumble | strips | shall | be | installed | after | the | longitudinal | pavement | markings | they | supplement | ||||
| (typically | edge | lines | or | channelizing | lines) | are | in | place. | Installation | of | any | diagonal | or | chevron | pavement | |||||
| markings | that | cross | the | Type | A | or | Type | B | rumble | strips | shall | only | occur | after | the | rumble | strips | are | in | place. |
| Type | C | rumble | strips | shall | be | installed | after | the | location | of | the | longitudinal | pavement | markings | they |
| supplement | (typically | center | lines) | has | been | laid | out, | but | before | the | pavement | markings | are | installed. | The |
| pavement | markings | shall | only | be | installed | after | the | Type | C | rumble | strips | are | in | place. |
| Type | D | rumble | strips | shall | be | installed | after | the | longitudinal | pavement | markings | they | supplement | (typically |
| center | lines) | are | in | place. |
477.63: Control of the Work Area
| At | the | end | of | each | working | day, | all | equipment | shall | be | moved | to | a | location | where | it | does | not | present | a | hazard |
| to | traffic. | The | pavement | shall | be | cleaned | by | sweeping | and | the | work | area | shall | be | reopened | to | traffic. |
Pavement millings shall become the property of the Contractor and shall be removed and disposed of off‐site.
COMPENSATION
477.80: Method of Measurement
| Milled | Rumble | Strip | (Type | A), | Milled | Rumble | Strip | (Type | C), | and | Milled | Rumble | Strip | (Type | D) | will | be | |
| measured | by | the | total | length | of | installed | rumble | strip. | Milled | Rumble | Strip | (Type | B) | will | be | measured | by | the |
| total | length | of | installed | rumble | strip | excluding | the | designed | gaps. | Breaks | at | castings, | bridge | decks, | ||||
| intersections | or | other | breaks | will | not | be | measured | for | payment | for | all | types. |
00715 - 3
477.81: Basis of Payment
| Payment | for | Milled | Rumble | Strip | (Type | A), | Milled | Rumble | Strip | (Type | B), | Milled | Rumble | Strip | (Type | C), | and | ||
| Milled | Rumble | Strip | (Type | D) | will | be | made | at | the | contract | unit | price | per | foot | of | rumble | strips, | complete | in |
| place. | Such | payment | will | be | full | compensation | for | furnishing | all | equipment | and | labor | for | satisfactorily | |||||
| performing | the | work | including | cleanup | and | disposal | of | excess | materials. |
477.82: Payment Items
Item number Description Unit
477. Milled Rumble Strip (Type A) Foot
477.1 Milled Rumble Strip (Type B) Foot
477.2 Milled Rumble Strip (Type C) Foot
477.3 Milled Rumble Strip (Type D) Foot
SUBSECTION 482: SAWCUTTING
| Subsection | 482.80: | Method | of | Measurement | |
| Replace | this | subsection | with | the | following: |
Sawcutting, when included in the Contract as its own bid item, will be measured for payment by the foot along the cut line, regardless of depth.
SECTION 600: HIGHWAY GUARD, FENCES AND WALLS
SUBSECTION 628: IMPACT ATTENUATORS
| Subsection | 628.82: | Payment | Items | ||
| Replace | this | subsection | with | the | following: |
Item number Description Unit
628.302 Permanent Impact Attenuator, Non‐Redirective, TL‐2 Each
628.303 Permanent Impact Attenuator, Non‐Redirective, TL‐3 Each
628.304 Temporary Impact Attenuator, Non‐Redirective, TL‐2 Each
628.305 Temporary Impact Attenuator, Non‐Redirective, TL‐3 Each
628.312 Permanent Impact Attenuator, Redirective, TL‐2 Each
628.313 Permanent Impact Attenuator, Redirective, TL‐3 Each
628.314 Temporary Impact Attenuator, Redirective, TL‐2 Each
628.315 Temporary Impact Attenuator, Redirective, TL‐3 Each
628.322 Permanent Impact Attenuator, Low‐Maintenance, TL‐2 Each
628.323 Permanent Impact Attenuator, Low‐Maintenance, TL‐3 Each
00715 - 4
SECTION 800: TRAFFIC CONTROL DEVICES
SUBSECTION 813: WIRING, GROUNDING AND SERVICE CONNECTIONS
| Subsection | 813.20: | General | |||
| Replace | this | subsection | with | the | following: |
| This | work | shall | consist | of | furnishing | and | installing | wire | and | cable | of | the | type | and | size | indicated | for | traffic |
| signals | and | other | traffic | control | devices, | ITS | systems, | highway | lighting | and | related | electrical | systems, | |||||
| equipment | grounding | systems, | new | ground | electrodes | or | connections | to | existing | ground | electrodes, | power | ||||||
| pedestals, | and | all | materials | and | equipment | necessary | to | deliver | power | to | such | systems. |
| Service | points | shown | on | the | plans | are | approximate | only. | The | Contractor | shall | determine | exact | locations | for |
| both | overhead | and | underground | service | access | points. | The | Contractor | shall | determine | riser | elevations | or | ||
| connections/routing | to | manhole | facilities | from | the | serving | utility, | and | arrange | to | complete | the | service |
connections.
All work under this Subsection shall comply with the MEC and the National Electrical Safety Code.
| Subsection | 813.41: | Grounding | and | Bonding | Conductions |
| Replace | this | subsection | with | the | following: |
| Grounding | and | bonding | conductors | shall | conform | to | M8.16.10: | Type | 10 | Grounding | and | Bonding | Conductors |
| (Solid | or | Stranded, | Insulated | or | Bare). |
| Subsection | 813.42: | Ground | Rods | ||
| Replace | this | subsection | with | the | following: |
| Ground | rods | shall | consist | of | driven | rod(s) | conforming | to | M8.17.0: | Ground | Rod | or | other | devices | approved | for |
| the | purpose. |
| Subsection | 813.44: | Power | Pedestal | ||
| Add | this | subsection | in | numerical | order: |
| A | Power | Pedestals | shall | consist | of | a | side‐of‐post | mounted | lockable | load | center | enclosure, | a | load | center | with |
| circuit | breakers, | an | exterior‐mounted | electrical | meter, | signal | post | and | base, | equipment | bonding, | ground | ||||
| rod(s) | conforming | to | 813.42: | Ground | Rods, | and | a | cement | concrete | foundation. | The | enclosure, | lock, | circuit | ||
| breakers, | signal | post | and | base, | and | foundation | shall | all | be | included | in | the | Shop | Drawing | submission. |
| The | enclosure | shall | be | rated | to | meet | or | exceed | NEMA | 3R | and | be | suitable | for | post‐mounting | and | shall | be | sized |
| appropriately | to | house | the | load | center. | The | enclosure | shall | be | capable | of | being | secured | with | an | integrated | |||
| locking | mechanism | or | by | a | Contractor‐supplied | padlock; | regardless | of | locking | mechanism, | it | shall | be | ||||||
| operated | with | a | #2 | key. |
| The | circuit | breakers | shall | be | designed | for | single‐phase, | 3‐wire, | 120/240 | VAC. | Circuit | breakers | shall | provide | a | ||
| means | to | manually | operate | a | circuit | and/or | automatically | open | a | circuit | that | is | in | overload | or | short | circuit |
| conditions. | All | circuit | breakers | shall | be | UL | listed | and | have | CSA | certification. |
| The | enclosure | shall | be | furnished | with | a | meter | socket | installed. | The | meter | socket | shall | be | approved | by | the |
| servicing | electrical | utility. |
| The | signal | post | and | base | shall | conform | to | M10.05.1: | Signal | Posts | and | Bases | and | the | Plans. | The | Contractor | |
| shall | supply | a | square | aluminum | base | with | a | natural | or | anodized | finish | and | a | Schedule | 80 | aluminum | post | with |
| a | brushed | or | spun | finish, | unless | otherwise | indicated | in | the | Plans. |
| The | Contractor | shall | supply | mounting | equipment | recommended | by | the | enclosure | manufacturer | to | side‐ |
| mount | the | cabinet | to | the | post. |
Bonding for the Power Pedestal shall utilize a #8 AWG or larger ASTM‐B3 wire.
00715 - 5
| The | cement | concrete | foundation | shall | conform | to | the | Plans | and | M4.02.0: | Concrete | Produced | by | Stationary |
| and | Truck | Mixers, | M4.03.0: | Concrete | Produced | by | Volumetric | Mixers, | M4.06.1: | Conventional | Concrete, | |||
| M4.09.0: | Precast, | Prestressed, | and | Prefabricated | Concrete | Products, | M4.11.0: | Evaporation | Reducing | |||||
| Materials, | and | M4.12.0: | Curing | Materials, | as | applicable. |
| Subsection | 813.64: | Power | Pedestal | ||
| Add | this | subsection | in | numerical | order: |
No work shall commence until Shop Drawings have been approved.
| The | Power | Pedestal | Cabinet | shall | be | mounted | side‐of‐post | to | the | Signal | Post, | per | the | manufacturer's |
| recommendations. | The | Power | Pedestal | Cabinet | should | be | installed | directly | below | the | meter | socket, | per | the |
| Plans. | If | dissimilar | metals | are | present, | they | shall | be | electrically | insulated | to | prevent | galvanic | corrosion. |
| The | Contractor | shall | supply | the | appropriate | type | (single | pole | or | double | pole) | and | number | of | circuit | breakers | |
| included | within | the | Power | Pedestal | Cabinet | to | provide | the | recommended | AC | power | to | each | device | receiving | ||
| power | from | the | Cabinet. | The | circuit | breakers | shall | be | clearly | labeled | as | to | which | device | they | are | powering |
| (e.g. | RRFB‐1, | RRFB‐2, | Warning | Beacon, | Speed | Feedback | Sign, | etc.). |
| The | Power | Pedestal | shall | be | grounded | and | bonded | per | 813.61: | Equipment | Grounding | and | Bonding | and |
| 813.62: | Grounding | Electrodes. |
| Subsection | 813.80.E: | Power | Pedestal | ||
| Add | this | subsection | in | numerical | order: |
Power Pedestals will be measured by the number of Power Pedestals each furnished and installed.
| Subsection | 813.81.E: | Power | Pedestal | ||
| Add | this | subsection | in | numerical | order: |
| Power | Pedestals | will | be | paid | for | at | the | contract | unit | price | for | each | installed | in | place. | This | includes | all | labor |
| and | materials | required | for | a | working | system. |
All costs associated with grounding and bonding of Power Pedestals shall be considered incidental to the item.
| All | costs | associated | with | providing | service | connections | to | Power | Pedestals | shall | be | paid | for | under | their |
| respective | pay | items. |
| Subsection | 813.82: | Payment | Items | ||||||||||||||
| Change | the | unit | of | measure | for | items | 813.80 | and | 813.81 | to | Each | and | add | the | following | pay | item: |
| Subsection | 815.82: | Payment | Items | |||||||||||
| Delete | payment | items | 818.90 | to | 818.94, | 819.39, | 819.832, | 819.52, | 819.53, | 819.60 | to | 819.64, | 819.70, | 819.71, |
| 819.72, | 819.800, | 819.801, | 819.802, | 819.803,:819.810, | 819.811, | 819.820, | 819.821, | 819.850, | 819.851, | 819.852. |
Add the following payment item:
813.90 Power Pedestal Each
00715 - 6
SUBSECTION 819: TRAFFIC SIGNAL DETECTION
| Subsection | 819: | Traffic | Signal | Detection |
| Add | this | subsection: |
DESCRIPTION
819.20: General
| Work | under | this | Subsection | consists | of | furnishing | and | installing | detection | devices | for | vehicles, | bicycles, |
| pedestrians, | and | other | road | users. |
MATERIALS
819.40: General
Materials shall meet the requirements specified in the following Subsections of Division III, Materials:
Material Section
Vehicle Detection Systems M10.08.0
Passive Stop Line Detectors M10.08.1
Passive Advanced Detectors M10.08.2
Pedestrian Detectors M10.09.0
Pedestrian Pushbutton Assembly M10.09.1
APS Pushbutton Assembly M10.09.2
The Contractor shall furnish Vehicle Detection Systems (VDS) and Pedestrian Detectors that are listed on the
QTCE.
| Any | software, | firmware, | cables, | or | adapters | required | to | program, | adjust, | fine‐tune, | or | monitor | VDS | or | |
| Pedestrian | Detectors | shall | be | provided | by | the | Contractor. | VDS | and | Pedestrian | Detectors | shall | have | the | latest |
| versions | of | software | and/or | firmware | installed | prior | to | inspection. | Manufacturer | updates | to | software | and/or | ||
| firmware | shall | be | included | at | no | cost | for | the | life | of | the | products. |
819.40.A: Vehicle Detection Systems
| A | VDS | shall | consist | of | one | or | more | Internet | Protocol | (IP) | ‐based | detector/sensor | assemblies | and | a | cabinet |
| interface | device | that | is | installed | in | a | Traffic | Signal | Controller | Cabinet | or | similar | device. |
| Stop | Line | VDS | shall | be | capable | of | providing | motor | vehicle | and | bicycle | detection | at | all | locations | shown | on | the |
| Plans. | The | Contractor | may | furnish | a | VDS | that | utilizes | a | single | detector/sensor | or | multiple, | as | long | as | all | stop |
| line | motor | vehicle | and | bicycle | detection | zones | are | encompassed | and | the | traffic | signal | or | other | device | utilizing | ||
| the | detection | can | operate | per | the | Plans. | All | Passive | Stop | Line | Detectors | required | to | provide | stop | line | ||
| detection | at | an | intersection | shall | be | included | in | the | cost | of | a | single | Stop | Line | Vehicle | Detection | System. |
| If | the | Contractor | furnishes | a | Stop | Line | VDS | that | does | not | utilize | an | integrated | video | monitoring | system, | a |
| separate | video | monitoring | system | per | 819.41: | Video | Monitoring | System | shall | be | furnished | and | installed | at | no | ||
| additional | cost. |
| Advanced | VDS | shall | be | capable | of | providing | motor | vehicle | detection | on | a | single | approach, | at | the | location | |
| shown | on | the | Plans. | The | Contractor | Shall | furnish | Passive | Advanced | Detectors | that | utilize, | and | are | compatible | ||
| with, | the | same | interface | device | installed | in | the | Traffic | Signal | Controller | Cabinet, | or | similar | device, | as | the | Stop |
| Line | VDS. |
00715 - 7
All VDSs shall be furnished with manufacturer‐supplied mounting hardware.
| If | multiple | VDSs | over | multiple | locations | are | supplied | under | a | single | contract, | all | components | furnished | by | the |
| Contractor | shall | be | of | the | same | make | and | model. |
819.40.B: Pedestrian Detectors
| Pedestrian | Pushbutton | Assembly | and | Accessible | Pedestrian | Signal | (APS) | Pushbutton | Assembly | shall | both | |||||
| include | a | pushbutton, | sign, | housing, | manufacturer‐specified | mounting | hardware, | and | wiring. | The | Contractor | |||||
| shall | review | the | Contract | Documents | to | determine | if | one | or | more | in‐cabinet | control | units | are | required | to |
| meet | the | pedestrian | detector | type | and | operational | requirements. | In‐cabinet | control | units | shall | be | considered | |||
| incidental | to | the | cost | of | the | item. |
| The | Contractor | shall | provide | a | pushbutton | housing | that | conforms | to | the | shape | of | the | pole | it | is | mounted | to | or |
| shall | furnish | and | install | a | manufacturer‐supplied | saddle | to | provide | a | flush, | secure | fit, | at | no | additional | cost. |
| An | APS | Pushbutton | Assembly | shall | include | a | pedestrian | pushbutton | sign | that | conforms | to | the | Plans. | If | the |
| sign | is | not | integral | to | the | housing, | separate | mounting | equipment | shall | be | furnished | and | installed | by | the |
| Contractor. | All | costs | associated | with | the | sign | and | mounting | equipment | shall | be | considered | incidental | to | the | |
| cost | of | the | item. |
819.41: Video Monitoring System
| When | required | by | 819.40.A: | Vehicle | Detection | Systems, | the | Contractor | shall | furnish | and | install | a | Video | |
| Monitoring | System. | The | Video | Monitoring | System | shall | consist | of | one | or | more | IP‐based | 4K, | 1080p, | H.264 |
| dome‐type | CCTV | cameras; | mounting | hardware, | including | but | not | limited | to: | brackets, | bands, | straps, | posts, | ||
| plates, | and | pole | mount | adapters; | power | distribution | and | conditioning | equipment | including | surge | ||||
| suppression; | and | all | necessary | cabling | and | wiring. |
| All | equipment | provided | for | the | Video | Monitoring | System | shall | be | commercial, | off‐the‐shelf | products. | Custom | ||
| equipment | designed | specifically | for | the | Contract | will | not | be | accepted. | All | cabling | and | wiring | shall | be |
| recommended | by | the | manufacturer | and | rated | for | outdoor | use. | Any | special | wiring | or | connectors | required | by |
| the | manufacturer | shall | be | identified | in | the | Shop | Drawings. |
| The | Video | Monitoring | System | shall | conform | to | National | Electrical | Manufactures | Association | (NEMA) | ||||
| standards, | Underwriters’ | Laboratory | (UL), | and | Military | Standards | (MIL), | as | applicable. | All | components | of | the | ||
| Video | Monitoring | System | shall | be | new | and | still | under | production | by | the | manufacturer. | Obsolete, | no | longer |
| produced, | and/or | no | longer | supported | components | will | not | be | accepted. |
The Video Monitoring System shall be capable of operating in temperatures ranging from ‐29Ԭ to +165Ԭ.
The camera shall meet or exceed the requirements found in Table 819.41‐1:
Table 819.41‐1: Minimum Camera Requirements
Feature Requirement
Zoom Ratio The minimum zoom ratio shall be 30x Optical and 12x Digital
Camera Type The camera shall be an IP‐type CCTV camera.
| Auto | Focus | The | camera | shall | include | auto | focus | with | a | selection | for | manual | override | of |
| auto | focus. |
Lens Aperture Ratio Typical: F/1.6 to F/4.7 (wide to telephoto)
On‐Screen Direction The CCTV camera shall display on‐screen azimuth indications.
| Privacy | Zones | The | CCTV | camera | shall | be | programmable | to | blank | out | up | to | 8, | four‐sided | areas |
| to | electronically | block | portions | of | the | camera’s | field | of | view | from | being |
00715 - 8
Feature Requirement
| displayed. | These | privacy | zones | shall | move | and | adjust | sizing | synchronously |
| with | camera | movements | and | degree | of | lens | zooming. |
| On‐Screen | Labels, | Text |
| and | Titles |
| The | CCTV | camera | shall | display | a | minimum | of | 20 | programmable | characters | for |
| on‐screen | camera | ID, | preset | position, | sector, | and | alarm | titles. |
| On‐Screen | Labels, | Text |
| and | Title | Positioning |
| The | position | of | the | on‐screen | text | shall | be | adjustable | to | appear | at | selectable |
| positions | on | the | CCTV | camera | screen | image. |
| Number | of | Pixels | The | camera | shall | provide | a | minimum | of | 1280H | x | 720V | effective | pixels. | The |
| camera | shall | be | capable | of | being | configured | to | operate | at | all | standard | lower | |||
| resolutions | down | to | 320H | x | 180V | effective | pixels. |
Image Sensor Size The camera shall include an image sensor of 1/1.8 in., nominal.
Lens Focal Length The camera shall include a zoom lens of 4.3 mm to 129 mm, minimum focal length.
| Color | and | Black | & | White |
| Image | Selection |
| The | camera | shall | have | Color | and | Black | & | White | video | image | display | modes | |
| incorporating | both | automatic | and | manual | override | image | mode | selection. | The | ||||
| camera | shall | transition | automatically | to | a | Black | & | White | mode | (when | in | ||
| automatic | mode) | when | the | luminance | level | reaches | a | user | predefined | ||||
| threshold. | At | all | times | the | camera | shall | provide | a | full | motion | video | output | at |
| 30 | frames | per | second. |
| Image | Stabilization | The | CCTV | camera | shall | incorporate | electronic | image | stabilization | to | reduce |
| the | effects | of | vibration | and | wind | gusts | on | the | displayed | video | image. |
| Automatic | Iris | The | camera | shall | include | both | automatic | iris | control | and | an | override | for |
| manual | iris | adjustments. |
Wide Dynamic Range The CCTV camera’s wide dynamic range shall be 120 dB.
CCTV Camera Optical Sensitivity
| The | camera’s | sensitivity | shall | be | sufficient | to | provide | a | clear, | usable | color | |||
| video | image | display | with | a | scene | illumination | of | ≤ | 0.1 | lux | at | an | aperture | of |
| F1.6, | nominal. |
Power Input The power input for the CCTV camera and dome shall be PoE+.
Alarms No alarm contacts shall be wired.
| The | Contractor | shall | mount | the | camera | at | a | location | that | optimizes | line‐of‐sight | for | all | approaches. | The | view | |||
| of | each | approach | shall | have | a | clear | line | of | sight, | free | from | obstructions | from | trees, | overhead | wires, | buildings, | ||
| and/or | other | obstructions. | If | the | Contractor | is | unable | to | provide | a | clear | line | of | sight | for | all | approaches | to | the |
| satisfaction | of | the | Engineer, | a | second | camera, | including | mounting | hardware, | cabling, | and | wiring, | shall | be | |||||
| furnished | and | installed | on | a | different | traffic | signal | structure | at | no | additional | cost. |
The Contractor shall be responsible for the following items prior to installation:
| Ensure | that | all | components | are | assembled | and | factory‐tested | prior | to | delivery | to | the | project | site. |
| Fully | configure | the | camera | settings, | including | but | not | limited | to: | camera | resolution, | camera | address, |
| default | settings, | and | pre‐set | and | home | positions, | per | the | direction | of | the | Engineer. | ||
| Coordinate | with | the | Engineer | to | set | the | camera | address | number | to | provide | unique | identification | that |
is compatible with the CCTV camera addressing schema utilized by the Department.
The Contractor shall deliver the camera(s) fully assembled to the project site.
00715 - 9
| The | Contractor | shall | provide | up | to | 3 | hard | copy | sets | of | operating | manuals, | service | manuals, | and | maintenance | ||
| instructions | for | all | components | of | the | system. | At | the | request | of | the | Engineer, | the | number | of | copies | may | be |
| reduced | if | the | manuals | are | provided | in | file | format. |
819.42: Material Warranties
| All | components | of | Vehicle | Detection | Systems, | including | Video | Monitoring | Systems, | and | Pedestrian | Detectors | |
| shall | include | a | minimum | two‐year | manufacturer’s | replacement | warranty | that | will | commence | upon | ||
| acceptance | by | the | Engineer. | The | warranty | shall | cover | any | manufacturing | defects | of | the | products. |
Construction Methods
819.60: General
| The | Contractor | shall | use | discretion | in | installing | the | detectors/sensors | at | locations | that | optimize | the | ||||||
| performance | of | the | VDS | and | to | eliminate | false | calls. | The | Contractor | shall | notify | the | Engineer | if | the | size | or | |
| location | of | the | detection | zones | differs | from | what | is | shown | in | the | Plans. | At | the | direction | of | the | Engineer, | the |
| Contractor | will | be | required | to | readjust | the | location | of | the | detection | zones | and/or | modify | the | detection | ||||
| channels | if | false | calls | are | observed | or | the | traffic | signal | system | is | not | operating | per | the | Plans | due | to | the |
| performance | of | the | VDS; | this | work | shall | be | considered | incidental | to | the | cost | of | the | item. |
| The | Contractor | shall | use | manufacturer‐specified | mounting | hardware | for | all | detectors/sensors. | If | mounted | to | ||||
| mast | arms | or | strain | poles, | any | addition | weight | or | wind | loading | from | the | detector/sensor | shall | be | accounted |
| for | in | the | structural | calculations. |
| The | Contractor | shall | install | the | cabinet | interface | device | in | the | traffic | signal | controller | cabinet. | The | cabinet | ||
| interface | device | shall | be | connected | to | the | Field | Monitoring | Unit | (FMU) | or | an | ethernet | switch | in | the | traffic |
| signal | controller | cabinet. | All | communication | between | devices | shall | be | IP‐based. | Use | of | external | |||||
| communications | that | are | not | routed | through | the | FMU | is | prohibited. |
| The | Contractor | shall | furnish | and | install | low | voltage | power | cabling | surge | protection | equipment | required | for |
| all | data | and | power | lines | associated | with | VDS, | Video | Monitoring | Systems, | and/or | Pedestrian | Detection | |
| Systems | entering | the | traffic | signal | controller | cabinet. |
| The | Contractor | shall | install | the | manufacturer‐specified | cable | between | the | detectors/sensors | to | the | cabinet | ||||
| interface | device | in | the | traffic | signal | controller | cabinet | via | traffic | signal | structures, | conduit, | and/or | pullboxes. | ||
| This | shall | include | all | connectors, | sealing | tape, | and | incidental | work | to | complete | the | connection(s). | All | ||
| equipment | installation | and | wiring | shall | be | installed | in | a | neat | and | orderly | manner | and | per | the | manufacturer’s |
specifications.
| The | VDS | shall | be | powered | through | one | of | the | power | outlets | available | on | the | FMU. | The | VDS | shall | be | capable | of |
| being | powered | down | and | remotely | restarted | through | remote | control | of | the | power | outlet | on | the | FMU. |
| Under | the | supervision | of | the | Engineer, | the | Contractor | shall | install | the | VDS | software | that | allows | visual |
| confirmation | of | the | detection | zones | on | Department | computers. |
The Contractor shall install Pedestrian Detectors at the location(s) and mounting height shown on the Plans.
| The | Contractor | shall | mount | and | orient | the | APS | Pushbutton | Assembly | in | a | manner | so | that | the | vibrotactile |
| arrow | is | aligned | parallel | to | the | crosswalk. |
| Prior | to | acceptance, | the | Contractor | shall | furnish | all | passwords | for | Vehicle | Detection | Systems | and | Pedestrian |
| Detectors | to | the | Engineer. | The | use | of | default | passwords | is | prohibited. |
00715 - 10
819.61: Programming APS Pushbuttons
| Each | APS | Pushbutton | shall | have | an | audible | walk | indication | during | the | associated | walk | interval. | The | duration | ||||
| of | the | audible | walk | indication | shall | match | the | duration | of | the | walk | interval | unless | the | pedestrian | signal | is | ||
| programmed | to | rest | in | walk. | If | programmed | to | rest | in | walk, | the | audible | walk | indication | shall | be | limited | to | 7 |
| seconds | in | length | but | may | be | recalled | by | a | subsequent | button | press | during | the | walk | interval. |
| The | APS | Pushbutton | locator | tone | and | audible | walk | indication | shall | be | programmed | to | broadcast | at | volume | 5 | |
| dBA | louder | than | ambient | sound, | except | when | audible | beaconing | is | provided | in | response | to | an | extended | ||
| pushbutton | press. | The | broadcast | volume | shall | be | programmed | to | not | exceed | 100 | dBA | at | 3 | ft. | from | the |
| emitter, | regardless | of | ambient | noise | conditions. |
The locator tone shall have a duration of 0.15 seconds or less and shall repeat at 1‐second intervals.
The locator tone shall be active during all signal intervals, except for the following conditions:
| When | the | audible | walk | indication | is | being | broadcast. | ||||||||||||
| If | the | signal | is | programmed | to | rest | in | walk, | the | locator | tone | shall | resume | 7 | seconds | after | the | start | of |
| the | walk | interval. | ||||||||||||||
| The | locator | tone | shall | be | disabled | if | the | traffic | control | signal | or | pedestrian | hybrid | beacon | is | operating |
in an emergency or fault flashing mode.
| The | locator | tone | shall | be | active | during | the | flashing | yellow | and | alternating | flashing | red | intervals | of | a |
| pedestrian | hybrid | beacon | phasing | sequence. |
| Upon | button | press, | the | locator | tone | at | that | pushbutton | shall | be | interrupted | and | a | speech | message | of | “Wait” |
| shall | be | broadcast. |
| The | normal | status | of | the | pilot | light | shall | be | dark. | The | pilot | light | shall | illuminate | upon | button | press | and | stay |
| illuminated | until | the | start | of | the | walk | interval, | when | it | shall | return | to | dark. | If | the | associated | pedestrian | phase | |
| is | set | to | pedestrian | recall, | the | pilot | light | shall | stay | illuminated | for | all | intervals | except | for | the | walk | interval. |
| The | audible | walk | indication | shall | an | audible | tone | unless | a | speech | message | is | called | for | in | the | Plans. | The |
| audible | tone | shall | repeat | at | 8 | to | 10 | ticks | per | second, | in | multiple | frequencies, | with | the | dominant | component | at |
| 880 | Hz. |
If a speech message is used, the following shall apply:
| For | exclusive | pedestrian | phases, | during | the | walk | interval | the | speech | message | shall | be: | “walk | sign | is |
| on | for | all | crossings.” | This | message | shall | be | broadcast | a | single | instance. |
| *For | concurrent | pedestrian | phases, | during | the | walk | interval | the | speech | message | shall | be: | “[STREET | ||
| NAME]. | Walk | sign | is | on | for | [STREET | NAME].” | This | message | shall | be | broadcast | a | single | instance. |
| If | the | signal | is | programmed | to | rest | in | walk, | the | concurrent | pedestrian | speech | message | shall | be |
| repeated | upon | each | subsequent | button | press. |
*Note: See Plans for Street Name information.
The vibrotactile arrow shall vibrate during the walk interval.
| The | Contractor | shall | include | a | fault | relay | that | will | default | to | placing | a | constant | pedestrian | call | from | any |
| pushbutton | assembly | that | fails | to | communicate | back | to | the | in‐cabinet | control | unit. |
| The | Contractor | shall | connect | the | in‐cabinet | control | unit | to | the | Field | Monitoring | Unit | (FMU) | via | an | open |
| ethernet | port. |
00715 - 11
819.62: VDS Testing and Evaluation
| After | the | VDS | is | installed, | but | prior | to | acceptance, | the | Contractor | shall | conduct | an | evaluation | of | the | system | in |
| the | presence | of | the | Engineer. | The | purpose | of | the | evaluation | is | to | certify | the | system | is | operating | per | the |
| requirements | of | M10.08.0: | Vehicle | Detection | Systems, | M10.08.1: | Passive | Stop | Line | Detectors, | and | M10.08.2: | ||||||
| Passive | Advanced | Detectors, | as | applicable. | The | Contractor | shall | submit | their | testing | and | evaluation | plan | as | a | |||
| part | of | the | Shop | Drawing | submittal. |
| The | testing | and | evaluation | shall | take | place | for | a | minimum | of | 30 | minutes | under | moderate | live | traffic |
| conditions. | Testing | shall | not | be | conducted | during | inclement | weather. |
| If | the | Engineer | determines | that | the | system | does | not | meet | the | operational | requirements, | the | Contractor | will | |||
| be | required | to | adjust | the | location, | orientation, | and/or | number | of | detector/sensors. | The | Contractor | may | also | ||||
| adjust | the | location | of | the | detection | zones | at | this | time. | Upon | completion | of | this | work, | the | system | shall | be |
| reevaluated | in | the | presence | of | the | Engineer. | This | process | shall | be | repeated | until | the | operational | ||||
| requirements | are | met. |
| All | costs | associated | with | testing | and | evaluation | of | the | VDS, | including | the | repositioning | or | addition | of | new |
| materials, | shall | be | considered | incidental | to | the | item. |
Compensation
819.80: Method of Measurement
Stop Line Vehicle Detection Systems will be measured as each system furnished and installed.
Advanced Vehicle Detection Systems will be measured as each system furnished and installed.
Pedestrian Pushbuttons and APS Pushbuttons will be measured as each pushbutton furnished and installed.
819.81: Basis of Payment
| Stop | Line | Vehicle | Detection | Systems | will | be | paid | for | each | system | installed | at | an | intersection. | For | the | purposes |
| of | this | work, | an | intersection | shall | be | defined | as | all | roadway, | path, | and/or | trail | approaches | controlled | by | a |
| single | traffic | signal | controller. | Where | a | Video | Monitoring | System | is | required | per | 819.40: | General, | it | shall | be | |
| included | in | the | cost | of | Item | 819.840. |
Advanced Vehicle Detection System will be paid for each system installed on an intersection approach.
| Pedestrian | Pushbutton | and | APS | Pushbutton | will | be | paid | for | each | pushbutton | assembly | installed. | The |
| pedestrian | sign | mounted | directly | above | the | pushbutton | shall | be | considered | incidental | to | the | item. |
| The | unit | cost | of | each | vehicle | detection | system | or | pushbutton | item | shall | include | all | wiring, | cabling, | mounting |
| hardware, | software, | firmware, | video | monitoring | system | (if | required), | testing, | calibrating, | Department | ||||||
| Acceptance, | training, | and | all | other | labor | and | materials | required | for | the | system(s) | to | operate | per | the | Plans. |
819.82: Payment Items
Item number Description Unit
819.840 Stop Line Vehicle Detection System Each
819.845 Advanced Vehicle Detection System Each
819.850 Pedestrian Pushbutton Each
819.855 APS Pushbutton Each
00715 - 12
| SUBSECTION | 850: | TRAFFIC | CONTROLS | FOR | CONSTRUCTION | AND |
| MAINTENANCE | OPERATIONS |
| Subsection | 850.25: | Arrow | Board |
| Subsection | 850.45: | Arrow | Board |
| Subsection | 850.65: | Arrow | Board |
| Delete | these | subsections. |
| Subsection | 850.80: | Method | of | Measurement | |||||||
| Delete | the | 7th | paragraph | beginning | with | “Arrow | Board | will | be | measured | …” |
| Subsection | 850.81: | Basis | of | Payment | ||||||||
| Delete | the | 7th | paragraph | beginning | with | “Arrow | Board | will | be | paid | for | …” |
| Subsection | 850.82: | Payment | Items | ||||||||||||
| Revise | description | and | unit | of | item | 852. | to | Safety | Signing | for | Traffic | Management | / | Square | Foot. |
| Delete | item | number | 856. |
| SUBSECTION | 856: | CONNECTED | WORK | ZONE | NOTIFICATION | SYSTEM | AND |
| ASSOCIATED | DEVICES |
| Subsection | 856: | Connected | Work | Zone | Notification | System | and | Associated | Devices |
| Add | this | new | subsection. |
DESCRIPTION
856.20: General
| The | Connected | Work | Zone | Notification | System | (CWZNS) | is | a | system | of | field | devices | that | transmit | real‐time | |
| location‐based | data | about | work | zones. | CWZNS | field | device | data | is | provided | in | a | Work | Zone | Data | Exchange |
| (WZDx) | Device | Feed | in | accordance | with | the | United | States | Department | of | Transportation | (USDOT) | WZDx | |||
| Specification. | The | Device | Feed | is | consumed | by | the | MassDOT | Work | Zone | Manager | (WZM) | application. |
| The | Contractor | shall | be | responsible | for | furnishing, | installing, | repositioning, | operating, | maintaining, | and |
| removing | these | CWZNS | devices. |
MATERIALS
856.40: General
Materials shall meet the requirements specified in the following Subsections of Division III, Materials:
Material Section
Connected Work Zone Notification System Devices M10.18.0
Location Marker M10.18.1
Connected Arrow Board M10.18.2
| End | Location | Markers | shall | conform | to | M10.18.1: | Location | Marker | and | include | power | and | communication |
| status | lights | and | an | on/off | switch. |
856.41: Arrow Board
| Arrow | Boards | shall | consist | of | a | matrix | of | yellow | elements | that | may | be | illuminated | in | flashing | or | sequential |
| patterns, | on | a | non‐reflective, | black | background. | The | light | output | from | the | Arrow | Board | shall | meet | the | ||
| minimum | legibility | distance, | per | the | MUTCD. | The | elements | shall | be | capable | of | at | least | 50% | dimming | from | full |
| brilliance | to | avoid | nighttime | glare. | Arrow | Boards | that | are | continuously | operational | in | both | daylight | and | |||
| nighttime | conditions | shall | automatically | adjust | the | light | output | based | upon | ambient | light | conditions. |
The mounting height of the Arrow Board, when in operation, shall be per the Plans.
00715 - 13
The minimum dimensions and number of elements for Arrow Boards shall be per Table 856.41‐1.
Table 856.41‐1: Arrow Board Dimensions and Elements
| Item | Numbers | |
| MUTCD | Type Minimum | Dimensions |
| (width | by | height) |
| Minimum | Number | of |
Elements
| 856.060, | 856.160 | ||||
| B | 60 | in. | by | 30 | in. 13 |
| 856.096, | 856.196 | ||||
| C | 96 | in. | by | 48 | in. 15 |
Arrow Boards shall be capable of the following operating modes, per the MUTCD:
| Four | Corners | Flashing | Caution | |
| Alternating | Diamond | Caution | ||
| Flashing | Arrow | (left | or | right) |
| Sequential | Chevron | (left | or | right) |
| Flashing | Double | Arrow |
| Arrow | Boards | that | are | categorized | as | “Connected | Arrow | Boards” | (Items | 856.160 | and | 856.196) | shall | meet | the |
| requirements | of | M10.18.2: | Connected | Arrow | Board | in | addition | to | the | requirements | of | an | Arrow | Board | |
| described | in | this | Subsection. |
856.42: Shop Drawings
| Within | 30 | days | of | the | Notice | to | Proceed, | the | Contractor | shall | submit | to | the | Engineer | for | review | and | approval |
| cut | sheets | for | each | model | of | CWZNS | device | to | be | used. | The | cut | sheets | shall | document | device | specifications, | |
| including | details | of | how | the | CWZNS | device | will | communicate. | Work | that | requires | the | use | of | CWZNS | devices | ||
| shall | not | commence | until | the | submission | has | been | approved. |
CONSTRUCTION METHODS
856.60: General
| At | least | 15 | days | prior | to | deploying | CWZNS | devices, | the | Contractor | shall | visit | the | site | to | verify | cellular |
| coverage. | If | the | devices | the | Contractor | plans | to | deploy | do | not | have | coverage, | the | Contractor | shall | swap | out |
| the | cellular | modem, | SIM | card, | or | both | to | a | carrier | that | provides | coverage. | If | no | adequate | cellular | coverage |
| exists | from | 4G | LTE | or | 5G | providers, | the | Contractor | shall | immediately | notify | the | Engineer. |
The Contractor shall install CWZNS devices at the locations shown on the Plans.
| Per | the | WZDx | Specification | Device | Feed, | an | End | Location | Marker | shall | have | a | single | MarkedLocation | with | the |
| “type” | property | as | “work‐zone‐end”. |
| The | Contractor | shall | install | and | power | on | the | End | Location | Marker | coinciding | with | the | deployment | of | the | ||
| temporary | traffic | control | setup | that | calls | for | its | use. | The | Contractor | shall | power | down | and | remove | the | ||
| Location | Marker | at | the | conclusion | of | the | removal | of | the | temporary | traffic | control | setup. | If | the | location | of | the |
| work | moves | during | a | work | shift, | the | Contractor | shall | power | down | the | Location | Marker, | relocate | it, | and | then | |
| power | it | back | on. |
| The | operating | mode | for | the | Arrow | Board | or | Connected | Arrow | Board | shall | be | per | the | Plans. | When | activated, |
| the | minimum | element | on‐time | shall | be | 50% | for | the | flashing | mode, | with | equal | intervals | of | 25% | for | each |
| sequential | phase. | The | flashing | rate | shall | be | not | less | than | 25 | or | more | than | 40 | flashes | per | minute. |
| If | a | Connected | Arrow | Board | is | being | used | to | transmit | its | location | without | utilizing | other | arrow | board |
| functions, | such | as | operating | a | Flashing | Arrow, | the | arrow | board | shall | remain | dark | and | removed | from | the |
| roadway | or | protected | from | approaching | traffic | while | the | data | is | being | transmitted. |
| The | Contractor | shall | be | responsible | for | remediating | any | CWZNS | device | that | is | not | operating | as | specified, | at |
| no | additional | cost | to | the | Department. |
00715 - 14
| CWZNS | devices | that | are | lost, | stolen, | vandalized, | damaged, | destroyed, | or | deemed | unacceptable | while | their | use | |||
| is | required | on | the | project | shall | be | replaced | by | the | Contractor | at | no | additional | cost | to | the | Department. |
COMPENSATION
856.80: Method of Measurement
| Arrow | Boards | and | Connected | Arrow | Boards | will | be | measured | by | the | Day. | Each | period | of | up | to | 24 | hours | |
| during | which | an | Arrow | Board | or | Connected | Arrow | Board | is | in | use | will | be | measured | as | one | day, | regardless | of |
| the | number | of | times | that | the | unit | is | positioned, | repositioned, | removed, | or | returned | to | service. |
| End | Location | Markers | will | be | measured | by | the | Day. | Each | period | of | up | to | 24 | hours | during | which | a | End | |
| Location | Marker | is | in | use | will | be | measured | as | one | day, | regardless | of | the | number | of | times | that | the | unit | is |
| positioned, | repositioned, | removed, | or | returned | to | service. |
856.81: Basis of Payment
| Arrow | Boards | and | Connected | Arrow | Boards | will | be | paid | for | at | the | contract | unit | price | per | day | which | shall |
| include | full | compensation | for | labor | and | materials, | positioning, | repositioning, | and | removing | or | returning | to |
service.
| End | Location | Markers | will | be | paid | for | at | the | contract | unit | price | per | day | which | shall | include | full | compensation |
| for | labor | and | materials, | positioning, | repositioning, | and | removing | or | returning | to | service. |
| If | an | End | Location | Marker | is | attached | to | another | traffic | control | device | that | is | not | otherwise | called | for | in | the |
| Plans | or | Specifications, | that | ancillary | device | shall | be | considered | incidental | to | the | cost | of | the | End | Location |
Marker.
| Licenses, | fees, | communication | costs, | power | costs, | and | access | to | real‐time | and | recorded | data | associated | with | |
| the | Device | Feed | for | CWZNS | devices | shall | be | considered | incidental | to | the | cost | of | the | item. |
The Department will not pay for CWZNS devices that fail to operate as specified.
856.82: Payment Items
Item number Description Unit
856.060 Arrow Board (Type B) Day
856.096 Arrow Board (Type C) Day
856.160 Connected Arrow Board (Type B) Day
856.196 Connected Arrow Board (Type C) Day
856.201 End Location Marker Day
SECTION 900: STRUCTURES
SUBSECTION 901: CEMENT CONCRETE
| Subsection | 901.20: | Materials | |||||||||||||||
| Delete | Asphaltic | Materials | – | M3, | Preformed | Bituminous | Fiber | Joint | Filler | – | M3.05.3 | and | add | the | following | in | M |
| number | sequence: |
Preformed Expansion Joint Filler M9.14.0
00715 - 15
SUBSECTION 983: REVETMENT
| Subsection | 983.40: | General | |||||||||||||
| Delete | Preformed | Bituminous | Fiber | Joint | Filler | – | M3.05.3 | and | add | the | following | in | M | number | sequence: |
Preformed Expansion Joint Filler M9.14.0
DIVISION III
MATERIALS SPECIFICATIONS
SECTION M3: ASPHALTIC MATERIALS
| Subsection | M3.05.5: | Preformed | Bituminous | Joint | Filler | for | Concrete |
| Delete | this | subsection. |
SECTION M9: MISCELLANEOUS MATERIALS
| Subsection | M9.14.0: | Preformed | Expansion | Joint | Filler |
| Replace | this | subsection | with | the | following: |
| Preformed | expansion | joint | filler | for | concrete | applications | and | structural | construction | shall | meet | the | ||||
| requirements | specified | herein. | The | Contractor | shall | provide | certified | test | data | which | documents | compliance | ||||
| with | the | required | physical | properties. | The | certified | test | data | shall | be | submitted | to | the | Engineer | for | approval. |
Table M9.14.0‐1: Types of Preformed Expansion Joint Filler
Speciϐication Type and Description
| AASHTO | M | 153 | |||
| Type | I | – | Sponge | Rubber | |
| Type | II | – | Cork | ||
| Type | III | – | Self‐Expanding | Cork | |
| Type | IV | – | Polyurethane‐Bonded | Recycled | Rubber |
| AASHTO | M | 213 | ||||||||
| Type | I | – | Asphalt‐Saturated | Cellulosic | Fiber | |||||
| Type | II | – | Asphalt | Binder‐Cork | with | Asphalt‐Saturated | or | Glass | Fiber | Felt |
| Type | III | – | Polyurethane‐Bonded | Recycled | Rubber |
| ASTM | D1752 | |||
| Type | IV | – | Recycled | PVC |
| ASTM | D7174 | |||||||
| Type | I | – | Closed‐Cell | Polyethylene | or | Blended | Polyethylene | Foam |
| ASTM | D8139 | ||||
| Type | I | – | Closed‐Cell | Polypropylene | Foam |
| Subsection | M9.14.2: | Closed | Cell | Foam | Joint | Filler |
| Delete | this | subsection: |
M10.03.1: Field Monitoring Unit
| All | Field | Monitoring | Units | (FMU) | shall | be | compatible | with | the | MassDOT | Critical | Operations | Multi‐ |
| jurisdictional | Modular | System | (MCOMMS), | cloud‐based | management | system. |
| Subsection | M9.14.2: | Closed | Cell | Foam | Joint | Filler |
| Delete | this | subsection: |
00715 - 16
SECTION M10: TRAFFIC CONTROL DEVICES
| Subsection | M10.03.1: | Field | Monitoring | Unit |
| Add | these | new | subsections: |
M10.03.1: Field Monitoring Unit
| All | Field | Monitoring | Units | (FMU) | shall | be | compatible | with | the | MassDOT | Critical | Operations | Multi‐ |
| jurisdictional | Modular | System | (MCOMMS), | cloud‐based | management | system. |
| FMUs | shall | be | capable | of | operating | independently | from | the | brand | of | traffic | signal | controller, | vehicle | and |
| pedestrian | detection | systems, | battery | backup | system | (BBS), | and | any | other | Ethernet‐based, | web | accessible | |||
| device | present | in | the | traffic | signal | controller | cabinet. |
M10.03.1.A: Hardware
| The | FMU | shall | communicate | via | an | Ethernet | port | with | an | RJ45 | connector | and | have | an | integrated | Ethernet |
| switch | with | a | minimum | of | four | ports. |
| The | FMU | shall | be | powered | via | standard | 120 | VAC | input | power. | The | FMU | shall | include | an | integrated | battery | |
| and | battery | charging/monitoring | circuit | that | will | allow | the | FMU | to | fully | function | even | if | all | other | electrical | ||
| service | to | the | cabinet | has | been | interrupted. | The | battery | shall | continue | to | supply | the | FMU | with | power | for | a |
| minimum | of | 5 | hours | on | a | single | charge. |
| The | FMU | shall | have | an | integrated | GPS | that | will | allow | for | automated | telemetry | without | additional | ||||
| configuration. | The | GPS | shall | be | capable | of | providing | a | time | sync | pulse | to | the | internal | clock | of | a | connected |
| traffic | signal | controller. | The | FMU | shall | utilize | the | integrated | GPS | to | geolocate | itself | on | a | map | via | the | FMU |
| management | software. |
M10.03.1.B: Software
| The | configuration | of | the | FMU | shall | be | accomplished | by | accessing | FMU | management | software | via | an | internet |
| browser. | It | shall | be | possible | to | configure | the | FMU | without | any | special | software. |
| The | FMU | shall | operate | without | requiring | a | static | IP | address. | The | only | configuration | required | at | the | FMU | is | to |
| enter | the | URL | to | the | host | of | the | FMU | management | software. |
| The | FMU | shall | utilize | HTTPS | protocols | and | XML | data | structure | for | communications | with | the | FMU |
| management | software. | The | data | shall | be | scalable | for | future | expansion; | proprietary | protocols | shall | not | be |
used.
M10.03.1.C: Wireless Connectivity
The FMU shall be supplied with an internal 4G LTE cellular modem.
| The | modem | shall | support | future | upgrades | to | 5G | service, | when | available, | and | shall | be | compatible | with | SIM |
| cards | from | multiple | cellular | carriers. |
M10.03.1.D: Remote Access
| Remote | access | to | any | traffic | signal | cabinet | component | that | has | a | web | interface | via | the | FMU | shall | not | require |
| the | end | user | to | create | a | separate | Virtual | Private | Network | (VPN) | connection. |
| Subsection | M10.08.0: | Vehicle | Detection | Systems |
| Subsection | M10.08.0: | Vehicle | Detection | Systems |
| Subsection | M10.08.0: | Vehicle | Detection | Systems |
| Add | theses | new | subsections: |
M10.08.0: Vehicle Detection Systems
| Vehicle | Detection | Systems | (VDS) | shall | be | capable | of | detecting | the | presence | of | all | motor | vehicle | types | and |
| bicycles | in | designated | areas | and | sending | corresponding | detector | outputs | to | a | traffic | signal | controller. |
00715 - 17
All in‐cabinet components of VDS shall be compatible with the following standards:
| • | ATCC | 5301 | v02 | |
| • | ATC | 5201 | v06 | |
| • | NEMA | TS2 | environmental | standards |
| Through | an | ethernet‐based | connection | to | the | detection | module | and/or | cabinet | interface | device | in | the | field | or |
| through | the | internal | network | of | the | traffic | signal | controller | cabinet, | the | VDS | shall | support | remote | |
| management | of | motor | vehicle | and | bicycle | detection | configurations | and | access | to | data | including: |
| • | The | number, | location, | and | size | of | detection | zones. | |||
| • | Configuration | of | the | detector | channel | and | assigned | phase | for | each | zone. |
| • | Configuration | of | detection | zones | for | signal | performance | measurement | data | collection. | |
| • | The | ability | to | add | and | remove | users. |