Facility Master Plan 2025_East Wing Renovation.pdf
PDF 399 KB Posted
- Attached to
- RRCC 27-01-RFQ01 East Wing Renovation
- Solicitation number
- RFQ1 GJLA 2027000002 2
- Issued by
- Jefferson County, Colorado
About this file
This is a Facility Master Plan document for Red Rocks Community College (RRCC) in Colorado, specifically detailing the East Wing Renovation project (RRCC 27-01-RFQ01). The plan outlines the relocation of the President's Office and Marketing suite to the East Wing Level 1, consolidating these departments with the Foundation Office to enhance operational alignment and communication. The project involves converting three low-utilization classrooms into office and collaborative spaces, reconfiguring two Institutional Research offices, and relocating the Call Center to a new One-Stop Shop facility. The proposed layout includes dedicated private offices for the President, Executive Assistant, and marketing staff (totaling 2 leadership and 3 marketing positions), along with a shared conference room and reconfigured Institutional Research space. No precedent projects are required prior to implementation.
The document includes floor plan comparisons showing the existing East Wing Level 1 layout and the proposed configuration, with clearly marked zones for circulation, office spaces, interactive learning spaces, and areas designated to remain. The plan adheres to institutional guiding principles emphasizing belonging, growth, and adaptability, with implementation anticipated on a near-term to mid-term timeline. The architectural firm Brownstein Hyatt & Farber Anderson Mason Dale was involved in the planning. Additional details regarding pricing, funding sources, response deadlines, and specific contract terms are not included in this facility planning document, as it serves as a strategic blueprint rather than a formal solicitation document with procurement specifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RRCC 27-01-RFQ01 East Wing Renovation.pdf | ||
| RRCC 27-01-RFQ01 Pre-bid Meeting Sign In Sheet.pdf | ||
| SC5.1 AE Agrmt and T&C.pdf | ||
| Lakewood Campus Map.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
4 The Plan | 54
b. Relocate Marketing and President’s Office
The Need The President’s office is currently located behind the Admissions suite, adjacent to classrooms. The existing Marketing suite is located on Level 3 of the West Wing. There is a functional need for these two programs to be located in close proximity in an accessible location.
The proposed relocation includes dedicated private offices, an open work environment, and a conference room to support communication and joint initiatives.
The Project The new plan places the President’s Office and Marketing suite adjacent to the Foundation Office, fostering stronger alignment amongst these working groups. To accommodate this change, three classrooms with low utilization will be taken offline and rescheduled to other existing general classrooms on campus. The Call Center will move to the new One-Stop Shop (see project a), while two existing Institutional Research offices will be reconfigured and absorbed into the plan. The balance of private offices will be assigned to leadership staff (2) and marketing (3).
Necessary Precedent Projects: none
Guiding Principles:
Priority:
Marketing & President’s Office Proposed
| 1. | President’s Office |
| 2. | Executive Assistant |
| 3. | Conference Room |
| 4. | Leadership Office |
| 5. | Institutional Research |
| 6. | Marketing |
| 7. | Marketing Office |
East Wing - Existing
| 1. | Classroom |
| 2. | Institutional Research |
| 3. | Call Center |
1 1 1 3
4 7 7 7
5 5
ADMISSIONS
ADMISSIONS
FOUNDATION
OFFICE
FOUNDATION
OFFICE
EAST ENTRY
EAST ENTRY
Legend
Existing to remain
Circulation
Office
Interactive
Existing exit learning spaces sense of belonging growth & adaptability near-term mid-term
Brownstein Hyatt & Farber Anderson Mason Dale
Proposed East Wing Level 1 Floor Plan
Existing East Wing Level 1 Floor Plan
The entire Master Plan will be shared with the awarded firm.