FACILITY ELECTRICAL ONE LINE REV 1.pdf
PDF 200 KB Posted
- Attached to
- J059--Copy of 3 Bath Year Electrical Testing (VA-22-00080720) Federal contract opportunity
- Solicitation number
- 36C24222Q1084
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| December 2017 - Bath VA Combined Test Report.pdf | ||
| Bath VA Panel Locations Breakdown 24 Aug 22.xlsx | XLSX spreadsheet | |
| 36C24222Q1084 0003.docx | DOCX document | |
| 36C24222Q1084 0002.docx | DOCX document | |
| 36C24222Q1084 0001_1.docx | DOCX document | |
| BATH SCA WD.docx | DOCX document | |
| Bath VA Primary Distribution Inventory.xls | XLS spreadsheet | |
| Facility One-Line.pdf | ||
| Bath VA Panel Locations.xlsx | XLSX spreadsheet | |
| VAAR 852.219-78.docx | DOCX document | |
| Statement of Work.docx | DOCX document | |
| 36C24222Q1084.docx | DOCX document | |
| BATH DBA WD.docx | DOCX document |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
POWER CO. METERING
TRANSFORMERS AND
BILLING METER MOUNTED
ON TERMINAL POLE.
SEE DWF VAC-514-590
FOR DETAILS
NYSEG/RG&E. 12.47KV
3 PHASE "SOLIDLY
GROUNDED" WYE WITH
STATIC/NEUTRAL WIRE
MTR
CB
CB 400A
CB
29A 35
34N
34S
GEN
76N
76S
PARK
E W
54 55
52 53
929310424201475 17
16 18
78N 78S 103
STC
5A
25 KVA
120/240V
5A
HOUSING
5A
25 KVA
120/240V
200A
80A
50A
200A
100A
5A
10A
18A 100A
20A
100A 100A
150A
40A
40A
175A 175A
15A
100A
100A 20A
10A 100A
10A
100A 50A
5A
15A
3 4
10A 10A
LOAD BANK
CONNECT
300 KVA
120/208V
750 KVA
480V
750 KVA
480V
112.5 KVA
120/208V
50 KVA
120/240V
150 KVA
120/208V
500 KVA
120/208V
300 KVA
480/277V
225 KVA
120/208V
167 KVA
120/240V
750 KVA
480V/277V
500 KVA
120/208V
75 KVA
120/208V
112.5 KVA
120/208V
75 KVA
120/208V
300 KVA
120/208V
300 KVA
120/208V
300 KVA
120/208V
225 KVA
120/208V
750 KVA
480 V
500 KVA
12.5 KV
500 KVA
120/208V
LOAD BANK
TRANSFORMER
25 KVA
120/240V
MAIN SERVICE SWITCH GEAR
WEST LOOP
E A
S T
L O
O P
EAST LOOP
LS9LS8
LS7
LS6LS5LS4LS3LS2LS1
LS13LS12LS11
LS10
LS14
LS15
LS16
LS17LS18
T6
T18-2
T2-1 T7
T16-2
T9
T13
T8T3 T5T4
225 KVA
480V/277V
T2-2
T17-1
T1-1
T11
T18-1
T16-1
T1-2
T17-2
T15
T14
T10
T12
20A
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
E001
One Line Diagram
A
AS-BUILT
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
ELECTRICAL
MAINTENANCE
Bath, NY
528A6-17-637
Building Number
8/11/17 Mortensen Steve W.Revisions: Date:
NOTE:
USERS OF THESE DRAWINGS ARE RESPONSIBLE FOR VERIFYING
EXISTING DIMENSIONS AND CONDITIONS IN THE FIELD
o n e e i g h t h i n c h o n e f o o t t h r e e i n c h e s e f o t o n e a n d o n e h a l f i n c h e s o t o n e i n c e f o o t t h r e e q u a r t e r s i n c o t o a l f i n c o t t h r e e e i g h t h s i n c e f o o t o n e q u a r t e r i n c e f o o t
One Line Diagram
LEGEND
PAD-MOUNTED LOOP SWITCH UNIT
PAD-MOUNTED SWITCH AND FUSE UNIT
TRANSFORMER WITH INTEGRAL FUSING
TRANSFORMER
BUILDING IDENTIFICATION NUMBER
CB CIRCUIT BREAKER
INDICATES SWITCHES TO BE OPENED FOR LOOP GENERATOR OPERATIONS.
INDICATES SWITCHES TO BE CLOSED FOR LOOP GENERATOR OPERATIONS.
INDICATES SWITCHES OPEN FOR ALL STANDARD OPERATIONS.
Numerous changes from power outage on 3/2/18. 3/7/18