This request for proposal and associated statement of work outline requirements for process water chemical treatment and fuel treatment services at Federal Aviation Administration facilities located in Hilliard, Florida. The services include furnishing chemicals and expertise to control scaling, corrosion, slime and algae in process water systems as well as biocide and sludge dispersant treatment for fuel systems. The contract period is one base year with four option years, with a targeted start date of October 1, 2021. Proposals are due by September 21, 2021 and shall be submitted electronically. The solicitation is set aside first for 8(a) SEDBs and SDVOSBs, then small businesses, with large businesses considered last.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FEDERAL AVIATION ADMINISTRATION

Statement of Work

PROCESS WATER CHEMICAL TREATMENT and FUEL TREATMENT PROGRAM

1. Background: The FAA operates and maintains at this facility, a closed hot water heating system, closed chilled water cooling system, open condenser water system as well as a well water and sewage treatment system.

Package type boilers are utilized for generating hot water, centrifugal chillers are utilized for generating chilled water and an open cell-cooling tower is utilized for condenser water heat rejection. Process water chemical treatment is utilized to control scale deposit, corrosion, pitting, slime and algae. A monitoring program using test coupons, and daily water sample testing is employed to verify satisfactory performance of the Process Water Chemical Treatment Program.

2. Requirement: The FAA has a need for Process Water Chemical Treatment and a Fuel Treatment Program whereby a private contractor furnishes necessary chemicals and chemical expertise to properly maintain control of scaling, corrosion, pitting, slime and algae in the Process Water System and biocide and sludge dispersant treatment for the fuel system. The contractor shall also furnish and maintain all chemical pumps necessary to pump liquid requirements by this contract. The pumps must be capable of variable/adjustable output as required to maintain proper chemical balance. The vendor shall provide and maintain all chemical injection pumps, tubing, injectors, and metering equipment. The vendors will supply all reagents and chemicals required to maintain the water treatment, fuel treatment and sewage treatment systems.

3. FAA Responsibility and Equipment:

a. Responsibility: The FAA will operate in accordance with the contractor's instructions, all chemical treatment equipment provided by the contractor.

b. Equipment: FAA owned chemical treatment equipment for the various systems are as follows:

(I) Hot Water Boiler System: Manual pot type feeder.

(2) Chilled water System: Manual pot type feeder.

(3) Condenser Water System: Maintaining the condenser system water chemical treatment will be the responsibility of the contractor. System is to be equal to the following and approved by the COTR. Conductivity controlled automatic bleed, sensor operated with automatic makeup. Automatic timed chemical feed pumps with injector. P-H monitoring equipment. Water meter on makeup line with electrical contacts.

(4) Sewage System

(5) Well Water System

(6) Fire protection System

(7) Soft Water System: We have three water softeners in chemical building and one in the B 116. All maintenance and repairs shall be the contractor's responsibility, it is not the Contractors responsibility to Replace the Softener heads, just maintain and repair if possible.

4. Regulatory Requirements: All chemicals and applications of chemicals and procedures shall be in accordance with all requirements of Federal, State and Local Governments.

5. Contractor Qualifications: The contractor and his/her field representatives who propose to regularly visit the facility shall be fully established, qualified and experienced in the field of process water chemical treatment. The field representative shall be experienced in process water treatment of the above listed systems and knowledgeable in the setup, use and adjustment of, based upon knowledge of local makeup water analysis, anticipating the types of water treatment problems likely to occur, and furnish the appropriate chemicals and recommended concentrations to prevent the problems. The heating and air conditioning equipment in which this contractor will be maintaining water quality control cost several millions of dollars. The cost of energy to operate this equipment is extremely high and therefore, the maintenance of maximum efficiency is essential. If a very thin film of deposit is allowed to develop and remain on this equipment, heat transfer for a year the reduction in efficiency will cost the FAA several times the annual cost of this contract. Therefore it is not only required that the contractors field representative be knowledgeable of local makeup water and atmospheric conditions as specified previously, he/she must also be reasonably available to visit the facility on within 12 hours of notice if required, due to unusual or emergency conditions.

In order to facilitate this, it is a contract requirement that the contractor or his/her field representative maintain an office or residence within an approximate 50 mile radius of the FAA facility and provide successful chemical treatment services to other similar customers in this geographical area containing similar water conditions. The chemicals furnished by the contractor for water treatment shall be the best chemical grade available for the purpose intended. They shall be scientifically and specifically formulated for each application and have been successfully used in the past and proved to be effective for the purpose intended with minimum side effects.

6. Process Water Chemical Treatment Program:

a. Hot Water System: Furnish and install as needed suitable chemicals which will control corrosion on internal metal pipe surfaces and prevent scale deposit buildup anywhere in the system. Provide a recommended chemical concentration level, and the test equipment as required to do test.

b. Chilled Water System: Furnish and install as needed suitable chemicals which will control corrosion on internal metal surfaces and prevent scale deposit buildup on chiller tubes and anywhere in the system.

Provide a recommended chemical concentration level, and test equipment as required to do test.

Regina Singleton Highlight

c. Condenser Water System: The current bleed off procedure will be based on recommended maximum cycles of concentration, adjust automatic bleed off for proper conductivity setting. Furnish and install suitable chemicals which will prevent growth of algae and slime by automatic feed methods. Furnish and install suitable chemicals which will hold minerals in the system water in solution and prevent them from depositing as scale on any surfaces of the system. Furnish and install suitable chemicals which will control corrosion of system metal surfaces. Make necessary adjustments to chemical feed pumps, timers, switches for proper operation with chemicals that contractor furnished. Provide a recommended chemical concentration level, and test equipment as required to do test.

d. Sewage Water System: ESA Cast-Away or equivalent will be used to prevent the buildup of scale in the quantity necessary to control scale and other deposits in the urinal drain lines and traps for biweekly PM's, the change will be quantity necessary to control scale and other deposits in the urinal drain lines and traps for weekly PM's. (This change will double the usage and quantity required and will need a new RFP The chemical "Bacstop" or equal will be provided to control odor in the sewer sumps.

e. Well Water System: Maintain to Florida State Standards for Potable Water.

f. Fire Protection System: Chemicals to prevent the buildup of scale in our wet pipe fire protection system.

g. Soft Water System: Maintain soft water for make up in condenser water system,, chill water system, and hot water heating system.

All chemicals to control buildup and deposits in the waste water system will be provided by the contractor. The chemicals used will be approved by the COTR

7. Chemicals: All chemicals shall be furnished to the FAA systems in sealed containers with a factory label conforming to EPA regulations completely describing the ingredients and any warnings. Hand written labels will not be acceptable. Chemicals shall be guaranteed to not damage systems in which they are placed using concentrations recommended. The contractor shall furnish the FAA with all material safety data sheets for chemicals used. The use of acid to accomplish the requirements previously specified is prohibited.

Prospective contractors whose bids incorporate the use of acid together with other chemicals will be rejected.

Acids can only be used on an individual circumstance basis to correct scale deposits buildup caused by a failure to comply with the requirements of this specification and then only with the written authorization of the contracting officer.

8. Service Program and Contractor Schedule:

a. At least one month's supply of all required chemicals shall be delivered to the facility within ten calendar days of contract start date. Three month's supply of all required chemicals shall be delivered to the facility within thirty calendar days of contract start date and each three month interval. Within ten days of the contract start date the contractors' field representative shall make a pre-scheduled visit to the facility at which time he/she shall set up and adjust all chemical feed equipment, train and supervise FAA employees in the mixing of a supply of all required chemicals, and establish a written program and schedule of required checks and tasks for FAA employees in connection with the chemical treatment program. This visit shall be repeated at two week intervals for the first month. Thereafter, the visits shall be at least monthly except upon notification of problems, then the visits shall be as often as required to maintain the water treatment program in accordance with specification requirements. If notified of a problem, the contractor shall call or visit the site within a minimum of twenty- four hours.

1. Service Provider will be able respond to customer service/support related inquires and requests within the applicable response time of 24 hours with a mile radius of North Florida/Southern Georgia 50 mile radius.

Tina Carter Highlight

b. During the initial site visit and the pre-scheduled final site visit the contractor and the FAA will jointly internally inspect all systems and verify existence and/or extent of scale deposit, corrosion, pitting, etc., prepare a report containing these findings, jointly sign the report and mail a copy to the contracting officer. If the initial site visit report indicates presence of scale deposit, immediate action, as directed by the contracting officer will be taken to chemically descale in a non- harmful manner the affected equipment in order to restore maximum operating efficiency. The expense of this operation as a result of the initial site visit will not be borne by the contractor without additional compensation. If the final site visit report shows evidence of scale, corrosion, or pitting, immediate action to descale affected equipment will be taken by the contractor, at the contractor's expense.

c. At least one month's supply of Salt will be kept on-sight and required for the soft water treatment system.

9. Contract Site Visit Report: Within ten calendar days of each site visit, a report shall be mailed to the facility and also the contracting officer containing at least the following information for each system.

a. Last previous recommended chemical concentration levels.

b. Chemical concentration levels based upon water samples taken at the time of the report.

c. Recommended changes to chemical treatment program to correct concentration levels.

d. Any unusual condition found during site visit, probable cause, and recommended corrective action.

e. Recommended changes to any other system parameter such as bleed off rate, conductivity set point, etc.

f. Other information affecting the system and recommended changes if applicable.

10. Fuel Treatment Program: The contractor will treat all diesel fuel with biocide and sludge dispersant. The treatment must be adequate to prevent any microbial contamination of the fuel and to remove all sludge in the fuel system. The contractor will test and analyze quarterly. The contractor will make necessary adjustments to the fuel treatment program based on test results.

11. Option to Renew: This contract may be renewed for a maximum of four additional years with the mutual agreement of the contractor and the FAA.

12. Licenses and Permits: The contractor shall obtain all required licenses and permits for the prosecution of the work. He/she shall require any and all of his/her subcontractors to comply with these provisions.

13. Contractor and/or employees that work at the site shall be badged with a FAA provided contractor badge which is obtained by security background checks through FAA security office.

14. Quarterly corrosion coupon analysis for cooling tower water and chilled loop water and hot loop water.