2. Valid Eval Rubric (Version 2.0).pdf
PDF 117 KB Posted
- Solicitation number
- FA9451-21-S-0001
About this file
This document is an evaluation criteria rubric for an advanced research announcement (ARA) issued by the Air Force Research Laboratory's Directed Energy Directorate (AFRL/RD) under Solicitation Number FA9451-21-S-0001 for the Directed Energy Technology Experimentation Research (DETER) program.
The DETER ARA seeks proposals for research, development, modeling and simulation, design, component/subsystem prototyping, fabrication, integration, and testing of directed energy source components, systems, and accessories to support laboratory research, experimentation, and field trials. The evaluation criteria covers areas such as technical merit, scientific and technical approach, relevance to AFRL programs, and value versus cost. Specific topic areas include directed energy sources, acquisition tracking and pointing, directed energy weapon systems, effects testing, modeling and simulation, wargaming, space domain awareness, and general support services. The ARA is an open, ongoing announcement with the potential for various call types and submission methods.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AFRL DETER/TACTICAL/RAD (version 2.0) Evaluation Criteria Defined
DEFINITION
TECHNICAL MERIT
OVERALL SCIENTIFIC /
PROBLEM BEING SOLVED
What is the problem being solved or the capability gap being addressed for AFRL with the proposed solution? Demonstrate the depth of your understanding of the problem's components and stakeholders.
SOLUTION/PRODUCT
SUMMARY
Write a clear, concise description of your product or solution. Succinctly explain what your product or solution is and how it addresses the problem statement/capability gap. Provide the reviewers with a clear sense of the solution you are proposing, specifically highlighting all proposed deliverables.
DEGREE OF INNOVATION Describe what's innovative about your approach. How big of a departure from the state-of-the-art is your solution?
RISK MITIGATION Identify the primary drivers of technical, schedule and cost risk, along with the proposed methods to reduce or mitigate them.
ENABLING
TECHNOLOGIES
Do the required enabling technologies introduce added risk? Using mature or proven underlying technologies and techniques helps to lower technical risk.
ALTERNATE
APPROACHES
Convince a skeptical audience that yours is the best from a technical perspective. Your case is strongest when you convincingly refute the alternatives.
weight 30%
RELEVANT EXPERIENCE Describe your relevant experience with similar work and/or with similar technologies.
Explain how your previous work with relevant projects makes you an ideal candidate to accomplish the proposed solution.
TECHNICAL MERIT
SOUNDNESS OF TECHNICAL
APPROACH
SCIENTIFIC FEASIBILITY Is the science behind the solution sound? Convince reviewers that the proposed solution is anchored by theory, analysis and/or data. Identify any foundational or proven technologies that were relied upon for the proposed solution.
TECHNICAL PERSONNEL
Briefly list and describe your core scientific and technical team. Do you have the people and technical capabilities you need to successfully complete your proposed project? If not, convince the reader you have a credible recruiting plan and can fill personnel gaps.
TECHNICAL FACILITIES &
RESOURCES
Briefly list and describe your technical facilities and resources. Do you have the resources and technical facilities you need to successfully complete your proposed project? If not, convince the reader you have a credible plan to attain the necessary facilities or resources to accomplish the proposed solution.
APPROPRIATENESS OF
MEASUREMENT
List the key performance indicators (KPIs) or technical performance measures (TPMs) that are most appropriate to measure your progress with this project. Prove these metrics are the most appropriate possible measurements of success for a project such as this one.
REASONABLE
SCHEDULE
Provide a schedule for the proposed solution. The provided schedule is realistic and reasonable for the proposed technical solution. Schedule includes thoughtfully considered milestones.
IMPORTANCE /
RELEVANCE TO AFRL
PROGRAMS
weight 20%
SOLUTION ALIGNMENT The proposed solution is logically mapped to one or more Topic Area(s). The proposed solution directly addresses one or more research thrust identified within the Topic Area(s).
IMPACT TO MISSION
Define the impact or benefits gained with your proposed solution. Specify contributions to
AFRL’s research and development within the Topic Area.
VALUE OF CONTRIBUTION The proposed solution provides meaningful contributions which outweighs the risks.
VALUE/COST
RELIABLE COST ESTIMATES Cost estimates provided are complete, realistic and credible. Cost estimates are supported with verifiable data or analysis.
PROPOSED VALUE The benefit or impact of the proposed solution appropriately outweighs the costs.
FUNDING AVAILABILITY The proposed solution and associated cost are within the availability budget or funding amounts.
AFRL DETER/TACTICAL/RAD (version 2.0) Evaluation Criteria
NOT SELECTABLE SELECTABLE, LOW SELECTABLE, HIGH HIGHLY RECOMMENDED
OVERALL SCIENTIFIC /
PROBLEM BEING
SOLVED
Undefined problem scope. Somewhat defined problem scope.
Adequately defined problem scope.
Very well-defined problem scope.
SOLUTION/PRODUCT
SUMMARY
Failed to describe intended solution.
Partly described intended solution.
Adequately described intended solution.
Clearly described intended solution.
DEGREE OF
INNOVATION
No departure from existing approaches.
Slight departure from existing approaches.
Significant departure from existing approaches.
Radical departure from existing approaches.
RISK MITIGATION Failed to identify key risks or mitigations.
Identified key risks but lacked credible mitigations.
Adequately identified key risks and mitigations.
Thoroughly identified key risks with credible mitigations.
ENABLING
TECHNOLOGIES
Relies on nonexistent or unavailable technology.
Relies on emerging, cutting-edge technology.
Relies on proven technologies.
Relies on commercially available or fielded technologies.
ALTERNATE
APPROACHES
No examination of alternatives.
Partially refutes alternatives. Adequately refutes alternatives.
Persuasively refutes alternatives.
RELEVANT
EXPERIENCE
Failed to provide relevant experience.
Indirect experience supporting relevant projects.
Direct experience completing relevant projects.
Direct experience successfully completing relevant projects.
TECHNICAL MERIT
SOUNDNESS OF
TECHNICAL APPROACH
SCIENTIFIC
FEASIBILITY
No scientific basis for presented approach.
Incomplete scientific basis for presented approach.
Credible scientific basis for presented approach.
Convincing scientific basis for presented approach.
TECHNICAL
PERSONNEL
Lacked essential expertise, or qualifications unclear.
Recognized gaps in expertise, but no plan to address needs.
Recognized gaps in expertise and presented specific plan to address needs.
Highly capable team with excellent composition. No unresolved gaps in expertise.
TECHNICAL FACILITIES
& RESOURCES
Lacked necessary facilities or resources.
Recognized gaps in necessary resources, but no plan to address needs.
Recognized gaps in necessary resources and offered specific plan to address needs.
Well-resourced to accomplish the proposed solution.
APPROPRIATENESS
OF MEASUREMENT
Failed to identify key performance metrics.
Poor measurement of indicators of impact.
Adequate measurement of indicators of impact.
Highly appropriate measurement of indicators of impact.
REASONABLE
SCHEDULE
Schedule is unrealistic or unreasonable.
Schedule is realistic and somewhat reasonable.
Schedule is realistic and reasonable.
Schedule is realistic, reasonable and includes well-conceived milestones.
IMPORTANCE /
RELEVANCE TO
AFRL PROGRAMS
SOLUTION ALIGNMENT Failed to address Topic Area.
Somewhat addressed Topic Area.
Adequately addressed Topic Area.
Directly addressed one or more research thrusts within Topic Area.
IMPACT TO MISSION
If successful, no improvement vs. existing technological approaches.
If successful, slight improvement vs. existing technological approaches.
If successful, significant improvement vs. existing technological approaches.
If successful, radical improvement vs. existing technological approaches.
VALUE OF
CONTRIBUTION
Expected contributions does not outweigh risks.
Expected contributions may outweigh risks.
Expected contributions outweigh risks.
Expected contributions substantially outweigh risks.
VALUE/COST
RELIABLE COST
ESTIMATES
Incomplete cost estimates.
Unrealistic cost estimates.
Credible cost estimates. Convincing cost estimates.
PROPOSED VALUE Expected pay-off does not outweigh proposed cost.
Expected pay-off may outweigh proposed cost.
Expected payoff outweigh proposed cost.
Expected payoff substantially outweigh proposed cost.
FUNDING
AVAILABILITY
Estimated cost exceeds available budget.
Estimated cost is within range of available budget.
Estimated cost is within available budget.
Estimated cost is well within available budget.
File details come from the government source that posted it. Updated .