Attach 6 - DD1423 CDRLs [A001-A012].pdf
PDF 1 MB Posted
- Solicitation number
- FA9451-18-S-0003
About this file
This Contract Data Requirements List (CDRL) outlines twelve data items required under a Broad Agency Announcement for the Pulsed And Continuous wave Innovation for Integration and Effects Research (PACIFIER) program. The Air Force Research Laboratory is seeking test and evaluation services related to laser vulnerability research. Required data items include computer software, test plans, design drawings, status reports, presentation materials, technical reports, user manuals, test reports, and property inventories. Submissions are due on various schedules as tests are conducted. Distribution of deliverables is restricted, and markings are required to control export. This CDRL establishes technical data rights policies and security procedures for all contract submissions.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA9451-18-S-0003 Call 0003 Attachment 1
11BCONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approval OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.: 0002
B. EXHIBIT....................................: A
C. CATEGORY..............................: OTHER
D. SYSTEM/ITEM........: Pulsed And Continuous wave Innovation For Integration and Effects Research (PACIFIER), Laser Vulnerability Research - Test (LVR-T) E. CONTRACT/PR NO.: FA9451-18-S-0003 Call 0003
F. CONTRACTOR.........: TBD
1. DATA ITEM NO.....................: A001
2. TITLE OF DATA ITEM .......: Computer Software Product End Items
3. SUBTITLE..............................:
4. AUTHORITY..........................: DI-AVCS-80700A (http://quicksearch.dla.mil)
5. CONTRACT REFERENCE..: See applicable Statement of Work (SOW)
6. REQUIRING OFFICE..............: AFRL/RDLE
7. DD250 REQ................................: LT
8. APP CODE.................................: A
9. DIST. STATEMENT REQUIRED.....: See Blk 16
10. FREQUENCY......................................: See Blk 16
11. AS OF DATE.......................................: See Blk 16
12. DATE OF FIRST SUBMISSION: See Blk 16
13. DATE OF SUBSEQUENT SUBM.: See Blk 16
14. DISTRIBUTION
0BA. ADDRESSEES
B. COPIES
DRAFT FINAL
AFRL/RDLE (PM) 1 1
AFRL/RDLB Ltr Ltr AFRL/RVKDL Ltr Ltr ACO Ltr Ltr
15. TOTAL: 1 1
16. REMARKS
Blk 4: Tailoring of DID Requirements. Computer Software Product End Items shall include appropriate documentation, source/object and executable code as well as operation guidance and algorithms developed under the contract to include line description and documentation for source code. Contractor format preferred. Documentation must be compatible with Microsoft Office 2010 or later version. The contractor shall submit the deliverable to the Government Program Manager on a CD-R. Submission via unencrypted or unsecure email is not permitted.
Blk 9: All technical data (including electronic media) shall be marked I.A.W. DoDI 5230.24 with Distribution Statement F and other required markings as shown indented below:
“DISTRIBUTION STATEMENT F: Further dissemination only as directed by Air Force Research Laboratory/RDLE, 01 January 2018, or higher DoD authority.” (ADD THIS ENTIRE DISTRIBUTION STATEMENT TO THE BOTTOM OF EVERY PAGE OF THE DELIVERABLE)
“WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec. 2751, et seq.) or the Export Administration Act of 1979, as amended. Title 50 U.S.C. App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate I.A.W. the provisions of the DoD Directive 5230.25.” (ADD “WARNING: EXPORT CONTROLLED” TO THE BOTTOM
OF EVERY PAGE OF THE DELIVERABLE)
“DESTRUCTION NOTICE—For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.”
DATA RIGHTS MARKINGS: If you are asserting technical data rights, all technical data shall be marked I.A.W. DFARS 252.227-7013.
Blks 8, 10-13: The contractor shall submit the draft Computer Software Product End Items 10 business days after Government request. The Government will provide comments to the contractor within 10 business days of receipt of the draft. The contractor shall provide the final version 10 business days after receipt of Government comments.
Blk 14: The contractor shall distribute the Computer Software Product End Items in accordance with Blk 14. When the addressee’s copy is identified by “Ltr”, send only a copy of the transmittal letter to that addressee.
17. PRICE GROUP: 18. ESTIMATED TOTAL PRICE :
G. PREPARED BY: Shane M. Johnson I. APPROVED BY: Mark Cruz
H. DATE: 10 January 2018 J. DATE: 23 January 2018
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 1 of 12 Pages http://quicksearch.dla.mil/
12BCONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approval OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.: 0002
B. EXHIBIT....................................: A
C. CATEGORY..............................: OTHER
D. SYSTEM/ITEM........: PACIFIER Laser Vulnerability Research - Test (LVR - T) E.
CONTRACT/PR NO.: FA9451-18-S-0003 Call 0003F.
CONTRACTOR.........: TBD
1. DATA ITEM NO........................: A002
2. TITLE OF DATA ITEM............: Test Plan
3. SUBTITLE..................................:
4. AUTHORITY.............................: DI-NDTI-80566A (http://quicksearch.dla.mil)
5. CONTRACT REFERENCE......: See applicable SOW
6. REQUIRING OFFICE..............: AFRL/RDLE
7. DD250 REQ................................: LT
8. APP CODE.................................: A
9. DIST. STATEMENT REQUIRED......: See Blk 16
10. FREQUENCY......................................: See Blk 16
11. AS OF DATE........................................: See Blk 16
12. DATE OF FIRST SUBMISSION: See Blk 16
13. DATE OF SUBSEQUENT SUBM.: See Blk 16
14. DISTRIBUTION
1BA. ADDRESSEES
B. COPIES
DRAFT FINAL
AFRL/RDLE (PM) 1 1
AFRL/RDLB Ltr Ltr AFRL/RVKDL Ltr Ltr ACO Ltr Ltr
15. TOTAL: 1 1
16. REMARKS
Blk 4: Tailoring of DID Requirements. A test plan shall be delivered for each test measurement series and coordinated with the Government Program Manager. Submissions shall be compatible with Microsoft Office 2010 or later version. Electronic versions must be submitted in a manner consistent with protecting export control and limited information. Submission via unencrypted or unsecure email is not permitted.
Blk 9: All technical data (including electronic media) shall be marked I.A.W. DoDI 5230.24 with Distribution Statement F and all other required markings as shown indented below:
“DISTRIBUTION STATEMENT F: Further dissemination only as directed by Air Force Research Laboratory/RDLE, 01 January 2018, or higher DoD authority.” (ADD THIS ENTIRE DISTRIBUTION STATEMENT TO THE BOTTOM OF EVERY PAGE OF THE DELIVERABLE)
“WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (title 22, U.S.C., Sec 2751, et. seq.) or the Export Administration Act of 1979, as amended (Title 50, U.S.C., App. 2401, et. seq.). Violations of these export law are subject to severe criminal penalties. Disseminate in accordance with the provisions of DoD Directive 5230.25.” (ADD “WARNING: EXPORT CONTROLLED” TO THE
BOTTOM OF EVERY PAGE OF THE DELIVERABLE)
“DESTRUCTION NOTICE—For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.”
DATA RIGHTS MARKINGS: If you are asserting technical data rights, all technical data shall be marked I.A.W. DFARS 252.227-7013.
Blks 8, 10-13: The contractor shall submit the draft Test Plan 30 calendar days prior to the applicable Test Readiness Review (TRR). The Government will provide comments to the contractor within 10 business days of receipt of the draft. The contractor shall provide the final version 10 business days prior to the applicable TRR.
Blk 14: The contractor shall distribute the Test Plan in accordance with Blk 14. When the addressee’s copy is identified by “Ltr”, send only a copy of the transmittal letter to that addressee.
17. PRICE GROUP: 18. ESTIMATED TOTAL PRICE :
G. PREPARED BY: Shane M. Johnson I. APPROVED BY: Mark Cruz
H. DATE: 10 January 2018 J. DATE: 23 January 2018
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 2 of 12 Page
13BCONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approval OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.: 0002
B. EXHIBIT....................................: A
C. CATEGORY..............................: OTHER
D. SYSTEM/ITEM........: PACIFIER Laser Vulnerability Research - Test (LVR - T) E. CONTRACT/PR NO.: FA9451-18-S-0003 Call 0003
F. CONTRACTOR.........: TBD
1. DATA ITEM NO........................: A003
2. TITLE OF DATA ITEM............: Developmental Design Drawings/Models and Associated Lists
3. SUBTITLE..................................:
4. AUTHORITY.............................: DI-SESS-81002F (http://quicksearch.dla.mil)
5. CONTRACT REFERENCE......: See applicable SOW
6. REQUIRING OFFICE..............: AFRL/RDLE
7. DD250 REQ................................: LT
8. APP CODE.................................: A
9. DIST. STATEMENT REQUIRED......: See Blk 16
10. FREQUENCY......................................: See Blk 16
11. AS OF DATE........................................: See Blk 16
12. DATE OF FIRST SUBMISSION: See Blk 16
13. DATE OF SUBSEQUENT SUBM.: See Blk 16
14. DISTRIBUTION
2BA. ADDRESSEES
B. COPIES
DRAFT FINAL
AFRL/RDLE (PM) 1 1
AFRL/RDLB Ltr Ltr AFRL/RVKDL Ltr Ltr ACO Ltr Ltr
15. TOTAL: 1 1
16. REMARKS
Blk 4: Tailoring of DID Requirements. This CDRL applies to the Developmental Design Drawings/Models and Associated Lists associated with each unique hardware item developed or modified under this contract. The contractor shall deliver one (1) set of design drawings and associated lists. In addition, the contractor shall supply an electronic version of the drawing package in a format compatible with Solidworks (most recent version). Submissions shall be compatible with Microsoft Office 2010 or later version. Electronic versions must be submitted in a manner consistent with protecting export control and limited information. Submission via unencrypted or unsecure email is not permitted.
Blk 9: All technical data (including electronic media) shall be marked I.A.W. DoDI 5230.24 with Distribution Statement F and all other required markings as shown indented below:
“DISTRIBUTION STATEMENT F: Further dissemination only as directed by Air Force Research Laboratory/RDLE, 01 January 2018, or higher DoD authority.” (ADD THIS ENTIRE DISTRIBUTION STATEMENT TO THE BOTTOM OF EVERY PAGE OF THE DELIVERABLE)
“WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (title 22, U.S.C., Sec 2751, et. seq.) or the Export Administration Act of 1979, as amended (Title 50, U.S.C., App. 2401, et. seq.). Violations of these export law are subject to severe criminal penalties. Disseminate in accordance with the provisions of DoD Directive 5230.25.” (ADD “WARNING: EXPORT CONTROLLED” TO THE
BOTTOM OF EVERY PAGE OF THE DELIVERABLE)
“DESTRUCTION NOTICE—For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.”
DATA RIGHTS MARKINGS: If you are asserting technical data rights, all technical data shall be marked I.A.W. DFARS 252.227-7013.
Blks 8, 10-13: The contractor shall submit the draft version of the “as built” Developmental Design Drawings/Models and Associated Lists 30 calendar days after Government request. The Government will provide comments to the contractor within 10 business days of receipt of the draft. The contractor shall provide the final version 10 business days after receipt of Government comments.
Blk 14: The contractor shall distribute the Developmental Design Drawings/Models and Associated Lists in accordance with Blk 14. When the addressee’s copy is identified by “Ltr”, send only a copy of the transmittal letter to that addressee.
17. PRICE GROUP: 18. ESTIMATED TOTAL PRICE :
G. PREPARED BY: Shane M. Johnson I. APPROVED BY: Mark Cruz
H. DATE: 10 January 2018 J. DATE: 23 January 2018
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 3 of 12 Page
14BCONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approval OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.: 0002
B. EXHIBIT....................................: A
C. CATEGORY..............................: OTHER
D. SYSTEM/ITEM........: PACIFIER, LVR - T
E. CONTRACT/PR NO.: FA9451-18-S-0003 Call 0003
F. CONTRACTOR.........: TBD
1. DATA ITEM NO....................: A004
2. TITLE OF DATA ITEM........: Presentation Material
3. SUBTITLE...............................:
4. AUTHORITY..........................: DI-ADMN-81373 (http://quicksearch.dla.mil)
5. CONTRACT REFERENCE..: See applicable SOW
6. REQUIRING OFFICE..............: AFLR/RDLE
7. DD250 REQ................................: LT
8. APP CODE.................................: A
9. DIST. STATEMENT REQUIRED....: See Blk 16
10. FREQUENCY......................................: See Blk 16
11. AS OF DATE.......................................: See Blk 16
12. DATE OF FIRST SUBMISSION: See Blk 16
13. DATE OF SUBSEQUENT SUBM.: See Blk 16
14. DISTRIBUTION
3BA. ADDRESSEES
B. COPIES
DRAFT FINAL
AFLR/RDLE (PM) 1 1
AFLR/RDLB Ltr Ltr AFRL/RVKDL Ltr Ltr ACO Ltr Ltr
15. TOTAL: 1 1
16. REMARKS
Blk 4: Tailoring of DID Requirements. The contractor shall provide project status updates for incorporation into Program Management Reviews/Technical Interchange Meetings (PMRs/TIMs). Updates shall include the manpower, skills and resources required to plan, organize, coordinate, direct, accomplish, and document technical efforts and track funding requirements, use an effective cost, schedule, and technical performance control systems, and implement an efficient organizational structure flexible to the changing requirement and workloads. The contractor shall provide the status of deliverables against schedule, track expenditures against both the budget and approved activities, and report technical progress on ongoing activities. The presentation shall include notes to explain each page/slide. The format shall be in Microsoft Office PowerPoint unless otherwise determined by the Government. Submissions shall be compatible with Microsoft Office 2010 or later version. Electronic versions must be submitted in a manner consistent with protecting export control and limited information. Submission via unencrypted or unsecure email is not permitted.
Blk 9: All technical data (including electronic media) shall be marked I.A.W. DoDI 5230.24 with Distribution Statement F and all other required markings shown indented below:
“DISTRIBUTION STATEMENT F: Further dissemination only as directed by Air Force Research Laboratory/RDLE, 01 January 2018, or higher DoD authority.”
(ADD THIS ENTIRE DISTRIBUTION STATEMENT TO THE BOTTOM OF EVERY PAGE OF THE DELIVERABLE)
“WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec. 2751, et seq.) or the Export Administration Act of 1979, as amended. Title 50 U.S.C. App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate I.A.W. the provisions of the DoD Directive 5230.25.” (ADD “WARNING: EXPORT CONTROLLED” TO THE BOTTOM OF EVERY PAGE OF THE
DELIVERABLE)
“DESTRUCTION NOTICE—For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.”
DATA RIGHTS MARKINGS: If you are asserting technical data rights, all technical data shall be marked I.A.W. DFARS 252.227-7013.
Blks 8, 10–13:
- For technical presentation, the submission is due the day of the presentation. If the Government requires revisions or corrections to the presentation, the contractor shall submit the revised version within 5 business days after the date of the presentation.
- For programmatic inputs to PMR’s/TMR’s, the presentation shall be submitted as required based on the scheduling of reviews and meetings. Where feasible, the Government will provide 30 calendar days’ notice with presentations due 10 business days later. If revisions or corrections are required, the contractor shall submit a revised copy within 5 business days of receipt of Government comments.
Blk 14: The contractor shall distribute the Presentation Materials in accordance with Blk 14. When the addressee’s copy is identified by “Ltr”, send only a copy of the transmittal letter to that addressee.
17. PRICE GROUP: 18. ESTIMATED TOTAL PRICE :
G. PREPARED BY: Shane M. Johnson I. APPROVED BY: Mark Cruz
H. DATE: 10 January 2018 J. DATE: 23 January 2018
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 4 of 12 Pages
15BCONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approval OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.: 0002
B. EXHIBIT....................................: A
C. CATEGORY..............................: OTHER
D. SYSTEM/ITEM........: PACIFIER, LVR -T
E. CONTRACT/PR NO.: FA9451-18-S-0003 Call 0003
F. CONTRACTOR.........: TBD
1. DATA ITEM NO........................: A005
2. TITLE OF DATA ITEM............: Status Report
3. SUBTITLE..................................: Technical and Cost Status Report
4. AUTHORITY.............................: DI-MGMT-80368A (http://quicksearch.dla.mil)
5. CONTRACT REFERENCE......: See applicable SOW
6. REQUIRING OFFICE..............: AFRL/RDLE
7. DD250 REQ................................: LT
8. APP CODE.................................:
9. DIST. STATEMENT REQUIRED......: See Blk 16
10. FREQUENCY......................................: See Blk 16
11. AS OF DATE........................................: See Blk 16
12. DATE OF FIRST SUBMISSION: See Blk 16
13. DATE OF SUBSEQUENT SUBM.: See Blk 16
14. DISTRIBUTION
4BA. ADDRESSEES
B. COPIES
DRAFT FINAL
AFRL/RDLE (PM) 0 1
AFRL/RDLB 0 1
ACO 0 Ltr AFRL/RVKDL 0 Ltr
15. TOTAL: 0 2
16. REMARKS
Blk 4: Tailoring of DID Requirements. The contractor shall report all activities at the WBS level III (work package level). Approval of contractor format is required on initial submission. Submissions shall be compatible with Microsoft Office 2010 or later. Electronic versions must be submitted in a manner consistent with protecting export control and limited information. Submission via unencrypted or unsecure email is not permitted.
Blk 9: All technical data (including electronic media) shall be marked I.A.W. DoDI 5230.24 with Distribution Statement F and all other required marking, shown indented below:
“DISTRIBUTION STATEMENT F: Further dissemination only as directed by Air Force Research Laboratory/RDLE, 01 January 2018, or higher DoD authority.” (ADD THIS ENTIRE DISTRIBUTION STATEMENT TO THE BOTTOM OF EVERY PAGE OF THE DELIVERABLE)
“WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec. 2751, et seq.) or the Export Administration Act of 1979, as amended. Title 50 U.S.C. App 2401 et seq. Violations of these export laws are subject to severe criminal penalties.
Disseminate I.A.W. the provisions of the DoD Directive 5230.25.” (ADD “WARNING: EXPORT CONTROLLED” TO THE BOTTOM OF EVERY
PAGE OF THE DELIVERABLE)
“DESTRUCTION NOTICE - For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.”
DATA RIGHTS MARKINGS: If asserting technical data rights, all technical data shall be marked I.A.W. DFARS 252.227-7013.
Blks 10-13: The contractor shall deliver the first Status Report within 15 calendar days after completion of the first full contractor accounting month.
Subsequent status reports shall be delivered within 15 calendar days after the end of each subsequent accounting period (monthly) thereafter through technical completion.
Blk 14: The contractor shall distribute the Status Report in accordance with Blk 14. When the addressee’s copy is identified by “Ltr”, send only a copy of the transmittal letter to that addressee.
17. PRICE GROUP: 18. ESTIMATED TOTAL PRICE :
G. PREPARED BY: Shane M. Johnson I. APPROVED BY: Mark Cruz
H. DATE: 10 January 2018 J. DATE: 23 January 2018
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 5 of 12 Pages
16BCONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approval OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.: 0002
B. EXHIBIT....................................: A
C. CATEGORY..............................: OTHER
D. SYSTEM/ITEM........: PACIFIER, LVR - T
E. CONTRACT/PR NO.: FA9451-18-S-0003 Call 0003
F. CONTRACTOR.........: TBD
1. DATA ITEM NO........................: A006
2. TITLE OF DATA ITEM............: Technical Report – Study/Services
3. SUBTITLE..................................: Scientific & Technical Reports
4. AUTHORITY.............................: DI-MISC-80508B (http://quicksearch.dla.mil)
5. CONTRACT REFERENCE......: See applicable SOW
6. REQUIRING OFFICE..............: AFRL/RDLE
7. DD250 REQ................................: LT
8. APP CODE.................................: A
9. DIST. STATEMENT REQUIRED......: See Blk 16
10. FREQUENCY......................................: See Blk 16
11. AS OF DATE........................................: See Blk 16
12. DATE OF FIRST SUBMISSION: See Blk 16
13. DATE OF SUBSEQUENT SUBM.: See Blk 16
14. DISTRIBUTION
5BA. ADDRESSEES
B. COPIES
DRAFT FINAL
AFRL/RDLE (PM) 1 1
AFRL/RDLB Ltr 1 ACO Ltr Ltr AFRL/RVKDL Ltr Ltr
15. TOTAL: 1 2
16. REMARKS
Blk 4: Tailoring of DID Requirements. Contractor format is authorized. This report shall document interim studies/services as requested by Government Program Manager. Submissions shall be compatible with Microsoft Office 2010 or later version. Submission via unencrypted or unsecure email is not permitted.
Blk 9: All technical data (including electronic media) shall be marked I.A.W. DoDI 5230.24 with Distribution Statement F and all other required markings as shown indented below:
“DISTRIBUTION STATEMENT F: Further dissemination only as directed by Air Force Research Laboratory/RDLE, 1 January 2018 or higher DoD authority.”
(ADD THIS ENTIRE DISTRIBUTION STATEMENT TO THE BOTTOM OF EVERY PAGE OF THE DELIVERABLE)
“WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec. 2751, et seq.) or the Export Administration Act of 1979, as amended. Title 50 U.S.C. App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate
I.A.W. the provisions of the DoD Directive 5230.25.” (ADD “WARNING: EXPORT CONTROLLED” TO THE BOTTOM OF EVERY PAGE OF THE
DELIVERABLE)
“DESTRUCTION NOTICE—For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.”
DATA RIGHTS MARKINGS: If you are asserting technical data rights, all technical data shall be marked I.A.W. DFARS 252.227-7013
Blks 8, 10-13: The contractor shall submit the draft version of the report 30 calendar days after Government request. The Government will provide comments to the contractor within 10 business days of receipt of the draft. The contractor shall provide the final version 10 business days after receipt of Government comments.
Blk 14: The contractor shall distribute the Technical Report – Study/Services in accordance with Blk 14. When the addressee’s copy is identified by “Ltr”, send only a copy of the transmittal letter to that addressee.
17. PRICE GROUP: 18. ESTIMATED TOTAL PRICE :
G. PREPARED BY: Shane M. Johnson I. APPROVED BY: Mark Cruz
H. DATE: 10 January 2018 J. DATE: 23 January 2018
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 6 of 12 Page
17BCONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approval OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.: 0002
B. EXHIBIT....................................: A
C. CATEGORY..............................: OTHER
D. SYSTEM/ITEM........: PACIFIER, LVR - T
E. CONTRACT/PR NO.: FA9451-18-S-0003 Call 0003
F. CONTRACTOR.........: TBD
1. DATA ITEM NO........................: A007
2. TITLE OF DATA ITEM............: Scientific and Technical Report
3. SUBTITLE..................................: Final Report
4. AUTHORITY.............................: DI-MISC-80711A (http://quicksearch.dla.mil)
5. CONTRACT REFERENCE......: See applicable SOW
6. REQUIRING OFFICE..............: AFRL/RDLE
7. DD250 REQ................................: DD
8. APP CODE.................................: A
9. DIST. STATEMENT REQUIRED......: See Blk 16
10. FREQUENCY......................................: See Blk 16
11. AS OF DATE........................................: See Blk 16
12. DATE OF FIRST SUBMISSION: See Blk 16
13. DATE OF SUBSEQUENT SUBM.: See Blk 16
14. DISTRIBUTION
6BA. ADDRESSEES
B. COPIES
DRAFT FINAL
AFRL/RDLE (PM) 1 1
AFRL/RDLB Ltr 1 ACO Ltr Ltr AFRL/RVKDL Ltr Ltr
15. TOTAL: 1 2
16. REMARKS
THE REPORT WILL BE PUBLISHED WITH THE DEFENSE TECHNICAL INFORMATION CENTER (DTIC) BY AFRL STINFO OFFICE. Under no circumstances shall the contractor submit any version of the scientific and technical report to DTIC.
Blk 4: GUIDANCE FOR PREPARATION OF THE REPORT: The Scientific and Technical Report shall be prepared I.A.W. the most current AFRL ANSI/NISO Standard Z39.18-2005, or other most current report preparation guidance. The contractor shall complete the most current SF 298 Report Documentation Page, and submit it with the report.
The contractor shall complete the following blocks of the SF 298: Blocks 2-5a, 6, 7, 8 and 13 (if applicable), and 14-16c. Incomplete reports will be immediately returned to the contractor. Following AFRL technical and STINFO reviews, any revisions required will be returned to the contractor. NOTE: The report preparation guidance and SF 298 are available at: http://www.afrlnewmexico.com/stinfo-1.
The contractor shall deliver two editable electronic copies of the report. The electronic copies shall be an editable .pdf file and the most current version of Microsoft Word. A CD- ROM (CD-R) is the acceptable media for submittal (CD-RWs are not acceptable). Electronic media shall be marked I.A.W. the AFRL ANSI/NISO Standard Z39.18-2005 guidelines, or other most current report preparation guidance. Submission via unencrypted or unsecure email is not permitted.
Blk 7: UPON NOTIFICATION OF ACCEPTANCE OF THE SCIENTIFIC AND TECHNICAL REPORT FROM THE PROGRAM OFFICE, the contractor shall submit the final Receiving Report (DD Form 250) in WAWF. In preparing the final DD Form 250, code the shipment number with a “Z.” Do not upload the Scientific and Technical Report into WAWF or DTIC. NOTE: SUBMITTAL OF THE DD FORM 250Z PRIOR TO ACCEPTANCE NOTIFICATION WILL RESULT IN REJECTION OF THE DD FORM
250Z FINAL RECEIVING REPORT.
Blk 9: All technical data (including electronic media/CD-R) shall be marked I.A.W. DoDI 5230.24 with Distribution Statement F and other required markings, shown indented below:
“DISTRIBUTION STATEMENT F: Further dissemination only as directed by Air Force Research Laboratory/RDLE, 01 January 2018, or higher DoD authority.” (ADD THIS ENTIRE DISTRIBUTION STATEMENT TO THE BOTTOM OF EVERY PAGE OF THE REPORT EXCEPT THE SF 298)
“WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec. 2751, et seq.) or the Export Administration Act of 1979, as amended. Title 50 U.S.C. App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate I.A.W. the provisions of the DoD Directive 5230.25.” (ADD “WARNING: EXPORT CONTROLLED” TO THE BOTTOM OF EVERY PAGE OF THE REPORT EXCEPT THE
SF 298)
“DESTRUCTION NOTICE—For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.”
Blks 8, 10 - 13: The contractor shall deliver the Scientific and Technical Report, in final format, no later than 30 calendar days after the end of the technical period of performance. The Government will review and, if necessary, return the report with comments no later than 30 calendar days after receipt of the report. If the report is returned to the contractor with comments, the contractor shall deliver the camera-ready copy of the report no later than 30 calendar days after receipt of Government comments.
Blk 14: The contractor shall distribute the Scientific and Technical Report (final/CRC version(s)) in accordance with Blk 14. When the addressee’s copy is identified by “Ltr”, send only a copy of the transmittal letter to that addressee.
17. PRICE GROUP: 18. ESTIMATED TOTAL PRICE :
G. PREPARED BY: Shane M. Johnson I. APPROVED BY: Mark Cruz
H. DATE: 10 January 2018 J. DATE: 23 January 2018
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 7 of 12 Pages http://www.afrlnewmexico.com/stinfo-1
FA9451-18-S-00003 Call 0003
18BCONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approval OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.: 0002
B. EXHIBIT....................................: A
C. CATEGORY..............................: OTHER
D. SYSTEM/ITEM........: PACIFIER, LVR - T
E. CONTRACT/PR NO.: FA9451-18-S-0003 Call 0003
F. CONTRACTOR.........: TBD
1. DATA ITEM NO........................: A008
2. TITLE OF DATA ITEM............: Software User’s Manual
3. SUBTITLE..................................:
4. AUTHORITY.............................: DI-IPSC-81443A (http://quickseach.dla.mil)
5. CONTRACT REFERENCE......: See applicable SOW
6. REQUIRING OFFICE..............: AFRL/RDLE
7. DD250 REQ................................: LT
8. APP CODE.................................: A
9. DIST. STATEMENT REQUIRED......: See Blk 16
10. FREQUENCY......................................: See Blk 16
11. AS OF DATE........................................: See Blk 16
12. DATE OF FIRST SUBMISSION: See Blk 16
13. DATE OF SUBSEQUENT SUBM.: See Blk 16
14. DISTRIBUTION
7BA. ADDRESSEES
B. COPIES
DRAFT FINAL
AFRL/RDLE (PM) 1 1
AFRL/RDLB Ltr Ltr AFRL/RVKDL Ltr Ltr ACO Ltr Ltr
15. TOTAL: 1 1
16. REMARKS
CDRL A008 is added to supplement CDRL A001 - Computer Software Product End Items
Blk 4: Tailoring of DID Requirements. The contractor shall submit a Software User’s Manual for each piece of software developed, new version released, or significant updates performed. Submission shall be compatible with Microsoft Office 2010 or later version. Electronic versions must be submitted in a manner consistent with protecting export control and limited information. Submission via unencrypted or unsecure email is not permitted.
Blk 9: All technical data (including electronic media) shall be marked I.A.W. DoDI 5230.24 with Distribution Statement F and all other required markings as shown indented below:
“DISTRIBUTION STATEMENT F: Further dissemination only as directed by Air Force Research Laboratory/RDLE, 01 January 2018, or higher DoD authority.” (ADD THIS ENTIRE DISTRIBUTION STATEMENT TO THE BOTTOM OF EVERY PAGE OF THE DELIVERABLE)
“WARNING – This document contains technical data whose export is restricted by the Arms Export Control Act (title 22, U.S.C., Sec 2751, et. seq.) or the Export Administration Act of 1979, as amended (Title 50, U.S.C., App. 2401, et. seq.). Violations of these export law are subject to severe criminal penalties. Disseminate in accordance with the provisions of DoD Directive 5230.25.” (ADD “WARNING: EXPORT CONTROLLED” TO THE
BOTTOM OF EVERY PAGE OF THE DELIVERABLE)
DESTRUCTION NOTICE—For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.
DATA RIGHTS MARKINGS: If you are asserting technical data rights, all technical data shall be marked I.A.W. DFARS 252.227-7013.
Blks 8, 10-13: The contractor shall submit the draft Software User’s Manual 30 calendar days after completion of major model upgrade. The Government will provide comments to the contractor within 10 business days of receipt of the draft. The contractor shall provide the final version 10 business days after receipt of Government comments.
Blk 14: The contractor shall distribute the Software User’s Manual in accordance with Blk 14. When the addressee’s copy is identified by “Ltr”, send only a copy of the transmittal letter to that addressee.
17. PRICE GROUP: 18. ESTIMATED TOTAL PRICE :
G. PREPARED BY: Shane M. Johnson I. APPROVED BY: Mark Cruz
H. DATE: 10 January 2018 J. DATE: 23 January 2018
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 8 of 12 Page http://quickseach.dla.mil/
19BCONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approval OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.: 0002
B. EXHIBIT....................................: A
C. CATEGORY..............................: OTHER
D. SYSTEM/ITEM........: PACIFIER, LVR - T
E. CONTRACT/PR NO.: FA9451-18-S-0003 Call 0003
F. CONTRACTOR.........: TBD
1. DATA ITEM NO........................: A009
2. TITLE OF DATA ITEM............: Test/Inspection Report
3. SUBTITLE..................................:
4. AUTHORITY.............................: DI-NDTI-80809B (http://quicksearch.dla.mil)
5. CONTRACT REFERENCE......: See applicable SOW
6. REQUIRING OFFICE..............: AFRL/RDLE
7. DD250 REQ................................: LT
8. APP CODE.................................: A
9. DIST. STATEMENT REQUIRED......: See Blk 16
10. FREQUENCY......................................: See Blk 16
11. AS OF DATE........................................: See Blk 16
12. DATE OF FIRST SUBMISSION: See Blk 16
13. DATE OF SUBSEQUENT SUBM.: See Blk 16
14. DISTRIBUTION
8BA. ADDRESSEES
B. COPIES
DRAFT FINAL
AFRL/RDLE (PM) 1 1
AFRL/RDLB Ltr 1 ACO Ltr Ltr AFRL/RVKDL Ltr Ltr
15. TOTAL: 1 2
16. REMARKS
Blk 4: Tailoring of DID Requirements. Contractor format is acceptable. This report shall document Test/Inspections as requested by Government Program Manager. Submissions shall be compatible with Microsoft Office 2010 or later version. Electronic versions must be submitted in a manner consistent with protecting export control and limited information. Submission via unencrypted or unsecure email is not permitted.
Blk 9: All technical data (including electronic media) shall be marked I.A.W. DoDI 5230.24 with Distribution Statement F and all other required markings as shown indented below:
“DISTRIBUTION STATEMENT F: Further dissemination only as directed by Air Force Research Laboratory/RDLE, 01 January 2018, or higher DoD authority.” (ADD THIS ENTIRE DISTRIBUTION STATEMENT TO THE BOTTOM OF EVERY PAGE OF THE DELIVERABLE)
“WARNING – This document contains technical data whose export is restricted by the Arms Export Control Act (title 22, U.S.C., Sec 2751, et. seq.) or the Export Administration Act of 1979, as amended (Title 50, U.S.C., App. 2401, et. seq.). Violations of these export law are subject to severe criminal penalties. Disseminate in accordance with the provisions of DoD Directive 5230.25.” (ADD “WARNING: EXPORT CONTROLLED” TO THE
BOTTOM OF EVERY PAGE OF THE DELIVERABLE)
DESTRUCTION NOTICE—For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.
DATA RIGHTS MARKINGS: If you are asserting technical data rights, all technical data shall be marked I.A.W. DFARS 252.227-7013.
Blks 8, 10-13: The contractor shall submit the draft version of the Test/Inspection Report 30 calendar days after Government request. The Government will provide comments to the contractor within 10 business days of receipt of the draft. The contractor shall provide the final version 10 business days after receipt of Government comments.
Blk 14: The contractor shall distribute the Test/Inspection Report in accordance with Blk 14. When the addressee’s copy is identified by “Ltr”, send only a copy of the transmittal letter to that addressee.
17. PRICE GROUP: 18. ESTIMATED TOTAL PRICE :
G. PREPARED BY: Shane M. Johnson I. APPROVED BY: Mark Cruz
H. DATE: 10 January 2018 J. DATE: 23 January 2018
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 9 of 12 Page
20BCONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approval OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.: 0002
B. EXHIBIT....................................: A
C. CATEGORY..............................: OTHER
D. SYSTEM/ITEM........: PACIFIER, LVR - T
E. CONTRACT/PR NO.: FA9451-18-S-0003 Call 0003
F. CONTRACTOR.........: TBD
1. DATA ITEM NO........................: A010
2. TITLE OF DATA ITEM............: Operations and Maintenance Instructions for Research and Development Equipment
3. SUBTITLE..................................:
4. AUTHORITY.............................: DI-MISC-81414A (http://quicksearch.dla.mil)
5. CONTRACT REFERENCE......: See applicable SOW
6. REQUIRING OFFICE..............: AFRL/RDLE
7. DD250 REQ................................: LT
8. APP CODE.................................: A
9. DIST. STATEMENT REQUIRED......: See Blk 16
10. FREQUENCY......................................: See Blk 16
11. AS OF DATE........................................: See Blk 16
12. DATE OF FIRST SUBMISSION: See Blk 16
13. DATE OF SUBSEQUENT SUBM.: See Blk 16
14. DISTRIBUTION
9BA. ADDRESSEES
B. COPIES
DRAFT FINAL
AFRL/RDLE (PM) 1 1
AFRL/RDLB Ltr 1 ACO Ltr Ltr AFRL/RVKDL Ltr Ltr
15. TOTAL: 1 2
16. REMARKS
Blk 4: Tailoring of DID Requirements. The contractor shall submit a report that includes the complete operation and maintenance instructions of the devices developed under this contract. Submissions shall follow the DID and be compatible with latest version of Solidworks and Microsoft Office 2010 or later version. Electronic versions must be submitted in a manner consistent with protecting export control and limited information. Submission via unencrypted or unsecure email is not permitted.
Blk 9: All technical data (including electronic media) shall be marked I.A.W. DoDD 5230.24 with Distribution Statement F and all other required markings as shown indented below:
“DISTRIBUTION STATEMENT F: Further dissemination only as directed by Air Force Research Laboratory/RDLE, 01 January 2018, or higher DoD authority.” (ADD THIS ENTIRE DISTRIBUTION STATEMENT TO THE BOTTOM OF EVERY PAGE OF THE DELIVERABLE).
“WARNING – This document contains technical data whose export is restricted by the Arms Export Control Act (title 22, U.S.C., Sec 2751, et. seq.) or the Export Administration Act of 1979, as amended (Title 50, U.S.C., App. 2401, et. seq.). Violations of these export law are subject to severe criminal penalties. Disseminate in accordance with the provisions of DoD Directive 5230.25.” (ADD “WARNING: EXPORT CONTROLLED” TO THE
BOTTOM OF EVERY PAGE OF THE DELIVERABLE).
DESTRUCTION NOTICE—For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.
DATA RIGHTS MARKINGS: If you are asserting technical data rights, all technical data shall be marked I.A.W. DFARS 252.227-7013.
Blks 8, 10-13: The contractor shall submit a draft version of the report 30 calendar days after Government request. The Government will provide comments to the contractor within 10 business days of receipt of the draft. The contractor shall provide the final version 10 business days after receipt of Government comments.
Blk 14: The contractor shall distribute the Operations and Maintenace Instructions for Research and Development Equipment documenation in accordance with Blk 14. When the addressee’s copy is identified by “Ltr”, send only a copy of the transmittal letter to that addressee.
17. PRICE GROUP: 18. ESTIMATED TOTAL PRICE :
G. PREPARED BY: Shane M. Johnson I. APPROVED BY: Mark Cruz H. DATE: 10 January 2018 J. DATE: 23 January 2018
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 10 of 12 Page
21BCONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approval OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.: 0002
B. EXHIBIT....................................: A
C. CATEGORY..............................: OTHER
D. SYSTEM/ITEM........: PACIFIER, LVR - T
E. CONTRACT/PR NO.: FA9451-18-S-0003 Call 0003
F. CONTRACTOR.........: TBD
1. DATA ITEM NO........................: A011
2. TITLE OF DATA ITEM............: Management Plan
3. SUBTITLE..................................:
4. AUTHORITY.............................: DI-MGMT-80004A (http://quicksearch.dla.mil)
5. CONTRACT REFERENCE......: See applicable SOW
6. REQUIRING OFFICE..............: AFRL/RDLE
7. DD250 REQ................................: LT
8. APP CODE.................................: A
9. DIST. STATEMENT REQUIRED......: See Blk 16
10. FREQUENCY......................................: 1TIME
11. AS OF DATE........................................: See Blk 16
12. DATE OF FIRST SUBMISSION: See Blk 16
13. DATE OF SUBSEQUENT SUBM.: See Blk 16
14. DISTRIBUTION
10BA. ADDRESSEES
B. COPIES
DRAFT FINAL
AFRL/RDLE (PM) 1 1
AFRL/RDLB Ltr 1 ACO Ltr Ltr AFRL/RVKDL Ltr Ltr
15. TOTAL: 1 2
16. REMARKS
Blk 4: Tailoring of DID Requirements. Contractor format is acceptable. Must be compatible with Microsoft Office 2010 or later version. Electronic versions must be submitted in a manner consistent with protecting export control and limited information. Submission via unencrypted or unsecure e-mail is not permitted.
The contractor shall work with the Government Program Manager…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .