Q and A.pdf
PDF 38 KB Posted
- Attached to
- AFRL SALSSA Badge Reader update and components
- Solicitation number
- FA9401Q260016
About this file
This document is a Questions and Answers (Q&A) file addressing technical specifications for an access control system (ACS) expansion project involving the Hirsch badge system.
The project involves expanding an existing FICAM-compliant Hirsch badge system currently running VELOCITY VER 3.8.2 with the server located in Building 66048, Room 229. The expansion includes reconnecting seven existing readers from the current ACS panels located in the South Staircase and installing new readers with associated infrastructure. New ACS panels will be installed in Building 66048, Room 145 and potentially on the 2nd floor in Room 267. All new doors have been equipped with electronic door handles, and dedicated power is available within 20 feet of the panel locations. Two new scramble pad readers for read-in access with exit motion sensors will be surface mounted, while other readers have 2x4 electrical boxes and conduit rough-ins already in place. Ceiling tiles exist in the area and no additional conduit is required above ceilings. The Hirsch network is closed and restricted; existing password protection is in place with no additional cyber hardening required. Switch ports are available at the server location on VLAN. Minor training or orientation is needed for existing users to familiarize them with new reader programming, identification, and naming conventions, though the existing user base is already trained on the current system.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA940126Q0016 Combo solicitation.pdf | ||
| 2. SON-SALSSA - Badge System_Redacted.pdf | ||
| Bldg 66048 2nd Floor Badge Readers.png | PNG image | |
| Bldg 66048 1st Floor Badge Readers.png | PNG image |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. What is the current Hirsch Software being run and where is the server located that the new panels would connect? VELOCITY VER 3.8.2 SERVER IS LOCATED IN BLDG
66048, ROOM 229
2. Is the proposed system to be FICAM compliant THE HIRSCH BADGE SYSTEM IS
FICAM COMPLIANT.
3. Where are the current ACS panels located and is power available at those locations
BLDG 66048, SOUTH STAIRCASE IS LOCATION OF CURRENT ACS PANELS THAT WILL BE
REUSED FOR THE 7 READERS TO BE RECONNECTED. NEW PANELS WILL BE REQUIRED
TO SERVICE THE NEW READERS TO BE ADDED TO THE SYSTEM. NEW PANELS WILL
LOCATED IN BLDG 66048, ROOM 145 AND MOST LIKELY 2ND FLOOR 267
4. When stated new Reader with motion sensors. Are you referring to a request to exit Motion sensors or IDS Sensors – EXIT MOTION – IDS IS NOT PART OF THE BADGE SYSTEM
5. Is there currently IDS devices in use to secure the building , that reside on the Hirsch system? IDS DEVICES ARE NOT PART OF THE BADGE SYSTEM
6. Are Door Position switches required on the doors or are HSS switches required ?
HSS IS AN IDS UNIQUE SENSOR – NOT PART OF THE BADGE SYSTEM – DO NOT KNOW
WHAT IS MEANT BY DOOR POSITION SWITCH
7. Is there existing electrical locking hardware in place for all new doors with the exception of the 1st floor mechanical room doors? YES – ALL NEW DOORS HAVE BEEN
PROVIDED WITH NEW ELECTRONIC DOOR HANDLES
8. What type of ceilings are in the area and is conduit required above ceilings? CEILING
TILES – CONDUIT NOT REQUIRED
9. Two (2) new scramble pad readers for read-in access w/motion sensors. Are these Access control readers or IDS Arm/Disarm Readers SCRAMBLE PAD READERS X2 FOR
THE ACS – IDS IS NOT PART OF THE BADGE SYSTEM
10. What is the wall structure of the new Reader locations? (drywall, brick , block other?) SCRAMBLE PAD READERS TO BE SURFACE MOUNTED – ALL OTHER READERS
HAVE 2X4 ELECTRICAL BOXES AND CONDUIT ROUGH-IN’S IN PLACE.
11. Will the reader locations require to be surface Mounted conduit? ALL READERS
HAVE ROUGH-IN CONDUITS IN PLACE – SCRAMBLE PADS WILL NEED TO BE SURFACE
MOUNTED
12. Please indicate space/room to be utilized for the New ACS Panels, IS dedicate power available within 20 feet? YES, POWER AVAILABLE. BLDG 66048 ROOM 145.
13. Is the current Communication from the New ACS panels to the Hirsch server locations? NOT FULLY UNDERSTANDING QUESTION BUT PLAN IS TO INSTALL NEW ACS
PANELS IN OR CLOSE TO SERVER ROOM LOCATION
14. Is there available Switch Ports available at the Hisch server location? YES – ON
VLAN
15. Is the Hirsch Network a Closed restricted, NipR or other CLOSED
16. Is Cyber hardening required? EXISITNG SYSTEM IS PASSWORD PROTECTED. NO
OTHER HARDENING REQUIRED.
17. Is training required , if so, how many personnel/ NO – THERE IS AN EXISTING
SYSTEM IN PLACE, USERS ARE TRAINED. HOWEVER, MINOR TRAINING/ORIENTATION ON
NEW READER PROGRAMMING TO IDENTIFY NEW READER AND NAMING CONVENTIONS
USED.