aft0747.pdf
PDF 43 KB Posted
- Attached to
- IT Infrastructure for Former DOE Buildings Federal contract opportunity
- Solicitation number
- FA940126B0001
About this file
This document is a PDF viewer error message indicating that the file content failed to load properly. The document does not contain contract opportunity information, solicitation details, or any substantive federal contracting data. The page only displays a standard Adobe Reader notification requesting users to upgrade their PDF viewing software to access the document contents. No contract requirements, timelines, pricing terms, agencies, or other procurement details are available for analysis.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA940126B0001 Site Visit Q and A.pdf | ||
| Solicitation - FA940126B0001.pdf | ||
| Kirtland AFB Comm Division Specs 15 MAY 2025.pdf | ||
| 020-504LA-9 (1).pdf | ||
| Sign in Sheet.pdf | ||
| Solicitation - FA940126B0001.pdf | ||
| Solicitation - FA940126B0001.pdf | ||
| Solicitation - FA940126B0001.pdf | ||
| Wage Determination - NM20250044.pdf | ||
| Solicitation - FA940126B0001.pdf | ||
| SOW - DoE OSP and Buildings ISP.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Please wait...
If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.
You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.
For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.
Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.
Page of AFTO Form 747, 20160218
CYBERSPACE INFRASTRUCTURE SYSTEM ACCEPTANCE
CIPS REQUIREMENT NUMBER
1. CIPS PROJECT TITLE
3. BASE
4. BUILDING AND ROOM NUMBER
5. USER
6. DOCUMENT AUTHORIZING SYSTEM
7. LIST OF RELATED PROJECTS/CONTRACTS
8. MAJOR ITEMS OF EQUIPMENT/SOFTWARE INSTALLED, REMOVED OR TRANSFERRED
NSN/PN
A
NOMENCLATURE
B
ASC
C
QTY
D
DETAIL DOCUMENT NUMBER
E I/R/T F
9. NARRATIVE PROJECT SUMMARY
2. CIPS PROJECT DASHBOARD NUMBER
(Use page 3 for additional space)
10. INSPECTION AND TRANSFER SUMMARY
(Enter "X" or "NA" on each line, A through I) A
. INSTALLATION ACTIVITY IS RELIEVED OF RESPONSIBILITY
B. INSTALLATION TESTED PER TEST PLAN CRITERIA. FLIGHT CHECK, IF APPLICABLE. TEST PLAN AND TEST RESULTS ARE ATTACHED TO
THE PROJECT DASHBOARD IN CIPS.
C. REPORT OF MEASURED X-RADIATION IS ATTACHED TO THE PROJECT DASHBOARD IN CIPS
D. RF INTENSITY PLOT IS ATTACHED TO THE PROJECT DASHBOARD IN CIPS
E. EQUIPMENT ACCOUNTABILITY WAS TRANSFERRED TO THE APPROPRIATE SUPPLY ACCOUNT AFEMS-CA/CRL OR AFEMS-AIM
F. COMSEC ACCOUNT NUMBER IS:
G. REAL PROPERTY WAS TRANSFERRED
H. AS INSTALLED DRAWINGS WERE PROVIDED TO THE BASE CSO
I. DESCRIPTION OF MINOR EXCEPTIONS
RESPONSIBLE
ACTIVITY
CORRECTION
DATE
CORRECTED
(Use page 3 for additional space)
FORECAST DATE OF
11. AN INSPECTION AND OPERATIONAL TEST WAS CONDUCTED. THE SYSTEM IS ACCEPTED AS INSTALLED AS PLANNED AND IN ACCORDANCE WITH ESTABLISHED STANDARDS. IT PERFORMS ACCORDING TO ESTABLISHED CRITERIA AND TO THE SATISFACTION OF THE UNDERSIGNED. SIGNATURES A-D ARE MANDATORY BEFORE ITEM 12. CERTIFICATION SIGNATURES.
ACCEPTANCE CERTIFICATE
FUNCTION
A
. INSTALLATION
ACTIVITY
ORGANIZATION
NAME/SIGNATURE
TITLE
GRADE
B. OPERATING
ACTIVITY
C. MAINTAINING
ACTIVITY
D. INSPECTION/
QUALITY
A
SSURANCE
A
CTIVITY
E. BASE
SUPPLY
H.
F. CIVIL
ENGINEERING
G.
I.
12. CERTIFICATION: ALL EXCEPTIONS, HAVE BEEN CORRECTED. ALL OPERATING AND MAINTENANCE PERSONNEL, SPARE PARTS, TEST EQUIPMENT, TOOLS, EXPENDABLE OPERATING SUPPLIES, TECHNICAL DATA AND OTHER LOGISTICAL SUPPORT DEEMED NECESSARY TO MEET THE OPERATIONAL
MISSION OF THE SYSTEM ARE AVAILABLE. A. IS MANDATORY SIGNATURE, B. IS OPTIONAL.
FUNCTION
A
. CSO/
CERTIFIER
ORGANIZATION
NAME/SIGNATURE
GRADE
B. USER/
ADDITIONAL
TITLE
ADDITIONAL REMARKS
8. MAJOR ITEMS OF EQUIPMENT/SOFTWARE INSTALLED, REMOVED OR TRANSFERRED
(Continued from Page 1)
NSN/PN
A
NOMENCLATURE
B
ASC
C
QTY
D
DETAIL DOCUMENT NUMBER
E I/R/T F 1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
DESCRIPTION OF MINOR EXCEPTIONS
RESPONSIBLE
ACTIVITY
FORECAST DATE OF
CORRECTION
DATE
CORRECTED
10. INSPECTION AND TRANSFER SUMMARY
(Enter "X" or "NA" on each line, A through I) (Continued from Page 1) 1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
Narrative explains purpose.
12. CERTIFICATION:
Self-explantory.
11. E-I maintaining activity.
Are mandatory signatures and are required before the system can be transferred from the installing activity to the
11. A-D
CERTIFICATION
11. ACCEPTANCE
CSO/Certifier via 12.A. signature.
commissioned whereas with minor exceptions, the system can be accepted but not commissioned by the NOTE: Major exceptions render the final inspection dead in the water and the system cannot be accepted or
10. I Self-explanatory.
10. A-H:
10. INSPECTION AND TRANSFER SUMMARY:
Enter a synopsis of what the project installed from the project dashboard or the project plan in CIPS.
SUMMARY:
9. NARRATIVE PROJECT
TRANSFERRED:
INSTALLED REMOVED, OR
list that equipment.
List the equipment items that were installed to provide the capability. If the project was for removing or transferring, PROJECTS/CONTRACTS:
7. LIST OF RELATED
number if applicable.
SYSTEM:
Enter the weapon system, certificate to operate, or Enterprise Information Technology Data Repository (EITDR)
6. DOCUMENT AUTHORIZING
Enter the organization and office symbol of the customer that requested the capability (equipment/software).
5. USER:
Enter the CIPS Requirement number associated with the project. Use local or MAJCOM/SPO/lead command number for requirements that do not meet the CIPS definition. All requirement numbers will follow the following identified/documented-5 digital sequential number. Example: BAEY-13-00006 Reference Tech Order 33D-3003 for CIPS information.
Enter the project title from the CIPS Project Dashboard. There should be only one project dashboard per requirement. Use local/SPO/MAJCOM project number for those projects that don't meet the CIPS project Enter the project number from the CIPS Project Dashboard. There should be only one project dashboard per Enter the building number and the room number where the MAJOR Equipment/Software is being installed.
Reference list in item 8.
4. BUILDING AND ROOM
Enter the location where the project is being installed.
3. BASE:
2. CIPS PROJECT NUMBER:
requirement. Use local/SPO/MAJCOM project title for those projects that don't meet the CIPS project definition.
1. CIPS PROJECT TITLE:
naming convention: base geological location code (4 alpha characters)-fiscal year (3 numeric) the requirement was
CIPS REQUIREMENT NUMBER:
REFERENCE TO 33D-3003, CHAPTER 6 FOR ADDITIONAL INFORMATION
INSTRUCTION FOR AFTO 747
EQUIPMENT/SOFTWARE
8. MAJOR ITEMS OR
Enter the CIPS project number or the contract number if there are related projects/contracts.
11.0.1.20130826.2.901444.899636
| CurrentPage: |
| PageCount: |
| TextField1: |
| DropDownList1: |
| DateField1: |
| DateField2: |
| DateField3: |
| DateField4: |
| DateField5: |
| DateField6: |
| DateField7: |
| DateField8: |
| DateField9: |
| DateField10: |
| DateField11: |
| DateField12: |
| SignatureField1: |
| DateField51: |
| DateField52: |
| DateField15: |
| DateField16: |
| DateField17: |
| DateField18: |
| DateField19: |
| DateField20: |
| DateField21: |
| DateField22: |
| DateField23: |
| DateField24: |
| DateField25: |
| DateField26: |
| DateField27: |
| DateField28: |
| DateField29: |
| DateField30: |
| DateField31: |
| DateField32: |
| DateField33: |
| DateField34: |
| DateField35: |
| DateField36: |
| DateField37: |
| DateField38: |
| DateField39: |
| DateField40: |
| DateField41: |
| DateField42: |
| DateField43: |
| DateField44: |
| DateField45: |
| DateField46: |
| DateField47: |
| DateField48: |
| DateField49: |
| DateField50: |
| DateField14: |
| DateField13: |
File details come from the government source that posted it. Updated .