This document contains the Site Visit Questions and Answers related to the federal contract opportunity for the Command Post Kitchen Renovation at Kirtland Air Force Base. The key details are:
The renovation requires a new 220V circuit for a 30-inch slide-in electric range, but the existing garbage disposal can be reused. Under-cabinet lighting will require a separate switch. The flooring will be 12x12 VCT, with Bernalillo County NMGRT to be included in the bid. Bids should be submitted via email to the Contracting Officer. Appliances must be Energy Star rated, but no specific brands are required. Laminate countertops are needed. The government will provide escorts during the site visit. The electric range should be 24-inch glass top with 4 elements. The contractor must provide all associated wiring and conduits for the dishwasher. The kitchen area is approximately 175 square feet.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Site Visit Questions and Answers
Is there currently a 22O v circuit for existing cooktop or will a new circuit be required for new 30” slide in range?
A new circuit will need to be installed.
Will new garbage disposal also be required in sink?
Existing garbage disposal can be used.
Will under cabinet lighting require a separate switch?
Yes.
12 x12 VCT flooring will be used correct?
Do we include NMGRT in our bid? If so at what rate?
Answer: Yes, the rate for Bernalillo County.
Where and how do we submit the bids?
Answer: Submit bids/quotes to the CO via email.
Is there a specific brand of appliances we need to provide (dishwasher and electric range)?
No. Make sure appliances are energy star rated as applicable.
What size does the vinyl flooring have to be, and does it have to be a specific manufacturer?
No size preference, best fit for space. No specific manufacturer required.
What kind of material is required for the countertops?
Laminate
Will the escorts be provided by the government?
What is the size of the electric range?
24-inch glass top with 4 elements
Does the contractor have to provide the wiring and conduits from the dishwasher to the panel?
Please clarify.
Yes, all associated wiring and conduits must be provided by the contractor.
Could you please send pictures of the existing cabinets and appliances connections?
Yes, attached.
Can I please have the square footage of the kitchen?
Square footage is approximately 175 ft