Responses to Site Visit Questions
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA9401-14-R-0018-0002_-_Revise_Section_M.pdf | ||
| MV_Club_Crosswalk_location_-_Q_ _A_-_4.pdf | ||
| FA9401-14-R-0018-0001_Update_FAR_52.236-27.pdf | ||
| 8._PP_Info_Form.docx | DOCX document | |
| FA9401-14-R-0018.pdf | ||
| 4._AF3052_Striping_Bid_Form.xlsx | XLSX spreadsheet | |
| 5._Construction_AF_66_Striping.xls | XLS spreadsheet | |
| 9._Map-Airport_to_Truman_Gate.pdf | ||
| 12._NM140013_Heavy_(03Jan14).pdf | ||
| 7._AF_3065_Progress_Report.pdf | ||
| 11._NM140047_Highway_(03Jan14).pdf | ||
| 6._AF_3064_-_Progress_Schedule.xls | XLS spreadsheet | |
| 10._Map-Truman_Gate_to_CE.jpg | JPG image | |
| 2._Striping_Exhibit_-_Drawings.pdf | ||
| 1._Striping_SOW.pdf | ||
| 3._Specifications_-_Basewide_Striping.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION FA9401-14-R-0018
SITE VISIT QUESTIONS AND ANSWERS
1. The SOW does not have the linear feet for the roadways listed. Will we be provided the linear feet of each roadway?
Answer: Estimated linear feet for the length of each road is shown in the following table.
Please note, this should be field verified prior to submitting proposals.
Contractor shall field verify all actual quantities of striping, arrows, words, etc.
Item number Roadway
Length of roadway (from drawing provided)
1 F Avenue; Eubank to Texas 6,927 ft
2 Pennsylvania; Gibson to Hardin 4,953 ft
3 Pennsylvania; Hardin to Wyoming 5,358 ft
4 Randolph; Southgate Rd to ANG Curve 3,762 ft
5 Randolph; ANG Curve to Flightline 7,839 ft
6 Gibson; Gate to Wyoming 3,571 ft
7 Wyoming; Gate to Hardin 4,105 ft
8 Wyoming; Hardin to Pennsylvania 7,327 ft
9 Lowry; Hickam to Maxwell 2,399 ft
10 Hardin; 9th St. to Randolph 8,301 ft
11 Aberdeen/San Mateo; Randolph to Kirtland 7,595 ft
12 Truman; Gibson to Randolph 2,697 ft
13 Maxwell; Aberdeen to Lowry 921 ft
14 Texas; Hardin to Gibson 4,368 ft
15 Carlisle; Gibson to Flightline 3,688 ft
2. Can we be provided AutoCAD drawing of the area where the roadway striping is located?
Answer: AutoCAD drawings will not be provided.
3. There are 4 crosswalks and stop bars at a lot of the intersections. At this point we plan on only including quantities for the 2 that are on the road to be striped unless you can provide further clarification. We could include all 4 to match, but we are not sure what you require.
Answer: We require replacement of what is currently installed. Field verify quantities as needed.
4. Where do you want the crosswalk(s) at the Mountainview Club? And any other “new” crosswalks? Can they be specified on the map provided?
Answer: In front of the main entrance where the previous crosswalk is located. This is a split crosswalk that crosses two “lanes” on either side of the island directly in front of the
SOLICITATION FA9401-14-R-0018
SITE VISIT QUESTIONS AND ANSWERS
Mountain View Club. See attached map of Mountain View Club with these answers for location of former/new crosswalk.
5. Will Kirtland AFB allow night work, mainly for the labor intensive items like crosswalks, legends and stop bars?
Answer: No night work. Weekends are acceptable.
6. We would like to recommend that you consider changing the crosswalks to continental style (what we call bar code) to avoid wear from vehicle tires. We space the bars between wheel paths. Please consider this.
Answer: Do not concur. Please use the ladder style.