5._Construction_AF_66_Striping.xls
XLS spreadsheet 39 KB Posted
- Attached to
- Roadway Pavement Striping
- Solicitation number
- FA9401-14-R-0018
About this file
AF66
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA9401-14-R-0018-0002_-_Revise_Section_M.pdf | ||
| MV_Club_Crosswalk_location_-_Q_ _A_-_4.pdf | ||
| FA9401-14-R-0018_Preaward_Site_Visit_Questions.pdf | ||
| FA9401-14-R-0018-0001_Update_FAR_52.236-27.pdf | ||
| 8._PP_Info_Form.docx | DOCX document | |
| FA9401-14-R-0018.pdf | ||
| 4._AF3052_Striping_Bid_Form.xlsx | XLSX spreadsheet | |
| 9._Map-Airport_to_Truman_Gate.pdf | ||
| 12._NM140013_Heavy_(03Jan14).pdf | ||
| 7._AF_3065_Progress_Report.pdf | ||
| 11._NM140047_Highway_(03Jan14).pdf | ||
| 6._AF_3064_-_Progress_Schedule.xls | XLS spreadsheet | |
| 10._Map-Truman_Gate_to_CE.jpg | JPG image | |
| 2._Striping_Exhibit_-_Drawings.pdf | ||
| 1._Striping_SOW.pdf | ||
| 3._Specifications_-_Basewide_Striping.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER: | PROJECT TITLE: | SOLICITATION/CONTRACT NO. | ||||||||||||||||||||
| CONTRACTOR TO SEE SPECIFICATIONS FOR ADDITONAL REQUIREMENTS | MHMV 110045 | Roadway Pavement Striping (Basewide) | |||||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | ||||||||||||||||||||||
| NUMBER OF COPIES REQUIRED (# CP) | |||||||||||||||||||||||
| LINE NO | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL (Note: Specification sections contain detailed requirements for submittals. Contractor Responsible for all submittal requirements listed on this form, as well as all requirements described in specification sections.) | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS - MFR. SPECS | SAMPLES | COLOR SELECTION, CHARTS | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG/ PRODUCT DATA | OPERATING INSTRUCTIONS | TEST DATA - REFERENCES | PLAN, SCHEDULE, LIST | AS-BUILT DRAWINGS | OTHER | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NO | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| D=DAYS | APPROVED | DISAPROVED | |||||||||||||||||||||
| PROJECT START UP | |||||||||||||||||||||||
| 1 | BASE PASS REQUESTS, PERSONNEL & VEHICLE LISTS | 3 | NTP+ 14 D | ||||||||||||||||||||
| 2 | SCHEDULE OF PRICES, COST LOADED AF 3064 | 3 | NTP+ 14 D | ||||||||||||||||||||
| 3 | CPM CONSTRUCTION SCHEDULE | 3 | NTP+ 3D | ||||||||||||||||||||
| 4 | SITE SPECIFIC SAFETY PLAN, HAZMAT PLAN | 3 | NTP+ 14 D | ||||||||||||||||||||
| 5 | MSDS AND WORKSHEET | 3 | NTP+ 14 D | ||||||||||||||||||||
| 6 | QC PLAN | 3 | NTP+ 14 D | ||||||||||||||||||||
| 7 | TRAFFIC CONTROL PLAN | 3 | NTP+ 14 D | ||||||||||||||||||||
| 8 | SUBCONTRACTING PLAN (ONLY APPLICABLE FOR LARGE BUSINESSES, NA FOR SMALLs OR 8As) - NA | NTP+ 14 D | |||||||||||||||||||||
| TECHNICAL | |||||||||||||||||||||||
| 9 | Pavement Marking System | 3 | 3 | 3 | NTP+ 14 D | ||||||||||||||||||
| 10 | Proposed Method of Eradication | 3 | 3 | NTP+ 14 D | |||||||||||||||||||
| PROJECT CLOSE OUT | |||||||||||||||||||||||
| 11 | AS BUILTS | 2 | AT FINAL ACCEPTANCE | ||||||||||||||||||||
| 12 | WARRANTY LETTER | 2 | AT FINAL ACCEPTANCE |
&CAPPENDIX 20
&L&6CP:COPY, ST:SET, PN:SAMPLES PANEL, MD:MODULE, SM:SQUARE METER, EA:EACH, KG:KILOGRAM, CON:CONTAINER, LM:LINEAR METER, MAT APP: MATERIAL APPROVAL&C
&R&6COMPUTER GENERATED AF 66, OCT 89&
&[1]
Sheet2
Sheet3
File details come from the government source that posted it. Updated .