This Q&A document contains 12 vendor questions and government responses regarding the TPS Classroom Network Console procurement for Edwards AFB Building 2750. Key clarifications include: the equipment will be stored inside the consoles with only monitors, keyboards, and mice on the workspace; consoles must be TAA compliant; award criteria prioritizes best technological solution and quality over price; power will be daisy-chained from wall sources; and the requirement for 36 seats can be met through either individual stations or shared 72-inch consoles accommodating two users each.
The questions address specific technical requirements including dimensions for equipment storage (Mirage B3000S PC, HP Z2 G9 Mini PCs, Belkin Secure KVM, and surge protectors), installation preferences (hardwired power preferred but plug-ins available), and room configuration flexibility (4 rows of 9 acceptable instead of 6 rows of 6, as long as 36 total seats are accommodated). The Q&A period closed March 4, 2025, ahead of the March 10, 2025 4:30PM PDT solicitation due date.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q & A from vendors for TPS Classroom Network Consoles
1. If not brand new, could you please provide the current / previous contract number?
Answer: N/A
2. Is that the case or is the equipment sitting on the work surface? We also see that the rows have changed to rows of 6 operators having only 36" of space each and one display each, is that correct Answer: The equipment will be sitting inside the consoles, the only thing on the workspace will be one monitor, keyboard, and mouse. The back of the console will need to hold all the equipment.
3. Do you require any certifications?
Answer: TAA Compliant consoles
4. What will the criteria be for making the final decision? Price, quality, best solution...
Answer: Best technological solution, quality, price is the order of our priorities. We have a set aside budget for this.
5. Can I have the dimensions (W x H x D) for all that will need to be stored in the rack (form factors and KVM) according to the dimensions of the room?
· 1 – Mirage B3000S (NIPR) Small Form Factor PC 12 x 11 x 3.6”
· 2 – HP Z2 G9 Mini (or other Mini Form Factor PC) – 9.3w x 8.6d x 2.7h”
· 1 – Belkin Secure KVM F1DN204KVM-UN-4 12.5 x 3.6 x 6.2”
· 2 – Surge Protectors (1 to connect Unclassified equipment / 1 for Classified Equipment) 10.8 x 1.850 x1.23”
6. Where is the power coming from? Raised floor, or core holes...
Answer: Power is coming from the walls so the consoles will be daisy chained.
7. Will they be hardwired or plug-ins?
Answer: Hardwired preferred but plug ins available
8. Due to the size of the room, we cannot have 6 rows of 6. I would suggest 4 rows of 9. Is the customer okay with this?
Answer: Our requirement is to sit 36 people in this room and meet the technological needs however you can do that.
9. Do we need to build all desks individually, or would it be ok if they were attached?
Answer: The only requirement is that the consoles fit in the room and we are able to seat 36 people.
10. If we build 18 desks at 72” for two users instead of 36 desks at 36” for 1 user, which means there would be no seem between the two, it would save a lot of cost. Would this be an option?
Answer: Yes absolutely, we just need to be able to sit 36 people in the room.
11. I am being asked to ask are we are able to submit a quote.
Answer: Yes
12. Where will the requirement be located?
Answer: Edwards AFB Building 2750 on the second floor – elevator or stairs to get to the second floor.
*Please note, if there are any additional questions or information requested, I will reach out back out before the solicitation closes on March 10th, 2025, at 4:30PM PDT.