Question and Answer – Solicitation # FA9302-14-M-L025 – Cable Rework

1. Will there will be a job walk, and if so when it will be scheduled?

A job walk will not be scheduled for this project.

2. The Requirements mention “Schedule Holders” are only GSA Schedule Holders eligible to bid this project? All responses are to be sent through GSA and via email to falilou.diouck@us.af.mil / shea.thomas.3@us.af.mil. Can you please clarify what it means by sending responses through GSA since this is not a GSA request?

No, this is an open market requirement that is available to all prospective bidders, assuming they have small business status. Please note that this is a small business set aside per the solicitation. The responses vetted through GSA was an error. Please also note that the CO's correct email is thomas.shea.3@us.af.mil.

3. Is there any additional information and/or requirements available for this project?

All available information is provided on the solicitation along with additional Q&A provided here.

4. Has a contractor performed similar work to this for the government in the past?

There are contractors interested in this buy that have done work on base at various locations, including the P-310 Complex at South Base. There is not specific work / contract # as it pertains to this buy.

5. If you are unable to provide a contract number, is it safe to assume this is a new requirement for the government?

Yes, this is a new requirement.

6. Does the cable tray go vertical?

Cable trays are outside next to the building P-310. They were required to be installed to keep the existing power cables off the ground

7. How many waterfalls, 90 degree, 45 degree in cable tray?

There will be twelve 90 degree waterfalls.

8. Are Kelm Grips required?

No.

9. Does the cable enter fire proof area explosion proof areas? If so is the Fire rating material re-usable ( fire blocks, pillows)?

No.

10. What Voltage is the switch gear for safety equipment?

Voltage will have to be shut-off at the source and this can only be accomplished on a non-interference basis of flight operations

11. Are current load readings available?

No.

12. Can the sizes of each cable be provided?

(Conductor/Gage) 6/4=1955 ft; 2/4=750 ft; 2/5=190 ft; 3/0=720 ft. These are approximate lengths.