412 TEST WING (TW)
PERFORMANCE-BASED STATEMENT OF WORK (SOW)
FOR
GLOBAL VIGILANCE REROUTING OF POWER CABLING AT
BUILDING P-310
AT
EDWARDS AFB, CALIFORNIA
18 JUNE 2014
SECTION I
DESCRIPTION OF SERVICES
1. SCOPE. This Statement of Work (SOW) defines contractor requirements for the proper removal and rerouting of three phase power cables for the P-310 Complex.
1.1. Background. During a Unit Compliance Inspection (UCI) at the P-310 complex, a deficiency was identified due to three phase electric power cables located on the ground. These cables presented an electric shock and tripping hazard to personnel on the ground. To mitigate these hazards, the CTF had cable trays installed in the complex to remove the cables from the ground and put them overhead. The contract to correct the deficiency only provided for cable tray installation and did not include placement of the cables onto the trays. The cable trays passed final inspection and are serviceable. This contract is for services related to the removal of the cables off the ground placement of the cables onto the cable trays.
SECTION II
REQUIREMENTS
3. REQUIREMENTS.
3.1. General.
3.1.1. The contractor will remove cables from the ground and place them onto newly installed cable trays. There are approximately forty-five cables with an accumulative measurement of approximately 5000 feet. Prior to placing cables onto cable trays, cables will be inspected for degradation and will be replaced when required.
This contract will allow up to 33% new cabling for cable deemed unsafe and/or unserviceable.
3.2. Duty Day.
3.2.1. The contractor shall provide services Monday through Friday, 0730 to 1630; with the exception of Federal Holidays.
3.2.2. After hours support may be requested and shall be provided on weekends or after normal duty hours and will not exceed 12 hours a day. The contractor shall respond to after hour services within two hours from notification.
3.3. Contractor Personnel.
3.3.1. The contractor shall provide continual contract management for the entire period of performance.
3.3.2. Contractor personnel shall present a neat professional appearance;
appropriate clothing worn, good house-keeping practices and compliance with all security and safety processes.
3.3.3. The contractor shall only provide contractor personnel to accomplish the work detailed in this SOW who have proof of U.S. Citizenry.
3.4. Safety Requirements and Reports.
3.4.1. The contractor shall comply with all Edwards Air Force Base safety standards and all OSHA standards. The contractor shall initiate and maintain programs to comply with the provisions of OSHA concerning entry requirements in confined spaces and handling potential hazardous substances. Resolution of citations for violations of Occupational Safety, Health Act Safety, and Health Standards is the contractor’s responsibility.
3.5. Physical Security.
3.5.1. The contractor shall be escorted at all times by approved Government or Government Contract Support personnel inside the P-310 compound.
3.5.2. The contractor shall be responsible for safeguarding all government property while working in the P-310 compound.
3.6. Specific Requirements/Task Details.
All work needs to be accomplished by a licensed electrician.
The contractor shall provide all required tools.
Work will need to be accomplished in phases as not to impact Global Hawk test operations.
Work should take no longer than six months to accomplish.
The contractor will disconnect all power cables from power sources.
Inspect cables for degradation.
Replace cables deemed unsafe or unserviceable.
Place cables from the ground on the newly installed cable trays and reconnect power.
Cables need to be secured to the tray assemblies using the proper mechanisms made for the external securing of various size cabling.
All cabling shall be labeled at each end.
All cabling shall be tested for serviceability at the end of each phase.
A load test is required when all work is accomplished to determine load capacity on mission critical external power back-up systems.
When all power cable rerouting is accomplished, the GV CTF PM and CO will inspect the site to ensure that no additional work is required. If additional work is required, the contractor shall perform the work identified in the inspection.