ATTACHMENT 2_Statement of Objectives_FA930124Q0014.pdf
PDF 67 KB Posted
- Attached to
- Rental of Air Cooled 30 Ton Chiller
- Solicitation number
- FA930124Q0014
About this file
This document is a Statement of Objectives (SOO) for the rental of an Air Cooled 30 TON Chiller for a duration of four months, to be installed at Building 3810 on the Pratt & Whitney premises. The rental requirements include delivery, connection, disconnection, and pick-up services, as well as necessary and regular scheduled maintenance within the rental period. The preferred chiller specifications are 460/3PH, CAT Class Code 244-0130, with a 30 ton capacity. The rental is being procured through Federal Contract Opportunity FA9301-24-Q-0014, a Small Business Set-Aside with a NAICS code of 333415 and a size standard of 1,250 employees. The contract will be a Firm-Fixed-Price (FFP) Purchase Order with a period of performance from 25 July 2024 to 25 November 2024. Offers are due by 22 July 2024 at 4:00PM Local Time.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Objectives (SOO) 01 July 2024
CHILLER, AIR COOLED, 30 TON, 460/3PH, CAT CLASS CODE 244-0130 RENTAL
HVAC requires the rental of an Air Cooled 30 TON Chiller (30 only), with specifications of 460/3PH, CAT Class Code 244-0130, for a duration of four months. This rental should encompass delivery, connection, disconnection, and pick-up services.
Additionally, all necessary and regular scheduled maintenance within the rental period must be included.
Required at Building 3810 on the Pratt & Whitney premises. The previous chiller has malfunctioned, concluding a replacement needed. A request for a replacement chiller has been initiated, however, the estimated time of arrival for the new unit is anticipated to be in the Spring of 2025. Size of unit does matter as the unit will be installed outside.
Note: alternative vehicles must meet minimum requirements and equal size to preferred listed above.
Minimum requirements and industry standards materials required for connection
• Onboard pump
• 30 ton capacity only (increase or decrease in size will not work)
• Hoses for connections, 50 ft hose supply (input) and return (output), All hoses need to be 4 inches in size.
• Electrical whips 100 feet long
• Cam and groove adapters, in/out
• Vendor will provide industry standard preventative maintenance (manufacture preventative maintenance requirements) and schedule with the PM.
• Vendor will also provide repairs due to wear and tear of the equipment.
Statement of Objectives (SOO)