Technical_Evaluation_Checklist.pdf

PDF 95 KB Posted

Attached to
Chemical Toilet/Hand Wash Station/Septic Tank Services
Solicitation number
FA9301-15-R-0009
Issued by

About this file

ATTACHMENT 4 Technical_Evaluation_Checklist

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL EVALUATION CHECKLIST

OFFEROR __________________

EVALUATOR: ______________

DATE: _____________________

General Criteria Pass Fail

1. FACTOR:

All solicitation requirements are adhered to and offeror submits proposal in accordance with the directives outlined in the solicitation

2. FACTOR:

Provide evidence of capabilities

a. SUBFACTOR:

Provide evidence of capability to provide/supply American Disability Act (ADA) compliant Chemical Toilets (See

PWS 1.1)

b. SUBFACTOR:

Provide evidence that Chemical Toilets proposed for use meet Portable Sanitation Industry commercial standards IAW ANSI Z4.3-2005 (See PWS 1.4.1)

c. SUBFACTOR:

Provide evidence that proposed hand wash stations will be fully functional (to include water) and supplied with paper towels and hand soap (See PWS 1.5)

d. SUBFACTOR:

Provide a detailed plan explaining how offeror will ensure chemical toilets and hand wash stations will be secured in windy conditions (up to 70 MPH) (See

PWS1.4.2.5)

e. SUBFACTOR:

Offeror provides Chemical Toilet Service Plan IAW ANSI Z4.3 2005 (to include how offeror will record, maintain and post service records on each unit (See PWS 1.4.2)

ATTACHMENT: 4 FA9301-15-R-0009 Technical Evaluation Checklist

f. SUBFACTOR:

Offeror Provides detailed plan for Plant 42 waste disposal (See PWS 1.9)

g. SUBFACTOR:

Offeror provides detailed emergency response plan to address how the offeror will respond to an emergency situation within 4 hours. The emergency plan will include:

i) Emergency Point of Contact

(POC)

ii) Emergency POC 24 hour contact information (telephone/email)

iii) Emergency service and supply details including, but not limited to: location of equipment for emergency use, qualified personnel available in the event of an emergency, and the offeror’s standard emergency operating procedures.

(See PWS 1.7.1)

3. FACTOR:

Offerors have met all Past Performance Information requirements outlined in solicitation.

a. SUBFACTOR:

Past Performance questionnaire consists of “Satisfactory” or above ratings only. “Marginal” and “Unsatisfactory” result are unacceptable and result in a fail.

b. SUBFACTOR:

Offeror has ensured three (3) completed questionnaires have been returned to the contracting office before solicitation end date.

c. SUBFACTOR:

Completed questionnaires are recent and relevant as defined in the solicitation.

Comments:

1.______________________________________________________________________

2 (a).

2 (b).

2 (c).

2 (d).

2 (e).

2 (f).

2(g).

3(a).

3(b).

3(c).

ADDITIONAL COMMENTS:

File details come from the government source that posted it. Updated .