This file is a comprehensive Technical Specifications document for a Job Order Contract at Arnold Air Force Base, covering construction and renovation work across multiple technical divisions from CSI Sections 01-48, dated January 2025. The extensive specifications document provides detailed technical requirements for various construction activities, including general requirements, existing conditions management, demolition procedures, concrete work, masonry, metals, wood and composite materials, thermal and moisture protection, openings, finishes, specialties, equipment, furnishings, special construction, conveying equipment, fire suppression, plumbing, HVAC, electrical systems, communications, and electronic safety and security.
The document is structured with granular technical specifications for each division, offering comprehensive guidance on materials, installation procedures, execution methods, product requirements, and quality control measures. Key areas of focus include construction waste management, cutting and patching, temporary facilities and controls, erosion control, mold remediation, lead and asbestos abatement, underground storage tank removal, overhead electrical distribution, and various renovation and construction techniques. The specifications are designed to provide detailed technical standards and requirements for contractors performing work at Arnold Air Force Base, ensuring consistent quality, safety, and compliance across a wide range of construction and renovation projects.
View the file
Other files for this federal contract opportunity
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Job Order Contract Technical Specifications CSI Divisions 01-48 January 2025
Arnold Air Force Base
This Page Intentionally Left Blank
Table of Contents
Arnold Air Force Base TOC - 1
01 General Requirements
01 00 00 00 General Requirements 01 11 13 00 Work Covered by Contract Documents 01 22 16 00 No Specification Required 01 42 13 00 Abbreviations and Acronyms 01 42 19 00 References 01 51 13 00 Electrical Renovation 01 52 13 00 Temporary Facilities and Controls 01 54 23 00 Temporary Scaffolding and Platforms 01 56 26 00 Erosion and Sedimentation Controls 01 71 23 16 Cutting and Patching 01 74 19 00 Construction Waste Management and Disposal
02 Existing Conditions
02 32 13 00 Subsurface Drilling and Sampling 02 41 13 13 Portland Cement Concrete Removal 02 41 16 13 Building Demolition 02 41 19 13 Selective Demolition 02 58 13 00 Snow And Other Temporary Fencing 02 61 13 00 Excavation And Handling Of Contaminated Material 02 61 13 00a Precision Testing Of Underground Fuel Oil Tanks 02 61 13 00b Hydrostatic Pressure Testing Of Air Receiving Tanks 02 61 26 00 Removal and Disposal of Contaminated Soils 02 65 00 00 Underground Storage Tank Removal 02 82 16 00 Engineering Control of Asbestos Containing Materials 02 82 33 00 Removal and Disposal of Asbestos Containing Materials 02 82 33 00a Removal Of Nonfriable Asbestos-Containing Materials 02 83 19 13 Lead Remediation 02 83 19 13a Lead-Based Paint Remediation 02 83 19 13b XRF Testing For Lead-Based Paint 02 83 19 13c Lead Dust Wipe, Air And Tclp Sampling And Analysis 02 84 16 00 Handling of Lighting Ballasts and Lamps Containing PCBs and Mercury 02 84 33 00 Overhead Electrical Distribution 02 87 13 33 Mold Remediation 02 87 16 13 Excrement Removal
03 Concrete
03 01 30 71 Maintenance of Cast-in-Place Concrete 03 01 30 71a Self-Adhering Sheet Waterproofing 03 11 16 13 Architectural Concrete 03 11 16 13a Rusticated Concrete Finishes 03 30 00 00 Cast-In-Place Concrete 03 30 53 00 Miscellaneous Cast-In-Place Concrete 03 31 13 00 Portland Cement Concrete Overlays 03 31 13 00a Steel Reinforced Portland Cement Concrete Overlays 03 31 13 00b Fiber Reinforced Portland Cement Concrete Overlays 03 31 13 00c Roller Compacted Concrete Pavement 03 35 23 00 Exposed Aggregate Concrete Finishing 03 37 13 00 Shotcrete 03 37 13 00a Glass-Fiber-Reinforced Concrete (GFRC) 03 41 16 00 Precast Structural Concrete 03 41 16 00a Precast Concrete Slabs 03 41 23 00 Precast Architectural Concrete 03 41 26 00 Unbonded Post-Tensioned Concrete 03 51 13 00 Cementitious Wood Fiber Decks 03 51 16 00 Gypsum Concrete Roof Decks 03 51 16 00a Gypsum Plank Decking 03 52 16 00 Lightweight Insulating Concrete 03 53 14 00 Concrete Topping 03 54 16 00 Hydraulic Cement Underlayment
TOC - 2 Arnold Air Force Base
04 Masonry
04 01 20 51 Masonry Cleaning 04 01 40 52 Stone Masonry 04 01 40 91 Maintenance of Stone Assemblies 04 05 23 16 Sheet Metal Flashing And Trim 04 20 00 00 Unit Masonry 04 23 13 00 Glass Unit Masonry 04 41 00 00 Exterior Stone Cladding 04 41 00 00a Stone Wall Facing
05 Metals
05 05 21 00 Structural Steel Framing 05 12 23 00 Cold-Formed Metal Framing 05 14 13 00 Architecturally-Exposed Structural Aluminum Framing 05 15 16 00 Decorative Metal 05 21 19 00 Steel Joist Framing 05 31 13 00 Steel Decking 05 50 00 00 Metal Fabrications 05 51 13 00 Metal Pan Stairs 05 51 13 00a Fabricated Metal Spiral Stairs 05 52 13 00 Pipe And Tube Railings 05 53 13 00 Bar Gratings 05 73 23 00 Miscellaneous Ornamental Metals 05 73 23 00a Decorative Metal Railings 05 75 00 00 Decorative Formed Metal
06 Wood, Plastics, and Composites
06 01 20 91 Maintenance of Finish Carpentry 06 01 40 91 Door Hardware 06 05 23 00 Timber Bridge Components 06 05 23 00a Miscellaneous Rough Carpentry 06 05 23 00b Heavy Timber Construction 06 05 73 91 Exterior Architectural Woodwork 06 10 00 00 Rough Carpentry 06 10 00 00a Miscellaneous Rough Carpentry 06 11 13 00 Maintenance of Rough Carpentry 06 15 13 00 Exterior Rough Carpentry 06 15 13 00a Wood Floor Decking 06 16 23 00 Sheathing 06 17 13 00 Glued-Laminated Construction 06 17 33 00 Metal-Plate-Connected Wood Trusses 06 22 13 00 Exterior Finish Carpentry 06 22 13 00a Interior Finish Carpentry 06 25 16 00 Wood Paneling 06 41 13 00 Interior Architectural Woodwork 06 41 13 00a Wood-Veneer-Faced Architectural Cabinets 06 41 13 00b Residential Cabinets 06 42 19 00 Plastic Paneling 06 51 13 00 Structural Plastics 06 51 13 00a Plastic Lumber 06 51 13 00b Composite Lumber 06 74 13 00 Fiberglass Reinforced Gratings 06 81 13 00 Pultruded Fiberglass Structural Shapes
Arnold Air Force Base TOC - 3
07 Thermal And Moisture Protection
07 01 50 81 Membrane Reroofing Preparation 07 01 50 81a Built-Up Coal Tar Roofing 07 11 13 00 Bituminous Dampproofing 07 13 13 00 Bituminous Sheet Waterproofing 07 13 53 00 Elastomeric Sheet Waterproofing 07 14 13 00 Hot Fluid-Applied Rubberized Asphalt Waterproofing 07 14 16 00 Cold Fluid-Applied Waterproofing 07 16 13 00 Polymer Modified Cement Waterproofing 07 16 16 00 Crystalline Waterproofing 07 16 19 00 Metal Oxide Waterproofing 07 17 13 00 Bentonite Waterproofing 07 19 13 00 Water Repellents 07 21 13 13 Modified Bitumous Protected Membrane Roofing 07 21 16 00 Thermal Insulation 07 22 16 00 Roof And Deck Insulation 07 24 13 00 Polymer-Based Exterior Insulation And Finish System (EIFS) 07 24 13 00a Water-Drainage Exterior Insulation And Finish System (EIFS) 07 31 13 13 Asphalt Shingles 07 31 16 00 Metal Shingles 07 31 26 00 Slate Shingles 07 31 29 00 Wood Shingles And Shakes 07 31 33 00 Composite Rubber Shingles 07 32 13 00 Clay Roof Tiles 07 32 16 00 Concrete Roof Tiles 07 41 13 00 Metal Roof Panels 07 41 13 00a Sheet Metal Roofing 07 42 13 19 Glazing 07 42 93 00 Siding 07 46 16 00 Metal Plate Wall Panels 07 46 16 00a Aluminum Siding 07 46 63 00 Insulated-Core Metal Wall Panels 07 51 13 00 Built-Up Asphalt Roofing 07 52 13 00 APP-Modified Bituminous Membrane Roofing 07 52 16 00 SBS-Modified Bituminous Membrane Roofing 07 53 16 00 Chlorosulfonate-Polyethylene (CSPE) Roofing 07 53 23 00 Ethylene-Propylene-Diene-Monomer (EPDM) Roofing 07 54 19 00 Polyvinyl-Chloride (PVC) Roofing 07 54 23 00 Thermoplastic-Polyolefin (TPO) Roofing 07 56 00 00 Coated Foamed Roofing 07 63 00 00 Common Work Results for Fire Suppression 07 63 00 00a Common Work Results for Plumbing 07 63 00 00b Common Work Results for HVAC 07 71 23 00 Roof Specialties 07 72 23 00 Roof Accessories 07 72 56 00 Heat Tracing for Fire-Suppression Piping 07 81 16 00 Sprayed Fire-Resistive Materials 07 84 13 16 Firestopping 07 84 13 16a Penetration Firestopping 07 84 43 00 Joint Firestopping 07 84 56 13 Board Fire Protection 07 91 23 00 Joint Sealants 07 95 13 13 Interior Expansion Joint Cover Assemblies 07 95 13 16 Manufactured Roof Expansion Joints
08 Openings
08 01 11 61 Steel Doors And Frames 08 01 52 61 Wood Windows 08 05 13 00 Stainless-Steel Doors and Frames 08 11 63 13 Steel Storm Doors 08 11 63 13a Security Window Screens and Doors 08 11 63 23 Aluminum Storm Doors 08 11 73 00 Sliding Metal Fire Doors 08 13 13 13 Steel Entry Doors 08 14 00 00 Wood Doors
TOC - 4 Arnold Air Force Base
08 14 16 00 Flush Wood Doors 08 14 16 00a Stile And Rail Wood Doors 08 16 13 00 Fiberglass Reinforced Plastic (FRP) Doors and Frames 08 18 16 00 Sliding Aluminum-Framed Glass Doors 08 18 16 00a Sliding Wood-Framed Glass Doors 08 31 13 00 Access Doors And Frames 08 33 23 11 Overhead Coiling Doors 08 33 26 00 Overhead Coiling Grilles 08 33 36 00 Side Coiling Grilles 08 34 49 13 Radiation Protection 08 34 53 00 Security Grilles 08 34 53 00a Detention Doors And Frames 08 34 59 00 Security Vault Doors 08 34 59 00a Vault Doors and Day Gates 08 34 59 00b Modular Vaults 08 34 73 00 Sound Control Doors 08 35 13 13 Folding Doors 08 36 13 00 Sectional Doors 08 36 23 00 Vertical Lift Doors 08 38 13 00 Flexible Doors 08 42 13 00 Aluminum-Framed Entrances And Storefronts 08 42 26 00 All-Glass Entrances And Storefronts 08 42 29 23 Intensive Care Unit_Critical Care Unit (ICU_CCU) Entrances 08 42 33 00 Revolving Door Entrances 08 44 13 00 Glazed Aluminum Curtain Walls 08 44 13 00a Structural-Sealant-Glazed Curtain Walls 08 44 13 00b Sloped Glazing Assemblies 08 45 23 00 Structured-Polycarbonate-Panel Assemblies 08 45 23 00a Fiberglass-Sandwich-Panel Assemblies 08 45 23 00b Unit Skylights 08 45 23 00c Metal-Framed Skylights 08 51 13 00 Aluminum Windows 08 51 13 00a Aluminum Replacement Windows 08 51 23 00 Steel Windows 08 51 69 00 Aluminum Storm Windows 08 53 13 00 Vinyl Windows 08 56 19 00 Security Windows 08 62 00 00 Roof Windows 08 71 11 00 Detention Door Hardware 08 71 13 00 Power Door Operators 08 83 13 00 Mirrors 08 84 00 00 Plastic Glazing 08 87 23 16 Fragment Retention Film For Glass 08 88 53 00 Security Glazing 08 90 00 00 Louvers And Vents
09 Finishes
09 22 13 13 Gypsum Plastering 09 22 13 13a Cement Plastering 09 22 13 13b Gypsum Veneer Plastering 09 22 16 13 Non-Structural Metal Framing 09 22 36 23 Lath and Plaster Renovation 09 23 13 00 Gypsum Board Renovation 09 28 13 00 Gypsum Board 09 29 82 00 Gypsum Board Shaft-Wall Assemblies 09 30 13 00 Ceramic Tiling 09 51 13 00 Acoustical Panel Ceilings 09 51 23 00 Acoustical Tile Ceilings 09 54 23 00 Acoustical Metal Pan Ceilings 09 54 23 00a Linear Metal Ceilings 09 63 13 00 Brick Flooring 09 64 13 00 Wood Flooring 09 64 66 00 Wood Athletic Flooring 09 65 13 13 Cork Flooring 09 65 13 13a Resilient Base and Accessories
Arnold Air Force Base TOC - 5
09 65 13 33 Linoleum Flooring 09 65 16 23 Resilient Sheet Flooring 09 65 19 19 Resilient Tile Flooring 09 65 66 00 Resilient Athletic Flooring 09 65 66 00a Interlocking Resilient Flooring 09 65 66 00b Fluid-Applied Athletic Flooring 09 66 13 00 Portland Cement Terrazzo Flooring 09 66 23 00 Resinous Matrix Terrazzo Flooring 09 67 23 00 Resinous Flooring 09 68 13 00 Tile Carpeting 09 68 16 00 Sheet Carpeting 09 69 13 00 Access Flooring 09 69 33 00 Low Profile Fixed Height Access Flooring Cable Management System 09 72 13 00 Wall Coverings 09 84 13 00 Acoustical Wall Panels 09 91 13 00 Exterior Painting 09 91 13 00a Staining and Transparent Finishing 09 91 13 00b High-Temperature-Resistant Coatings 09 91 23 00 Interior Painting 09 91 23 00a Multicolor Interior Finishing 09 93 23 13 Floor Treatment Refinishing Wood Floors 09 96 00 00 High-Performance Coatings 09 96 56 00 Fiberglass Reinforced Epoxy Coating 09 96 66 00 Cementitious Coatings
10 Specialties
10 11 13 13 Visual Display Units 10 12 00 00 Display Cases 10 14 00 00 Signage 10 14 16 00 Vitrified Brick Pavement Replacement 10 14 53 11 Traffic Signs 10 17 16 13 Telephone Specialties 10 21 13 13 Metal Toilet Compartments 10 21 13 19 Plastic Toilet Compartments 10 21 16 17 Shower and Dressing Compartments 10 21 16 17a Cubicle Curtains and Track 10 22 13 00 Wire Mesh Partitions 10 22 19 13 Demountable Partitions 10 22 43 00 Operable Panel Partitions 10 26 23 13 Impact-Resistant Wall Protection 10 28 13 13 Toilet, Bath, and Laundry Accessories 10 28 13 13a Detention Toilet Accessories 10 28 13 63 Detention Toilet Accessories 10 28 16 13 Bath Accessories 10 44 13 00 Fire Protection Cabinets 10 44 16 13 Fire Extinguishers 10 51 13 00 Metal Lockers 10 51 26 00 Plastic-Laminate-Clad Lockers 10 55 23 23 USPS-Delivery Postal Specialties 10 56 13 16 Metal Storage Shelving 10 71 13 13 Exterior Shutters 10 73 13 13 Awnings 10 73 26 13 Extruded Aluminum Walkway Cover 10 75 16 00 Ground-Set Flagpoles 10 81 13 00 Oriented Flexible Netting Bird Barrier 10 86 00 00 Detention Furniture
11 Equipment
11 12 16 00 Parking Control Equipment 11 13 13 00 Loading Dock Equipment 11 14 13 19 Turnstiles 11 21 63 00 Foodservice Equipment 11 30 13 13 Residential Appliances
TOC - 6 Arnold Air Force Base
11 30 13 13a Refrigerators 11 30 13 13b Gas Ranges 11 30 13 13c Electric Ranges 11 30 13 13d Range Hoods 11 32 13 00 Unit Kitchens 11 41 33 00 Residential Casework 11 52 13 13 Projection Screens 11 53 13 11 Laboratory Fume Hoods 11 61 23 00 Folding And Portable Stages 11 66 23 13 Gymnasium Equipment 11 66 53 11 Gymnasium Dividers 11 68 13 00 Playground Equipment And Structures 11 68 23 13 Playing Fields 11 82 19 00 Packaged Incinerators 11 82 26 00 Facility Waste Compactors 11 98 12 00 Detention Enclosures 11 98 14 00 Detention Door Hardware
12 Furnishings
12 01 60 00 Fixed Audience Seating 12 21 13 13 Horizontal Louver Blinds 12 21 16 13 Vertical Louver Blinds 12 22 13 00 Curtains and Drapes 12 24 13 00 Roller Window Shades 12 24 13 00a Pleated Window Shades 12 31 16 00 Kitchen Casework, Stainless Steel Cabinets 12 36 40 00 Stone Countertops 12 36 61 16 Solid Polymer Fabrications 12 48 13 13 Entrance Floor Mats and Frames 12 48 13 13a Entrance Floor Grilles 12 56 53 00 Laboratory Casework 12 59 16 00 Systems Furniture 12 62 23 00 Portable Bleachers 12 66 13 00 Telescoping Stands
13 Special Construction
13 34 16 13 Grandstands And Bleachers 13 34 16 13a Fixed Wood Bleachers (Exterior) 13 34 16 13b Demountable Bleachers (Exterior) 13 34 19 00 Metal Building Systems 13 34 23 16 Fabricated Control Booths 13 42 63 16 Security Ceiling Assemblies 13 46 13 00 Lightning Protection 13 47 13 13 Cathodic Protection
14 Conveying Equipment
14 01 30 71 Electric Traction Elevators 14 01 30 71a Hydraulic Elevators 14 11 00 00 Dumbwaiters 14 31 00 00 Escalators 14 41 16 00 Personnel Lifts 14 41 19 00 Wheelchair Lifts 14 45 13 00 Vehicle Lifts 14 91 82 00 Trash Chutes
Arnold Air Force Base TOC - 7
21 Fire Suppression
21 05 13 00 Common Motor Requirements for Fire Suppression Equipment 21 05 48 13 Vibration And Seismic Controls For Fire-Suppression Piping And Equipment 21 07 00 00 Fire-Suppression Systems Insulation 21 11 19 00 Fire-Suppression Standpipes 21 12 29 00 Piped Utilities Basic Materials And Methods 21 13 13 00 Wet-Pipe Fire-Suppression Sprinklers 21 13 16 00 Dry-Pipe Fire-Suppression Sprinklers 21 13 39 00 Foam-Water Systems 21 22 16 00 Clean-Agent Fire-Extinguishing Systems 21 24 00 00 Fiberglass Reinforced Polyester (FRP) Flush Doors 21 31 13 00 Electric-Drive, Centrifugal Fire Pumps 21 31 16 00 Diesel-Drive, Centrifugal Fire Pumps 21 34 13 00 Pressure-Maintenance Pumps
22 Plumbing
22 05 13 00 Common Motor Requirements for Plumbing Equipment 22 05 19 00 Meters and Gages for Plumbing Piping 22 05 23 00 Architecturally Exposed Structural Steel Framing 22 05 23 00a General-Duty Valves for Plumbing Piping 22 05 33 00 Heat Tracing for Plumbing Piping 22 05 48 13 Vibration And Seismic Controls For Plumbing Piping And Equipment 22 05 53 00 Identification for Plumbing Piping and Equipment 22 05 76 00 Storm Drainage Piping Specialties 22 07 19 00 Plumbing Insulation 22 11 16 00 Domestic Water Piping 22 11 16 00a Storm Drainage Piping 22 11 16 00b General-Service Compressed-Air Piping 22 11 16 00c Compressed-Air Piping For Laboratory And Healthcare Facilities 22 11 16 00d Vacuum Piping For Laboratory And Healthcare Facilities 22 11 16 00e Gas Piping For Laboratory And Healthcare Facilities 22 11 16 00f Steam And Condensate Piping 22 11 16 00g Refrigerant Piping 22 11 23 13 Water Distribution Pumps 22 11 23 13a Domestic-Water Packaged Booster Pumps 22 11 23 23 Water Supply Wells 22 12 19 00 Facility Ground-Mounted, Potable-Water Storage Tanks 22 12 19 00a Facility Aboveground Fuel-Oil Storage Tanks 22 13 16 00 Sanitary Waste And Vent Piping 22 13 19 26 Sanitary Waste Piping Specialties 22 13 29 13 Sanitary Sewerage Pumps 22 13 29 13a Lift Station 22 13 29 13b Facility Packaged Sewage Pumping Stations 22 14 29 13 Sump Pumps 22 15 19 13 General-Service Packaged Air Compressors and Receivers 22 31 16 00 Water Treatment Plant Electrical Controls And Instrumentation 22 31 16 00a Domestic Water Softeners 22 33 00 00 Electric, Domestic-Water Heaters 22 34 00 00 Fuel-Fired, Domestic-Water Heaters 22 35 23 13 Domestic-Water Heat Exchangers 22 40 00 00 Plumbing Fixtures 22 41 19 00 Tub and Shower Enclosures 22 43 00 00 Healthcare Plumbing Fixtures 22 45 00 00 Emergency Plumbing Fixtures 22 46 13 13 Security Plumbing Fixtures 22 47 13 00 Drinking Fountains And Water Coolers 22 66 83 16 Chemical-Waste Systems for Laboratory and Healthcare Facilities 22 67 00 00 Processed Water Piping for Laboratory and Healthcare Facilities
TOC - 8 Arnold Air Force Base
23 Heating, Ventilating, and Air-Conditioning (HVAC)
23 01 10 91 Sequence Of Operation 23 01 30 51 Air Duct Cleaning 23 01 60 71 Packaged Compressor and Condenser Units 23 05 13 00 Common Motor Requirements for HVAC Equipment 23 05 16 00 Expansion Fittings and Loops for Plumbing Piping 23 05 16 00a Expansion Fittings and Loops for HVAC Piping 23 05 19 00 Meters and Gages for HVAC Piping 23 05 23 00 General-Duty Valves for HVAC Piping 23 05 29 00 Hangers and Supports for Plumbing Piping and Equipment 23 05 29 00a Hangers and Supports for HVAC Piping and Equipment 23 05 29 00b Steam Distribution 23 05 33 00 Heat Tracing for HVAC Piping 23 05 48 13 Vibration and Seismic Controls for HVAC 23 05 53 00 Identification for HVAC Piping and Equipment 23 05 93 00 Testing, Adjusting, and Balancing for HVAC 23 07 13 00 HVAC Insulation 23 09 00 00 HVAC Instrumentation And Controls 23 11 23 00 Facility Natural-Gas Piping 23 11 23 00a Facility Liquefied-Petroleum Gas Piping 23 11 23 00b Potable Water Supply Wells 23 11 23 00c Monitoring Wells 23 13 13 13 Facility Underground Fuel-Oil Storage Tanks 23 13 23 16 Facility Fuel-Oil Piping 23 21 13 23 Hydronic Piping 23 21 13 23a Radiant-Heating Hydronic Piping 23 21 23 13 Hydronic Pumps 23 21 23 23 Electric-Drive, Vertical-Turbine Fire Pumps 23 21 23 23a Diesel-Drive, Vertical-Turbine Fire Pumps 23 22 23 13 Steam Condensate Pumps 23 25 13 00 HVAC Water Treatment 23 31 13 13 Metal Ducts 23 31 13 13a Shop-Fabricated HVAC Casings 23 31 13 19 Air Duct Accessories 23 31 16 13 Nonmetal Ducts 23 34 13 00 Axial Fans 23 34 16 00 Centrifugal Fans 23 34 23 00 Power Ventilators 23 34 33 00 Commercial Air Curtains 23 35 16 16 Tailpipe Exhaust Equipment 23 36 13 00 Air Terminal Units 23 37 13 13 Registers and Grilles 23 37 23 13 HVAC Gravity Ventilators 23 41 13 00 Air Filters 23 41 33 00 High-Efficiency Particulate Air Filtration 23 42 13 00 Gas-Phase Air Filtration 23 43 00 00 Electronic Air Cleaners 23 51 13 19 Draft Control Devices 23 51 16 00 Fabricated Breechings and Accessories 23 52 13 00 Electric Boilers 23 52 16 13 Condensing Boilers 23 52 23 00 Cast-Iron Boilers 23 52 33 16 Water-Tube Boilers 23 52 39 13 Fire-Tube Boilers 23 53 16 00 Boiler Feedwater Pumps 23 53 16 00a Deaerators 23 54 16 13 Electric-Resistance Furnaces 23 55 23 13 Radiant Heating and Cooling Units 23 55 23 13a Radiant-Heating Electric Panels 23 55 33 16 Fuel-Fired Unit Heaters 23 57 13 00 Heat Exchangers for HVAC 23 63 13 00 Air-Cooled Refrigerant Condensers 23 63 13 00a Split-System Air-Conditioners 23 64 13 16 Direct-Fired Absorption Water Chillers 23 64 13 16a Indirect-Fired Absorption Water Chillers 23 64 16 16 Centrifugal Water Chillers 23 64 23 13 Scroll Water Chillers
Arnold Air Force Base TOC - 9
23 64 23 16 Reciprocating Water Chillers 23 64 26 13 Rotary-Screw Water Chillers 23 65 13 16 Cooling Towers 23 72 13 00 Heat Wheel Air-To-Air Energy Recovery Units 23 73 13 00 Modular Indoor Central-Station Air-Handling Units 23 74 16 13 Packaged, Outdoor, Central-Station Air-Handling Units 23 74 16 13a Rooftop Replacement Air Units 23 74 16 13b Self-Contained Air-Conditioners 23 74 16 13c Unit Ventilators 23 74 23 13 Indirect-Fired, Packaged H&V Units 23 74 23 13a Direct-Fired, Makeup Air Units 23 81 13 11 Packaged Terminal Air Conditioners 23 81 23 12 Computer-Room Air-Conditioners, Ceiling-Mounted Units 23 82 16 11 Hydronic Air Coils 23 82 19 00 Fan Coil Units 23 82 33 00 Convectors 23 82 39 13 Unit Heaters 23 83 13 00 Radiant-Heating Electric Cables 23 84 13 16 Humidifiers 23 84 16 33 Dehumidification Units
26 Electrical
26 05 00 00 Common Work Results for Electrical 26 05 13 00 Medium-Voltage Cables 26 05 19 13 Undercarpet Electrical Power Cables 26 05 19 16 Low-Voltage Electrical Power Conductors and Cables 26 05 19 16a Common Work Results for Communications 26 05 19 16b Communications Equipment Room Fittings 26 05 19 16c Communications Copper Backbone Cabling 26 05 19 16d Communications Coaxial Horizontal Cabling 26 05 19 16e Common Work Results for Electronic Safety and Security 26 05 19 16f Conductors and Cables for Electronic Safety and Security 26 05 23 00 Control-Voltage Electrical Power Cables 26 05 26 00 Grounding and Bonding for Electrical Systems 26 05 29 00 Hangers And Supports For Electrical Systems 26 05 29 00a Vibration And Seismic Controls For Electrical Systems 26 05 33 00 Raceways And Boxes 26 05 33 23 Supplemental Requirements for Electrical 26 05 33 23a Surface Raceways for Electrical Systems 26 05 33 23b Sleeves and Sleeve Seals for Electrical Raceways and Cabling 26 05 36 00 Cable Trays for Electrical Systems 26 05 39 00 Underfloor Raceways For Electrical Systems 26 05 53 00 Identification for Electrical Systems 26 05 53 00a Intercommunications and Program Systems 26 09 23 00 Electrical Power Monitoring 26 09 23 00a Lighting Control Devices 26 09 23 00b Lighting Controls 26 09 23 00c Central Dimming Controls 26 09 23 00d Modular Dimming Controls 26 11 16 11 Secondary Unit Substations 26 11 16 11a Secondary Unit Substations with Switchgear Secondary 26 12 13 00 Medium-Voltage Transformers 26 22 13 00 Low-Voltage Distribution Transformers 26 24 13 00 Switchboards 26 24 13 00a Electricity Metering 26 24 13 00b Enclosed Switches And Circuit Breakers 26 24 16 00 Panelboards 26 24 19 00 Motor-Control Centers 26 25 13 00 Low-Voltage Enclosed Bus Assemblies 26 27 26 00 Wiring Devices 26 27 33 00 Power Distribution Units 26 28 13 00 Fuses 26 29 13 13 Enclosed Controllers 26 29 33 13 Controllers for Fire Pump Drivers 26 31 00 00 Photovoltaic Collectors 26 32 13 13 Packaged Engine Generators 26 33 43 00 Central Battery Inverters
TOC - 10 Arnold Air Force Base
26 33 43 00a Public Address Systems 26 33 43 00b Nurse Call_Code Blue Systems 26 33 53 00 Static Uninterruptible Power Supply 26 35 33 16 Power Factor Correction Equipment 26 36 13 00 Transfer Switches 26 43 13 00 Surge Protective Devices for Low-Voltage Electrical Power Circuits 26 51 00 00 Interior Lighting 26 55 61 00 Theatrical Lighting 26 56 00 00 Exterior Lighting
27 Communications
27 13 23 13 Communications Optical Fiber Backbone Cabling 27 51 43 00 Educational Intercommunications and Program Systems 27 52 23 00 Nurse Call_Code Blue Systems 27 53 13 13 Clock Systems
28 Electronic Safety and Security
28 16 11 00 Security Access 28 16 11 00a Intrusion Detection 28 16 11 00b Area and Perimeter Intrusion Detection 28 21 31 00 Video Surveillance 28 46 13 31 Zoned (DC Loop) Fire-Alarm System 28 46 13 31a Digital, Addressable Fire-Alarm System
31 Earthwork
31 05 13 00 Earth Moving 31 05 13 00a Subdrainage 31 11 00 00 Site Clearing 31 13 16 00 Tree Protection And Trimming 31 23 16 13 Excavation Support And Protection 31 23 19 00 Dewatering 31 24 13 00 Embankment 31 24 13 00a Levees 31 25 14 00 Stabilization Measures for Erosion and Sedimentation Control 31 25 14 23 Unit Paving 31 25 14 26 Silt Fences 31 31 16 13 Termite Control 31 31 19 13 Soil Sterilization 31 32 13 19 Soil Stabilization-Lime 31 32 19 13 Geosynthetic Fabric 31 32 19 16 Sewage Treatment Lagoons 31 32 19 16a Pond Reservoir Liners 31 36 13 00 Wire Mesh Gabions 31 37 13 00 Riprap 31 41 13 00 Drilled Concrete Piers and Shafts 31 45 13 00 Soil Stabilization-Vibroflotation 31 62 13 23 Concrete Piles 31 62 16 16 Steel Piles 31 62 19 00 Timber Piles 31 62 23 00 Composite Piles 31 66 15 00 Resistance Pier Systems
Arnold Air Force Base TOC - 11
32 Exterior Improvements
32 01 11 53 Traffic Coatings 32 01 11 53a Pavement Joint Sealants 32 01 13 61 Spray Applications, Seal Coats, And Surface Treatments 32 01 13 61a Crack Sealing Of Bituminous Pavements 32 01 16 71 Cold Mix Recycling 32 01 16 71a Grinding/Grooving Pavement 32 01 16 74 Bituminous Rejuvenation 32 01 16 74a Central Plant Hot-Mix Recycling 32 11 16 16 Crushed Stone 32 11 16 16a Select Gravel 32 11 16 16b Crushed Stone Paving 32 12 13 13 Asphaltic Concrete Overlays 32 12 13 13a Bituminous Paving-Repair And Resurfacing 32 12 16 13 Asphalt Paving 32 13 13 33 Concrete Paving 32 13 13 33a Decorative Concrete Paving 32 14 09 00 Plants 32 14 11 00 Asphalt Concrete Sidewalks 32 14 11 00a Precast Sidewalks And Pavers 32 14 33 13 Porous Unit Paving 32 16 13 16 Steel Curbs 32 16 23 00 Miscellaneous Sidewalks 32 17 23 13 Track, Court, And Playground Markings 32 17 26 00 Tactile Warning Surfacing 32 18 16 13 Playground Surface Systems 32 18 23 13 Turf and Grasses 32 18 23 29 Colored Athletic Wearing Surface 32 18 23 29a Synthetic Turf 32 18 23 39 Synthetic Running Track Surface 32 31 13 13 Chain Link Fences And Gates 32 31 13 53 High-Security Chain Link Fences and Gates 32 31 19 00 Decorative Metal Fences and Gates 32 31 26 13 Wire Fences with Steel Posts 32 31 29 00 Permanent Wood Fencing 32 32 23 13 Modular Retaining Walls 32 32 23 13a Segmental Retaining Walls 32 33 13 00 Miscellaneous Site and Street Furnishings 32 33 13 00a Recreational Facilities 32 33 23 00 Site Furnishings 32 84 13 00 Planting Irrigation 32 91 13 16 Transplanting 32 91 19 13 Concrete Revetment 32 91 19 13a Facility Septic Tanks
33 Utilities
33 01 10 58 Repair And Maintenance Of Imhoff Tanks 33 01 10 71 Pipe Lining 33 01 30 41 Sewer Line Cleaning 33 01 30 42 Repair And Maintenance Of Siphon Tank And Siphons 33 01 30 81 Underground Ducts and Utility Structures 33 01 30 81a Stormwater Conveyance 33 05 07 13 Trenchless Excavation Using Microtunneling 33 11 13 00 Well Repair 33 14 00 00 Water Distribution 33 14 13 23 Sand Drains 33 14 13 23a Ground-Loop Heat-Pump Piping 33 14 13 23b Hydronic Distribution 33 16 13 00 Facility Elevated, Potable-Water Storage Tanks 33 31 11 00 Sanitary Sewerage 33 42 11 00 Stormwater Conveyance 33 42 13 13 Culverts 33 44 36 00 Oil/Water Separator
TOC - 12 Arnold Air Force Base
34 Transportation
34 41 13 00 Electrical Traffic Control Signals 34 71 13 16 Active Vehicle Barriers 34 71 13 26 Vehicle Guide Rails
35 Waterway and Marine Construction
35 22 26 00 Sluice Gates
41 Material Processing and Handling Equipment
41 22 23 13 Material Handling Hoists 41 22 23 13a Hoists 41 22 23 13b Monorails With Electric Powered Hoists 41 22 23 13c Monorails With Manual Hoist 41 22 23 23 Ash Hoists
01 - General Requirements
2025 General Requirements Arnold Air Force Base 01 00 00 00 - 1
SECTION 01 00 00 00 - GENERAL REQUIREMENTS
PART 1 - GENERAL
1.1 BRACKETED OPTIONS
A. Within these Technical Specifications there are bracketed options. For example [6ft] [12ft] [24ft]. The final selection will be made by the Contracting Officer and set forth in the Detailed Scope of Work.
1.2 WARRANTY
A. Within these Technical Specifications there are warranty periods listed. The warranty periods listed cover both material and labor for that period. If a manufacture will warranty a material for a longer period than what is listed, the material is covered as a replacement by the manufacture for the extra period.
The labor to replace will be at the installation price for the contractor.
END OF SECTION 01 00 00 00
General Requirements 2025 01 00 00 00 - 2 Arnold Air Force Base
THIS PAGE INTENTIONALLY LEFT BLANK
Arnold Air Force Base 01 10 00 00 to 01 11 00 00 - 1
Task Specification Specification Description 01 10 00 00 01 00 00 00 General Requirements 01 11 00 00 01 00 00 00 General Requirements
01 10 00 00 to 01 11 00 00 - 2 Arnold Air Force Base
2025 Work Covered by Contract Documents Arnold Air Force Base 01 11 13 00 - 1
SECTION 01 11 13 00 - WORK COVERED BY CONTRACT DOCUMENTS
1.1 GENERAL
A. If any conflicts arise in the Specifications; the Contracting Officer’s Standard Plans and Specifications supersede the Gordian Technical Specifications. Specification conflicts shall be resolved as directed by the Contracting Officer.
B. Contractor is to provide a competent person to ensure operations are completed per plans, specifications, local laws and regulations which pertain.
C. Specification Format
1. The specification format shall be based on the Construction Specifications Institute (CSI) Section
Format.
1.2 PRODUCTS - (Not Used)
1.3 EXECUTION - (Not Used)
END OF SECTION 01 11 13 00
Work Covered by Contract Documents 2025 01 11 13 00 - 2 Arnold Air Force Base
Arnold Air Force Base 01 11 19 00 to 01 22 00 00 - 1
01 11 19 00 01 00 00 00 General Requirements 01 11 19 00 01 22 16 00 No Specification Required 01 20 00 00 01 00 00 00 General Requirements 01 22 00 00 01 00 00 00 General Requirements
01 11 19 00 to 01 22 00 00 - 2 Arnold Air Force Base
2025 No Specification Required Arnold Air Force Base 01 22 16 00 - 1
SECTION 01 22 16 00 - NO SPECIFICATION REQUIRED
A. A separate specification is not required for this item. The description given in the line item of the Construction Task Catalog completely defines the item.
1.2 PRODUCTS - (Not Used)
1.3 EXECUTION - (Not Used)
END OF SECTION 01 22 16 00
No Specification Required 2025 01 22 16 00 - 2 Arnold Air Force Base
Arnold Air Force Base 01 22 16 00 to 01 42 00 00 - 1
01 22 16 00 01 00 00 00 General Requirements 01 22 20 00 01 00 00 00 General Requirements 01 22 20 00 01 22 16 00 No Specification Required 01 22 23 00 01 00 00 00 General Requirements 01 22 23 00 01 22 16 00 No Specification Required 01 30 00 00 01 00 00 00 General Requirements 01 33 00 00 01 00 00 00 General Requirements 01 33 23 00 01 00 00 00 General Requirements 01 35 00 00 01 00 00 00 General Requirements 01 35 29 00 01 00 00 00 General Requirements 01 35 53 00 01 00 00 00 General Requirements 01 40 00 00 01 00 00 00 General Requirements 01 41 00 00 01 00 00 00 General Requirements 01 41 26 00 01 00 00 00 General Requirements 01 42 00 00 01 00 00 00 General Requirements
01 22 16 00 to 01 42 00 00 - 2 Arnold Air Force Base
2025 Abbreviations and Acronyms Arnold Air Force Base 01 42 13 00 - 1
SECTION 01 42 13 00 - ABBREVIATIONS AND ACRONYMS
A. Description Of Work
1. This specification covers abbreviations, acronyms, definitions, and symbols used in the Contract
Documents.
B. Unit of Measure Definitions
1. Following is a list of Industry Standard abbreviations.
A Area Square Feet;
Ampere AB Anchor Bolt ABC Aggregate Base Course ABS Acrylonitrile Butadiene Styrene AC Alternating Current;
Air-Conditioning;
Asphaltic Concrete;
Plywood Grade A & C ACFM Actual Cubic Feet Per Minute ACM Asbestos Containing Material ACP Asphaltic Concrete Paving ACR Acre ACZA Ammoniacal Copper Zinc Arsenate AD Plywood, Grade A & D ADDL Additional ADJ Adjustable ADMIN Administer; Administration AGG Aggregate AH Ampere Hours AHM Ampere-Hour Meter AHU Air Handling Unit AIC Amperes Interrupting Capacity AL Aluminum ALT Alternate AMP Ampere AMT Amount AOT Adjusted Oxygen Transfer APP Attactic Polypropylene APPROX Approximate Apt. Apartment ART Articulated ASB Asbestos ASJ All Surface Jacketing Avg. Average AWG American Wire Gauge
BAG Bag BBL Barrel B&B Grade B and Better;
Balled & Burlapped B&S Bell and Spigot
B&W Black and White BC Between Centers BCY Bank Cubic Yard BDL Bundle BD FT Board Feet BEV Bevel/Beveled BF Board Feet BFP Boiler Feed Pump BHN Brinell Hardness Number BHP Boiler Horsepower;
Brake Horsepower BI Black Iron Bit. Bituminous Bitum. Bituminous Bk. Backed Brkrs. Breakers Bldg. Building BLK Black; Block BM Bank Measure; Beam BOD Biochemical Oxygen Demand BOX Box (each) BR Bedroom Brg. Bearing BRK Brick BTFLY VLV Butterfly Valve BTR Better (Lumber) BTU British Thermal Units BTU/HR British Thermal Units per Hour BUR Built Up Roof BW Butt Weld BWG Birmingham Wire Gauge BX Interlocked Armored Cable
C Centigrade; Conductance;
Conductivity, Hundred CA Corrosion Allowance Cab. Cabinet CAP Capacity CB Circuit Breaker CC Center to Center CCA Chromate Copper Arsenate CCF Hundred Cubic Feet
Abbreviations and Acronyms 2025 01 42 13 00 - 2 Arnold Air Force Base
CCY Compacted Cubic Yard cd Candela cd/sf Candela per Square Foot CF Cubic Foot (Feet) CFM Cubic Feet per Minute CHG Charge CHW Chilled Water;
Commercial Hot Water CI Cast Iron CIP Cast in Place; Cast Iron Pipe CIRC Circulating; Circuit CLF Hundred Linear Feet;
Current Limiting Fuse CLP Cross Linked Polyethylene cm Centimeter CMP Corrugated Metal Pipe CMPA Corrugated Metal Pipe - Arched CMU Concrete Masonry Unit CO Carbon Monoxide CO2 Carbon Dioxide COL Column Comb Combination Compr Compressor CONC Concrete CONSTR Construction Cont Continuous; Continued Corr Corrugated CP Chrome Plated CPE Chlorinated Polyethylene Cplg. Coupling CPM Cycles per Minute CPM Critical Path Method CPS Centipoise CPRSR Compressor CPVC Chlorinated Polyvinyl Chloride CS Carbon Steel CSF Hundred Square Feet CSPE ChloroSulphinated Polyethylene CSS Cast Semi Steel CT Current Transformer CTB Cement Treated Base CTR Center CU FT Cubic Foot CU IN Cubic Inch CU YD Cubic Yard CW Chilled Water; Cold Water CWR Chilled Water Return CWS Chilled Water Supply CWT Hundred Weight CY Cubic Yard (27 cu. ft.); Cycle CYH Cubic Yards Per Hour Cyl Cylinder d Penny (nail size) D Deep; Depth; Discharge
Dis. Discharge Disch. Discharge DB Dry Bulb; Decibel DBL Double DC Direct Current DCS Distributed Control System DDC Direct Digital Control Demob Demobilization DF Douglas Fir DFT Dry Film Thickness DH Double Hung DHW Domestic Hot Water DI Ductile Iron D/P Differential Pressure DIA Diameter Diam Diameter Diag. Diagonal Distrib. Distribution DL Dead Load; Diesel DLH Deep Long Span Bar Joist DPST Double Pole, Single Throw DS Double Strength DSA Double Strength A Quality Glass DSB Double Strength B Quality Glass DWV Drain, Waste, Vent Piping DX Deluxe White, Direct Expansion dyn Dyne e Eccentricity E Electrical Grade (Fiberglass Construc-tion) EA Each Econ. Economy ECR Electrical Grade, Corrosion Resistant
(Fiberglass Construction) EDP Electronic Data Processing EDR Equiv. Direct Radiation EG Electro Galvanized EIFS Exterior Insulation Finish System ELEC Electric; Electrical Elev. Elevator; Elevating EM Electron Microscopy EMT Electric Metallic Tubing; Thin Wall Con-duit Eng. Engine, Engineered EPDM Ethylene Propylene Diene Monomer EPS Expanded Polystyrene EQL Equally Equip. Equipment ERW Electrical Resistance Welded EROPS Enclosed Roll Over Protection System ES Energy Saver Est. Estimated EW Each Way EWT Entering Water Temperature
Arnold Air Force Base 01 42 13 00 - 3
Excav. Excavation EXH Exhaust Exp. Expansion; Exposure EXP JT Expansion Joint Ext. Exterior
F Fahrenheit; Female; Fill f Fiber stress fc Compressive Stress in Concrete fy Minimum Yield Stress of Steel f'm Compressive Strength of Masonry F&D Flanged-and-Dished F&I Furnished and Installed Fab. Fabricated FAD Free Air Delivery FBGS Fiberglass FC Footcandles FCXP Fan Cooled Explosion Proof FDA Food and Drug Administration FEP Fluorinated Ethylene Propylene (Teflon) FF Flat Face Fig. Figure Fin. Finished FL Full Load FLDG Folding Fl. Oz. Fluid Ounces Flr. Floor FM Frequency Modulation;
Factory Mutual Frmg. Framing Fndtn. Foundation FT Foot, Feet FTNG(S) Fitting(s) FLG Flange FOB Freight on Board Fount. Fountain FPM Feet Per Minute FPS Feet Per Second FPT Female Pipe Thread FRP Fiberglass Reinforced Plastic FS Forged Steel FSC Cast Body, Cast Switch Box Ftg. Footing Ft. Lb. Foot Pound Furn. Furniture FVNR Full Voltage Non-Reversing FXM Female by Male
G Gravity g Gram GA Gauge or Gage G & A General and Administrative GAL Gallon Gal./Min. Gallon per Minute GALV Galvanized GBSD Gear Box Sheave Diameter
Gen. General GFCI Ground Fault Circuit Interrupter GFR Ground Fault Relay GPD Gallons per Day GPH Gallon per Hour GPM Gallon per Minute GR Grade Grnd. Ground GSF Ground Square Foot GVW Gross Vehicle Weight
H High, Height; High Strength Bar Joist HC Handicapped; High Capacity HD High Density; Heavy Duty HDO High Density Overlay HDPE High Density Polyethylene Hdr. Header Hdw. Hardware HEPA High Efficiency Particulate Air Hg Mercury HIC High Interrupting Capacity HM Hollow Metal HNDL Handle HO High Output; Heel Outlet Horiz. Horizontal HP High Pressure;Horse Power HPF High Pressure Factor HPL High Pressure Laminate HR Hour HRS Hot-Rolled Steel HS High Speed; High Strength HSC High Short Circuit HSLA High Strength Low Alloy HT Hospital Tips; Height Htg. Heating Htrs. Heaters HVAC Heating, Ventilating & Air Conditioning Hvy. Heavy HW Hot Water HWR Hot Water Return HWS Hot Water Supply HWT Hundred Carton Weight Hyd. Hydraulic Hydr. Hydraulic HZ Hertz (cycles)
I Moment of Inertia IC Interrupt Capacity ICFM Inlet Cubic Feet per Minute ID Inside Diameter I.D. Identification; Inside Dimension IF Inside Frosted IMC Intermediate Metal Conduit IN Inch IN LB Inch Pound IN WC Inches Water Column
01 42 13 00 - 4 Arnold Air Force Base
Incan. Incandescent Incl. Include, Including Inst. Install, Installation Insul. Insulation, Insulated Int. Interior INTSCT Intersect IP Iron Pipe IPS International Pipe Standard Iron Pipe Size Inches per Second IPT Iron Pipe Threaded ISP Inlet Steam Pressure IW Indirect Waste
J Joule JOB Job JOC Job Order Contracting JT Joint
K Thousand; Thousand Pounds;
Heavy Wall Copper Tubing; Kelvin KAH Thousand Amp Hours KD Kiln Dried; Knocked Down KDAT Kiln Dried After Treatment Kip 1000 Pounds KO Knockout Km Kilometer KLF Kips per Linear Foot KSF Kips per Square Foot KSI Kips per Square Inch kA KiloAmp kg Kilogram kHz Kilohertz kJ Kilojoule kV Kilovolt kVA Kilovolt Ampere (1,000 volt amps) KVAR Kilovar (Reactance) kW Kilowatt kWh Kilowatt Hour
L Length; Long;
Medium Wall Copper Tubing L&E Labor and Equipment LAB Labor LAN Lane LAT Latitude LAV Lavatory L.B. Load Bearing; L Conduit Body LB Pound (Force or Mass) LB/HR Pounds per Hour LBS Pounds LBSF Pounds per Square Foot LCD Liquid Crystal Display LCL Less Than Carload Lot LCY Loose Cubic Yard
LE Leading Edge; Lead Equivalent LED Light Emitting Diode LEL Lower Explosive Limit LF Linear Foot LFD Linear Feet Per Day LFTL Lineal Feet Tube Length Lge. Large; Long LH Labor Hours; Long Span Bar Joist LIN Linear LL Live Load LLD Lamp Lumen Depreciation LNG Liquid Natural Gas LOA Length Over All L-O-L Lateralolet LP(G) Liquid Propane (Gas) LS Low Speed; Lump Sum Lt Light Lt Ga Light Gauge LTL Less than Truck Load Lt Wt Light Weight LV Low Voltage lm Lumen lm/sf Lumen per square foot lm/W Lumen per Watt m Meter m3/H Cubic Meters per Hour mA Milliampere m/S Meters per Second M Thousand; Male;
Light Wall Copper Tubing MATL Material MAX Maximum Mach Machine Mag. Str. Magnetic Starter Maint. Maintenance Mat Material Mat’l; Material Max. Maximum Mb Million Bytes (characters( MBF Thousand Board Feet MBH Thousand BTU per Hour MBtu Thousand British Thermal Units MC Metal Clad Cable MCF Thousand Cubic Feet MCM Thousand Circular Mills MCP Motor Circuit Protector MD Medium Duty MDO Medium Density Overlaid Med. Medium MF Thousand Feet MF3 Thousand Cubic Feet Mfg. Manufacturing Mfrs. Manufacturers Mg Milligram
Arnold Air Force Base 01 42 13 00 - 5
MG Market Grade MGD Million Gallons per Day MGPH Thousand Gallons per Hour MH Manhole; Manhour; Metal Halide MHz MegaHertz Mi Mile MI Malleable Iron; Mineral Insulated MIN Minimum; Minute MISC Miscellaneous ml Milliliter; Mainline MLF Thousand Linear Feet mm Millimeter MO Month Mobil. Mobilization Mog. Mogul Base MPH Miles Per Hour MPT Male Pipe Thread MRT Mile Round Trip ms Millisecond MSD Motor Sheave Diameter MSF Thousand Square Feet MSY Thousand Square Yards MT Mount MTD Mounted MTG Mounting MTR Mill Test Report MVA Million Volt Ampere MVAR Million Volt Amperes Reactance MV Megavolt MW Megawatt MXM Male by Male MYD Thousand Yards
N Natural; North nA Nanoampere NA Not Applicable NC Normally Closed NEHB Bolted Circuit Breaker to 600V NDT Non Destructive Testing NIOSH National Alloy NLB Non-Load Bearing NM Non-Metallic Cable nm Nanometer NO Normally Open No. Number NOM Nominal NQOD Combination Plug-on/Bolt-on Circuit
Breaker to 240V NRC Noise Reduction Coefficient NPT National Pipe Thread NPS Nominal Pipe Size NRP Non-Removable Pins NRS Non-Rising Stem ns Nanosecond NTE Note NTP National Taper Pipe (Thread) nW Nanowatt
OAL Overall Length OB Opposing Blade OC On Center OD Outside Diameter O.D. Outside Dimension ODP Open Drip Roof ODS Overhead Distribution System OEM Original Equipment Manufacturer OG Ogee OH Overhead OH&P Overhead and Profit OHL Over Hung Load Oper. Operator Opng. Opening OPR Operating Orna. Ornamental OSA Outside Air OSB Oriented Strand Board OS & Y Outside Screw and Yoke OUT Outlet or Output (each) Ovhd. Overhead OWG Oil, Water or Gas OWSJ Open Web Steel Joist OZ Ounce
P Pole; Applied Load; Projection p Page pp Pages PAPR Powered Air Purifying Respirator PAR Weatherproof Reflector PB Push Button PC Personal Computer; Piece;
PCs Pieces P.C. Portland Cement; Power Connector PCF Pounds per Cubic Foot PCM Phase Contrast Microscopy PE Professional Engineer; Plain End Porcelain Enamel; Polyethylene;
PERF Perforated PH Phase PI Pressure Injected PID Programmable Integral Derivative Con-troller PKG Package PL Plate PLC Programmable Loop Controller PLM Polarized Light Microscopy PLTC Power Limited Tray Cable PLY Plywood PNEU Pneumatic PNTD Painted POA Priced On Application/Priced On Approv-al PESB Pre-engineered Steel Building
01 42 13 00 - 6 Arnold Air Force Base
PPD Pounds Per Day PP; PPL Polypropylene PPM Parts Per Million PPS Polyphenylene Sulfide PR Pair Prefab. Prefabricated Prefin. Prefinished PROGEN® Proposal Generator Software for
Job Order Contracting PROP Propelled; Propeller PSF Pounds Per Square Foot PSI Pounds Per Square Inch PSIA Pounds Per Square Inch Atmosphere PSIG Pounds Per Square Inch Gauge PSP Plastic Sewer Pipe PT Power or Potential Transformer Pt. Pint Ptns. Partitions P&T Pressure & Temperature PTFE Polytetrafluoroethylene Pu Ultimate Load PV Photovoltaic PVA Polyvinyl Acrylate PVC Polyvinyl Chloride PVDC Polyvinylidene Chloride PVDF Polyvinylidene Fluoride PVF Polyvinyl Fluoride Pvmt. Pavement PVQ Pressure Vessel Quality Pwr. Power
Q Quantity Heat Flow QA Quality Assurance QC Quality Control; Quick Coupling QT Quart Quan. Quantity Qty. Quantity
R Thermal Resistance R/L Random Lengths R/W/L Random Widths and Lengths RA Return Air; Registered Architect RCP Reinforced Concrete Pipe Rect. Rectangle REINF Reinforced/Reinforcing Req’d Required RF Raised Face RGH Rough RGS Rigid Galvanized Steel RH Relative Humidity RHW Rubber, Heat & Water Resistant;
Residential Hot Water rms Root Mean Square RND Round ROL Roll (each)
ROM Room ROPS Roll Over Protection System ROW Row R.O.W. Right of Way RPM Revolutions Per Minute RR Direct Burial Feeder Conduit RS Rapid Start RSC Rigid Steel Conduit RSR Riser (Per Rise) RT Round Trip RTD Resistance Temperature Detector RTJ Ring Type Joint RTRP Reinforced Thermoset Resin Piping RVT Reinforced Vinyl Tile
S Suction; Single Entrance; South S1S2E Surfaced 1 side, 2 Edges S2S Surfaced 2 Sides S4S Surfaced 4 Sides Sa Sack SA Supply Air SBS Styrene Butyl Styrene Scaf. Scaffolding SCFH Standard Cubic Foot Per Hour SCFM Standard Cubic Foot per Minute SCH Schedule SCR Modular Brick SCRD Screwed SD Sound Deadening SDR Standard Dimension Brick;
Size To Diameter Ratio SE Surfaced Edge; Semi-Elliptical SEA Seat SER Service Entrance Cable SEU Service Entrance Cable SET Set SF Square Foot/Feet SFCA Square Feet of Form in Contact with
Concrete SHTS Sheets SI Square Inch SIS Synthetic Heat-Resistant SLDR Solder SLH Super Long Span Bar Joist SN Solid Neutral S-O-L Socketolet SP Self-Propelled; Single Pole;
Space; Standpipe Static Pressure (measured in inches of water);
SPDT Single Pole, Double Throw SPGR Specific Gravity SPWG Static Pressure Water Gauge SQ Square;
Hundred Square Feet (10’ x 10’ area)
Arnold Air Force Base 01 42 13 00 - 7
SQ FT Square Foot/Square Feet SQ IN Square Inch SQ YD Square Yard SS Stainless Steel; Single Strength SSB Single Strength B Quality Glass SSL Self Sealing Lap STC Sound Transmission Class STD Standard STK Select Tight Knot STP Stop (each);
Standard Temperature & Pressure SURF Surface STL Steel SURF Surface SW Seam Weld SW Switch SWBD Switchboard SWS Segmentally Welded Steel SWSI Single Width, Single Inlet SY Square Yard SYN Synthetic SYP Southern Yellow Pine SYS System
T Thick; Temperature; Ton T&C Threaded and Coupled T&G Tongue and Grove TBC Tensile Bolt Cloth TBE Threaded Both Ends TC Terra Cotta TCLP Toxicity Characteristic Leaching Proce-dure TDS Total Dissolved Solids TEAO Totally Enclosed Air Over TEFC Totally Enclosed Fan Cooled TETC Totally Enclosed Tube Cooled TFE Tetrafluoroethylene (Teflon) THHN Nylon Jacketed Wire THK Thick THKNS Thickness THW Insulated Strand Wire THWN Nylon Jacketed Wire TI Titanium TL Truckload TM Track Mounted T-O-L Threadolet TON Ton Tot. Total TPH Tons Per Hour Transf. Transformer TSHP Total Shaft Horse Power T’STAT Thermostat TV Television TW Thermoplastic Water Resistant Wire
UA Unequal Angle UCI Uniform Construction Index UF Underground Feeder UHF Ultra High Frequency UI United Inch UNC Unified Coarse (Threads) USP United States Primed UTP Unshielded Twisted Pair UV Under Voltage
V Volt VA Volt Amperes VAV Variable Air Volume VCT Vinyl Composition Tile Vert. Vertical VF Vinyl Faced VHF Very High Frequency VLF Vertical Linear Foot VLV Valve Vol. Volume VRP Vinyl Reinforced Polyester w/ With W Watt; Width; Wire; West WB Wet Bulb WC Water Column; Water Closet WF Wide Flange WG Water Gauge WHM Watthour Meter WK Week Wldg. Welding WOG Water, Oil, Gas W-O-L Weldolet WP Weather Protected WR Water Resistant WSP Water, Steam, Petroleum WT Weight WWF Welded Wire Fabric
X or x By or Times XFER Transfer XFMR Transformer XHD Extra Heavy Duty XHHW; XLPE Cross-Linked Polyethylene Wire
Insulation XLP Cross-Linked Polyethylene XP Explosion Proof XRF X-Ray Fluorescence Y Wye YD Yard YR Year
2. Symbols
01 42 13 00 - 8 Arnold Air Force Base
Δ Delta / per
- through or to @ at % per 100 or percent $ U.S. dollars ~ Approximate
Ø Diameter or Phase ' feet “ inches # pound or number ° degree < Less Than > Greater Than
3. Explanation Of Terms
BTU: Stands for British Thermal Unit. The BTU number indicates the amount of heat required to raise one pound of water by one degree Fahrenheit. What this means is the higher the BTU rating, the higher the heating capacity of a product.
MBH: Equal to 1000 BTUs.
Tons (In Reference To Cooling): Unit of measurement for determining cooling capacity. One ton equals 12,000 BTUH.
SEER: Stands for Seasonal Energy Efficiency Ratio. This measures the cooling efficiency in air conditioners or heat pumps. The higher the SEER rating, the more energy-efficient the unit. The government's minimum SEER rating is 10.
4. Calculation Of Board Feet
a. All Lumber Grades Are Presumed To Be 75 Percent Construction And 25 Percent Standard Or Equivalent Grade Unless Otherwise Listed. Dimensions Are Nominal. Board Foot Is Defined As 1" x 12" x 1' Long; To Calculate BF/LF, Multiply The Size Of The Board Height x Width/12.
1) 1"x2" = 0.167 BF/LF
2) 1"x3" = 0.25 BF/LF
3) 2"x3" = 0.5 BF/LF
4) 2"x4" = 0.667 BF/LF
5) 2"x6" = 1.0 BF/LF
6) 2"x8" = 1.333 BF/LF
7) 2"x10" = 1.667 BF/LF
8) 2:x12" = 2.0 BF/LF
9) 4"x4" = 1.333 BF/LF
10) 6"x4" = 2.0 BF/LF
11) 6"x6" = 3.0 BL/LF
12) 8"x8" = 5.333 BF/LF
13) etc.
b. To Calculate Board Feet;
1) For most lumber: Thickness (inches) x width (inches) x length (feet) divided by 12 = board feet.
2) For small pieces: Thickness (inches) x width (inches) x length (inches) divided by 144 = board feet.
5. Conversion Tables
ENGLISH TO METRIC CONVERSION TABLE
MULTIPLY BY TO GET MULTIPLY BY TO GET
acres 0.404 687 3 Hectares ounce(force) 0.278 013 9 newtons=N board feet 0.002 359 74 cubic meter pint(liq.) 0.473 176 liters=l
Arnold Air Force Base 01 42 13 00 - 9
ENGLISH TO METRIC CONVERSION TABLE
cubic ft. 0.028 316 85 cubic meter pint(dry) 0.550 61 liters=l cubic yd. 0.764 554 9 cubic meter pound(wt.) 0.453 592 37 kilogram feet 0.304 8 Meters pound(force) 4.448 222 newtons=N footcandles 10.763 91 lux=lumens/m2 pound/sq.ft 47.880 26 pascal=N/m2 ft.-lbf 1.355 818 N�m=joule pound/sq.in 6.894 757 kilopascals gallon (US) 3.785 412 Liters quart(liq.) 0.946 352 9 liters horsepower* 745.699 9 watt=J/sec sq. feet 0.092 903 04 sq. meter
* horsepower=550 ft-lbf/sec sq. in. 645.16 sq. mm inch 25.4 Millimeters sq. mile 258.998 8 hectares inch-poundf 0.112 984 8 N�m=joule sq. mile 2.589 988 sq. km kips 4.448 222 Kilonewton sq. yard 0.836 127 4 sq. meter kips/in2 6.894 757 megapascal ton(short) 0.907 184 7 metric ton miles (US) 1.609 347 Kilometer ton(short) 907.184 7 kilogram=kg ounce (wt.) 28.349 52 Grams ton(short) 8896.444 newtons=N ounce(liq.) 29.573 53 Ml yards 0.914 4 meters=m
FOR TEMPERATURE CONVERSION USE °C= 5/9(°F - 32)
01 42 13 00 - 10 Arnold Air Force Base
METRIC TO ENGLISH CONVERSION TABLE
MULTIPLY BY TO GET MULTIPLY BY TO GET
cubic meter 1.308 0 cubic yard liter 0.264 17 gallon
35.314 7 cubic foot 1.056 7 quart 61,024 cubic inch 2.113 4 pint
264.172 Gallon 33.814 fl.ounce
gram 0.035 274 ounce(wt) milliliter 0.033 814 fl.ounce
0.002 204 6 pound(wt) liter/m 0.080 52 gal/ft kilogram 35.274 ounce(wt) liter/m2 0.220 88 gal/sq.yd
2.204 623 pound(wt) lux 0.092 902 ft-candle
0.002 204 6 Kip meter 1.093 6 yard
0.001 102 3 Ton 3.280 84 foot megagram 1.102 3 ton millimeter 0.039 370 inch (metric ton) kilometer 0.621 37 mile hectare 2.471 04 Acre micrometer 0.039 370 1 mil 107,639 square feet Newton 0.224 81 pound(f) 11,959.9 square yard kilonewton 0.224 81 kip(f)
0.003 861 02 square mile Pascal 0.020 885 lb/sq. feet microare 0.155 00 square inch kilopascal 0.145 04 lb/sq. inch joule 0.737 56 foot pound megapascal 0.145 04 kips/sq. inch
8.849 5 inch pound square meter 1.195 99 square yard kg/m3 1.685 55 lbs./cubic yards d
10.763 9 square feet
0.062 428 lbs./cubic feet square millimeter 0.001 55 square inch km/hr 0.621 37 miles per hour square kilometer 0.386 102 square mile watt (J/second) 0.001 341 horsepower
0.737 56 ft-lb/second
FOR TEMPERATURE CONVERSION USE °F = 9/5 °C + 32
Arnold Air Force Base 01 42 13 00 - 11
C. Material Weights/Engineering Values
1. The following engineering values are guidelines for establishing shrink/swell factors and shall be used unless otherwise directed by the Contracting Officer.