Questions and Answers for FA910123Q0030.pdf

PDF 75 KB Posted

Attached to
Rainfield Piping Federal contract opportunity
Solicitation number
FA9101-23-Q-0030
Issued by
Department of the Air Force Materiel Command Test Center

About this file

This document contains questions and answers regarding solicitation number FA9101-23-Q-0030 from the Department of the Air Force Materiel Command Test Center for replacing piping at Rainfield. The existing piping will be reused where possible, with repairs or replacements as needed to the supports. The solicitation requires replacing existing 0.050 inch thick piping with thicker 0.072 inch or greater piping. The questions confirm the double rolled ends on the piping diagram are for strength and not welding, and that no particular grade of aluminum or additional means of connection are required beyond the existing connectors.

View the file

Other files for this federal contract opportunity

Other files attached to Rainfield Piping, newest first.
File Type Posted
SOW Rain Field Piping V2.pdf PDF
Combined Synopsis Solicitation for Rainfield Piping V2.docx DOCX document
Requirements Document Rain Field Piping.pdf PDF
Combined Synopsis Solicitation for Rainfield Piping.docx DOCX document
Atch 02 FAR DFARS AFFARS Prov and Clauses Rainfield Piping.pdf PDF
ATCH 3 - Rainfield Piping Drawings.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers for FA9101-23-Q-0030 – Rainfield Piping

1. Will we be reusing the existing saddles, couplings, valves, fittings, supports and risers?

Answer: Yes, some of the supports may need repair or replacement but are not within the scope of the contract. All of the other pieces and parts should be reusable.

2. On the piping diagram it calls for a double rolled end pipe. This is for welding the pipe together. Are we welding the pipe?

Answer: None of the pipes are welded together. The double rolled end is there to strengthen the ends.

3. On the piping diagram is state pipe thickness of .050 pipe thickness. On the SOW it calls for .075 thickness. What thickness do we use.

Answer: The .050 thickness is the thickness of the existing pipes and the reason for this contract is to replace them with thicker, stronger .072 inch or greater pipes.

4. Will .072 thickness work?

Answer: Yes. Requirement document revised to reflect this change.

5. Do we need to provide an extruded pipe at a greater thickness?

Answer: No

6. What grade Aluminum do we need to use?

Answer: No particular grade is required.

7. Will we need to provide means of connecting? If so what kind of connections would be preferred?

Answer: The existing connectors are all that is required.

File details come from the government source that posted it. Updated .