TOS II FRFP Cover Letter.pdf
PDF 447 KB Posted
- Attached to
- Test Operations and Sustainment (TOS) II Federal contract opportunity
- Solicitation number
- FA910122RB001
View the file
Other files for this federal contract opportunity
Show all 50
Test Operations and Sustainment (TOS) II has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
HEADQUARTERS AIR FORCE TEST CENTER (AFMC)
EDWARDS AIR FORCE BASE CALIFORNIA
16 May 2023
MEMORANDUM FOR ALL POTENTIAL OFFERORS
FROM: AFTC/PZZ (Arnold)
SUBJECT: Test Operations and Sustainment (TOS) II Contract Competition - Request for Proposal (RFP) Number FA9101-22-R-B001
1. The Department of the Air Force invites your company to submit a proposal for the TOS II service contract for Arnold Engineering Development Complex (AEDC). We are seeking the most effective, productive, and efficient contract to fulfill AEDC's test mission requirements.
2. We have appreciated your ideas and comments since the inception of this acquisition early last year. Beginning with a comprehensive Request for Information (RFI) process, we have held three industry days, seven site visits including to AEDC’s geographically separated units (GSUs), engaged in one-on-one meetings, released a draft RFP (DRFP), and conducted a multi-step advisory process focused on addressing potential organizational conflict of interest (OCI) issues. Companies who did not participate in these industry opportunities may find it beneficial to visit the System for Award Management at sam.gov and the TOS II Competition Library at https://www.arnold.af.mil/Home/TOSII/ for all of the documents currently available for public review.
3. Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs.
Proposals shall be valid for 280 days after submission of proposals.
4. Foreign competitors, including United States companies with foreign ownership or control, are not permitted to propose at the prime contractor level in the TOS II acquisition.
In accordance with DFARS 252.225-7048, Export-Controlled Items, 22 CFR Parts 120-130 and 15 CFR Parts 730-774 apply to this solicitation. U.S. prime contractors desiring to use foreign subcontractors or employ foreign nationals / non-U.S. citizens must comply with DFARS 252.225-7048 and all applicable laws and regulations regarding export-controlled items.
5. The attachment to this letter serves as a guide to the changes between the DRFP and the Final RFP (FRFP). This is a guide only and should not be used as a substitute for carefully reviewing the content of the FRFP. All offerors are responsible for reviewing the FRFP and responding to the requirements listed therein. A highlight of those changes includes:
a. Changing the acquisition strategy to only Cost-Plus-Award-Fee with Firm-
Fixed-Price Transitions
b. Adding PWS paragraph 3.26, Industrial Security, and adjusting the Cost
Model to reflect these changes
c. Revising the relative importance of the evaluation factors
d. Removing OCI as a Measure of Merit and including it in the Contract
Documentation Volume to be evaluated as part of the responsibility determination
6. As a reminder, your award fee pool must be at least 5% of the fee-bearing elements.
See Solicitation Attachment 12, Section L Instructions to Offerors, paragraph L-3.4.5.9, Award Fee Pools.
7. Communication between the Government and industry regarding this solicitation should now be addressed only through the Procuring Contracting Officer, Ms. Rebecca Gardner at aedc.sso@us.af.mil. In her absence, you may contact Ms. Kristi Martin, Contract Specialist, at aedc.sso@us.af.mil.
8. We expect substantial competition for this acquisition and ultimately outstanding performance from the successful offeror. Proposals are due in two phases. The first phase consists of the Past Performance Information Volume, due 20 June 2023 at 2:00 PM central daylight time (CDT). The second phase consists of the Contract Documentation Volume, Technical Proposal Volume, and Cost / Price Proposal Volume and is due 30 June 2023 at 2:00 PM CDT. Thank you for your continued interest in this acquisition.
REBECCA J. GARDNER, NH-04, DAF
TOS II Procuring Contracting Officer
Attachment Draft RFP to Final RFP Changes List
TOS II
FA9101-22-R-B-001
Cover Letter
ATTACHMENT TO COVER LETTER
CHANGES BETWEEN DRAFT RFP (DRFP) AND FINAL RFP (FRFP)
The following list of changes from the DRFP to the FRFP is provided only as a guide and should not be used as a substitute for the content of the FRFP. All offerors are responsible for reviewing the FRFP and responding to the requirements listed therein.
SF 33
- FAR Clause Updates o 52.215-3 is deleted o 52.216-1 is revised. Added “Firm-Fixed Price” o 52.216-8 is deleted o 52.216-9 is deleted o 52.216-10 is deleted o 52.217-9 is revised. Changed to “15 days” o 52.204-7 is revised. Provision was moved from Section K to Section L o 52.222-43 is added.
o 52.247-67 is revised. Removed reference to “Cost-Plus-Incentive-Fee” and
“Cost-Plus-Fixed-Fee”
- DFARS Clause Updates o 252.217-7028 is deleted o Updated Clause and Provision on the following:
252.203-7001 252.223-7008 252.227-7016 252.203-7004 252.225-7001 252.227-7017 252.204-7004 252.225-7003 252.227-7019 252.204-7009 252.225-7009 252.227-7025 252.204-7012 252.225-7016 252.227-7037 252.204-7015 252.225-7021 252.232-7006 252.204-7018 252.225-7052 252.237-7010 252.204-7020 252.225-7056 252.239-7010 252.204-7021 252.225-7058 252.244-7000 252.211-7003 252.225-7060 252.246-7003 252.215-7010 252.226-7001 252.246-7007 252.215-7013 252.227-7013 252.246-7008 252.222-7006 252.227-7014 252.247-7023
- AFFARS Clause Updates o 5352.201-9101 is revised. Deleted alternate information in para (c)
- H Clause Updates o H025 clause is deleted.
o H102 is revised. Added “if any” following prepayment credit liabilities
Cover Letter o H103 is revised. Changed “Davis Bacon Act” to Wage Rate Requirements
(Construction). Removed reference to “National Aerospace Solutions, LLC” and the “Air Engineering Metal Trades Union” o H104(g) is revised. Updated “as of” date o H109 is revised. Changed “will” to “may” in “for a given fiscal year may result in negotiations”. Deleted sentences beginning with “For purposes of determining the value” and “Unrealized labor hour reductions:”
o H110(a) is revised. Added information about GSUs o H115 is revised. Updated clause date and revised paragraph (n) to include
“through (m) of this clause” o H119 is revised. Revised Self-Evaluation information and modified Award Term language for clarity o H123 is revised. Updated “Contracts” list o H124 is deleted. This information has been added to Section I02, DFARS
252.234-7002 o H125 is revised. Added “or equivalent” to Positions and removed “in advance” o H127(c) is revised. Added full title of ACO with acronym o H128 is revised. Added “whether as a witness or otherwise” and “Safety and
Accident Investigation Boards” o Updated the following H clauses to remove “TBD”
H050 H104 H110 H118 H126 H100 H105 H111 H119 H127 H101 H107 H112 H120 H128 H102 H108 H114 H123 H103 H109 H117 H125
- CLIN Updates o Deleted the following CPFF CLINs:
CLIN 0104 CLIN 0404 CLIN 0804 CLIN 1204
CLIN 0108 CLIN 0504 CLIN 0904 CLIN 1304
CLIN 0204 CLIN 0604 CLIN 1004
CLIN 0304 CLIN 0704 CLIN 1104
o Updated the date of clause H119 in the following CLINs:
CLIN 0103 CLIN 0403 CLIN 0803 CLIN 1203
CLIN 0106 CLIN 0503 CLIN 0903 CLIN 1303
CLIN 0203 CLIN 0603 CLIN 1003
CLIN 0303 CLIN 0703 CLIN 1103
o CLIN 0001 and 0204 is updated for Quantity and Unit of Measure o CLIN 0105 is renumbered to CLIN 0104 o CLIN 0106 is renumbered to CLIN 0105 o CLIN 0107 is renumbered to CLIN 0106 o CLIN 0205 is renumbered to CLIN 0204
- Section B Updates o B01 is revised. Updated CLIN number from 0205 to 0204. Added “Stage 1” and “Stage 2” o B03 is deleted
- Section C Updates o C01 is revised. Updated dates
- Section F Updates o Updated clause dates o Added “possible” after 01 July 2024 through 30 September 2025 date range
- Section I Updates o I01 is revised. Updated clause date o I02 is revised. Updated clause date o Removed 252.227-7017 and added to Section K
- Section J Updates o Section J is revised. Updated dates, page counts, and attachment numbers o Removed Attachment 12, CPFF Labor Hour Category Description o Added Attachment L_9.1 Cost Model for Subs
- Section K Updates o K02 is revised. Updated date and corrected titles and CFR citation o Added 252.227-7017
- Section L Updates o L01 is revised. Updated date, title, and attachment number o Updated 252.215-7010(d)(3) fill-in to read “Attachment L-9 Cost Model for
Prime and Attachment L-9.1 Cost Model for Sub”
- Section M Updates o M01 is revised. Updated date and attachment number
Exhibit A, CDRLS
- CDRLs A001-A116 are revised. Completed blocks 17 and 18
- CDRL A057 is revised. Updated block 5 to 3.10.2, 3.10.3, and 3.10.4
- CDRL A060 is revised. Updated block 10 to MTHLY. Updated remarks in block 16
- CDRL A087 is revised. Updated block 5 to 3.17.8.5.1.; 3.26.2.3.5. Updated block 14(a) to add AEDC/TSD-IP
- CDRL A117 is added
- CDRL A118 is added
- CDRL A119 is added
- CDRL A120 is added
- CDRL A121 is added
- CDRL A122 is added
- CDRL A123 is added
- CDRL A124 is added
- CDRL A125 is added
Cover Letter Exhibit B, DIDs
- DI-ADMIN-81969 is added
- DI-MGMT-80934C is added
- DI-MGMT-81606 is added
- DI-MGMT-82000 is added
- OT-2023-30006 is added
- OT-2023-30007 is added
- OT-2023-30008 is added
- OT-2023-30009 is added
- OT-2023-30010 is added
Attachment 2, DD254
- Added Continuation Sheet and AEDC Notification of Security Policy attachments
Attachment 5, Award Fee Term Plan
- Pages are renumbered due to the changes below
- 1.3 is revised. Deleted sentence beginning with “The Award Fee/Term Review Board
(AF/TRB) and the F/TDO shall not hesitate”. Added “Each Award Fee/Term is rated independently” and “even when performance drives significant deviations in score from one period to another.”
- 2.1.1 is revised. Removed list of advisors, and replaced with “as needed”
- 2.1.2 is revised. Removed “Administrative” and added Functional Directors (FDs) and
Recorder
- 2.1.4 is added
- 2.1.5 is added
- Figure 1. Award Fee Term Plan, is revised. Correct PWS paragraph (para) number 3.13 for Data and Docs for Conf Mgmt, changed “Staff” to “Program Management”, and added 3.26 Industrial Security and Capital Improvements FD. Added 3.16, 3.17, 3.20, 3.21, and 3.22 to Program Management
- 2.2.1 is revised. Deleted “and any significant changes to it”
- 2.2.2 is revised. Changed “review” to “consider”
- 2.2.4 is revised. Removed “Administrative”
- 2.2.5 is revised. Added “"the outcome of the results of", "deficiencies, "participates on the AF/TRB", and "briefs the F/TDO"
- 2.2.6 is revised. Added “objective and subjective”
- 2.2.7 is revised. Changed office providing the Recorder to AEDC/PM. Deleted “The
ACO may serve as the recorder”
- 3.0 is revised. Added “or improvement areas” and “for those areas”. Added “…Award
Fee Plan. This may include, but isn’t limited to, changing the" and "The Government reserves the right to assign percentages to each of the functional areas for allocation of the Award Fee Pool." Changed "same ones" to "same measures" and "is started" to "commences"
- 4.1.1.3 is added.
- 4.4 is revised. Updated paragraph to say “The contractor will provide a briefing on their performance for the Period to the AF/TRB and/or the F/TDO”
Cover Letter
- 4.5 is revised. Added "but may be delayed for mission reason by mutual agreement of the Government and contractor. "
- 5.1 is added, and subsequent paragraph numbers adjusted accordingly.
- 5.2, deleted duplicative paragraph
- 6.2 is revised. Added “or equivalent” and the sentence beginning with “Unless coordinated as directed in Contract Clause H125”. Removed "in advance" and added "and submit justification"
- 8.1.1 is revised. Added the sentence beginning with “In the event that either of these Award Terms are not exercised…”. Changed Award Term year numbering for clarity
- 8.1.2 is revised. Added the sentence beginning with “In the event that either of these Award Terms are not exercised…”. Changed Award Term year numbering for clarity
- 8.1.2.1 is revised. Paragraph is now numbered 8.1.3. Table 2 is revised. Added Award Term numbering for clarity
- 8.1.3 is revised. This language was moved to paragraphs 8.1.1 and 8.1.2 and clarified
- 8.2 through 8.5 including subparagraphs thereof, are combined. Adjusted numbering of paragraphs.
o 8.2 is revised. Deleted “first” and made “Award Terms” plural.
o 8.2.1 is changed to 8.2. Changed “will” to “may” o 8.2.1.1 is changed to 8.2.1. Added “their respective Evaluation Periods” o 8.2.1.2 is changed to 8.2.2. Added “their respective Evaluation Periods” o 8.2.1.3 is changed to 8.2.3. Added “and Improvement Areas, if applicable” o 8.2.1.4 is changed to 8.2.4. Added “and” o 8.2.5 is added.
- Annex 1 is revised. Updated AF/TRB membership
- Annex 2 is revised. Changed Corporate Services to Program Management, added
Improvement Area, Capital Improvements, and corrected the name of the 704TG to Test System and “Evaluation” 704 TG.
- Annex 3, Para (1)(a) is revised. Added “as noted in Annex 2 and”
- Annex 3, Para 5(f) is added.
- Annex 4 is revised. Added “$TBD” to Period 21.
Attachment 7, Performance Work Statement
- Minor revisions throughout for acronym clean-up and spelling / grammar / formatting.
- Minor revisions for clarity in the following paragraphs:
1.3.1 1.3.2 3.6.10 3.6.11 3.6.13.4 3.6.15
3.6.16 3.6.18 3.16 3.16.1
- 1.2 is revised. Replaced “commercial best practices” with “industry best practices,” and deleted “These types of documents are not considered Deliverables and are not included in the PWS.”
- 3.1.2 is revised. Subparagraph changed to “The Contractor shall deliver a completed SOC for testing conducted at the NFAC. Support the Government in development of the SOC for tests conducted at Arnold AFB, Tunnel 9, NRTF, LGTF, and AVSF.”
- 3.1.5.1 is revised. Subparagraph changed to “The Contractor shall complete this requirement for testing conducted at the NFAC. This requirement will be met by the Government for tests to be conducted at Arnold AFB, Tunnel 9, NRTF, LGTF, and
AVSF.”
Cover Letter
- 3.6 is revised. Introductory paragraph rewritten to provide more insight into ID&C requirements.
- 3.6.12 is revised. Paragraph changed to “Reserved”
- 3.6.14 is revised. Deleted “Fastenal”
- 3.6.15 is revised. Changed from “95%” to “98%”
- 3.6.18 is revised. Added “of every classification / security level, including SAP,…”.
Added SAP systems requirements. Revised Performance Standards f) and g). Added Performance Standard h).
- 3.6.19 is revised. Updated Table
- 3.7.1.4.2 is revised. Added the sentence beginning with “The Contractor shall plan in advance, the pending TMDE calibration due dates…”
- 3.7.1.6 is revised. Changed to “and will exceed the planned calibration due date”
- 3.8.2.1.2 is revised. Added “Arnold AFB-specific data within”
- 3.8.3.1 is revised. Deleted the sentence beginning with “This work may result in additional Contract Line Items (CLINs) being incorporated into the contract”
- 3.9.6 is revised. Added “Gaseous Helium, and Gaseous Hydrogen”
- 3.9.9 is revised. Paragraph changed to “Reserved”
- 3.10 is revised. Added “capital improvement, and technology efforts” and “sustainment, capital improvement, and technology efforts”
- 3.10.1 is revised. Added “machining and fabrication” and deleted “in support of” statement
- 3.11 is revised. Language is revised to remove Base Operations activities, such as vehicle management, cargo movement, command and control, etc.
- 3.11.6 is revised. Deleted “Energy Action Month and”
- 3.12.1 is revised. Updated “The Contractor shall” statements
- 3.12.2 is revised. Deleted “Develop utility pool rates”
- 3.12.4 is revised. Added “to the Government” and revised the sentence beginning with
“The NFAC, Tunnel 9, NRTF, LGTF, and AVSF”
- 3.14.8 is revised. Updated “The FSS contractor will ‘support’ AEDC/SE with ‘AEDC’
Class D and E mishap ‘investigations’
- 3.15.2 is revised. Added “The Contractor shall provide” and Performance Standard
- 3.15.2.2 is revised. Performance Standard is moved to 3.15.2.
- 3.15.3 is revised. Added “The Contractor shall provide” and Performance Standard
- 3.15.3.1 is revised. Performance Standard is moved to 3.15.3
- 3.15.4 is revised. Added “The Contractor shall provide” and Performance Standard
- 3.15.4.1 is revised. Performance Standard is moved to 3.15.4
- 3.15.5 is revised. Added “The Contractor shall provide” and Performance Standard
- 3.15.5.1 is revised. Performance Standard is moved to 3.15.5
- 3.18.3 is revised. Revised paragraph to state “The Contractor shall coordinate with the
FSS contractor for disposition of items that require shipment. Requirement 3.18.3 applies to Arnold AFB only.”
- 3.18.4 is revised. Added “Domestic Object Damage (DOD)” and “spills, release of oil/hazardous substances”
- 3.18.5 is revised. Revised paragraph to state “The Contractor shall support the Commander’s Inspection Program…”
- 3.18.10 is revised. Paragraph changed to “Reserved,” and subparagraphs are deleted
Cover Letter
- 3.20.1 is revised. Added “AEDC Strategic Plan ‘Action’ Annex”, “and AEDC”, and changed “generation” to “development”
- 3.20.3 is revised. Added “recommended solutions to assist the Government with development of Government Facility Modernization Plan which can cover requirements up to 30 years in the future.”
- 3.20.3.1 is revised. Added “T&E requirements development and validation processes”
- 3.20.4 is revised. Changed “required” to “necessary”
- 3.20.5 is revised. Updated to reflect “The Contractor shall collaborate and support”
- 3.21.1 is revised. Moved Deliverable after Performance Standards
- 3.21.2 is revised. Added Performance Standard
- 3.21.3 is revised. Added Performance Standard
- 3.21.3.4 is revised. Added Performance Standards
- 3.21.4 is revised. Added Performance Standard
- 3.25.4 is revised. Updated to state “The Contractor shall establish a NIPRNet-hosted performance management system, with view-only privileges for Government personnel.”
- 3.26 is added.
- Section 5.0, Acronyms o Table updated with current acronyms
- Section 6.0, Deliverables o Added identifiers and descriptions for CDRLS A117 through A125
- Section 7.0, Performance Requirement Summary (PRS) Updates o 3.6.11.2 is revised. Corrected numbering from 3.6.11.12 to 3.6.11.2; Updated Method of Performance Assessment o 3.6.18 is revised. Updated Performance Standards and Method of Performance Assessment o 3.7.1.4 is moved to 3.7.1.4.2; Method of Performance Assessment added o 3.7.1.6 is revised. Updated Method of Performance Assessment o 3.15.2 is revised. Added language from PRS 3.15.2.2. Deleted PRS 3.15.2.2 o 3.15.3 is revised. Added language from PRS 3.15.3.1. Deleted PRS 3.15.3.1 o 3.15.4 is revised. Added language from PRS 3.15.4.1. Deleted PRS 3.15.4.1 o 3.15.5 is revised. Added language from PRS 3.15.5.1. Deleted PRS 3.15.5.1 o 3.18.10.1 is deleted. Requirements moved to 3.26 o 3.19.2 is revised. Changed from TBD to “Periodic Project and Financial Status
Reviews” o 3.19.3 is revised. Changed from TBD to “Random Inspections” o 3.19.19 is revised. Changed TBD to “Compliance review as required” o 3.21.1 is revised. Updated Method of Performance Assessment to “Review of
Government Intelligence Office evaluations” o 3.21.2 is added o 3.21.3 is added o 3.21.3.4 is added o 3.21.4 is added o 3.26 and subparagraphs are added
- Appendix F o Added list of Secured Areas as a result of Industrial Security requirements
Attachment Numbers
- Deleted Attachment 12, CPFF Labor Category Descriptions
- Changed the following Attachment Numbers:
o From Attachment 13 to Attachment 12 o From Attachment 13, L-1 to Attachment 12, L-1 o From Attachment 13, L-2 to Attachment 12, L-2 o From Attachment 13, L-3 to Attachment 12, L-3 o From Attachment 13, L-4 to Attachment 12, L-4 o From Attachment 13, L-5 to Attachment 12, L-5 o From Attachment 13, L-6 to Attachment 12, L-6 o From Attachment 13, L-7 to Attachment 12, L-7 o From Attachment 13, L-8 to Attachment 12, L-8 o From Attachment 13, L-9 to Attachment 12, L-9 o From Attachment 13, L-10 to Attachment 12, L-10 o From Attachment 13, L-11 to Attachment 12, L-11 o From Attachment 13, L-12 to Attachment 12, L-12 o From Attachment 14 to Attachment 13
- Added Attachment 12, L-9.1, Cost Model for Subcontractors
Attachment 12, Section L Instruction to Offerors
- L-1.4, Cross-Teaming Restriction, is revised for grammar.
- L-1.5 is deleted. Language revised and moved to L-3.1.2.4.2.
- L-2.1, Competitive, Best Value Source Selection, is revised. Updated contract type and
Contract Line Item Numbers (CLINs) type
- L-2.1.2, Competitive Range, is revised. Added approval by the Source Selection
Authority (SSA)
- L-2.1.3, FPRs, is revised. Added Cost / Price “volume”
- L-2.3.1.2, Page Limitations, is revised. Added “characters” and “Contractor Work
Breakdown Structure and Dictionary”
- L-2.3.1.3, Page Size and Format, is revised. For paragraph (a) added “not including displays as defined in paragraph (b) below.” For paragraph (b) added “11x17”
- L-2.4, Distribution, is revised. Added “For purpose of proposals only, a major subcontractor is defined…” and changed submission time/date to “2:00 pm Central Time on 30 Jun 23”
- L-3.1.1.1, Cover Letter, is revised. Changed Data Universal Number System (DUNS) number to Unique Entity Identification (UEI)
- L-3.1.2.3, Company / Division Address, Identifying Codes, and Applicable Designations, is revised. Changed “DUNS” to “UEI.” Added sentence “If proposing a JV, provide the information above for each JV partner.”
- L-3.1.2.4.1, Government Furnished Property (GFP) and Base Support Requirements, is revised. Added “Attachments 8.0, 8.1, 8.2, and 8.3 (GFP and Contractor Acquired Property)”
Cover Letter
- L-3.1.2.4.2, OCI is revised. Moved language from DRFP L-3.2.4.6 to L-3.1.2.4.2.
Updated language to reflect OCI is being reviewed as an issue of responsibility and not a technical Measure of Merit. Updated date on clause H115. Changed “FAR 9” to “FAR Subpart 9.5.” Incorporated language from deleted L-1.5.
- L-3.1.2.4.5, Associate Contractor Agreements (ACAs), is revised. Paragraph is substantially changed
- L-3.2.1, Volume II – Technical Proposal, is revised. Removed OCI plan from prescribed outline for Technical Volume
- L-3.2.3, Technical Risk, is revised. Added “risk assessment”, and “identifying ‘and assessing’ risk”
- L-3.2.4.6, OCI Plan, is deleted. Moved to L-3.1.2.4.2
- L-3.2.5.4, Surge Project Execution, is revised. Changed “solution” to “approach”
- L-3.2.5.5, Data Assertions, is added
- L-3.3.3.1, Number of PPI References, is revised. Added sentence beginning with “A single Task order from an Indefinite-Delivery Indefinite Quantity (IDIQ)…”
- L-3.3.3.2, PPI Submission, is revised. Provided email to request PPI tool. Added “on 20
Jun 23”
- L-3.3.3.3, Relevant Contracts and Recency Determination, is revised. Added “For work performed as part of a joint venture, Offerors shall clearly define the percentage of effort and type of work for which they were / are responsible.”
- L-3.3.3.5, Organizational Structure Change History, is revised. Changed “intends to consider” to “may consider”
- L-3.4.1, Volume IV Organization, is revised. Added “for Primes and Attachment L-9.1, Cost Model for Subcontractors”
- L-3.4.2.1, General Instructions, is revised. Added “unreasonably” and “unreasonable” and “for Prime and Attachment L-9.1, Cost Model for Subcontractors”
- L-3.4.2.2, Estimating Techniques and Methods, is revised. Changed “and depicted” to “as depicted”
- L-3.4.2.3, Cost or Pricing Data, is revised. Added “certified.”
- L-3.4.3, Accounting System, is revised. Changed requirement for an “approved” accounting system to an “acceptable” accounting system
- L-3.4.4, Estimating Methodology, is revised. Removed “major,” added “Clarify if a portion of the required information is not applicable for a particular cost element”, and added “for labor, subcontractors, and materials.” Deleted “it is permissible for those rates to be equivalent” and “Indicate whether the Offeror has Government approval of the system and if so, provide evidence of such approval.”
- L-3.4.4.1, Explanation of Estimating Methods, is deleted.
- L-3.4.4.2 is revised. Paragraph substantially changed
- L-3.4.4.4, Management Reduction, is deleted
- L-3.4.5.3, Schedule of Hours by Labor Mix, is revised. Added “A completed Cost Model will communicate’ the Offeror’s ‘resourcing for their’ approach” and added “Volume.”
Added “…in either the cost narrative or via additional tabs to the Cost Model(s)…” and added new second paragraph
- L-3.4.5.5, Subcontractor Submissions, is revised. The entire paragraph is revised
Cover Letter
- L-3.4.5.6, Defined Benefit Pension Plan (DBPP) CAS Contribution, is revised.
Renumbered CLIN to reflect new Contract Type structure. Added “Cost Model ‘for Prime’”
- L-3.4.5.7, Material Costs, is revised. Renumbered CLIN to reflect new Contract Type structure.
- L-3.4.5.8, Travel Costs, is revised. Renumbered CLIN to reflect new Contract Type.
Added “These values are pre-populated in Attachment L-9, Cost Model for Prime.
Adjusted dollar values.
- L-3.4.5.9, Award Fee Pools, is revised. Changed dollar values and added “in accordance with the ‘Instructions’ tab on Attachment L-9”. Added “but not any offeror-specific G&A. These values are pre-populated in Attachment L-9, Cost Model for Prime”.
Added “G&S associated with labor is not considered a labor-related expense for the purposes of award fee pool as reflected in the…”
- L-3.4.5.10, Cost-Plus-Fixed-Fee (CPFF) Labor, is deleted
- L-3.4.5.11, G&A Costs, is revised. Paragraph number is now L-3.4.5.10. Deleted sentence beginning with “The G&A cost ceiling should include all home office allocated…” and added “The values proposed in the cost model will be transferred to H104.” Added “for each “G&A classification”
- L-3.4.5.13, Submission of Cost Models, is revised. Paragraph number is now L-3.4.5.12.
Removed “approved” estimating system. Added sentence “Subcontractors are required to complete an independent cost model as provided via SAM.gov (Attachment L-9.1 – see L-3.4.5.5).”
- Attachment 12, L-1, PPI Tool o Changed instructions from downloading PPI tool from sam.gov to requesting PPI tool via email o Changed Step 15 to “Enter contract number or Equivalent (Commercial), “Enter
‘N/A’” for DUNS Number, added “If not, enter ‘N/A’” for Delivery/Task Order
- Attachment 12, L-2, PPQ o Removed A.1. K) Organizational Conflict of Interest o Corrected numbering scheme on sections C-E
- Attachment 12, L-6, Relevancy Matrix o Removed M-2.2.4.6 Organizational Conflict of Interest
- Attachment 12, L-9 Cost Model Updates o L-9, Cost Model, is revised. Significant changes were made including, but not limited to:
Changing CPFF to CPAF Formula adjustments throughout document Add instructions at B16 Adjusting pre-populated information to be in sync with Attachment 12, Section L – Instructions to Offerors cost information Adjusting salary ranges Adjusting hours for various labor categories
Adjusted labor categories
- Attachment 12, L-12, Small Business Participation Template o Introductory paragraph is revised. Changed “objectives/goals set forth in the evaluation of this area" to “Minimum Quantitative Requirement (MQR) objective/goal set forth in the evaluation of this area" o Paragraph b, Example is revised. Changed “price” to “TCV”.
o Paragraph e. changed “Other Than U.S. Small Businesses” to “Other Than Small
Businesses”
Attachment 13, Section M
- Overall Attachment number is revised from Attachment 14 to Attachment 13
- M-1.4, Correction Potential of Proposals, is revised. Removed “without evaluating the proposal against the evaluation factors….” And added “if during valuations, the proposal is found”
- M-1.5, Discussions, is revised. Changed to state that the Government anticipates discussions. Added “with the approval of the SSA”.
- M-1.6, Competitive Range, is revised. Added “which will be approved by the SSA”
- M-2.1.2, Relative Importance of Factors and Subfactors, is revised. Changed to state that the relative importance of each factor and subfactor is as follows: “The Technical factor is more important than either the Past Performance factor or Cost / Price. The Past Performance factor is more important than Cost / Price.”
- M-2.2.2, Technical Risk Rating, is revised. Added “and/or deficiency(ies)”
- M-2.2.4.6, OCI Plan, is deleted
- M-2.2.5.5, Data Assertions, is added
- M-2.2.5.4, Surge Project Execution, is revised. Changed “sound solution” to “sound approach”
- M-2.3.1.2, Relevancy Assessment, is revised. Changed the Magnitude description from
“…will not be considered relevant…” to read “…will be considered Not Relevant…”.
Added “in term of scope and complexity” to the last sentence.
- M-2.3.1.3, Performance Quality Assessment, is revised. Added “Each recent, relevant reference will be assigned a quality rating as defined in Table M-2.3.1.3-1.”
- M-2.4.1.3, Realism, is revised. Renumbered CLINs to reflect new CPAF contract type
- M-2.4.1.5, TEP, is revised. Added “CLINs 0101-0103” to last sentence, and defined
CLINs for Transitions
- M-3.0, Reviews and Visits, is deleted