Attachment 2 - Clearer Drawings

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ANZY099037

JOB NO. 12870

MODIFY AMSC CLASSIFIED STORAGE

Drawing Approved Electronically

06/06/2011

RELEASED FOR EXECUTION

NOTES:

TYPICAL NEW GRAVEL AREA DETAIL

GRADING PLAN - BUILDING 940

LEGEND:

GENERAL NOTES:

N O

T

A

E D

C

S

T I N

F O

Drawing Approved Electronically

06/01/2011

GENERAL NOTES:

SITE PLAN - BUILDING 940

LEGEND:LEGEND:

N O

T

A

E D

C

S

T I N

F O

Drawing Approved Electronically

TURNDOWN SLABCONCRETE SIDEWALK DETAIL

FLOOR PLAN

GENERAL NOTES:

N O

T

A

E D

C

S

T I N

F O

Drawing Approved Electronically

SOUTH ELEVATION

EAST ELEVATION

NORTH ELEVATION

WEST ELEVATION

GENERAL NOTES:

SECTION VIEW OF CANOPY

N O

T

A

E D

C

S

T I N

F O

Drawing Approved Electronically

GENERAL POTABLE WATER NOTES:

LEGEND:

TYPICAL VALVE BOX COLLAR DETAILS

SECTION: POTABLE WATER COLLAR PLAN: POTABLE WATER COLLAR

SOIL BEARING 2000 P.S.F.-TEST PRESSURE 200 P.S.I.

THRUST BLOCK AREA TABLE

45Á, 22 1/2Á, 11 1/4Á BENDS90Á BEND TYPICAL SECTION

TYPICAL THRUST BLOCK DETAILS

TYPICAL BACKFILL DETAILTYPICAL VALVE ANCHOR

N O

T

A

E D

C

S

T I N

F O

Drawing Approved Electronically

LEKTRIEVER AND CABINET LAYOUT - BUILDING 940

Drawing Approved Electronically

- SLAB MOUNTED AT GRADE

TYPICAL - AIR-COOLED CONDENSING UNIT

INSTALLATION PLAN - SUPPLY DUCTWORK - BUILDING 940

LEGEND:

INSTALLATION NOTES:

M1

D ELEVATION

Drawing Approved Electronically

06/03/2011

INSTALLATION PLAN - RETURN DUCTWORK - BUILDING 940

INSTALLATION NOTES:

SEQUENCE OF OPERATION

SPACE TEMP HUMIDITY

65Á F 30 %

72Á F 40 %

SEASON

WINTER

SPRING

SUMMER

FALL

Á F 40 %

65Á F 30 %

SET POINT

M2

F ELEVATION

Drawing Approved Electronically

INSTALLATION PLAN - INDUSTRIAL WATER - BUILDING 940

M3

E SECTION - INDUSTRIAL WATER

ENLARGED VIEW - MECHANICAL ROOM

INDUSTRIAL WATER DETAIL

INSTALLATION NOTES:

Drawing Approved Electronically

06/06/2011

SPLIT SYSTEM HEAT PUMP - INDOOR UNIT SCHEDULE

SPLIT SYSTEM HEAT PUMP - OUTDOOR UNIT SCHEDULE

THICKNESS & REINFORCING SCHEDULE - * LOW PRESSURE DUCTWORK

DIFFUSER AND GRILLE SCHEDULE

LOUVER SCHEDULE

Drawing Approved Electronically

FIRE ALARM INSTALLATION PLAN - BUILDING 940

FIRE ALARM SYSTEM RISER DIAGRAM - BUILDING 940

F

SC

F

F

F

HD

F F

FACP

GENERAL NOTES:

HD

Drawing Approved Electronically

ELECTRICAL SITE PLAN

LEGEND:

Drawing Approved Electronically

06/02/2011

LEGEND:LEGEND:

GROUNDING PLAN

GENERAL NOTES:

Drawing Approved Electronically

H

LEGEND:

ELECTRICAL INSTALLATION PLAN - BUILDING 940

ELECTRICAL PANELS - ELEVATION - BUILDING 940

E3

F

Drawing Approved Electronically

S

S

LIGHTING PLAN - BUILDING 940

FIXTURE SCHEDULE

LEGEND:

GENERAL NOTES:

Drawing Approved Electronically

COMMUNICATIONS SITE PLAN

LEGEND:

Drawing Approved Electronically

NEW PANEL SCHEDULE

EXISTING PANEL SCHEDULEMODIFIED PANEL SCHEDULE

BLDG. 940 60

BOLD TEXT

LEGEND:

Drawing Approved Electronically

TYT34488.G1_-_01_stamp
TYT34488.C1_-_01_stamp
TYT34488.C2_-_01_stamp
TYT34488.C3_-_01_stamp
TYT34488.C4_-_01_stamp
TYT34488.C5_-_01_stamp
TYT34488.A1_-_01_stamp
TYT34488.M1_-_01_stamp
TYT34488.M2_-_01_stamp
TYT34488.M3_-_01_stamp
TYT34488.M4_-_01_stamp
TYT34488.F1_-_01_stamp
TYT34488.E1_-_01_stamp
TYT34488.E2_-_01_stamp
TYT34488.E3_-_01_stamp
TYT34488.E4_-_01_stamp
TYT34488.E5_-_01_stamp
TYT34488.E6_-_01_stamp

File details come from the government source that posted it. Updated .