This document is a Bid Schedule for a Design-Bid-Build construction project to repair the 400 Aircraft Parking Ramp at Travis Air Force Base, California. The project involves demolition and replacement of approximately 60,000 square yards of concrete pavement and associated underground drainage utilities across Phases 5 and 8, with a total project completion time of 18 months from the award date. The solicitation (FA8903-25-B-0002) is a Total Small Business Set-Aside with a price range of $25M to $100M, using NAICS code 237310 for Highway, Street, and Bridge Construction.
Key milestones include a site visit on 03 June 2025, with site visit attendee names due by 20 May 2025, and final sealed bids due on 05 August 2025 at 11:00 AM Central Time. The contractor will be required to establish an on-site staging area with a batch plant capable of producing 250 cubic yards of concrete per hour, located approximately 1.5 miles from the project site. The project will be awarded to the lowest price responsible firm that is registered in the System for Award Management (SAM), with the solicitation expected to be posted on SAM.gov on or about 02 July 2025.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CSI Summary
| Contractor's Name | |
| Project No.: | XDAT06100105 & XDAT06100108 |
| Project Title: | Repair 400 Aircraft Parking Ramp Phases 5 & 8 |
| Project Location: | TRAVIS AFB, CA |
| Contracting No.: | TBD |
| Task Order No.: | N/A |
| Date: | 03 April 2025 |
| CSI SUMMARY |
MasterSpec Divisions Total
| Division 01 — General Conditions | |||
| Division 02 — Existing Conditions | |||
| Division 03 — Concrete | |||
| Division 04 — Masonry | |||
| Division 05 — Metal | |||
| Division 06 — Wood, Plastics, and Composites | |||
| Division 07 — Thermal and Moisture Protection | |||
| Division 08 — Openings | |||
| Division 09 — Finishes | |||
| Division 10 — Specialties | |||
| Division 11 — Equipment | |||
| Division 12 — Furnishings | |||
| Division 13 — Special Construction | |||
| Division 14 — Conveyance | |||
| Division 21 — Fire Suppression | |||
| Division 22 — Plumbing | |||
| Division 23 — Heating Ventilating and Air Conditioning | |||
| Division 25 — Cybersecurity | |||
| Division 26 — Electrical | |||
| Division 27 — Communications | |||
| Division 28 — Electronic Safety and Security | |||
| Division 31 — Earthwork | |||
| Division 32 — Exterior Improvements | |||
| Division 33 — Utilities | |||
| BASE BID ITEMS | |||
| CLIN # | CLIN Description | UI | CLIN Price |
| BASE BID ITEMS | |||
| 0001 | Base Bid Item 1 400 Aircraft Parking Ramp Phase 5 | LS | |
| 0002 | Base Bid Item 2 400 Aircraft Parking Ramp Phase 8 | LS | |
| Base Bid Items Subtotal | $ - | ||
| OPTIONS | |||
| N/A | $ - | ||
| Bid Options Subtotal | $ - | ||
| Grand Total for All CLINs | $ - |
Project Completion Time: 18 months from Award Date.